SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Storage and Preservation of Materials of Well Head Piping
PROJECT TITLE

SAIC NUMBER

DATE APPROVED

QR NUMBER

SAIS-L-2084
WBS / BI / JO NUMBER

25-May-05

PIPING -

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A. A1 A2 A3 A4 A5 A6

ACCEPTANCE CRITERIA Pipe Storage, Handling and Preservation Pipe handling procedure and equipment is approved by the Saudi Aramco PMT, and is available. End bevel protectors shall remain on pipes and fittings while in storage, protectors shall not damage internal or external coating. Slings for lifting pipe shall be nylon or similar material to prevent damage to the pipe surface. Wire rope slings shall not be used. Pipe shall not be rolled or dropped off trucks. Pipe stacking shall be made in a manner which will not damage the pipe or the coating. Internally coated pipe shall be handled from the outside diameter (O.D.), only. When a length of pipe is cut from a longer joint of pipe, all vendor markings and other identifying information shall be transferred to each length of pipe. Storage, Handling and Preservation of fittings & Flanges Fittings and Flanges must be packaged in steel-banded wooden crates or secured to skids. Fittings and Flanges must be protected from mechanical damage. Welding ends must be protected with suitable wood, plastic, or metal covers, (see Attachment 1). Storage, Handling and Preservation of Valves Valve end flanges shall be fitted with plywood covers. The cover diameter shall be the same as the outside diameter of the flange and shall be at least 10 mm thick for valves up to NPS 10 inch and 12 mm thick for valves NPS 12 inch and larger. The cover shall be attached by machine bolts with a nut and washer fitted on the inside of the flange. There shall be four (4) bolts on valves up to NPS 10 inch nominal size and eight (8) bolts on valves NPS 12 inch and larger. The bolts diameter shall not be less than the size of the flange bolt hole. The raised face portion of the flange and the ring joint groove shall be covered with a heavy grease, (see Attachment 1). A heavy duty moisture-proof disc shall be fitted between the greased flange face and the cover. The disc shall have a diameter equivalent to the inside diameter of the bolt holes. The ends of threaded and socket weld end valves shall be protected with tight fitting plastic caps.

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

SAES-L-450, Para. 8.1 SAES-L-450, Para. 8.4 SAES-L-450, Para. 8.5 SAES-L-450, Para. 8.6 SAES-L-450, Para. 8.3 SAES-L-450, Para. 8.7 SAES-L-450, Para. 8.8

A7 B. B1

02-SAMSS-011, Para. 10 02-SAMSS-011, Para. 10

B2 C.

C1

04-SAMSS-035 Para. 12.2

C2

04-SAMSS-035 Para. 12.2

C3

04-SAMSS-035 Para. 12.2 04-SAMSS-035 Para. 12.2 04-SAMSS-035 Para. 12.3

C4

C5

Page 1 of 3

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Storage and Preservation of Materials of Well Head Piping
PROJECT TITLE

SAIC NUMBER

DATE APPROVED

QR NUMBER

SAIS-L-2084
WBS / BI / JO NUMBER

25-May-05

PIPING -

CONTRACTOR / SUBCONTRACTOR

ITEM No. REMARKS:

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

REFERENCE DOCUMENTS: 1. SAES-L-450, Construction of On-Land and Near-Shore Pipelines, 30 September, 2003 3. 02-SAMSS-011, Forged Steel Weld Neck Flanges for Low and Intermediate Temperature Service, 28 January, 2004 3. 04-SAMSS-035, General Requirements for Valves, 31 July, 2001 ATTACHMENTS: 1. FIGURE 1 - Flanged Valves; FIGURE 2 - Weld End Valves

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 2 of 3

SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Storage and Preservation of Materials of Well Head Piping

SAIC NUMBER

DATE APPROVED

QR NUMBER

SAIS-L-2084

25-May-05

PIPING -

Attachment 1

Page 3 of 3

You might also like