Agenda
Geological risk management Mineral Resource Optimisation Mine design & scheduling Schedules and graphs Future capital projects Planning Wheel
Geological risk
A geological risk is any feature that endangers the realisation of a production plan.
Severity of impact on :
One to three year plans (short term) LOM plan (longer term) The Business Plan (includes areas of opportunity)
LOM 2002 risk blocks with new boreholes drilled to December 2002
500m
L O R ISK
M E D RISK
21,23 22
H I R IS K
V e ry H I R ISK
19
V e ry L O R IS K
20
Exploration
UNCERTAINTY
7 HI
Development
13 17,18 4a 11 18a 7
4 1 2
H I R ISK
Current mining
V e ry H I R ISK
MED LO
8,9,12,14 3a 4b
L O R IS K
2 Very LO
6
V e ry L O R IS K
1 V e ry L O
1b
2 3 LO
2a,15
5 MED 6 HI
10
M E D R IS K
7
16
8 V e ry H I 9
IM P A C T
500m
Mineral Resource
Global underground mineral inventory Published Resource Planning Resource Optimised Resource Scheduled Resource Reserve
8Km
VCR
VCR
X X X
8
VCR
Optimisation
Big picture look at the Resource Value area curves (VACs) Cost/volume curves Basic mining equation (BME) and Basic financial equation (BFE)
6,000,000
100% 90%
3,400
5,500,000 5,000,000
3,000
80%
4,500,000 4,000,000 3,500,000 3,000,000 2,500,000 2,000,000 1,500,000 1,000,000
70% 60%
2,600
2,200
50%
1,800
% Margin
1,400
Breakeven
500,000 0 0 250 500 750 1,000 1,250 1,500 1,750 2,000 2,250 2,500 2,750 1,000 3,000
105.000
R m illion
45.000
Variable
R / m2
75.000
10
BME
FACE LENGTH x = x = x FACE ADVANCE TOTAL m2 ON REEF PERCENTAGE REEF m2 ON REEF cmg/t m m m2 % m2 cmg/t kg kg kg kg % % 39,954 8.01 320,005 96.78% 309,696 1,584 13,641 382 363 14,386 97.21% 98.28% 41,760 8.03 335,429 96.09% 322,299 1,698 15,214 391 206 15,811 97.20% 98.25% 41,405 8.11 335,612 95.67% 321,093 1,698 15,157 405 225 15,787 97.20% 98.29% 41,502 8.10 336,048 96.62% 324,674 1,698 15,326 429 209 15,965 97.20% 98.22%
x RD = kg GOLD EX STOPES + + = x x VAMPING kg REEF DEVELOPMENT kg TOTAL kg BROKEN MINE CALL FACTOR RECOVERY FACTOR
Planning Brief Rock engineering considerations Capacities & constraints Strategic objectives
11
Development schedule
12
BME
FACE LENGTH x = x = x FACE ADVANCE TOTAL m2 ON REEF PERCENTAGE REEF m2 ON REEF cmg/t m m m2 % m2 cmg/t kg kg kg kg % % 39,954 8.01 320,005 96.78% 309,696 1,584 13,641 382 363 14,386 97.21% 98.28% 41,760 8.03 335,429 96.09% 322,299 1,559 13,967 391 206 14,564 97.20% 98.25% 41,405 8.11 335,612 95.67% 321,093 1,622 14,479 405 225 15,109 97.20% 98.29% 41,502 8.10 336,048 96.62% 324,674 1,628 14,694 429 209 15,333 97.20% 98.22%
x RD = kg GOLD EX STOPES + + = x x VAMPING kg REEF DEVELOPMENT kg TOTAL kg BROKEN MINE CALL FACTOR RECOVERY FACTOR
13
4,500
4,000
3,500
Current profile
3,000
2,500
2,000
1,500
1999
2000
2001
2002
2003 F/C
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Total M2
40,000
35,000
30,000
Current profile
m2
25,000
20,000
15,000
10,000
1999
2000
2001
2002
2003 F/C
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
14
Exploiting the VCR resource 120 125L Will require some $115m capex Will add some 267 000 oz annually at a total cash cost of $267/oz Will commence production (pending board approval) in 2009
113 lvl 116 lvl Twin decline 120 lvl VCR 123 lvl 125 lvl 126 lvl
15
16
17
B1 B2
B3
B4 E1
J4
K1
18