1
Copyright 2011, Southern California Edison
2
Copyright 2011, Southern California Edison
3
Copyright 2011, Southern California Edison
Electrical System
Grid impacts
Distribution level Transmission Level Solar PV Generation
(Transmission)
Solar PV Generation
(Distribution)
TRANSMISSION SUBSTATION
TRANSMISSION
500/220 KV 500/115 KV 500/220 KV 220/115 KV 220/66 KV
GENERATION
4
Copyright 2011, Southern California Edison
Background
The distribution systems were not originally designed for generation injection
One way for power from substation to load
System operations did not take into account distributed generation Planning standards were not updated to account distributed generation New technology operating characteristics are not very well known and additional research is required to fully its affects to the distribution system and customers
5
Copyright 2011, Southern California Edison
Assist with testing large inverters similar to those being connected to the distribution system
6
Copyright 2011, Southern California Edison
Presently has 22 rooftop sites and 1 ground mount site in service, generating 70+ MW. In March of 2012, CPUC approved a Petition For Modification to reduce the SPVP to 125 MW based on:
$300M of rate payers savings based on recent IPP bids Main SPVP goals have been met dealing with market transformation. SCE will continue to share lessons learned with the State and energy industry.
7
Copyright 2011, Southern California Edison
WDAT INTERCONNECTION
Large number of WDAT application submitted to Transmission Distribution Business Unit (TDBU) at the same time Modified technical data of requests as knowledge increased, causing rework by TDBU in studies and results
8
Copyright 2011, Southern California Edison
Design code: ASCE Year 2007 Roof condition: Want buildings <5yrs old to minimize future re-roofing situations Located in higher solar irradiance areas with existing distribution load
For SCE territory, best areas were located in the Inland Empire
Approx. 45 miles east of downtown Los Angeles
9
Copyright 2011, Southern California Edison
Leasing Issues
Initial lease cost was $20k/MW/yr Owners expected more Lease cost raised to $30K/MW/yr Owners looking for SCE indemnification responsibility
Insurance
SCE is self insured
10
Copyright 2011, Southern California Edison
Inverters
600v (500kw)used in all projects Investigating using 1000v inverters for 2 ground mount projects
Switchgear
Used All Phase 12kv units (pilots used 480v units)
11
Copyright 2011, Southern California Edison
Engineering/Design Issues
Design Firms
Design contracted with two firms Needed to understand which industry standards applied
UL,NEC, IEEE, California Fire Code for solar installations on roofs
Needed design firms to work with module vendors to maximize wattage for roof area Needed to understand equipment vendor parameters to generate constructible packages. Needed open communication with discussions regarding SCE engineering requirements .
requirements.
12
Copyright 2011, Southern California Edison
Construction Challenges
Needed to understand the safety hazards of rooftop work and develop expectations for SCE and the General Contractors (GC) Needed to learn which GCs could do this work safely, economically and efficiently Needed to work with the IBEW 47 under the Project Labor Agreement (PLA) and train linemen on solar installation work Needed to learn the concerns of TDBU Distribution with respect to the interconnection process Needed to work with GCs on efficient installation methods regarding working with roof surfaces and wire management issues
13
Copyright 2011, Southern California Edison
14
Copyright 2011, Southern California Edison
15
Copyright 2011, Southern California Edison
16
Copyright 2011, Southern California Edison
17
Copyright 2011, Southern California Edison
Required for projects that sell power to any other then SCE May be used for projects which sell power to SCE SPVP
18
Copyright 2011, Southern California Edison
Distribution System
2009 2010 2011 2012 CA Tariff 3 80 281 43 FERC Tariff 36 101 52 36 Running Total 39 220 553 632
19
Copyright 2011, Southern California Edison
20
Copyright 2011, Southern California Edison
22
Copyright 2011, Southern California Edison
Protection
Overall circuit protection coordination
Problems arise on project by project basis Integrate more sophisticated protection schemes to the traditional distribution protection systems.
Coordination with inverter protection to avoid breaker reclosing into hot line Fault current effects on breaker ratings Ground fault detection at the inverters No known issues with subtransmission and transmission protection
No major issues More analysis needed Steps need to be taken
24
Copyright 2011, Southern California Edison
Substation
Low MT settings
Power Flow
25
Copyright 2011, Southern California Edison
Distribution Engineering
Voltage regulation
Steady state overvoltage issues
o Depends on location of projects, Load on the feeder, Voltage Regulating Devices, size of conductor/cable, etc
Generation ability support load Lack of standard communications protocol Remote switching capability
No major issues
300
1.5
200
1.0
100
0.5
Time (Days)
27
Copyright 2011, Southern California Edison
400
2.0
High Voltage
Substation
Power Power Flow Flow
Power Flow
Power Flow
28
Copyright 2011, Southern California Edison
Operations Issues
Switching impacts resulting from large generation
No major issues
Temporary Overvoltage
Voltage phase-ground (both sides of the switch)
30
Copyright 2011, Southern California Edison
Temporary Overvoltage
Voltage Across the Switch
31
Copyright 2011, Southern California Edison
Questions
32
Copyright 2011, Southern California Edison
Backup Slides
33
Copyright 2011, Southern California Edison
SPVP Status
34
Copyright 2011, Southern California Edison