Professional Documents
Culture Documents
1.1 MINILINK Installation, conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m Hop 6,000,000
Minilink Installation, conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Hop
6,300,000
Minilink Installation, conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. < 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+1 SD or DP (all config), Ant. < 1.2m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Hop
8,000,000
Minilink Installation, conf 1+1 SD or DP (all config), 1.2m <= Ant. < 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+1 SD or DP (all config), Ant. >= 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
2.1.1
MINILINK Upgrade Capacity 2.2 with Additional of Indoor Module
2.2.1
Additional Minilink Indoor Installation and Pre-Commissioning (upgrade Hop execution) Commissioning and ATP - Upgrade execution Hop
Hop 7,250,000
2.2.2
MINILINK Upgrade Capacity 2.3 with Additional of Indoor and Outdoor
2.3.1 2.3.2
MINILINK Upgrade Capacity with Swap Indoor & Outdoor 2.4 (RAU And Antenna), All config and all system and All antenna size
Capacity Upgrade with Indoor Module and Swap Outdoor (RAU), without antenna Commissioning and ATP - Upgrade execution
Hop Hop
2.4
Upgrade Capacity with Swap Indoor & Outdoor (RAU And Antenna), All config and all system and All antenna size
Hop 6,600,000
2.5
2.5.1 2.5.2
MINILINK Upgrade Protection, 2.6 conf 1+0 to 1+1 SD, Ant. < 1.2m
Upgrade Protection and Precommissioning (upgrade execution), conf 1+0 to 1+1 HS Commissioning and ATP - Upgrade execution
Hop Hop
Hop 7,200,000
2.6.1
Upgrade Protection and Precommissioning (upgrade execution), conf 1+0 to 1+1 SD, Ant. < 1.2m Commissioning and ATP - Upgrade execution
Hop
2.6.2
MINILINK Upgrade Protection, 2.7 conf 1+0 to 1+1 SD, 1.2m <= Ant. < 2.4m
Hop
Hop
7,580,000
2.7.1
2.7.2
MINILINK Upgrade Protection, 2.8 conf 1+0 to 1+1 SD, Ant. >= 2.4m
Upgrade Protection and PreCommissioning (upgrade execution), Hop conf 1+0 to 1+1 SD, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade Hop execution
Hop 8,458,000
2.8.1
Upgrade Protection and PreCommissioning (upgrade execution), Hop conf 1+0 to 1+1 SD, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.8.2
MINILINK Upgrade Protection 2.9 (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity by Software / Softkeys, Ant. < 1.2m
Hop
9,360,000
2.9.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, Ant. < 1.2m Commissioning and ATP - Upgrade execution Hop
2.9.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.10 Upgrade Capacity by Software / Softkeys, 1.2m <= Ant. < 2.4m
7,800,000
2.10.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution Hop
2.10.2
MINILINK Upgrade Protection 2.11 (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity by Software / Softkeys, Ant. >= 2.4m
8,458,000
2.11.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.11.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.12 Upgrade Capacity with Additional of Indoor Module, Ant. < 1.2m
9,366,000
2.12.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity with Hop Additional of Indoor Module, Ant. < 1.2m
2.12.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.13 Upgrade Capacity with Additional of Indoor Module, 1.2m <= Ant. < 2.4m
Hop
7,835,000
2.13.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity with Additional of Indoor Module, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution Hop
2.13.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.14 Upgrade Capacity with Additional of Indoor Module, Ant. >= 2.4m
8,458,000
2.14.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity with Additional of Indoor Module, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.14.2
MINILINK Upgrade with Swap 2.15 Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m
7,244,000
2.15.1 2.15.2
MINILINK Upgrade with Swap 2.16 Outdoor Only conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. <2.4m
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m Commissioning and ATP - Upgrade execution
Hop Hop
10,117,000
2.16.1 2.16.2
MINILINK Upgrade with Swap 2.17 Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution
Hop Hop
10,760,000
2.17.1
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m
Hop
2.17.2
2.18 MINILINK Upgrade with Swap Outdoor Only Without Antenna
Hop
6,200,000
2.18.1 2.18.2
3.1 Dismantle Minilink Indoor and Outdoor < 2.4m - 1 hop
Capacity Upgrade with Swap Outdoor Only Without Antenna Commissioning and ATP - Upgrade execution
Hop Hop
2,387,000
3.1.1
3.2 Dismantle Minilink Indoor and Outdoor >= 2.4m - 1 hop
hop
3,438,000
3.2.1
3.3 Dismantle Minilink Indoor and Outdoor < 2.4m - 1/2 hop
hop
1,970,000
3.3.1
3.4 Dismantle Minilink Indoor and Outdoor >= 2.4m - 1/2 hop
Site
2,111,000
3.4.1
3.5 Dismantle Minilink Indoor Unit Only
Site
1,373,000
3.5.1
Dismantle Minilink Indoor and 3.6 Outdoor < 2.4m - 1 hop <> Conf. 1+1 SD
Site
3,438,000
3.6.1
Dismantle Minilink Indoor and 3.7 Outdoor >= 2.4m - 1 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor < 2.4m - 1 hop <> Conf. 1+1 hop SD
3,720,000
3.7.1
Dismantle Minilink Indoor and 3.8 Outdoor < 2.4m - 1/2 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor >= 2.4m - 1 hop <> Conf. 1+1 SD
hop
2,111,000
3.8.1
Dismantle Minilink Indoor and 3.9 Outdoor >= 2.4m - 1/2 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor < 2.4m - 1/2 hop <> Conf. 1+1 SD
Site
2,250,000
3.9.1
Cross Connect On 4.1 Dependency Link (Physical/Hardware)
Dismantle Minilink Indoor and Outdoor >= 2.4m - 1/2 hop <> Conf. 1+1 SD
Site
544,000
4.1.1
4.2 Ethernet Traffic Activation
4.2.1
Traffic Migration SDH : Traffic 4.3 migration of transmission with capacity > 32E1 until 63E1 / 75E1
Site
2,215,000
4.3.1
Traffic Migration SDH : traffic migration of transmission with capacity > 32E1 until 63E1 / 75E1
Hop
Traffic Migration SDH : Traffic migration of transmission with 4.3 capacity > 32E1 until 63E1 / 75E1 (If done at the same time /day with swap work) 1,340,000
4.3.1
If done at the same time /day with swap work, Traffic Migration SDH : traffic migration of transmission with capacity > 32E1 until 63E1 / 75E1
Hop
Traffic Migration PDH : Traffic 4.4 migration of transmission with capacity until 32E1 1,940,000
4.4.1
Traffic Migration PDH : Traffic migration of transmission with 4.4 capacity until 32E1 (If done at the same time /day with swap work)
Traffic Migration PDH : traffic migration of transmission with capacity until 32E1
Hop
1,000,000
4.4.1
If done at the same time /day with swap work, Traffic Migration PDH : traffic migration of transmission with capacity until 32E1
Hop
4.5
1,490,000
4.5.1
4.6 Antenna Re-Pointing/ReAlignment, with Ant. < 1.2m
Day
1,535,000
4.6.1 4.6.2
Antenna Re-Pointing/Re4.7 Alignment, with 1.2m <= Ant. < 2.4m
Antenna Re-Pointing/Re-Alignment, with Ant. < 1.2m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
1,570,000
4.7.1 4.7.2
4.8 Antenna Re-Pointing/ReAlignment, with Ant. >= 2.4m
Antenna Re-Pointing/Re-Alignment, with 1.2m <= Ant. < 2.4m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
1,710,000
4.8.1 4.8.2
Antenna Re-Positioning/ReLocation, with Ant. < 1.2m
Antenna Re-Pointing/Re-Alignment, with Ant. >= 2.4m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
4.9
3,000,000
Antenna Re-Positioning/Re-Location, Site with Ant. < 1.2m Antenna Re-Pointing/Re-Alignment, Hop with Ant. < 1.2m Minilink Pre-commissioning, Hop Commissioning & ATP
3,280,000
4.10.1
Antenna Re-Positioning/Re-Location, Site with 1.2m <= Ant. < 2.4m Antenna Re-Pointing/Re-Alignment, with 1.2m <= Ant. < 2.4m Minilink Pre-commissioning, Commissioning & ATP Hop Hop
4.10.2 4.10.3
Antenna Re-Positioning/ReLocation, with Ant. >= 2.4m
4.11
4,880,000
Antenna Re-Positioning/Re-Location, Site with Ant. >= 2.4m Antenna Re-pointing/re-alignment, Hop with Ant. >= 2.4m Minilink Pre-commissioning, Hop Commissioning & ATP
1,400,000
4.12
4.13 Daily Installation Services
4.13
Day
4.14
1,060,000
4.14
Daily Installation and Testing Work/Troubleshooting Services
Day
4.15
1,400,000
4.15
MINILINK Upgrade Capacity 4.16 with Additional of Indoor Module And Traffic Migration
Day
4,970,000
4.16.1
Additional Minilink Indoor Installation, Traffic Migration & PreHop Commissioning (upgrade execution) Commissioning and ATP - Upgrade execution Hop
30,124
4.16.2
4.17 Printing of Outdoor Label
4.17
4.18 Bandwidth Optimation (end to end basis)
Site
1,540,000
4.18.1
4.19 Dismantle E1 cable
e2e
1,080,000
4.19.1
4.20 Bandwidth Optimation and Dismantle E1 cable (site basis)
site
1,690,000
4.20.1
Unit
Site Hop
RBS
RBS IMPLEMENTATION NEW 1.1 SITE - MACRO BTS with Power System
RBS Installation (Outdoor & Indoor) - Macro (Max 2 RBS cabinets, 3 antennas & 6 feeders) with Power System
1.2.1
RBS Installation (Outdoor & Indoor) - Macro (Max 2 RBS cabinets, 3 antennas & 6 feeders, site no power system) VSWR/DTF Measurement RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site site
RBS Installation (Outdoor & Indoor) - Micro, 1 site OMNI/dual sector antenna, wall mounted type RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Installation (Outdoor & Indoor) - Micro, 1 site OMNI/dual sector antenna, pole PLN type RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.5.1
RBS Installation (Outdoor & Indoor) - Micro, 3 site sectors, 3 antennas - using fiber
RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), include BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), include PBC cabinet set Micro RBS Pre-Commissioning / Stand alone test site Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site
1.9.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (30 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.10.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (50 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G site site
1.10.2 1.10.3
1.10.4
RBS Implementation Main Remote 1.11 (RBS 6601) 1 sector configuration (GSM/DCS/3G) 4/4/4, Antenna height 70 m
site
1.11.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (70 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.12.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (30 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
1.13.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (50 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
1.14.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (70 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
RBS Implementation Main Remote 1.15 (RBS 6601) 2 sector configuration (GSM/DCS/3G) 4/4/4, antenna height 30 m
1.15.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (30 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.16.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (50 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.17.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (70 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.18.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (30 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Implementation Main Remote 1.19 (RBS 6601) 2 sector configuration (GSM/DCS/3G) 8/8/8, antenna height 50 m
1.19.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (50 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.20.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (70 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.21.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (30m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.22.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (50m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Implementation Main Remote 1.23 (RBS 6601) 3 sector configuration (GSM/DCS/3G) 4/4/4, antenna height 70 m
1.23.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (70m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.24.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (30 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.25.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (50 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.26.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (70 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
Upgrade TRX with additional 2.1 hardware (up to max cabinet capacity)
2.1
2.2 TRX Downgrade (2G System)
site
2.2
2.3 2.4 2.5 Upgrade E1 (IMA)
TRX Downgrade (2G System) Upgrade E1 (IMA) Upgrade to Native Ip Upgrade to Dual Stack
2.3
Upgrade to Native Ip
2.4
Upgrade to Dual Stack
2.5
2.6 Decongestion (Upgrade / Downgrade)
2.6
2.7 Upgrade RF Power (Radio Unit)
site
2.7
2.8 Upgrade RF Power (Remote Radio Unit)
site
2.8
2.9 Upgrade HSPA
site site
2.9
Second Carrier implementation 2.10 type 1 (change/replace RU-21 to Ru-22)
Second Carrier implementation type 1 (change/replace RU-21 to Ru-22) RBS Ready for Integration 2G/3G RBS Commissioning / ATP
2.11.1
Second Carrier implementation type 2,3 & 4 (expanding cabinet, including add RU and FU site on RBS 3206 from M (mid Size ) to F (Full Size)) RBS Pre-Commissioning / Stand alone test site Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site
2.12
RBS Reconfiguration, option 2.13 activation (EDGE, GPRS) with additional E1 (if any) onsite
site
2.13
2.14 Capacity Upgrade BBS8500
RBS Reconfiguration, option activation (EDGE, GPRS) with additional E1 (if any) onsite
site
Install Battery 1 bank (4 batteries) Install Extension Subrack BBS 8500 (If required) Commissioning, integration test & ATP Upgrade PBC6500 Commissioning, integration test & ATP
2.15.1 2.15.2
3.1.1 3.1.2
Install Feeder (1 1/4" and 1 5/8"), 3.1 Antenna Height: <= 50m - 2 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
1 sector 1 sector
3.1.1 3.1.2
Install Feeder (1 1/4" and 1 5/8"), 3.1 Antenna Height: <= 50m - 3 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
2 sectors 2 sectors
3.1.1 3.1.2
3.2 Install Feeder 7/8", Antenna Height: <= 50m - 1 sector 3.2.1 3.2.2 3.2 Install Feeder 7/8", Antenna Height: <= 50m - 2 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
3 sectors 3 sectors
1 sector 1 sector
3.2.1 3.2.2
3.2 Install Feeder 7/8", Antenna Height: <= 50m - 3 sectors
2 sectors 2 sectors
3.2.1 3.2.2
3.3 Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m - 1 sector
3 sectors 3 sectors
3.3.1 3.3.2
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
1 sector 1 sector
3.3
3.3.1 3.3.2
3.3 Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m - 3 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
2 sectors 2 sectors
3.3.1 3.3.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 1 sector
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
3 sectors 3 sectors
3.4.1 3.4.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 2 sectors
1 sector 1 sector
3.4.1 3.4.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 3 sectors
2 sectors 2 sectors
3.4.1 3.4.2
ANTENNA (ONLY) & VSWR 3.5 Install Antenna - 1 sector
3 sectors 3 sectors
3.5.1 3.5.2
3.5 Install Antenna - 2 sectors
Install Antenna VSWR/DTF Measurement Install Antenna VSWR/DTF Measurement Install Antenna VSWR/DTF Measurement
3.5.1 3.5.2
3.5 Install Antenna - 3 sectors
3.5.1 3.5.2
ASC OR TMA 3.6 Install ASC or TMA with jumper - 1 Sector
3.6.1 3.6.2
3.6 Install ASC or TMA with jumper - 2 Sectors
pcs sector
3.6.1 3.6.2
3.6 Install ASC or TMA with jumper - 3 Sectors
2 pcs 2 sectors
3.6.1 3.6.2
COMBINER and/or SPLITTER
3 pcs 3 sectors
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 1 Sector
3.7.1 3.7.2
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 2 Sectors
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
pcs sector
3.7.1 3.7.2
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 3 Sectors
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
2 pcs 2 sectors
3.7.1 3.7.2
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
3 pcs 3 sectors
3.8
VSWR/DTF Measurement
3.8
VSWR/DTF Measurement
3.8
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
OTHER
3.9 Install SIU (Site Integration Unit) Colo with RBS
3.9
Abis over IP for RBS Remote site 3.10 (RBS Micro or RBS using FO) using ML
Install SIU (Site Integration Unit) Colo with RBS (Note: Activity b2, b3, b6 & b7 is done by site EID)
3.10
Reconfigure RBS Power Supply AC to DC
Abis over IP for RBS Remote site (RBS Micro or RBS using FO) using ML (Note: Activity b1, site b2, b5 & b6 is done by EID)
3.11
3.11
3.12 Battery Installation
site
3.12
3.13 Dismantle RBS Indoor and/or Outdoor
site
3.13
3.14 Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro
site
3.14
3.15 Dismantle RBS Cabinet only (include PBC Cabinet) - Micro
site
3.15
3.16 Dismantle RBS Feeder only - 1 pcs
site
3.16
3.16 Dismantle RBS Feeder only - 2 pcs (1 sector)
pcs
3.16
3.16 Dismantle RBS Feeder only - 4 pcs (2 sectors)
2 pcs
3.16
3.16 Dismantle RBS Feeder only - 6 pcs (3 sectors)
4 pcs
3.16
3.17 Dismantle RBS Antenna only - 1 pcs
6 pcs
3.17
3.17 Dismantle RBS Antenna only - 2 pcs
pcs
3.17
3.17 Dismantle RBS Antenna only - 3 pcs
2 pcs
3.17
Dismantle RBS Feeder & RBS Antenna - 1 sector
3 pcs
3.16 3.17
Dismantle RBS Feeder & RBS Antenna - 2 sectors
2 pcs pcs
3.16 3.17
Dismantle RBS Feeder & RBS Antenna - 3 sectors
4 pcs 2 pcs
3.16
6 pcs
3.17
3.18 3.19 BBS Dismantling work
3.18
Daily Installation Services
3.19
3.20 Daily Testing Work/Troubleshooting Services
3.20
Daily Installation and Testing Work/Troubleshooting Services
day
3.21
3.21
4.1 Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
day
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro BBS Dismantling RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
4.4.1 4.4.2
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro
site site
RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Sumatera 145,860
7,800,000
6,570,000
4,100,000
5,190,000
5,470,000
3,690,000
3,370,000
3,400,000
4,700,000
5,900,000
5,990,000
6,490,000
6,500,000
6,400,000
7,000,000
7,100,000
7,100,000
7,600,000
7,990,000
8,070,000
8,240,000
9,530,000
9,640,000
9,730,000
9,840,000
1,020,000
1,420,000
1,420,000
1,420,000
1,420,000
1,900,000
1,420,000
2,070,000
3,090,000
1,580,000
1,420,000
1,800,000
1,580,000
1,890,000
2,190,000
2,480,000
1,800,000
2,100,000
2,370,000
1,970,000
2,340,000
3,480,000
1,890,000
2,100,000
2,400,000
1,450,000
1,660,000
1,870,000
1,270,000
1,370,000
1,480,000
1,270,000
1,370,000
1,480,000
2,440,000
2,870,000
3,590,000
2,400,000
2,800,000
3,480,000
2,740,000
3,250,000
4,590,000
2,440,000
2,870,000
3,590,000
1,670,000
1,426,000
964,000
1,227,000
2,157,000
1,227,000
1,227,000
706,000
763,000
875,000
988,000
706,000
763,000
819,000
1,180,000
1,351,000
1,520,000
1,220,000 976,000
1,040,000
1,330,000
3,800,000
3,890,000
4,300,000
3,900,000
Unit
Site Hop
RBS
RBS IMPLEMENTATION NEW 1.1 SITE - MACRO BTS with Power System
RBS Installation (Outdoor & Indoor) - Macro (Max 2 RBS cabinets, 3 antennas & 6 feeders) with Power System
1.2.1
RBS Installation (Outdoor & Indoor) - Macro (Max 2 RBS cabinets, 3 antennas & 6 feeders, site no power system) VSWR/DTF Measurement RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site site
RBS Installation (Outdoor & Indoor) - Micro, 1 site OMNI/dual sector antenna, wall mounted type RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Installation (Outdoor & Indoor) - Micro, 1 site OMNI/dual sector antenna, pole PLN type RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.5.1
RBS Installation (Outdoor & Indoor) - Micro, 3 site sectors, 3 antennas - using fiber
RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), include BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
RBS Installation (Cabinet only), include PBC cabinet set Micro RBS Pre-Commissioning / Stand alone test site Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site
1.9.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (30 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.10.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (50 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G site site
1.10.2 1.10.3
1.10.4
RBS Implementation Main Remote 1.11 (RBS 6601) 1 sector configuration (GSM/DCS/3G) 4/4/4, Antenna height 70 m
site
1.11.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) 4/4/4, 1 antenna tripple band, site 1 Hybrid Trunk Cable (70 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.12.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (30 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
1.13.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (50 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
1.14.1
RBS Installation (Outdoor & Indoor) - Main Remote 1 sector (configuration (GSM/DCS/3G) max 8/8/8, 1 antenna tripple band, 1 Hybrid Trunk Cable (70 m), 3 RRU, 1 Filter & 1 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP
site
RBS Implementation Main Remote 1.15 (RBS 6601) 2 sector configuration (GSM/DCS/3G) 4/4/4, antenna height 30 m
1.15.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (30 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.16.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (50 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.17.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 4/4/4, 2 antenna tripple band, site 2 Hybrid Trunk Cable (70 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.18.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (30 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Implementation Main Remote 1.19 (RBS 6601) 2 sector configuration (GSM/DCS/3G) 8/8/8, antenna height 50 m
1.19.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (50 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.20.1
RBS Installation (Outdoor & Indoor) - Main Remote 2 sector (configuration (GSM/DCS/3G) 8/8/8, 2 antenna tripple band, site 2 Hybrid Trunk Cable (70 m), 6 RRU, 2 Filter & 2 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.21.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (30m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.22.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (50m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
RBS Implementation Main Remote 1.23 (RBS 6601) 3 sector configuration (GSM/DCS/3G) 4/4/4, antenna height 70 m
1.23.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 4/4/4, 3 antenna tripple band, site 3 Hybrid Trunk Cable (70m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.24.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (30 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.25.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (50 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
1.26.1
RBS Installation (Outdoor & Indoor) - Main Remote 3 sector (configuration (GSM/DCS/3G) 8/8/8, 3 antenna tripple band, site 3 Hybrid Trunk Cable (70 m), 9 RRU, 3 Filter & 3 Upper Box) RBS Pre-Commissioning / Stand alone test RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site site
Upgrade TRX with additional 2.1 hardware (up to max cabinet capacity)
2.1
2.2 TRX Downgrade (2G System)
site
2.2
2.3 2.4 2.5 Upgrade E1 (IMA)
TRX Downgrade (2G System) Upgrade E1 (IMA) Upgrade to Native Ip Upgrade to Dual Stack
2.3
Upgrade to Native Ip
2.4
Upgrade to Dual Stack
2.5
2.6 Decongestion (Upgrade / Downgrade)
2.6
2.7 Upgrade RF Power (Radio Unit)
site
2.7
2.8 Upgrade RF Power (Remote Radio Unit)
site
2.8
2.9 Upgrade HSPA
site site
2.9
Second Carrier implementation 2.10 type 1 (change/replace RU-21 to Ru-22)
Second Carrier implementation type 1 (change/replace RU-21 to Ru-22) RBS Ready for Integration 2G/3G RBS Commissioning / ATP
2.11.1
Second Carrier implementation type 2,3 & 4 (expanding cabinet, including add RU and FU site on RBS 3206 from M (mid Size ) to F (Full Size)) RBS Pre-Commissioning / Stand alone test site Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP site site
2.12
RBS Reconfiguration, option 2.13 activation (EDGE, GPRS) with additional E1 (if any) onsite
site
2.13
2.14 Capacity Upgrade BBS8500
RBS Reconfiguration, option activation (EDGE, GPRS) with additional E1 (if any) onsite
site
Install Battery 1 bank (4 batteries) Install Extension Subrack BBS 8500 (If required) Commissioning, integration test & ATP Upgrade PBC6500 Commissioning, integration test & ATP
2.15.1 2.15.2
3.1.1 3.1.2
Install Feeder (1 1/4" and 1 5/8"), 3.1 Antenna Height: <= 50m - 2 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
1 sector 1 sector
3.1.1 3.1.2
Install Feeder (1 1/4" and 1 5/8"), 3.1 Antenna Height: <= 50m - 3 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
2 sectors 2 sectors
3.1.1 3.1.2
3.2 Install Feeder 7/8", Antenna Height: <= 50m - 1 sector 3.2.1 3.2.2 3.2 Install Feeder 7/8", Antenna Height: <= 50m - 2 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m VSWR/DTF Measurement
3 sectors 3 sectors
1 sector 1 sector
3.2.1 3.2.2
3.2 Install Feeder 7/8", Antenna Height: <= 50m - 3 sectors
2 sectors 2 sectors
3.2.1 3.2.2
3.3 Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m - 1 sector
3 sectors 3 sectors
3.3.1 3.3.2
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
1 sector 1 sector
3.3
3.3.1 3.3.2
3.3 Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m - 3 sectors
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
2 sectors 2 sectors
3.3.1 3.3.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 1 sector
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m VSWR/DTF Measurement
3 sectors 3 sectors
3.4.1 3.4.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 2 sectors
1 sector 1 sector
3.4.1 3.4.2
3.4 Install Feeder 7/8", Antenna Height: > 50m - 3 sectors
2 sectors 2 sectors
3.4.1 3.4.2
ANTENNA (ONLY) & VSWR 3.5 Install Antenna - 1 sector
3 sectors 3 sectors
3.5.1 3.5.2
3.5 Install Antenna - 2 sectors
Install Antenna VSWR/DTF Measurement Install Antenna VSWR/DTF Measurement Install Antenna VSWR/DTF Measurement
3.5.1 3.5.2
3.5 Install Antenna - 3 sectors
3.5.1 3.5.2
ASC OR TMA 3.6 Install ASC or TMA with jumper - 1 Sector
3.6.1 3.6.2
3.6 Install ASC or TMA with jumper - 2 Sectors
pcs sector
3.6.1 3.6.2
3.6 Install ASC or TMA with jumper - 3 Sectors
2 pcs 2 sectors
3.6.1 3.6.2
COMBINER and/or SPLITTER
3 pcs 3 sectors
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 1 Sector
3.7.1 3.7.2
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 2 Sectors
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
pcs sector
3.7.1 3.7.2
Install Combiner (Diplexer, 3.7 Coupler, MCM, MC) and/or Splitter with jumper - 3 Sectors
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
2 pcs 2 sectors
3.7.1 3.7.2
Install Combiner (Diplexer, Coupler, MCM, MC) and/or Splitter with jumper VSWR/DTF Measurement
3 pcs 3 sectors
3.8
VSWR/DTF Measurement
3.8
VSWR/DTF Measurement
3.8
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: <= 50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder (1 1/4" and 1 5/8"), Antenna Height >50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
Install Feeder 7/8", Antenna Height: > 50m Install Antenna VSWR/DTF Measurement
OTHER
3.9 Install SIU (Site Integration Unit) Colo with RBS
3.9
Abis over IP for RBS Remote site 3.10 (RBS Micro or RBS using FO) using ML
Install SIU (Site Integration Unit) Colo with RBS (Note: Activity b2, b3, b6 & b7 is done by site EID)
3.10
Reconfigure RBS Power Supply AC to DC
Abis over IP for RBS Remote site (RBS Micro or RBS using FO) using ML (Note: Activity b1, site b2, b5 & b6 is done by EID)
3.11
3.11
3.12 Battery Installation
site
3.12
3.13 Dismantle RBS Indoor and/or Outdoor
site
3.13
3.14 Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro
site
3.14
3.15 Dismantle RBS Cabinet only (include PBC Cabinet) - Micro
site
3.15
3.16 Dismantle RBS Feeder only - 1 pcs
site
3.16
3.16 Dismantle RBS Feeder only - 2 pcs (1 sector)
pcs
3.16
3.16 Dismantle RBS Feeder only - 4 pcs (2 sectors)
2 pcs
3.16
3.16 Dismantle RBS Feeder only - 6 pcs (3 sectors)
4 pcs
3.16
3.17 Dismantle RBS Antenna only - 1 pcs
6 pcs
3.17
3.17 Dismantle RBS Antenna only - 2 pcs
pcs
3.17
3.17 Dismantle RBS Antenna only - 3 pcs
2 pcs
3.17
Dismantle RBS Feeder & RBS Antenna - 1 sector
3 pcs
3.16 3.17
Dismantle RBS Feeder & RBS Antenna - 2 sectors
2 pcs pcs
3.16 3.17
Dismantle RBS Feeder & RBS Antenna - 3 sectors
4 pcs 2 pcs
3.16
6 pcs
3.17
3.18 3.19 BBS Dismantling work
3.18
Daily Installation Services
3.19
3.20 Daily Testing Work/Troubleshooting Services
3.20
Daily Installation and Testing Work/Troubleshooting Services
day
3.21
3.21
4.1 Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
day
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro BBS Dismantling RBS Installation (Cabinet only), exclude BBS & Battery - Macro RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
4.4.1 4.4.2
Dismantle RBS Cabinet only (exclude BBS Cabinet) - Macro RBS Installation (Cabinet only), exclude BBS & Battery - Macro
site site
RBS Pre-Commissioning / Stand alone test Install additional cabinet RBS Ready for Integration 2G/3G RBS Commissioning / ATP
Sumatera
60%
145,860
2,246,400 1,497,600
7,800,000
2,574,000
6,570,000
2,168,100
919,800
328,500
3,153,600
4,100,000
1,353,000
574,000
205,000
1,968,000
5,190,000
1,712,700
726,600
259,500
2,491,200
5,470,000
1,805,100
765,800
273,500
2,625,600
3,690,000
1,217,700
516,600
184,500
1,771,200
3,370,000
1,112,100
471,800
168,500
1,617,600
3,400,000
1,122,000
476,000
170,000
1,632,000
4,700,000
1,551,000
658,000
235,000
2,256,000
5,900,000
1,947,000
826,000
295,000
2,832,000
5,990,000
1,976,700
838,600
299,500
2,875,200
6,490,000
2,141,700
908,600
324,500
3,115,200
6,500,000
2,145,000
910,000
325,000
3,120,000
6,400,000
2,112,000
896,000
320,000
3,072,000
7,000,000
2,310,000
980,000
350,000
3,360,000
7,100,000
2,343,000
994,000
355,000
3,408,000
7,100,000
2,343,000
994,000
355,000
3,408,000
7,600,000
2,508,000
1,064,000
380,000
3,648,000
7,990,000
2,636,700
1,118,600
399,500
3,835,200
8,070,000
2,663,100
1,129,800
403,500
3,873,600
8,240,000
2,719,200
1,153,600
412,000
3,955,200
9,530,000
3,144,900
1,334,200
476,500
4,574,400
9,640,000
3,181,200
1,349,600
482,000
4,627,200
9,730,000
3,210,900
1,362,200
486,500
4,670,400
9,840,000
3,247,200
1,377,600
492,000
4,723,200
1,020,000
336,600
142,800
51,000
489,600
1,420,000
497,000
284,000
198,800
426,000
1,420,000
1,420,000
1,420,000
511,200
284,000
198,800
426,000
1,900,000
684,000 511,200
380,000 284,000
266,000 198,800
570,000 426,000
1,420,000
2,070,000
745,200
414,000
289,800
621,000
3,090,000
1,112,400
618,000
432,600
927,000
1,580,000
568,800
316,000
221,200
474,000
1,420,000
511,200
284,000
198,800
426,000
1,800,000
360,000
252,000
540,000
648,000
1,580,000
568,800
316,000
221,200
474,000
1,890,000
680,400
378,000
264,600
567,000
2,190,000
788,400
438,000
306,600
657,000
2,480,000
892,800
496,000
347,200
744,000
1,800,000
648,000
360,000
252,000
540,000
2,100,000
756,000
420,000
294,000
630,000
2,370,000
853,200
474,000
331,800
711,000
1,970,000
709,200
394,000
275,800
591,000
2,340,000
842,400
468,000
327,600
702,000
3,480,000
1,252,800
696,000
487,200
1,044,000
1,890,000
680,400
378,000
264,600
567,000
2,100,000
756,000
420,000
294,000
630,000
2,400,000
864,000
480,000
336,000
720,000
1,450,000
522,000
290,000
203,000
435,000
1,660,000
597,600
332,000
232,400
498,000
1,870,000
673,200
374,000
261,800
561,000
1,270,000
457,200
254,000
177,800
381,000
1,370,000
493,200
274,000
191,800
411,000
1,480,000
532,800
296,000
207,200
444,000
1,270,000
457,200
254,000
177,800
381,000
1,370,000
493,200
274,000
191,800
411,000
1,480,000
532,800
296,000
207,200
444,000
2,440,000
878,400
488,000
341,600
732,000
2,870,000
1,033,200
574,000
401,800
861,000
3,590,000
1,292,400
718,000
502,600
1,077,000
2,400,000
864,000
480,000
336,000
720,000
2,800,000
1,008,000
560,000
392,000
840,000
3,480,000
1,252,800
696,000
487,200
1,044,000
2,740,000
986,400 -
3,250,000
1,170,000 -
4,590,000
1,652,400 -
2,440,000
878,400 -
2,870,000
1,033,200 -
3,590,000
1,292,400 -
1,670,000
601,200 -
1,426,000
513,360
964,000
192,800 245,400 431,400 245,400 245,400 141,200 152,600 175,000 197,600 141,200 152,600 163,800 236,000 270,200 304,000 -
134,960 171,780 301,980 171,780 171,780 98,840 106,820 122,500 138,320 98,840 106,820 114,660 165,200 189,140 212,800 -
289,200 368,100 647,100 368,100 368,100 211,800 228,900 262,500 296,400 211,800 228,900 245,700 354,000 405,300 456,000 -
347,040 -
1,227,000
441,720 -
2,157,000
776,520 -
1,227,000
441,720 -
1,227,000
441,720 -
706,000
254,160 -
763,000
274,680 -
875,000
315,000 -
988,000
355,680 -
706,000
254,160 -
763,000
274,680 -
819,000
294,840 -
1,180,000
424,800 -
1,351,000
486,360 -
1,520,000
547,200 -
1,220,000 976,000
1,040,000
1,330,000
478,800 -
3,800,000
1,368,000 -
3,890,000
1,400,400 -
4,300,000
1,548,000 -
3,900,000
1,404,000 -
MINILINK
1.1 MINILINK Installation, conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m Hop 6,000,000
Minilink Installation, conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Hop
6,300,000
Minilink Installation, conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. < 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+1 SD or DP (all config), Ant. < 1.2m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Hop
8,000,000
Minilink Installation, conf 1+1 SD or DP (all config), 1.2m <= Ant. < 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
Minilink Installation, conf 1+1 SD or DP (all config), Ant. >= 2.4m MINILINK Pre-Commissioning MINILINK Commissioning and ATP
2.1.1
MINILINK Upgrade Capacity 2.2 with Additional of Indoor Module
2.2.1
Additional Minilink Indoor Installation and Pre-Commissioning (upgrade Hop execution) Commissioning and ATP - Upgrade execution Hop
Hop 7,250,000
2.2.2
MINILINK Upgrade Capacity 2.3 with Additional of Indoor and Outdoor
2.3.1 2.3.2
MINILINK Upgrade Capacity with Swap Indoor & Outdoor 2.4 (RAU And Antenna), All config and all system and All antenna size
Capacity Upgrade with Indoor Module and Swap Outdoor (RAU), without antenna Commissioning and ATP - Upgrade execution
Hop Hop
2.4
Upgrade Capacity with Swap Indoor & Outdoor (RAU And Antenna), All config and all system and All antenna size
Hop 6,600,000
2.5
2.5.1 2.5.2
MINILINK Upgrade Protection, 2.6 conf 1+0 to 1+1 SD, Ant. < 1.2m
Upgrade Protection and Precommissioning (upgrade execution), conf 1+0 to 1+1 HS Commissioning and ATP - Upgrade execution
Hop Hop
Hop 7,200,000
2.6.1
Upgrade Protection and Precommissioning (upgrade execution), conf 1+0 to 1+1 SD, Ant. < 1.2m Commissioning and ATP - Upgrade execution
Hop
2.6.2
MINILINK Upgrade Protection, 2.7 conf 1+0 to 1+1 SD, 1.2m <= Ant. < 2.4m
Hop
Hop
7,580,000
2.7.1
2.7.2
MINILINK Upgrade Protection, 2.8 conf 1+0 to 1+1 SD, Ant. >= 2.4m
Upgrade Protection and PreCommissioning (upgrade execution), Hop conf 1+0 to 1+1 SD, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade Hop execution
Hop 8,458,000
2.8.1
Upgrade Protection and PreCommissioning (upgrade execution), Hop conf 1+0 to 1+1 SD, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.8.2
MINILINK Upgrade Protection 2.9 (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity by Software / Softkeys, Ant. < 1.2m
Hop
9,360,000
2.9.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, Ant. < 1.2m Commissioning and ATP - Upgrade execution Hop
2.9.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.10 Upgrade Capacity by Software / Softkeys, 1.2m <= Ant. < 2.4m
7,800,000
2.10.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution Hop
2.10.2
MINILINK Upgrade Protection 2.11 (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity by Software / Softkeys, Ant. >= 2.4m
8,458,000
2.11.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity By Software / Softkeys, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.11.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.12 Upgrade Capacity with Additional of Indoor Module, Ant. < 1.2m
9,366,000
2.12.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Upgrade Capacity with Hop Additional of Indoor Module, Ant. < 1.2m
2.12.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.13 Upgrade Capacity with Additional of Indoor Module, 1.2m <= Ant. < 2.4m
Hop
7,835,000
2.13.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity with Additional of Indoor Module, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution Hop
2.13.2
MINILINK Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and 2.14 Upgrade Capacity with Additional of Indoor Module, Ant. >= 2.4m
8,458,000
2.14.1
Upgrade Protection (1+0 to 1+1 HS / 1+1 SD) and Pre-Commissioning (upgrade execution) and Upgrade Hop Capacity with Additional of Indoor Module, Ant. >= 2.4m Commissioning and ATP - Upgrade execution Hop
2.14.2
MINILINK Upgrade with Swap 2.15 Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m
7,244,000
2.15.1 2.15.2
MINILINK Upgrade with Swap 2.16 Outdoor Only conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. <2.4m
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. < 1.2m Commissioning and ATP - Upgrade execution
Hop Hop
10,117,000
2.16.1 2.16.2
MINILINK Upgrade with Swap 2.17 Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, 1.2m <= Ant. < 2.4m Commissioning and ATP - Upgrade execution
Hop Hop
10,760,000
2.17.1
Capacity Upgrade with Swap Outdoor Only conf 1+0 or 1+1 HS or MPH, Ant. >= 2.4m
Hop
2.17.2
2.18 MINILINK Upgrade with Swap Outdoor Only Without Antenna
Hop
6,200,000
2.18.1 2.18.2
3.1 Dismantle Minilink Indoor and Outdoor < 2.4m - 1 hop
Capacity Upgrade with Swap Outdoor Only Without Antenna Commissioning and ATP - Upgrade execution
Hop Hop
2,387,000
3.1.1
3.2 Dismantle Minilink Indoor and Outdoor >= 2.4m - 1 hop
hop
3,438,000
3.2.1
3.3 Dismantle Minilink Indoor and Outdoor < 2.4m - 1/2 hop
hop
1,970,000
3.3.1
3.4 Dismantle Minilink Indoor and Outdoor >= 2.4m - 1/2 hop
Site
2,111,000
3.4.1
3.5 Dismantle Minilink Indoor Unit Only
Site
1,373,000
3.5.1
Dismantle Minilink Indoor and 3.6 Outdoor < 2.4m - 1 hop <> Conf. 1+1 SD
Site
3,438,000
3.6.1
Dismantle Minilink Indoor and 3.7 Outdoor >= 2.4m - 1 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor < 2.4m - 1 hop <> Conf. 1+1 hop SD
3,720,000
3.7.1
Dismantle Minilink Indoor and 3.8 Outdoor < 2.4m - 1/2 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor >= 2.4m - 1 hop <> Conf. 1+1 SD
hop
2,111,000
3.8.1
Dismantle Minilink Indoor and 3.9 Outdoor >= 2.4m - 1/2 hop <> Conf. 1+1 SD
Dismantle Minilink Indoor and Outdoor < 2.4m - 1/2 hop <> Conf. 1+1 SD
Site
2,250,000
3.9.1
Cross Connect On 4.1 Dependency Link (Physical/Hardware)
Dismantle Minilink Indoor and Outdoor >= 2.4m - 1/2 hop <> Conf. 1+1 SD
Site
544,000
4.1.1
4.2 Ethernet Traffic Activation
4.2.1
Traffic Migration SDH : Traffic 4.3 migration of transmission with capacity > 32E1 until 63E1 / 75E1
Site
2,215,000
4.3.1
Traffic Migration SDH : traffic migration of transmission with capacity > 32E1 until 63E1 / 75E1
Hop
Traffic Migration SDH : Traffic migration of transmission with 4.3 capacity > 32E1 until 63E1 / 75E1 (If done at the same time /day with swap work) 1,340,000
4.3.1
If done at the same time /day with swap work, Traffic Migration SDH : traffic migration of transmission with capacity > 32E1 until 63E1 / 75E1
Hop
Traffic Migration PDH : Traffic 4.4 migration of transmission with capacity until 32E1 1,940,000
4.4.1
Traffic Migration PDH : Traffic migration of transmission with 4.4 capacity until 32E1 (If done at the same time /day with swap work)
Traffic Migration PDH : traffic migration of transmission with capacity until 32E1
Hop
1,000,000
4.4.1
If done at the same time /day with swap work, Traffic Migration PDH : traffic migration of transmission with capacity until 32E1
Hop
4.5
1,490,000
4.5.1
4.6 Antenna Re-Pointing/ReAlignment, with Ant. < 1.2m
Day
1,535,000
4.6.1 4.6.2
Antenna Re-Pointing/Re4.7 Alignment, with 1.2m <= Ant. < 2.4m
Antenna Re-Pointing/Re-Alignment, with Ant. < 1.2m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
1,570,000
4.7.1 4.7.2
4.8 Antenna Re-Pointing/ReAlignment, with Ant. >= 2.4m
Antenna Re-Pointing/Re-Alignment, with 1.2m <= Ant. < 2.4m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
1,710,000
4.8.1 4.8.2
Antenna Re-Positioning/ReLocation, with Ant. < 1.2m
Antenna Re-Pointing/Re-Alignment, with Ant. >= 2.4m Minilink Pre-commissioning, Commissioning & ATP
Hop Hop
4.9
3,000,000
Antenna Re-Positioning/Re-Location, Site with Ant. < 1.2m Antenna Re-Pointing/Re-Alignment, Hop with Ant. < 1.2m Minilink Pre-commissioning, Hop Commissioning & ATP
3,280,000
4.10.1
Antenna Re-Positioning/Re-Location, Site with 1.2m <= Ant. < 2.4m Antenna Re-Pointing/Re-Alignment, with 1.2m <= Ant. < 2.4m Minilink Pre-commissioning, Commissioning & ATP Hop Hop
4.10.2 4.10.3
Antenna Re-Positioning/ReLocation, with Ant. >= 2.4m
4.11
4,880,000
Antenna Re-Positioning/Re-Location, Site with Ant. >= 2.4m Antenna Re-pointing/re-alignment, Hop with Ant. >= 2.4m Minilink Pre-commissioning, Hop Commissioning & ATP
1,400,000
4.12
4.13 Daily Installation Services
4.13
Day
4.14
1,060,000
4.14
Daily Installation and Testing Work/Troubleshooting Services
Day
4.15
1,400,000
4.15
MINILINK Upgrade Capacity 4.16 with Additional of Indoor Module And Traffic Migration
Day
4,970,000
4.16.1
Additional Minilink Indoor Installation, Traffic Migration & PreHop Commissioning (upgrade execution) Commissioning and ATP - Upgrade execution Hop
30,124
4.16.2
4.17 Printing of Outdoor Label
4.17
4.18 Bandwidth Optimation (end to end basis)
Site
1,540,000
4.18.1
4.19 Dismantle E1 cable
e2e
1,080,000
4.19.1
4.20 Bandwidth Optimation and Dismantle E1 cable (site basis)
site
1,690,000
4.20.1
33 1,980,000
14 840,000
5 300,000
48 2,880,000
2,079,000
882,000
315,000
3,024,000