DAILY SITE REPORT & ACTIVITIES

Project Title : Project No. : Project Site : HARAMAIN HIGH SPEED RAIL IIP-199 BR445 Date : Weather : Min. Temp.: Max. Temp.: December 9, 2012 Partly Cloudy

" EXECUTED WORKS TODAY AND PROGRAM FOR PROPOSED WORK"


SHADE MANPOWER TOOLS & EQUPIMENTS

INDIRECT
Construction Manager Tech. Dept. Head Sr. Superintendent General Foreman Engineer Tech. Dept. Safety Officer Planning Engineer Surveyor Surveyor Aide AutoCAD Operator Carpenter Foreman Foreman Steel Fixer Civil Foreman Secretary Leadman Carpenter Office Boy Leadman Steel Fixer Foreman Electrician Timekeeper Store Keeper Foreman Mason Sub - TOTAL

NO.
1 1 1 1 1 1 1 1 2 1 2 1 4 5

DIRECT
Carpenter Steel Fixer Mason Electrician Plumber L/M Labor Purchaser Erector/Rigger Painter Waterproof works Guard Heavy Equipment Operator Driver Bob cut operator Plumber Watchman Mechanic

NO.
2 1

Tools/Others
Grinder Big Grinder Small Jack hammer Small Jig saw Machine Hilti Drill Machine Makita Drill Machine Dewalt Drill Machine

NO.
1 1 1 3 2 1 2

Equipments
Air Compressor Generator ( NTC & Big) Bending Machine Shovel Loader (Big) Theodolite Total Station Level Machine Vibrator Hose Vibrator Machine Power Helicopter Welding Machine (Big)

NO.
1 4 1

Offset Cutter or Speed Makita Circular Saw Water Pump 1.5HP Water Pump 2HP

3 2

Steel Bar Cutter Screw Drill Makita Electric Planner Dewalt Electric Planner

1 1

Welding Machine Small Asphalt Cutter Electric Lifter Mobile Crane Bobcat Dump truck Tata pikup Blower

2 2

Spit Gun Ductile Water Tank Big Water Tank Small Electric Water cooler

1 1
25

Bus (50 Seater) Electric Hydraulic Bender Sub - TOTAL


14

2 2
17

Chain Block Chipping gun Sub - TOTAL


13

Sub - TOTAL

TOTAL SHADE MANPOWER

39

TOTAL TOOLS & EQUIPMENTS

30

RENTAL MANPOWER RENTAL MANPOWER


Carpenter Steel Fixer Leadman Steel Fixer Mason Heavy Equipment Operator Sub - TOTAL 4 1
128

NO.
31 92

RENTAL MANPOWER

NO.

RENTAL MANPOWER

NO.

RENTAL MANPOWER

NO.

Sub - TOTAL

Sub - TOTAL

Sub - TOTAL

TOTAL RENTAL MANPOWER


AL-OFI COMPANY SUBCON MANPOWER
Steel Fixer

128
SUBCON MANPOWER

NO.

SUBCON MANPOWER

NO.

SUBCON MANPOWER

NO.

SUBCON MANPOWER

NO.

Sub - TOTAL

Sub - TOTAL

Sub - TOTAL

Sub - TOTAL

TOTAL SUBCON MANPOWER


TOTAL MANPOWER @ SITE

167

ACTUAL EXECUTED WORK


STEEL WORKS 1.) Install rebars at the girder between pier 5 and Pier 6 with a total weight of 845.95 kgs. 2.) Removal of cut wires at the bottom of the girder between pier 5 and peir 6. 3.) Insert tension wire in 2" diameter steel pipe for lifting hook. 4.) Install rebars for the girder between pier 8 and pier 9 with a total weight of 3347.72 kgs. 5.) Bending the crown bars at pier column 4 to attain the minimum covering of the steel. 6.) Install two layers ring bars at pier column 6 with a total weight of 103.06 kgs. 7.) Chipping the top surface of the pier column 6. 8.) Install rebars at peir column 38 and pier column 26 with a total weight of 1,752.73 kgs. 9.) Install rebars at 17 foundation with a total weight of 3,679.43 kgs. 10.) Install rebars for pier 37 foundation with a total weight of 2,431.48 kgs. 11.) Install rebars for pier column 38 with a total weight of 3335.85 kgs. 12.) Install rebars at pier 30 foundation with a total weight of 6,905.55 kgs. 13.) Cutting and bending of rebars with a total weight of 26,418.24 kgs.

December 9, 2012

CARPENTRY WORKS 1.) Align the teel shuttering at pier column 4. 2.) Install scaffolding at pier 31 foundation. 3.) Put wooden planks for the access of the workers at girder between pier 8 and 9 with total accomplishment of 320 bd.ft. 4.) Repairing the interior shuttering of the girder between pier 5 and peir 6 with a total area of 95 sq.m 5.) Fixed all exterior support of the girder located between pier 8 nad pier 9. 6.) Install shuttering of the girder located between pier 14 and pier 15 with a total area of 22.17 sq.m 7.) Install three set of anchor box of the girder located between pier 8 and pier 9. 8.) Put shoring support for the steel shuttering of pier 14. 9.) Preparing the materials for pier 30 foundation shuttering. 10.) Drilling for the anchorage of the support for the girder shuttering. MASON 1.) Repairing the surface of the foundation at pier 39. 2.) Repairing the surface of the first phase column at pier 8. 3.) Apply two coats betumin painting with a total area of 92 sq.m at pier 24 foundation.

SAFETY WORKS 1.) Cleaning and Removal of Construction Waste and Debris from the project site. 2.) Checking and Monitoring of Safety Rules and Regulations at the project site. MISCELLANEOUS WORKS

REMARKS:

Prepared By:

Approved By:

Engr. Tarek Hamed


Construction Manager - Shadeco, Ltd. Project Manager - Shadeco, Ltd.