Professional Documents
Culture Documents
ENTRY: LFNVD4WBVLY1
ENTRY: LFNVD4WBVLY1
One of the many strengths the architect brought to the project was creative thinking within the context of physical space limitations. Beginning with the earliest phases of needs assessment and facility analysis, the architects professional staff listened intently to the words and ideas of the Board, faculty, analysis, staff, and administration. They encouraged all of our groups to look forward and to imagine what the educational environment could be in decades ahead. Their broad knowledge and skill in school design was evident throughout our project. The goal achieved was a completely updated and expanded school facility that has been received by the community as a success. The actual construction activity of the project, originally projected to take three years, was completed in two years. The architect was timely in their design and planning so that the information needed was provided to keep construction moving forward.
ENTRY: LFNVD4WBVLY1
photo tab
ENTRY: LFNVD4WBVLY1
ENTRY: LFNVD4WBVLY1
How do you provide a unified design to a high school building that has had multiple additions over the years, all the while, preserving & celebrating personality & character of the administration, faculty, students & community?
ENTRY: LFNVD4WBVLY1
A 80,000 SF addition and a 245,000 SF renovation to Manhattan High School west campus creates a renewed identity along the terminus of Manhattans main street, and captures valuable square footage on a highly constrained campus.
ENTRY: LFNVD4WBVLY1
ENTRY: LFNVD4WBVLY1
10
ENTRY: LFNVD4WBVLY1
Pre-Design Research; Mapping & surveying from students & faculty helped identify the need to cluster community spaces.
11
ENTRY: LFNVD4WBVLY1
In relocating community spaces, an interior heart is formed allowing community activities to become transparent and the school to become one.
CAFE COURTYARD
LIBRARY COMMONS
COURTYARD
0 EXISTING DIAGRAM
Existing Floor Plan
50 100
12
ENTRY: LFNVD4WBVLY1
COURTYARD CAFETERIA
COMMONS
LIBRARY COURTYARD
ENTRY: LFNVD4WBVLY1
14
ENTRY: LFNVD4WBVLY1
15
ENTRY: LFNVD4WBVLY1
16
ENTRY: LFNVD4WBVLY1
17
ENTRY: LFNVD4WBVLY1
18
ENTRY: LFNVD4WBVLY1
Rain screens, which wrap the new and old buildings, are designed to look like the pre-exisitng brick.
19
ENTRY: LFNVD4WBVLY1
20
ENTRY: LFNVD4WBVLY1
21
ENTRY: LFNVD4WBVLY1
How do you optimize program spaces to increase efficiency, enhance security, & provide ample space for social interation & study?
22
ENTRY: LFNVD4WBVLY1
23
ENTRY: LFNVD4WBVLY1
24
ENTRY: LFNVD4WBVLY1
25
ENTRY: LFNVD4WBVLY1
26
ENTRY: LFNVD4WBVLY1
27
ENTRY: LFNVD4WBVLY1
28
ENTRY: LFNVD4WBVLY1
29
ENTRY: LFNVD4WBVLY1
30
ENTRY: LFNVD4WBVLY1
31
ENTRY: LFNVD4WBVLY1
32
ENTRY: LFNVD4WBVLY1
33
ENTRY: LFNVD4WBVLY1
34
ENTRY: LFNVD4WBVLY1
How do you create a wayfinding experience with a new visual language that is overlaid on a multitude of scales & included aspects that increase efficiency & reduce the impact made on the environment?
35
ENTRY: LFNVD4WBVLY1
36
ENTRY: LFNVD4WBVLY1
37
ENTRY: LFNVD4WBVLY1
38
ENTRY: LFNVD4WBVLY1
39
ENTRY: LFNVD4WBVLY1
40
ENTRY: LFNVD4WBVLY1
41
ENTRY: LFNVD4WBVLY1
42
ENTRY: LFNVD4WBVLY1
Braille is used on the windows to give the transparency another dimension without adding unnecessary noise.
43
ENTRY: LFNVD4WBVLY1
Color patterns were developed in order for students to easily identify where their locker is located.
44
ENTRY: LFNVD4WBVLY1
45
ENTRY: LFNVD4WBVLY1
Light is used to penetrate the school allowing for an interior visual connection related to the stiching of new and old buildings together.
46
ENTRY: LFNVD4WBVLY1
47
ENTRY: LFNVD4WBVLY1
Performance qualifications
North
48