Summary

ITEM NO. SECTION TOTAL

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

DEMOLITION WORKS: CEILING WORKS: PARTITION WORKS: FINISHING WORKS: FLOOR WORKS: ELECTRICAL WORKS: AIR CONDITIONING WORKS

8,000.00 13,975.00 32,210.00 8,446.00 7,520.00 0.00 0.00 0.00 0.00 70,151.00

FIRE FIGHTING / FIRE ALARM SYSTEM ROLL UP SHUTTER / GLASS PARTITION


TOTAL (SAR)

PROJECT: Area:

BOSSINI - Waseer Mall 188 SQM

ITEM NO 1.00 1.01

DESCRIPTION
DEMOLITION WORKS: To carefully cut and demolish the existing gypsumboard ceiling, AC grills, floor tiles, glass partition, roller shutter etc. and cart away the debris. Total for Demolition works: CEILING WORKS:

UNIT QTY

RATE

AMOUNT

Lot

8,000.00

8,000.00 8,000.00

2.00 2.01 3.00 3.01

Supply and install gypsum board false ceiling (fire rated, 12.5mm thickness) with 215 Sqm suitable suspension system as per the ceiling plan. (show window area) Total for Ceiling works: PARTITION WORKS: Supply and install 12mm thick MDF single face partitions cladding on wooden frame, all partitions up to 10cm above ceiling level as per ceiling drawing. Supply and install 12mm thick MDF double face partitions cladding on wooden frame, all partitions up to 10cm above ceiling level as per ceiling drawing. 184 Sqm

65.00

13,975.00 13,975.00

60.00

11,040.00

3.02 3.03 3.04 3.05 3.06 3.07 4.00 4.01 4.02 4.03 5.00 5.01 6.00 6.01

24

Sqm

90.00 30.00 50.00 450.00 15.00 65.00

2,160.00 6,960.00 900.00 900.00 825.00 9,425.00 32,210.00

Supply and install gypsum board cladding to the entire MDF partitions as per the 232 Sqm plan. 18 LM Supply and install 15cm size acrylic light cover (4mm thick) for partitions. Supply and install wooden door for back store, offices, show window, electrical 2 Nos. room with all required ironmongeries etc. Supply and install 10cm x 12mm thick wooden skirting to the partition area. 55 LM

Supply and install 12mm thick MDF single face partitions for temporary 145 LM hordings including removal works. Total for Partition works: FINISHIING WORKS: Supply and apply interior quality s paint to the exposed ceiling as per drawing 215 Sqm specifications ( Sigma or Jotun paint) Supply and apply 1 base coat & 2 full coat of emulsion paint to all exposed wall 232 Sqm as per drawing specifications ( Sigma or Jotun paint) Supply and apply 1 base coat & 2 full coat of laquer paint to all doors as per 2 Nos. drawing specifications ( Sigma or Jotun paint) Total for Finishing Works: FLOOR WORKS: Installation of client supplied 80cmx80cm size floor tiles with all required floor 188 Sqm screed, grouting works etc. Total for Floor Works: ELECTRICAL WORKS: Supply and installation of client supplied light fixtures, new conduits, drops, cables including testing and commisioning the entire electrical work. (AC cabling 188 Sqm and main electrical cable not included) Total for Electrical works: AIR CONDITIONING WORKS:

18.00 18.00 200.00

3,870.00 4,176.00 400.00 8,446.00

40.00

7,520.00 7,520.00

0.00 0.00

7.00

Supply and installation of client supplied Air conditioning Machines with all cabiling and piping with necessary detilas, as per the satisfaction of the client. Total for air conditioning works

Lot 0.00