TABLE OF CONTENTS
AACE International Recommended Practice No. 10S-90 COST ENGINEERING TERMINOLOGY TCM Framework: General Reference (All Sections) AACE International Recommended Practice No. 11R-88 REQUIRED SKILLS AND KNOWLEDGE OF COST ENGINEERING TCM Framework: General Reference (All Sections) AACE International Recommended Practice No. 12R-89 MODEL MASTERS DEGREE PROGRAM WITH EMPHASIS IN COST ENGINEERING TCM Framework: General Reference AACE International Recommended Practice No. 13S-90 RECOMMENDED METHOD FOR DETERMINING BUILDING AREA TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 14R-90 RESPONSIBILITY AND REQUIRED SKILLS FOR A PROJECT PLANNING AND SCHEDULING PROFESSIONAL TCM Framework: General Reference 7.2 Schedule Planning and Development AACE International Recommended Practice No. 15R-81 PROFITABILITY METHODS TCM Framework: 3.3 Investment Decision Making 6.1 Asset Performance Assessment AACE International Recommended Practice No. 16R-90 CONDUCTING TECHNICAL AND ECONOMIC EVALUATIONS AS APPLIED FOR THE PROCESS AND UTILITY INDUSTRIES TCM Framework: 3.2 Asset Planning 3.3 Investment Decision Making AACE International Recommended Practice No. 17R-97 COST ESTIMATE CLASSIFICATION SYSTEM TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 18R-97 COST ESTIMATE CLASSIFICATION SYSTEM AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE PROCESS INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 19R-97 ESTIMATE PREPARATION COSTS AS APPLIED FOR THE PROCESS INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting
Copyright AACE International
November, 1990
November, 1990
April 1991
Table of Contents
AACE International Recommended Practice No. 20R-98 PROJECT CODE OF ACCOUNTS TCM Framework: 7.1 Project Scope and Execution Strategy Development 7.2 Schedule Planning and Development 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 21R-98 PROJECT CODE OF ACCOUNTS AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE PROCESS INDUSTRIES TCM Framework: 7.1 Project Scope and Execution Strategy Development 7.2 Schedule Planning and Development 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 22R-01 DIRECT LABOR PRODUCTIVITY MEASUREMENT AS APPLIED IN CONSTRUCTION AND MAJOR MAINTENANCE PROJECTS TCM Framework: 9.2 Progress and Performance Measurement AACE International Recommended Practice No. 23R-02 IDENTIFICATION OF ACTIVITIES TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 24R-03 DEVELOPING ACTIVITY LOGIC TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 25R-03 ESTIMATING LOST LABOR PRODUCTIVITY IN CONSTRUCTION CLAIMS TCM Framework: 6.4 Forensic Performance Assessment AACE International Recommended Practice No. 27R-03 SCHEDULE CLASSIFICATION SYSTEM TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 28R-03 DEVELOPING LOCATION FACTORS BY FACTORING AS APPLIED IN ARCHITECTURE, ENGINEERING, PROCUREMENT, AND CONSTRUCTION TCM Framework: 7.3 Cost Estimating and Budgeting 10.4 Project Historical Database Management AACE International Recommended Practice No. 29R-03 FORENSIC SCHEDULE ANALYSIS TCM Framework: 6.4 Forensic Performance Assessment AACE International Recommended Practice No. 30R-03 IMPLEMENTING PROJECT CONSTRUCTABILITY TCM Framework: 11.5 Value Management & Value Improving Practices (VIPs)
May 3, 2007
Table of Contents
AACE International Recommended Practice No. 31R-03 REVIEWING, VALIDATING, AND DOCUMENTING THE ESTIMATE TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 32R-04 DETERMINING ACTIVITY DURATIONS TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 34R-05 BASIS OF ESTIMATE TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 36R-08 DEVELOPMENT OF COST ESTIMATE PLANS AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE PROCESS INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 37R-06 SCHEDULE LEVELS OF DETAIL AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 38R-06 DOCUMENTING THE SCHEDULE BASIS TCM Framework: 7.2 Schedule Planning and Development AACE International Recommended Practice No. 39R-06 PROJECT PLANNING AS APPLIED IN ENGINEERING AND CONSTRUCTION FOR CAPITAL PROJECTS TCM Framework: 3.1 Requirements Elicitation and Analysis 3.2 Asset Planning 4.1 Project Implementation 7.1 Project Scope and Execution Strategy Development 7.2 Schedule Planning and Development 7.3 Cost Estimating and Budgeting 7.4 Resource Planning 7.5 Value Analysis and Engineering 7.6 Risk Management 7.7 Procurement Planning 8.1 Project Control Plan Implementation AACE International Recommended Practice No. 40R-08 CONTINGENCY ESTIMATING GENERAL PRINCIPLES TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 41R-08 RISK ANALYSIS AND CONTINGENCY DETERMINATION USING RANGE ESTIMATING TCM Framework: 7.6 Risk Management
April 4, 2013
December 8, 2011
Table of Contents
AACE International Recommended Practice No. 42R-08 RISK ANALYSIS AND CONTINGENCY DETERMINATION USING PARAMETRIC ESTIMATING TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 43R-08 RISK ANALYSIS AND CONTINGENCY DETERMINATION USING PARAMETRIC ESTIMATING EXAMPLE MODELS AS APPLIED FOR THE PROCESS INDUSTRIES TCM Framework: 7.6 Risk Management (Microsoft Excel models included in downloadable product and at www.aacei.org) AACE International Recommended Practice No. 44R-08 RISK ANALYSIS AND CONTINGENCY DETERMINATION USING EXPECTED VALUE TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 45R-08 SCHEDULING CLAIMS PROTECTION METHODS TCM Framework: 6.4 Forensic Performance Assessment 7.2 Schedule Planning and Development 8.1 Project Control Plan Implementation AACE International Recommended Practice No. 46R-11 REQUIRED SKILLS AND KNOWLEDGE OF PROJECT COST ESTIMATING TCM Framework: General Reference 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 47R-11 COST ESTIMATE CLASSIFICATION SYSTEM AS APPLIED IN THE MINING AND MINERAL PROCESSING INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 48R-06 SCHEDULE CONSTRUCTABILITY REVIEW TCM Framework: 7.2 Schedule Planning and Development 11.5 Value Management & Value Improving Practices (VIPs) AACE International Recommended Practice No. 49R-06 IDENTIFYING THE CRITICAL PATH TCM Framework: 7.2 Schedule Planning and Development 9.2 Progress and Performance Measurement 10.1 Project Performance Assessment 10.2 Forecasting AACE International Recommended Practice No. 52R-06 TIME IMPACT ANALYSIS AS APPLIED IN CONSTRUCTION TCM Framework: 6.4 Forensic Performance Assessment 7.2 Schedule Planning and Development 10.2 Forecasting 10.3 Change Management
December 4, 2012
June 1, 2009
July 6, 2012
March 5, 2010
Table of Contents
AACE International Recommended Practice No. 53R-06 SCHEDULE UPDATE REVIEW AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION TCM Framework: 9.2 Progress and Performance Measurement 10.3 Change Management AACE International Recommended Practice No. 54R-07 RECOVERY SCHEDULING AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION TCM Framework: 10.2 Forecasting 10.3 Change Management AACE International Recommended Practice No. 55R-09 ANALYZING S-CURVES TCM Framework: 10.1 Project Performance Assessment AACE International Recommended Practice No. 56R-08 COST ESTIMATE CLASSIFICATION SYSTEM AS APPLIED FOR THE BUILDING AND GENERAL CONSTRUCTION INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 57R-09 INTEGRATED COST AND SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION OF A CPM MODEL TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 58R-10 ESCALATION ESTIMATING PRINCIPLES AND METHODS USING INDICES TCM Framework: 7.3 Cost Estimating and Budgeting 7.6 Risk Management AACE International Recommended Practice No. 59R-10 DEVELOPMENT OF FACTORED COST ESTIMATES AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE PROCESS INDUSTRIES TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 60R-10 DEVELOPING THE PROJECT CONTROLS PLAN TCM Framework: 8.1 Project Control Plan Implementation AACE International Recommended Practice No. 62R-11 RISK ASSESSMENT: IDENTIFICATION AND QUALITATIVE ANALYSIS TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 63R-11 RISK TREATMENT TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 64R-11 CPM SCHEDULE RISK MODELING AND ANALYSIS: SPECIAL CONSIDERATIONS TCM Framework: 7.6 Risk Management
December 5, 2012
May 2, 2012
Table of Contents
AACE International Recommended Practice No. 65R-11 INTEGRATED COST AND SCHEDULE RISK ANALYSIS AND CONTINGENCY DETERMINATION USING EXPECTED VALUE TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 66R-11 SELECTING PROBABILITY DISTRIBUTION FUNCTIONS FOR USE IN COST AND SCHEDULE RISK SIMULATION MODELS TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 68R-11 ESCALATION ESTIMATING USING INDICES AND MONTE CARLO SIMULATION TCM Framework: 7.6 Risk Management AACE International Recommended Practice No. 69R-12 COST ESTIMATE CLASSIFICATION SYSTEM AS APPLIED IN ENGINEERING, PROCUREMENT, AND CONSTRUCTION FOR THE HYDROPOWER INDUSTRY TCM Framework: 7.3 Cost Estimating and Budgeting AACE International Recommended Practice No. 71R-12 REQUIRED SKILLS AND KNOWLEDGE OF DECISION AND RISK MANAGEMENT TCM Framework: General Reference 3.3 Investment Decision Making 7.6 Risk Management AACE International Recommended Practice No. 72R-12 DEVELOPING A PROJECT RISK MANAGEMENT PLAN TCM Framework: 7.6 Risk Management
May 2, 2012
May 2, 2012