1.- CARACTERISTICAS TOPOGRAFICAS DE LA CUENCA


N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

ELEVACIN
MINIMA

ELEVACIN
MAXIMA

AREA M

AREA en Km

3200.00
3250.00
3300.00
3350.00
3400.00
3450.00
3500.00
3550.00
3600.00
3650.00
3700.00
3750.00
3800.00
3850.00
3900.00
3950.00
4000.00
4050.00
4100.00
4150.00
4200.00
4250.00
4300.00
4350.00
4400.00
4450.00
4500.00
4550.00
4600.00
4650.00
4700.00
4750.00
4800.00
4850.00
4900.00
4950.00
5000.00
5050.00
5100.00

3250.00
3300.00
3350.00
3400.00
3450.00
3500.00
3550.00
3600.00
3650.00
3700.00
3750.00
3800.00
3850.00
3900.00
3950.00
4000.00
4050.00
4100.00
4150.00
4200.00
4250.00
4300.00
4350.00
4400.00
4450.00
4500.00
4550.00
4600.00
4650.00
4700.00
4750.00
4800.00
4850.00
4900.00
4950.00
5000.00
5050.00
5100.00
5150.00

2,003,388.80
2,727,164.01
3,044,654.58
3,986,457.58
7,651,776.21
8,018,265.81
9,761,342.43
11,797,596.51
13,473,184.61
16,368,306.30
17,625,001.42
18,691,016.28
21,003,174.97
23,439,662.65
27,720,403.45
30,857,260.12
33,027,786.99
35,753,257.78
46,881,844.70
48,248,464.63
60,419,097.81
70,386,533.03
85,858,490.73
105,711,811.72
124,487,638.90
136,556,627.22
137,386,292.28
131,865,256.07
110,203,957.29
84,166,067.72
64,416,403.87
51,345,896.44
37,909,051.01
27,971,577.81
22,275,183.06
9,017,075.03
2,038,302.61
309,174.61
18,291.06

2.00
2.73
3.04
3.99
7.65
8.02
9.76
11.80
13.47
16.37
17.63
18.69
21.00
23.44
27.72
30.86
33.03
35.75
46.88
48.25
60.42
70.39
85.86
105.71
124.49
136.56
137.39
131.87
110.20
84.17
64.42
51.35
37.91
27.97
22.28
9.02
2.04
0.31
0.02

1,644,648,785.05

1,644.42

TOTAL

RESUMEN
PERIMETRO TOTAL (Km)
AREA TOTAL (Km)

205.409
1,645.011

2.- CALCULOS PREVIOS PARA LA OBTENCION DE LA CURVA HIPSOMETRICA


ALTITUD(
msnm)

3200.000
3250.000
3300.000
3350.000
3400.000
3450.000
3500.000
3550.000
3600.000
3650.000
3700.000
3750.000
3800.000
3850.000
3900.000
3950.000

AREAS
PARCIALES(km)

AREAS
ACUMULADAS(km)

0.000
2.003
2.727
3.045
3.986
7.652
8.018
9.761
11.798
13.473
16.368
17.625
18.691
21.003
23.440
27.720

0.000
2.003
4.731
7.775
11.762
19.413
27.432
37.193
48.991
62.464
78.832
96.457
115.148
136.151
159.591
187.311

AREAS QUE
QUEDAN SOBRE
ALTITUDES (km)

1644.423
1642.419
1639.692
1636.648
1632.661
1625.009
1616.991
1607.230
1595.432
1581.959
1565.591
1547.966
1529.275
1508.271
1484.832
1457.111

% TOTAL

% TOTAL QUE QUEDAN


SOBRE LA ALTITUD

0.000
0.122
0.166
0.185
0.242
0.465
0.488
0.594
0.717
0.819
0.995
1.072
1.137
1.277
1.425
1.686

100.000
99.878
99.712
99.527
99.285
98.819
98.332
97.738
97.021
96.201
95.206
94.134
92.998
91.720
90.295
88.609

ANALISIS DE CUENCA
PROYECTO

CUENCA
DEPARTAMENTO
PROVINCIA
DISTRITO
FECHA
4000.000
4050.000
4100.000
4150.000
4200.000
4250.000
4300.000
4350.000
4400.000
4450.000
4500.000
4550.000
4600.000
4650.000
4700.000
4750.000
4800.000
4850.000
4900.000
4950.000
5000.000
5050.000
5100.000
5150.000

: "CONSTRUCCIN DE LA IRRIGACION SAN ISIDRO - CHONTA - MARCAS - HUARPA Y


MOZOBAMBA DEL DISTRITO DE MARCAS PROVINCIA DE ACOBAMBA DEPARTAMENTO
DE HUANCAVELICA"
: CUENCA RIO URUBAMBA
: HUANACAVELICA
: ACOBAMBA
: MARCAS
: MAYO 2010

30.857
33.028
35.753
46.882
48.248
60.419
70.387
85.858
105.712
124.488
136.557
137.386
131.865
110.204
84.166
64.416
51.346
37.909
27.972
22.275
9.017
2.038
0.309
0.018
1644.423

218.169
251.196
286.950
333.832
382.080
442.499
512.886
598.744
704.456
828.944
965.500
1102.887
1234.752
1344.956
1429.122
1493.538
1544.884
1582.793
1610.765
1633.040
1642.057
1644.095
1644.404
1644.423

1426.254
1393.226
1357.473
1310.591
1262.343
1201.924
1131.537
1045.679
939.967
815.479
678.923
541.536
409.671
299.467
215.301
150.885
99.539
61.630
33.658
11.383
2.366
0.327
0.018
0.000

1.876
2.008
2.174
2.851
2.934
3.674
4.280
5.221
6.429
7.570
8.304
8.355
8.019
6.702
5.118
3.917
3.122
2.305
1.701
1.355
0.548
0.124
0.019
0.001
100.000

86.733
84.724
82.550
79.699
76.765
73.091
68.811
63.589
57.161
49.591
41.286
32.932
24.913
18.211
13.093
9.176
6.053
3.748
2.047
0.692
0.144
0.020
0.001
0.000

3.- GRFICA CURVA HIPSOMTRICA Y DE FRECUENCIAS DE ALTITUDES


AREAS

COTAS

% TOTAL

1644.423
1642.419
1639.692
1636.648
1632.661
1625.009
1616.991
1607.230
1595.432
1581.959
1565.591
1547.966
1529.275
1508.271
1484.832
1457.111
1426.254
1393.226
1357.473
1310.591
1262.343
1201.924
1131.537
1045.679
939.967
815.479
678.923
541.536
409.671
299.467
215.301
150.885
99.539
61.630
33.658
11.383
2.366
0.327
0.018
0.000

3200.00
3250.00
3300.00
3350.00
3400.00
3450.00
3500.00
3550.00
3600.00
3650.00
3700.00
3750.00
3800.00
3850.00
3900.00
3950.00
4000.00
4050.00
4100.00
4150.00
4200.00
4250.00
4300.00
4350.00
4400.00
4450.00
4500.00
4550.00
4600.00
4650.00
4700.00
4750.00
4800.00
4850.00
4900.00
4950.00
5000.00
5050.00
5100.00
5150.00

0.000
0.122
0.166
0.185
0.242
0.465
0.488
0.594
0.717
0.819
0.995
1.072
1.137
1.277
1.425
1.686
1.876
2.008
2.174
2.851
2.934
3.674
4.280
5.221
6.429
7.570
8.304
8.355
8.019
6.702
5.118
3.917
3.122
2.305
1.701
1.355
0.548
0.124
0.019
0.001

Curva Hipsomtrica y Frecuencias de Altitudes Cuenca Rio Lircay

ANALISIS DE CUENCA
PROYECTO

: "CONSTRUCCIN DE LA IRRIGACION SAN ISIDRO - CHONTA - MARCAS - HUARPA Y


MOZOBAMBA DEL DISTRITO DE MARCAS PROVINCIA DE ACOBAMBA DEPARTAMENTO
DE HUANCAVELICA"
: CUENCA RIO URUBAMBA
: HUANACAVELICA
: ACOBAMBA
: MARCAS
: MAYO 2010

CUENCA
DEPARTAMENTO
PROVINCIA
DISTRITO
FECHA

Curva Hipsomtrica y Frecuencias de Altitudes Cuenca Rio Lircay


Cotas m

0.00

1.00

0.001
0.019
0.124
0.548

5000.00

2.00

3.00

1.355
1.701

4800.00

2.305

4.00

3.122

5.00

3.917

6.00

7.00

5.118

6.702

4600.00

4400.00

4200.00
2.174
2.008
1.876
1.686
1.425
1.277
1.137
1.072
0.995
0.819
0.717
0.594
0.488
0.465
0.242
0.185
0.166
0.122
0.000

4000.00

3800.00

3600.00

3400.00

3200.00
0

100

200

300

2.934
2.851

400

3.674

500

4.280

600

6.429

5.221

700

800

900

1000

8.00

9.00

10.00

11.00

12.00

8.019
8.355
8.304
7.570

1100

1200

1300

1400

1500

1600

1700

Areas Km^2
Curva de Frecuencias

Curva Hipsomtrica

4.- CLCULO DE INDICE DE FORMA Y EL INDICE DE COMPACIDAD


k 0.28

k=

P
A
1.418

Cuenca Alargada mayor a 1

5.- CALCULO DE INDICE DE FORMA


B=
L=

Ancho promedio de la cuenca: (ver plano cartogrfico)


Longitud promedio de la cuenca: (ver plano cartogrfico)

33471.13
64601.57
f

A
L2

f= 0.518

2162287260.1
4173362833.5

6.- RECTANGULO EQUIVALENTE DE LA CUENCA

2.2E+09
4.2E+09

2
Kx A
1.12
1 1

1.12
K

l=

82839.84

m
82839.8

ANALISIS DE CUENCA
PROYECTO

CUENCA
DEPARTAMENTO
PROVINCIA
DISTRITO
FECHA

: "CONSTRUCCIN DE LA IRRIGACION SAN ISIDRO - CHONTA - MARCAS - HUARPA Y


MOZOBAMBA DEL DISTRITO DE MARCAS PROVINCIA DE ACOBAMBA DEPARTAMENTO
DE HUANCAVELICA"
: CUENCA RIO URUBAMBA
: HUANACAVELICA
: ACOBAMBA
: MARCAS
: MAYO 2010

L = 19853.36

7.- TIEMPO DE CONCENTRACIN

= (

0.9 3 0.385
)

Tc =

Kx A
1.12
1 1

1.12
K

REGISTRO DE PRECIPITACIONES DIARIAS (mm)


ESTACION: TUNSULLA
CODIGO: 006

AO

ENE

FEB

MAR

ABR

DISTRITO:
PROVINCIA:
DEPRTAMENTO:

PARAS
CANGALLO
AYACUCHO

ALTITUD:
LATITUD:
LONGITUD:

MAY

JUL

SET

JUN

AGO

1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005

16.90
29.60
28.20
21.30
16.60
32.00
49.30
25.40
32.43
43.71
27.60
35.25
35.25
11.00

14.10
26.80
26.80
47.90
24.50
34.30
35.30
35.30
28.20
34.55
30.32
31.02
33.14
24.50

22.60
28.20
42.30
39.20
19.70
50.10
46.50
28.90
38.78
22.56
26.79
28.20
45.12
20.00

7.10
25.40
25.40
14.80
23.10
25.40
35.30
47.90
9.87
22.56
23.27
31.02
11.28
11.50

9.90
9.90
5.60
8.00
7.90
11.80
4.20
9.90
15.51
35.25
15.51
6.00
16.92
2.00

8.50
8.50
5.60
4.40
4.20
0.00
12.70
8.50
7.05
11.28
3.12
0.00
14.10
0.00

8.50
4.20
4.20
5.40
2.10
0.00
0.00
8.50
7.05
15.51
15.51
7.05
17.63
22.00

12.70
9.90
7.10
5.10
18.90
19.70
14.10
11.30
13.40
7.15
10.60
10.58
7.05
8.50

11.30
15.50
8.50
17.50
11.10
22.60
19.70
39.50
2.82
9.17
12.69
12.69
19.74
21.00

MAX
PROM

49.30
28.90

47.90
30.48

50.10
32.78

47.90
22.42

35.25
11.31

14.10
6.28

22.00
8.40

19.70
11.15

39.50
15.99

X
p(x)
G(Y)
Ordinario M. Lineal

G(Y)

Delta

0.0055
0.0079
0.3331
0.3331
0.3358
0.483
0.5171
0.6727
0.7238
0.7683
0.8384
0.8384
0.8659
0.8796

0.0643
0.1297
0.1165
0.0498
0.014
0.0768
0.0467
0.1457
0.1325
0.1118
0.1163
0.0496
0.0103
0.0429

1.- Calculos de ajustes Smirnov Kolmogorov


max
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14

24.50
25.00
35.25
35.25
35.30
38.10
38.78
42.30
43.71
45.12
47.90
47.90
49.30
50.10

0.0667
0.1333
0.2
0.2667
0.3333
0.4
0.4667
0.5333
0.6
0.6667
0.7333
0.8
0.8667
0.9333

0.0023
0.0037
0.3165
0.3165
0.3193
0.4768
0.5133
0.679
0.7325
0.7785
0.8496
0.8496
0.877
0.8905

Hidro esta (Exportar)

ESTACION
TUNSULLA

PRECIPITACIONES PARA DIFERENTES PERIODOS DE RETORNO


TR = 25
TR = 50
TR = 100
TR = 200
56.86
61.41
65.93
70.44

DESCRICIN
Cuenca Ro Opamayo
Cuenca Ro Sicra

AREA (km2)
964.5
654.59

PERIMETRO (km)
143.34
136.98

OCT

3900.00 m.s.n.m.
1319'57"
7434'59"

NOV

DIC

35.30
26.80
33.80
29.30
6.30
22.60
19.70
32.40
26.79
11.28
18.33
10.58
11.99
25.00

14.10
24.00
32.40
34.80
21.40
29.60
40.90
14.10
15.51
22.56
21.15
15.00
13.40
6.00

25.40
38.10
31.20
31.00
21.70
35.30
49.30
23.97
37.37
23.27
35.25
12.00
40.00
15.00

35.30
38.10
42.30
47.90
24.50
50.10
49.30
47.90
38.78
43.71
35.25
35.25
45.12
25.00

35.30
22.16

40.90
21.78

49.30
29.92

50.10
39.89

Hidro esta (Exportar)

P24 Mximo Estacin T

MAX
60.00
50.00
40.00
P24 (mm)

ALTITUD:
LATITUD:
LONGITUD:

30.00
20.00
10.00
0.00
1990

1992

1994

1996
Tiempo (aos)

ximo Estacin Tunsulla

1998
Tiempo (aos)

2000

2002

2004

2006

max

max

24.5
25
35.25
35.25
35.3
38.1
38.78
42.3
43.71
45.12
47.9
47.9
49.3
50.1

24.5
25
35.25
35.25
35.3
38.1
38.78
42.3
43.71
45.12
47.9
47.9
49.3
50.1

GRUPO

Grupo A

Grupo B

Grupo C

Grupo D

DESCRIPCION
Bajo potencial de escurrimiento. Suelos que tienen altas velocidades
de infiltracin cuando estn mojados y consisten principalmente de
arena y gravas profundas, con bueno a exceso drenaje. Estos suelos
tienen altas velocidades de transmisin del agua.
Suelos con moderada velocidad de infiltracin cuando estn mojados y
consisten principalmente de suelos con cantidades moderadas de
texturas finas y gruesas, con drenaje medio y algo profundo. Son
bsicamente suelos arenosos.
Suelos que tienen bajas velocidades de infiltracin cuando estn
mojados, consisten principalmente de suelos que tienen un estrato que
impide el flujo del agua. Son suelos con texturas finas (margas arcillosas,
margas arenosas poco profundas). Estos suelos tienen bajas velocidades
de transmisin.
(Alto potencial de escurrimiento. Suelos que tienen muy bajas
velocidades de infiltracin cuando estn mojados y consisten
principalmente de suelos arcillosos con alto potencial de hinchamiento,
suelos con nivel fretico y permanente, suelos con estratos arcillosos
cerca de sus superficie, o bien, suelos someros sobre horizontes
impermeables.

DESCRICIN
Cuenca Ro Opamayo
Cuenca Ro Sicra

COBERTURA
Matorrales,
de cultivo
Matorrales,
de cultivo

bofedales, tierras
bofedales, tierras

GRUPO DE
CN
SUELO

% IMPERMEABLE

72

0.00

70

0.00

Descripcin del uso de la tierra

Tierra
cultivada

Grupo hidrlgico del suelo


A

Sin tratamiento de
conservacin

72

81

88

91

Con tratamiento de
conservacin

62

71

78

81

68
39
30

79
61
58

86
74
71

89
80
78

45

66

77

83

25

55

70

77

39

61

74

80

49

69

79

84

92
94
88
91
Grupo hidrolgico del suelo

95
93

Condiciones pobres
Condiciones ptimas
Vegas de ros: Condiciones ptimas
Troncos delgados, cubierta
pobre sin hierbas
Bosques
Cubierta buena

Pastizales

Areas abiertas, csped, parques en


condiciones ptimas, cubiertas > 75%
Areas abiertas, csped, parques en
condiciones aceptables entre el 50% y 75%
Area comerciales (85% impermeable)
Area industriales (72% impermeable)

89
81

Residencial
Tamao promedio del lote

Porcentaje
promedio
impermeable

505.8 m2
65%
1011.6 m2
38%
1348.9 m2
30%
2023.5 m2
25%
4046.9 m2
20%
Pavimentos, techos, accesos, etc.
Pavimento con
cunetas y
alcantarillado
Calles y carreteras
Grava
Tierra

77
61
57
54
51
98

85
75
72
70
68
98

90
83
81
80
79
98

92
87
86
85
84
98

98

98

98

98

76
72

85
82

89
87

91
89

DESCRICIN
Cuenca Ro Opamayo
Cuenca Ro Sicra

CN
72
70

S
98.78
108.86

Ia
19.756
21.771

CLCULO DE LA PENDIENTE DEL CAUCE SEGN TAYLOR Y SCHARZ


CUENCA: RIO SICRA
Longitud (L)m.

0
1
2
3
4
5
6
Suma

0
15,834.98
13,853.98
5,907.95
6,592.63
6,327.05
4,533.55
53050.14

Cota

Desnivel

L/S

4,750.00
4,050.00
3,700.00
3,550.00
3,400.00
3,250.00
3,200.00

700.00
350.00
150.00
150.00
150.00
50.00

0.044
0.025
0.025
0.023
0.024
0.011

0.210
0.159
0.159
0.151
0.154
0.105

75314.237
87162.125
37077.408
43706.160
41091.932
43169.048
327520.909

Cota

Desnivel

L/S

4,750.00
3,950.00
3,750.00
3,600.00
3,400.00
3,300.00
3,250.00

800.00
200.00
150.00
200.00
100.00
50.00

0.042
0.027
0.031
0.016
0.022
0.018

0.206
0.164
0.175
0.126
0.149
0.134

91708.016
44959.726
28022.002
99640.685
30416.728
20638.260
315385.418

CUENCA: RIO OPAMAYO


Longitud (L)m.

0
1
2
3
4
5
6
Suma

0
18,878.53
7,394.22
4,901.89
12,569.01
4,522.81
2,771.86
51038.32

N de datos
S=
S=

N de datos

6
0.0262 m/m
26.2358 m/km

S=

0.0262 m/m

S=

26.1884 m/km

Cuenca/ Quebrada

Longitud

Desnivel

Tc (min.)

Tc (horas)

Ro Opamayo

51,038.32

1,500.00

319.79

5.330

Ro Sicra

53,050.14

1,550.00

330.19

5.503

Cuenca/ Quebrada

Tc (min.)

T lag (min)

t (min)

Ro Opamayo

319.79

191.8717688

Ro Sicra

330.19

198.1166991

Tc
Tlag
t (min)
Tp (min.)
Tb
D

Tiempo de concentracion
Tiempo de retraso
Duracion en exceso
Tiempo pico
Tiempo base
Duracion intervalo de lluvia

t (min) asum.

Tp (min.)

34.886

35

209.3717688

36.021

40

218.1166991

93.45

0.18181818
0.18181818

TR = 25

TR = 50

TR = 100

TR = 200

TR = 500

DESCRICIN

AOS

AOS

AOS

AOS

AOS

Rio Opamayo
Rio Sicra

165.6
80.6

228.3
115.8

299.3
156.4

358
225

376.5
201.3

Rio Lircay (Union)

245.7

343.7

455.6

225

577.8

METAS PRE INVERSIN


Mejoramiento de la captacin de Ahuay

COSTO S/.
8,874.00

Mejoramiento de la captacin de Atto

5,863.00

Mejoramiento del sedimentador y construccin de 02 unidades de filtracin (fuente Atto)

298,794.00

Rehabilitacin y ampliacin del sedimentador, filtro lento y construccin de 01

119,559.00

unidad de filtracin (fuente Ahuay)


Construccin de reservorio de 350 m3

268,613.00

Instalacin de redes de distribucin, vlvulas y accesorios

215,567.00

Rehabilitacin de cajas y suministro de micromedidores (conexiones domiciliarias A.P)

348,075.00

Instalacin de colectores (alcantarillado)

293,727.00

Instalacin de interceptor y emisor

503,233.00

Instalacin de sistema de pretratamiento (rejas y desarenador)

28,654.00

Instalacin de reactor UASB y laguna de pulimento

455,876.00

Instalacin de tanque sptico (02) y pozos de percolacin (04)

127,233.00

Instalacin de cruces aereos

103,049.00

Transporte de insumos, materiales y equipos


Estudios y diseos

23,951.00
83,314.00

Gastos Generales

201,906.00

Utilidades

201,906.00

Supervisin

100,953.00

IGV

643,938.00

TOTAL

4,033,085.00

METAS PRE INVERSION

COSTO S/.

EXPEDIENTE TECNICO
COSTO DIRECTO
SUPERVISION
GASTOS GENERALES
UTILIDADES

20,000.00
811,516.20
20,632.00
55,018.00
34,386.00

TOTAL

941,552.20