INSPECTION REQUEST FORM FOR REINFORCED CONCRETE WORK

Unless otherwise approved,this inspection request form shall be submitted during the daily morning meeting among LTA,Contractor and QP(S) Contractor:
SAMWOH CORPORATION PTE LTD SK E & C

NO:

Project:
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

To: LTA

Date: Time:

The work described below has been inspected by our Site Engineer and is complete and ready for your inspection. A checklist is attached overleaf. Location Checked and Requested By: Chainage Activity Drawings Used for Construction Other Description Contractor's PM Name & Signature

The meeting noted that the information provided by the Contractor is adequate/not adequate*. QP(S) may proceed * delete where appropriate Request Rejected

INITIAL INSPECTION DECISION BY QP(S)


We have inspected the above referenced works and found them acceptable. You may proceed. However, please return the completed checklist upon completion of the remaining work. You cannot proceed. Please carry out corrective works as noted on the checklist and submit a fresh request for inspection. Other comments:

RE/RTO Name & Signature/ Date

FINAL INSPECTION BY QP(S)


_______________________________________ QP(S) Name & Signature/Date

Work approved to Start:_________________________ LTA

Work Completed on:________________________

The above process for request for inspection of work by Contractor and approval by QP(S) in noted.

LTA's representative/Date/Time

CHECKLIST FOR REINFORCED CONCRETE WORK NO:


Date/Time:
S/No 1 Reinforcement 1.1 Check steel grade, bar size, numbers and spacing 1.2 Ensure that reinforcement is free from loose scale/rust, oil and mortar 1.3 Check bends, laps and anchorage 1.4 Ensure correct cover to concrete 1.5 Check that spacers and steel chairs are provided 1.6 Ensure that starter bars are provided 1.7 Check that additional steel at opening etc. are provided 2 Formwork 2.1 Check that only approved and undamaged form boards or panels are used 2.2 Check correct patterns 2.3 Check the location of construction joints and properly sealed 2.4 Check dimension, levels and alignment of formwork 2.5 Check that falsework design with sufficient bracings has been approved 2.6 Check that the ground below props is firm 2.7 Check form ties 2.8 Check that correct camber is provided 2.9 Ensure correct usage of form releasing agent 2.10 Ensure that formwork is thoroughly cleaned 3 4 5 6 7 8 9 10 Check access to concreting site No. of manpower Availability of water for curing No. of vibrators Quantity of ready-mix concrete : Check concrete grade Take slump test Take test cubes No. of sets : Reference: Grade : Desired slump : mm m3

Location:
Description of Works

Chainage:
Checked by Contractor Confirmed by QP(S)

11 12 13

Check concrete cube strength at transfer for prestressing work Check sufficient temporary traffic devices if lane closure is required Others