S.No Test Title Equipment Required Adjustments Before Test 1. Place the fan such that blade center is * 1.20m from the Floor & Back wall * 1.80m from the Side wall 2. Place the Anemometer axis Parallel to the axis of the Blades 3. Distance B/W Test panel and Blades must be as Specification 3. Run the fan at Full speed at highest rated voltage for 1hr
1. Thermometer 2. Mutimeter
Test Panel
1. Switch on the Tester and Stopwatch 1. High Voltage Tester 2. Set the Tester to 1.5KV using the 2. Stop Watch dimmer
Starting Test
Single Phase Auto Connect the Fan to Supply through Transformer (0~230V) Auto Transformer
1. Test Panel [Single Fan Speed and Phase Auto Input power Transformer] Test 3. Tachometer
1. Connect the Fan to Supply through Test Panel 2. Switch on the fan at highest speed a) without the oscillation for RPM test b) with the oscillation for Input test
Protection 1. Connect the Test finger one probe against Electric Test Finger Apparatus to live part of the fan Shock 2. Fan must be in ON condition 1. Set the humidity chamber to 405C 2. Relative humidity to 95% 3. Set the timer for 48hrs
10
Deleted
g Report
Procedure in Steps Standard parameters
1. Reading at 20mm from the blades axis and proceed in the horizontal line up to 40mm wide 2. Reading must be taken in both Air delivery must be direction till the velocity falls minimum 65m/min below 24m/min 3. Mutiply average velocity by area to get the total A.D
1. Measure the initial resistance(R1) of the winding at t1 using multimeter 2. Run the fan for long time till the temp becomes constant t2 < 85C for Class B 3. Measure the resistance(R2) of the winding using multimeter 4. Calculate t2 t2=R2/R1(t1+235)-235 262 1. Connect one terminal of the meter to live part and other to Body Value must be < 210A (rms)
1. Connect one terminal of the Tester to live part and other to The motor must withstand inaccessible metal part of motor such a high voltage if not 2. push the HT ON button the sample is rejected 3. Conduct the Test for 1min by setting the Stopwatch 1. Conncet the test probes B/W live & Body 2. Press & hold the TEST botton for 1min by setting the Stopwatch
1. Apply 90% of the Rated voltage & start the fan at Minimum Speed 2. Then increase the Fan Speed to the maximum 3. Increase the Voltage to maximum rated voltage by adjusting the Transformer 4. Start the fan in high rated voltage
Test is conducted for 10times to conform whether the fan is starting at high(230V) and low(207V) Rated voltage
1. Measure the Input wattage with Test panel 2. Set the fan at highest speed along without oscillation 3. Place the sticker on the blade cap by removing the grill 4. take the reading through Tacho meter
1. Input < 10% Rated input 2. RPM value must be 10% of Decleared value 3. Power Factor > 0.9
1. Place the test finger in various The lamp in the apparatus parts of the fan with appreciable glows if there is a risk of force. electric shock 1.Place the sample inside the humidity chamber 2. After 48hrs immediately Conduct Insulation & H.V Test 3. H.V conducted at 80% standard voltage 1. No damage must be seen 2. IR > 2M 3. No Breakdown or Flash over
Deleted
NA
Starting Test
Parboiled Rice
Input Test
Parboiled Rice
Leakage Test
Humidity Chamber
NA
water
Insulation Test
NA
Copper Foil
10
1. Test panel 2. Stopwatch Operational Test 3. Test sieves 4. weighing Balance Temperature Withstand Test for Bowl
11
Rating
12
Markings
13 14
Deleted
1. During the test input wattage 1.Operating voltage should be shall not deviate from the rated 230V voltage be 15% (max wattage 2. Normal Load is applied 632.5W) 1. Paper pulp should be placed 1. Connect one terminal of the inside the jar meter to live part and other to 2. Food mixer is operated for its Leakage < 210A Body rated operating time 2. Imput voltage is set to 230 3. Measure the Leakage current during the last cycle 1. Palace the sample in Humidity chamber 1. Chamber Setting 2. Run the Humidity chamber *RH should be 91-95% *temp for 48hrs 15 to 35 shall be maintained 3.After 48hrs immediately Conduct Insulation & H.V Test
1. Measure the water capacity using measuring jar 2. Fix the jar on the mixer which is completely filled with water 1. IR > 2M 3. Pour the water equivalent to 2. No Breakdown or 15% of bowl capacity on the Flash over already filled jar to overflow 4. Remove the jar and measure IR & H.V(800V)
1. Conncet the test probes B/W live & Body 2. Press & hold the TEST botton Value must be > 2M for 1min by setting the Stopwatch 1. Connect one terminal of the Tester to live part and other to inaccessible metal part of motor No Breakdown or Flash 2. push the HT ON button over 3. Conduct the Test for 1min by setting the Stopwatch
1. Switch on the Tester and Stopwatch 2. Set the Tester to 1KV using the dimmer
1.Prefered voltage =230V 2.Rated Imput <750W 3.Capacity of jar 1&0.4 liter 1.Voltage -230V 2. Nature of supply-AC 3. Rated frequency-50Hz 4. Rated Input-550W 5. Rated operating time30 to 60min 6. Power Cord*length 2mcross *copper area-0.75sqmm *CML no: 3083348
Deleted