You are on page 1of 23

PREPARED BY CHECKED BY APPROVED BY CERTIFIED (PTT) REV. DATE NO.

D1 18-Feb-08 D2 16-Jul-08 D3 18-Aug-08

NA

PTT PUBLIC COMPANY LIMITED ONSHORE COMPRESSOR STATION 4 PROJECT

NA REVISED BY APPROVED BY NA NA NA DESCRIPTION ISSUED FOR ITB REVISION ISSUED FOR ITB TO CORRECT DOCUMENT

SPECIFICATION FOR BASIS ENGINEERING DESIGN DATA (BEDD)


SPC-0804.02-99.90 REV D3
TOTAL 24 PAGES

AREA CODE OF SITE LOCATION GENERAL AREA: 010 PTT PLC. CONTRACT NO.

PTT PLC. PROJECT NO. 0804.02

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 2 OF 23 REV: D3

CONTENTS SECTION 1.0 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 GENERAL .........................................................................................3 BASIC ENGINEERING DESIGN DATA ....................................................3 PROJECT DESCRIPTION .....................................................................3 APPLICABLE CODES, STANDARDS, GOVERNMENT ACTS, AND LOCAL AUTHORITY REGULATIONS ................................................................3 CLIMATIC DATA ...............................................................................4 UTILITIES .........................................................................................5 HEAT EXCHANGERS ........................................................................10 MECHANICAL EQUIPMENT ...............................................................10 CIVIL ENGINEERING .........................................................................10 PIPING ...........................................................................................13 INSTRUMENTATION.........................................................................14 ELECTRICAL ...................................................................................15 PROTECTIVE COVER........................................................................17 SAFETY FACILITIES .........................................................................18

APPENDIX A UNITS OF MEASUREMENT ......................................................20 APPENDIX B FUEL GAS ANALYSIS ..............................................................23

BASIS ENGINEERING DESIGN DATA (BEDD) 1.0 GENERAL

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 3 OF 23 REV: D3

The purpose of this standard is to provide the basis technical information requirements for engineering and design of the Onshore Compressor Station 4. The station will be erected adjacent to the LNG Terminal in the Map Ta Phut Industrial estate in the Rayong province, approximately 200 km south-east Bangkok BASIC ENGINEERING DESIGN DATA Project Description Client Station Name Plant Location PTT PUBLIC COMPANY LIMITED ONSHORE COMPRESSOR STATION 4 MAP TA PHUT, RAYONG, THAILAND

of 2.0 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.2 2.2.1 2.2.2 2.2.3 2.2.4

The System of measurements shall be SI units to ISO 31 and ISO 1000 with Imperial unit in bracket. For details see appendix A. Applicable Codes, Standards, Government Acts, and Local Authority Regulations Deleted. Government Acts, Regulations applying on general basis refer to SPC0804.02-91.04 HSE Regulation. Design and construction shall conform to the latest edition of the PTT specifications, codes and/or regulations listed in ITB. Code and Standard Precedence Area of conflict between relevant specification, code and standard shall take the following order of precedence or the most stringent one to determine the actual requirements. a) PTT Engineering Specifications b) Thai Standards and Statutory Regulations c) US and International Codes and Standards

The information given in each of these standards shall be used in conjunction with all the other listed standards. Thai Standards and Statutory Regulations shall apply if more onerous then the others.

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 4 OF 23 REV: D3

2.3 2.3.1

Climatic Data Wind Refer to SPC-0804.02-40.05 Wind and Earthquake loading And for process design: 10 m/s

2.3.2

Ambient Temperature Maximum recorded Minimum recorded Design Dry Bulb Minimum design temperature Design wet bulb (all applications) Mean Daily Mean (Max.) Daily Mean (Min.) 45.0 11.0 43.0 10.0 28.5 28.2 32.7 24.8 C C C C C C C C

2.3.3

Relative Humidity Mean Maximum Mean Minimum. Extremes Minimum 95 % 51 % 17 %

2.3.4

Rainfall Average annual Maximum recorded in 24 hours Design rainfall 1401 mm 193 mm 104 mm/hour for 30 minutes for drainage system NONE

2.3.5 2.3.6

Snowfall Barometric Pressure Design Maximum Minimum

1021 mbar 1021 mbar 1000 mbar

2.3.7

Solar Heat Mid-day Solar heat flux, maximum 949 W/m2

2.3.8

Atmosphere a) Extreme moisture (tropical climate) b) Marine exposure (salt spray) c) Sand storms TROPICAL CLIMATE MARINE NONE ENVIRONMENT

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 5 OF 23 REV: D3

2.3.9

Miscellaneous Site Data a) Frost Level b) Thunderstorm Frequency c) Sandstorm Frequency d) Temperature Inversion Occurrence NONE SEASONAL (Daily May to Oct) NONE DATA NOT AVAILABLE

2.3.10

Seismic design code The zone of seismicity for the STATION is defined as ZONE 0 and is not subject to seismic activity.

2.4 2.4.1
D3

Utilities LP Steam
Supply source: Users: N/A N/A

Operating Conditions
Pressure, bar g. Temperature, C Minimum 2.5 Saturated Operating 4.0 160 Maximum 4.5 170

Mechanical Design Conditions Pressure, bar g. Temperature, C 9.0 260

2.4.2

Condensate Condensate shall not be recovered.

2.4.3 2.4.3.1

Water Raw water


Supply source: User: Third party supplier Utility stations, Fire water system

Operating Conditions Pressure, bar g. Temperature, C Minimum 4.0 25.0 Operating 6.0 28.0 Maximum 7.3 30.0

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 6 OF 23 REV: D3

Mechanical Design Conditions Pressure, Bar g. Temperature, C Quality pH Turbidity Max. Electric Conductivity Max. Total dissolved solids Max. Alkalinity Alkalinity - Phenolphthalein Alkalinity - Total Chloride max. Calcium max. Magnesium max. Hardness max. Organic-N max. Ammonia-N max. Phosphate max. Sulfate max. Nitrate max. Dissolved SiO2 max. Dissolved oxygen max. BOD max. Iron Iron - Dissolved Total max. 6.0-9.0 10.0 NTU 136 microsiemens/cm 132 mg/l 0 50 18 20 1.5 56 1.3 0.4 0.23 35 1.5 19.5 8.6 4 0 0.6 mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l mg/l CaCO3 CaCO3 Cl Ca Mg CaCO3 N N P SO4 NO3 12.2 55.0

mg/l Fe mg/l Fe

Note: Contractor shall confirm the above parameters with the supplier. 2.4.3.2
D3

Demineralised water Supply source: N/A User: N/A Operating Conditions Pressure, bar g. Temperature, C Minimum 3.0 25 Operating 4.0 28 Maximum 5.0 30

Mechanical Design Conditions Pressure, bar g. Temperature, C Quality Conductivity at 25 C max. 10 s/cm 8.3 55

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION


max. max. max. max. max. max. max. max. nil 3 3 5 5 0.1 5 50 100

SPC-0804.02-99.90 PAGE: 7 OF 23 REV: D3

Sodium Potassium Dissolved Iron Silicon Dissolved 02 Silica Total Hardness Suspended Solids Oily matter

ppm wt. Na+ ppm wt. K+ ppm wt. Fe+ ppm wt. Si mg/l ppm wt. pm wt. Ca2+ ppm wt. (Note)

Note:- 35 ppm wt. In range of 5 to 10 micronmeters, reminder below 5 micrometers 2.4.3.3 Potable water Source: User: Third party supplier Safety shower and Sanitary in buildings

Operating Condition Pressure, bar g Temperature, C Minimum 1.0 25 Operating 3.75 28 Maximum 4.75 30.0

Mechanical Design Conditions Pressure, bar g. Temperature C 5.6 55

Note. The Contractor shall confirm the above parameters with the supplier. 2.4.3.4 2.4.3.5
D3

Deleted Fire Water Supply source : Raw water supplied by Third party supplier : Sea water (Back up) supplied by Third party supplier Operating Conditions Pressure, bar g. Temperature C Minimum 7.0 Operating 11.5 35 Maximum 14

Mechanical Design Conditions Pressure. bar g. Temperature, C 2.4.4 2.4.4.1 Air Utility Air Supply source: OCS4 Instrument Air Package 16.0 60.0

BASIS ENGINEERING DESIGN DATA (BEDD)


Users:

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION


Distribution to utility stations

SPC-0804.02-99.90 PAGE: 8 OF 23 REV: D3

Operating Conditions Minimum 6.0 50 Uncontrolled Oil Free Mechanical Design Conditions Pressure, bar g Temperature C Dew Point C Pressure bar g. Temperature C 2.4.4.2 Instrument Air Supply source: Users: Operating Conditions Pressure, bar g Temperature, C Dew Point Minimum Operating 6.0 7.6 50 52 Less than 5oC @ 8.3 barg Less than 0oC @ atm Oil free Maximum 7.6 52 OCS4 Instrument Air Package Distribution to instrument air user 10.0 77 Operating 7.6 52 Maximum 8.8 52

Mechanical Design Conditions Pressure bar g. Temperature C 2.4.5


D3

10.0 77

Nitrogen Supply source: Users: Operating Conditions Pressure, bar g. Temperature, C Purity Minimum Operating Note 1 Note 1 7.0 28.5 Less than 1000 ppm O2 Maximum Note 1 50.0 OCS4 Nitrogen Package. Utility stations, dry gas seals and various users

Mechanical Design Conditions Pressure, bar g. Temperature, C 9.0 75.0

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 9 OF 23 REV: D3

D3

Note 1. To be specified by contractor. The contractor shall ensure that the Vendor provides the nitrogen with pressure and temperature meet the requirement of compressor vendor. 2.4.6 2.4.6.1 Fuel MP fuel gas
Supply source: Operating Conditions Pressure, bar g. Temperature C Minimum 30 -10 Operating 34.5 Between min and max Maximum 42 30 Upstream of SDV 101 and S-101 A/B/C common outlet header.

Mechanical Design Conditions Pressure, bar g. Temperature C 51 55

2.4.6.2

LP fuel gas
Supply source: User: Operating Conditions Pressure, bar g. Temperature, C Minimum Operating 0.5-1 22 Maximum Let down from MP fuel gas Flare purge/pilot.

Mechanical Design Conditions Pressure, bar g. Temperature, C 7 150

2.4.6.3 2.4.8

Fuel gas characteristics analysis is shown on appendix B. Pressure Vessels and Tankage Welded Unfired Pressure Vessels a) b) Engineering Specification SPC-0804.02-20.01 Vessel Standard shall be applied for Pressure Vessel Design. Engineering Specification SPC-0804.02-20.02 Quality requirement for Pressure Vessel shall be applied for Pressure Vessel Fabrication.

BASIS ENGINEERING DESIGN DATA (BEDD) 2.4.9 2.4.9.1


D3

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 10 OF 23 REV: D3

Tankage Engineering Specification SPC-0804.02-20.06 Field erected low pressure storage tank shall be applied for low pressure storage tanks Fabrication. Not used Heat Exchangers Air Coolers

2.4.9.2 2.5

2.5.1 2.5.2.2 2.5.2.3 2.5.2.4 2.5.2.5 2.5.2.6 2.5.2.7 2.5.2.8 provided 2.5.2.9 2.6 2.6.1 2.6.1.1

Air cooled exchangers shall be designed in accordance with Engineering Standard SPC-0804.02-20.22 Air Cooled heat Exchanger. The design air inlet temperature shall be 40 oC dry bulb unless specified otherwise on the Process Datasheet. The minimum ambient temperature shall be 15 oC dry bulb. Fans shall be forced draft type unless specified otherwise on the Process Datasheet. The preferred tube lengths for Air Coolers shall be 9144 mm or 12195 mm. The preferred tube sizes for air coolers shall be as API661 or other. Winterising is not required. Accelerometer and velometer type vibration transmitters shall be for motors and fans respectively. Minimum requirement of structure column size and quantity shall be H200, 6 columns per bay. Mechanical Equipment Pumps, Compressors and Turbines Pumps, compressors and turbines shall be specified in accordance with the related specifications, applicable National and Local Codes listed in the contract document Deleted Air blower design shall use 77 % relative humidity, 40 oC dry bulb temperature. Deleted Civil Engineering

2.6.1.2 2.6.1.3 2.6.1.4 2.7

BASIS ENGINEERING DESIGN DATA (BEDD) 2.7.1

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 11 OF 23 REV: D3

Site Preparation Site shall be prepared and levelled by CONTRACTOR. Site Preparation shall be in accordance with site preparation drawings prepared by the contractor.

2.7.2 2.7.2.1 2.7.2.2 2.7.2.3

Soil Conditions A preliminary soils report is attached in the ITB. A soil profile is available by reference to bored hole logs in soil report. Foundation design: Foundations shall be in accordance with Engineering Specification SPC0804.02-40.11 Foundation and Structural support for Machinery.

2.7.2.4

For piles: Type & size, capacity, maximum uplift and lateral resistance shall be referred to Preliminary Soil Report for the design and construction.

2.7.2.5

Type of foundations: a) b) Major equipment, buildings and structures: Concrete foundation Minor equipment, pipe supports : Concrete foundation

2.7.3 2.7.3.1
D3

Paving/Water Run-Off/Sewers a) Paving shall be provided in process area (concrete paving), control building and substation area (concrete paving), Maintenance area (concrete paving), Product storage (concrete paving) ,slope protection (concrete paving) and/or as identified on overall plot plan. Access ways shall be concrete paved. Run-off design factors are in accordance with Engineering Specification SCP-0804.02-40.13 Drainage Design. Roadways shall be paved in according with the Engineering Specification SPC-0804.02-40.12 Specification for Road and Paving.

b) c) d)

2.7.3.2 2.7.3.3

Surface drainage systems shall be designed in accordance with Engineering Specification SPC-0804.02-40.13 Drainage Design. The following drainage systems shall be provided: Storm Drainage Oily Water Drainage Sanitary Sewer

D3

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 12 OF 23 REV: D3

Closed Drain System 2.7.3.4 2.7.3.5 Additional sloping of grade shall be provided in fire risk areas. Sewer pipe shall be designed in accordance with Engineering Specification SPC-0804.02-40.13 Drainage Design. Waste Treatment Facilities Waste treatment facilities are to be provided as follows: Type Waste Oily Sanitary Chemical Other 2.7.4.1 Exiting Partially To be provided by PTT by CONTRACTOR [ ] [ ] [ ] [ ] [ ] [ ] [ ]

2.7.4 2.7.4.1

[ ]

Waste water from Raw water filtering system shall be treated to meet PROJECT SPECIFICATION by its unit. Unit Elevation Site preparation elevation to be confirmed by CONTRACTOR. High Point of Paving (HPP) for different areas is to be determined by the CONTRACTOR based on survey data and requirements for access and drainage of site. HPP shall be referenced to the PTT station Datum and agreed with PTT. Station design elevation shall be considered as high point of paving and equal to be 0.000 m.

2.7.5 2.7.5.1 2.7.5.2

2.7.5.3

Minimum height for top of foundations above high point of paving shall be per Engineering Specification SPC-0804.02-40.12 Specification for Road and Paving. Structural Materials a) b) Structural material shall be in accordance with Engineering Specification SPC-0804.02-40.07 Structural steelwork design. Deleted

2.7.6 2.7.6.1

D3

2.7.6.2

In general, elevated walkways and platforms shall be Hot Dip Galvanized

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 13 OF 23 REV: D3

Grating. Checkered plate shall be used where only specified by PTT. 2.7.6.3
D3

Pipe supports shall be in accordance with Engineering Specification SPC0804.02-50.01 Piping Arrangement. Buildings Buildings shall be in accordance with related project documentation. Air conditioning shall be provided for the control, substation, warehouse buildings and guardhouse. Pressurising is required for the substation, control building and compressor shelter.

2.7.7 2.7.7.1 2.7.7.2 2.7.7.3

D3

2.7.8
D3

Security PVC coated perimeter fencing type chain link diamond mesh shall be provided. Area fencing is required as shown on overall plot plan 01-3-0804.026000-002. Security gate house shall be provided at the entrance to the facility. Main gate with traffic shall be polished stainless steel sliding gate. All building shall be equipped with computerized ID card touched access control. Roads specification shall be referred to SPC-0804.02-40.12. Piping Piping shall be designed in accordance with the edition plus Addenda of the ASME/ANSI Code for Pressure Piping: Chemical Plant and Petroleum Refinery Piping, ASME/ANSI B31.3; Gas Transmission and Distribution Piping, ASME/ANSI B31.8 and other sections which apply as listed below in remarks: Piping shall be designed in accordance with Engineering Specifications SPC-0804.02-50.01 Design Fabrication, Inspection and Testing of SPC-0804.02-50.03 Piping Lay Out and SPC-0804.02-50.05 Arrangement and other applicable specifications Not used. Severe Cyclic Service Lines ASME/ANSI B31.3 requires the designer to identify those lines subject to

2.7.8.1 2.7.8.2 2.7.8.3 2.7.8.4 2.7.9 2.8 2.8.1

D3

D3

2.8.1.1 Piping, Piping 2.8.1.2 2.8.1.3

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 14 OF 23 REV: D3

SA

severe cyclic conditions. These conditions exist where SE exceeds 0.8 and the equivalent number of cycles exceeds 7000; or where other conditions will produce an equivalent effect. These lines shall be identified on line classification list by CONTRACTOR.

2.9 2.9.1

Instrumentation Instrumentation and Control Systems shall be furnished in accordance with Piping and Instrument Diagrams, and other instrument engineering specifications, project philosophy and the scope of work Volume 1 Part 5. Deleted Deleted Deleted Deleted Deleted Analysers Analysers are required as shown on Engineering Flow Diagram. Analyser Location: [ ] Local Enclosures [ ] Central Analyser House [ ] Area/Unit Analyser House

2.9.2 2.9.3 2.9.4 2.9.5 2.9.6 2.9.7

2.9.8

Package Equipment Instrumentation Instrumentation Supplied by: [ ] CONTRACTOR [ ] Manufacturer Manufacturer-Supplied Instrumentation [ ] Supplied to Engineering Standard SPC-0804.02-60.01 Instrument General Specification and other related specifications drawings and contract documents. [ ] Other

2.9.9

Control Valves Primary type of Modulating Control Valve shall be: [ ] Globe-Type (see Note 1) [ ] Wafer/Butterfly Type [ ] Rotary Plug Type [ ] Other The type chosen shall be the type used for routine applications. Other types shall be used as required by process.

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 15 OF 23 REV: D3

Valve positioners shall be: [ ] Pneumatic [ ] Electropneumatic [ ] Pneumatic + I/P Converter 2.9.10 Special Approval Agency Requirements Approval of instruments and/or systems is required by: [ ] BASEEFA [ ] PTB [ ] CSA [ ] Other 2.9.11 Transmitted Signal Levels: [ ] Electronic 4-20 mA, Pneumatic: [ ] 3-15 Psig [ ] 0.2 - 1.0 Barga 2.9.12 Electrical Equipment in Hazardous Areas Electronic instrumentation in hazardous areas shall be based upon: [ ] intrinsically safe [ ] explosion proof/flame proof [ ] non-indecisive/non-sparking [ ] Other See section 2.9.10 above for approval authority 2.9.13 Instrument Installation Cable routing Service ISBL OSBL Cable Types ISBL: - Armoured OSBL: - Armoured
D3

[ ] Foundation Fieldbus

Underground Above Ground [ [ ] ] [ ] [ ]

Direct Buried [ [ ] ]

Conduit [ [ ] ]

Tray [ ] [ ]

Process Hook-ups Electrical

[ ] Tubing

] Piping

2.10 2.10.1

General requirements for electrical equipment, materials and design shall

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 16 OF 23 REV: D3

be in accordance with Engineering Specifications for Electrical and Telecommunication System. 2.10.2 Power Supply The system characteristics shall be as follows: 2.10.2.1 2.10.2.2 2.10.2.3 2.10.2.4 2.10.2.5 Incoming supply refer to SPC-0804.02-70.01 and Single Line Diagram 70-3-0804.02-6000-001 Deleted. The power source location at the battery limit shall be referred to SPC0804.02-70.01 and Single Line Diagram 70-3-0804.02-6000-001. The maximum 3 phase fault level shall be referred to SPC-0804.0270.01. An emergency power supply shall be provided by CONTRACTOR in accordance with Engineering Specification SPC-0804.02-70.02.08 Diesel generator Set An Uninterruptible Power Supply shall be provided by CONTRACTOR in accordance with Engineering Standard SPC-0804.02-70.02.06 Uninterruptible Power Supply. Generally, the ISBL systems Voltage Levels and System Design Data shall be designed, performed, operated and utilized as specified in SPC0804.02-70.01 section 2.0 System design. Utilisation Voltages shall be designed, performed, operated and utilized specified in SPC-0804.02-70.01 section 2.0 system design. Distribution and Lighting Service Above Ground Power Lighting Communication 2.10.4.2 ISBL OSBL ISBL OSBL ISBL OSBL Direct Buried ISBL OSBL ISBL OSBL Conduit Tray

2.10.2.6

2.10.2.7

2.10.3 as 2.10.4 2.10.4.1

ISBL OSBL ISBL OSBL ISBL OSBL

Cable Types shall refer to SPC-0804.02-70.01 section 2.14 Cable and Wiring.

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 17 OF 23 REV: D3

2.10.4.3

Area Classification and minimum required type of Protection for equipment in Hazardous Areas shall be designated as SPC-0804.0270.01 section 1.3 Hazardous Area. Detail Single Line Diagrams shall be provided by CONTRACTOR. The location of motor control stations shall be in the substation building. Lighting fixtures shall refer to SPC-0804.02-70.01 section 2.16 Lighting. Soil Characteristics such as Soil Temperature, Soil Thermal Resistivity and Soil Resistivity shall refer to Preliminary Soil Report. Supplementary Lighting shall be provided. Type Emergency Location Critical Plant, wherever safety requirement

2.10.4.4 2.10.4.5 2.10.4.6 2.10.4.7 2.10.4.8

Aviation obstruction According to ICAO Security Other 2.10.4.9 2.10.5 2.10.5.1 2.10.5.2 2.10.5.3 Exit/entry and control room Indication Purpose for Safety

Offsite lighting shall be provided. Miscellaneous Requirements A fire alarm system shall be provided. (Also see Section 13 Safety Facilities) Not used A communications system shall be provided in accordance with SPC0804.02-70.01 section 2.13 Communication system. Protective Cover Insulation for hot piping and equipment Insulation for hot piping and equipment shall be in accordance with SPC0804.02-93.01 Hot Insulation.

2.11 2.11.1

2.11.2

Insulation for cold piping and equipment Insulation for cold piping and equipment shall be in accordance with SPC0804.02-93.02 Cold Insulation.

2.11.3

Winterising is not applicable on this plant.

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 18 OF 23 REV: D3

2.11.4 2.11.4.1 2.11.5 2.11.5.1 2.11.6 2.11.6.1


D3

External heating External heating for piping and equipment shall be electric tracing as specified on Piping and Instrument diagram. Personnel Protection Piping and equipment operating at or above 60 oC shall be provided with insulation guards for personnel protection where accessible. Fireproofing Fireproofing of equipment and supports shall be provided in accordance with Engineering Standard SPC-0804.02-93.05 External Fireproofing for equipment support and structure and Attachment provided in ITB. Painting Painting for all piping, equipment structures and all externals shall be in accordance with Engineering Standard SPC-0804.02-93.06 Painting. (included internal painting prior to internal lining of WHRU ,Boiler ,Stack. Linings of internals are excluded) Wrapping Underground Pipe Coating and wrapping of underground steel pipe shall be in accordance with Engineering Standard SPC-0804.02-92.07 Cathodic protection of Onshore and buried pipe. Galvanising Galvanising of iron and steel items shall be accordance with SPC0804.02-40.08 Structural Steel Fabrication and Erection.

2.11.7 2.11.7.1

2.11.8 2.11.8.1

2.11.9

2.12 2.12.1
D3

Safety Facilities Fire Fighting Fire Fighting facilities shall be provided in accordance with specification SPC-0804.02-90.03 Fire and Gas Specification and 19-1-0804.02-600001 Conceptual Fire Protection plan.

2.12.1.1 2.12.1.2 2.12.1.3 2.12.1.4

Deleted Deleted A foam system shall be provided in accordance with Engineering Standard SPC-0804.02-90.03 Fire and Gas Specification. Sprinkler systems shall be Water Spray systems are covered in the Fire and Gas Detection and Protection Specification SPC-0804.02-90.03.

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 19 OF 23 REV: D3

2.12.1.5

Detection, Alarm and Control Systems shall be provided in accordance with Engineering Standard SPC-0804.02-90.03 Fire and Gas Specification. Fire and Safety Display System in process area shall be centralised in the control room.

2.12.2 2.12.2.1 2.12.2.2 2.12.2.3 2.12.2.4 2.12.2.5 2.12.2.6 2.12.2.7

Blowdown and Flare System Blowdown and flare facilities shall be provided. Flare shall be elevated type. Not used. Relief valves handling hydrocarbon vapour shall be vented to a closed relief system. The liquid relief system shall be combined with the vapour relief system. The allowable ground level radiation shall be 6.3 KW/m2. The air pollution control requirements shall be in accordance with PTT related specifications. Aircraft Warning Lights Warning lights for aircraft shall be provided on the following tall structures. Note: See also SPC-0804.02-70.01 Electrical and Communication standard Section 2.16.4 Aircraft warning lights.

2.12.3 2.12.3.1

D3

2.12.4

Safety Showers Safety showers and eye wash stations (fountain type) shall be provided by CONTRACTOR in accordance with SPC-0804.02-90.04 Personnel Protection and SPC-0804.02-50.05 Piping Layout .

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION APPENDIX A UNITS OF MEASUREMENT

SPC-0804.02-99.90 PAGE: 20 OF 23 REV: D3

UNITS OF MEASUREMENT The units of measurement to be used on this project are the International System of units (SI) with the imperial unit in bracket, except for the rating and sizing of piping and equipment nozzles where pound-inch units shall be used. Description Length Name kilometer Meter Millimeter metric ton Kilogram Gram Micro gram kilo mole Mole square meter square centimeter square millimeter Mole percent Mole fraction Weight percent Weight fraction Parts per million Cubic meter Cubic centimeter mm3 Cubic meter l Degree centigrade Kelvin Symbol km m mm t, ton kg g micro kmol mol m2 cm2 mm2 mol % % by weight ppm m3 cm3 m3 C K (K=C + 273.15 (K is used for physical variables) y d h min s * * * * * * * * equivalent to10-6g * * Remarks

Mass (weight)

Molecular weight Area

Concentration

Volume (for gas and solid) Cubic millimeter (for liquid) litre Temperature

Plan angle Time

Degree Year Day Hour Minute Second

BASIS ENGINEERING DESIGN DATA (BEDD) Description Force Stress Name

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION Symbol N MPa (1 pa=1N/m2)

SPC-0804.02-99.90 PAGE: 21 OF 23 REV: D3 Remarks

Newton Megapascal

Hardness
Pressure - gauge - absolute 1.020 kg/cm2) Velocity Flow - volume - weight - gases

N/mm2

Bar gauge Bar absolute

Barg Bara (1

* * bar =

Meter/second Kilometer/hour

m/s km/h

Cubic meter/hour m3/h Ton/hour or kilogram/hour t/h or kg/h Normal cubicmeter/hour at 0C, Nm3/h 1.013 bara kilogram Kmol/h mole/hour mole/hour Mol/s or millions mole standard cubic feet per day Kilogram/cubic meter Joule/square meter or Joule/square centimeter kg/m3 m/(m x K) (or m/mC) J/m2 or J/cm2 J or kJ kJ/kg, J/mol kJ/kg or J/mol Watt kW (or kJ/s)

* * MMSCFD

Density Linear expansion Coefficient Impact strength

Energy, enthalpy, heatJoule or kilojoule Specific enthalpy Heating value Heat duty, electric Power Heat flux

1 W = 1 J/s = 0.860 kcal/h

J/(m2 x s) (or W/m2) (or J/m2 x h))

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 22 OF 23 REV: D3

Description Specific conductivity J/(mol x K) Thermal conductivity Kcal/mhC

Name

Symbol kJ/(kg x K) W/mK W/m2K cP m2/s (or mm2/s) m2K/W N/m dB s-1 (or 1/s) min-1 (or 1/min) A mA V Hz, 1/s

Remarks

1W/K = 0.860

Heat transfer coefficient Absolute viscosity Kinematic viscosity Fouling factor Surface tension Sound pressure level decibel Rotating speed Electric current Voltage Frequency Electric resistance Electric energy

(1 m2K/W = 1.163 m2hC/kcal) (1N/m=1,000 dyn/cm)

revolutions per second or minute ampere Milliampere volt hertz ohm Kilowatt hour

KWh Lx (Lx = 1m/m2) Nxm

Intensity of illumination Moment Notes 1. 2. 3.

Symbols marked * are deviating from the SI system. Further units outside the SI can be agreed upon after consultation with PTT. Pipe diameters shall be in inches (primarily) or mm (limited for special application).

BASIS ENGINEERING DESIGN DATA (BEDD)

PTT PUBLIC COMPANY LIMITED ENGINEERING SPECIFICATION

SPC-0804.02-99.90 PAGE: 23 OF 23 REV: D3

APPENDIX B FUEL GAS ANALYSIS See table 5.1 of the Part 5 Volume 1 scope of work