Professional Documents
Culture Documents
01 UNIT I 02 03
17/12/2012 Introduction to the syllabus of PPE. Power plants and Economic Analysis. 18/12/2012 Introduction, factors affecting selection of site 19/12/2012 Schematic diagrams and relative demerits of steam, gas,diesel, hydro power plants. 04 20/12/2012 Present status of power generation in India, role of private and government organization. 05 24/12/2012 State level scenario, Load shedding, carbon credits. 06 26/12/2012 Introduction to economic analysis cost of electric energy. 07 27/12/2012 Fixed and operating cost, selection and type of generation. 08 31/12/2012 Selection of generation equipment. 09 01/01/2012 Performance and operation characteristics of power plants and tariff methods. bridging the gap: Connected Load, On & above: Electricity Generation And Distribution UNIT II Thermal and Co-Generation Power Plant 02/01/2012 Introduction, general layout of modern thermal power plant. 10 11 03/01/2012 Working of thermal power plant, coal classification. 07/01/2012 Coal handling, Coal blending, coal desulphurization, Indian coals. 12 13 08/01/2012 Selection of coal for TPP, coal handling, storage and preparation and feeding. 09/01/2012 Ash handling and dust collection, fluidized bed combustion system. 14 15 10/01/2012 Steam turbine, condenser, cooling pond and cooling condenser 14/01/2012 Condenser efficiency, vacuum efficiency, necessity of feed water treatment, 16 high pressure boilers and importance of water purity. 15/01/2012 Thermodynamic cycles, Cogeneration power plant. 17 UNIT III Hydroelectric and gas Turbine Power Plant 16/01/2012 18 19 17/01/2012 Classification of HPP and their field of use, capacity calculation for hydro power. 20 20/01/2012 Dam, head water control, penstock, water turbines, specific speeds, governors, hydro electric plant auxiliaries, plant layout 21 21/01/2012 Plant layout, automatic and pumped storage, project cost of HPP, advantages of HPP. 22 22/01/2012 Gas Turbine Power Plant: Plant layout, method of improving output and performance, fuel and fuel systems. 23 23/01/2012 Method of testing open and closed cycle plants, operating characteristics, applications, free piston engine plant, limitations and application, combined cycle plants, advantages. 24/01/2012 Need of power generation plant in power systems based load station and peak 24 load station, concept of maximum and optimum pressure ratio, actual cycle. 28/01/2012 Effect of operating variable on thermal efficiency, regeneration, intercooling, 25 reheating, performance of closed and semi-closed cycle gas turbine plant (numerical treatment).bridging the gap: Rankin Cycle, open cycle, Closed Cycle On & above: Reheating UNIT IV Nuclear and Diesel Power Plant 26 29/01/2012 Elements of nuclear power plant, nuclear reactor and its types. 30/01/2012 Fuel moderators. 27 28 31/01/2012 Coolants, control rod.
17%
33%
Hydr
50%
83%
100%
Introduction to Subject practicals conduction and marks Study of Power plant Instruments. Trial on Diesel Power plant Study of Environmental Impact on power plant Study of industrial and Domestic tariffs Study of Cogeneration plant Study of Non-Conventional power plant Study of Fluidized bed Combustor Industrial visit