You are on page 1of 6

SIVAKUMARREDDY MUSUNURU

+919490653531

+919902401745

sivakumarreddy.mtech@gmail.com

Objective sivakumarreddy.me@gmail.com

To work for an organization, where I can apply my technical proficiency in working


towards the organizational needs and benefits, and to traditionally render
professional services for the organizational and personal growth.

Work Summary:

Working with Power Research & Development Consultancy Pvt. Ltd.,


Bangalore, from October 2007 to till date as a software engineer for Energy
Management Systems prior I did educational (M.E.) project in Siemens
information Systems, Bangalore, from July 2006 to June 2007 as a project
trainee for Industrial Automation Systems.

Professional Summary:

• Around 2 years of experience in C++ development in VC++ Environment.


• Hands on experience with VC++ programming with MFC.
• Hands on experience in Industrial automation and PLC programming.
• Strong Knowledge in Power Systems, Power Electronics and FACTS
Controllers.
• Good in coordinating and communicating with project team.
• Excellent debugging skills, identifying and solving critical problems in
customer environment.
• Excellent Analytical/Problem-solving skills, Fast-learner, Resourceful,
Committed, Hard-worker.
• Got 98.25% in GATE.
• Got 1200 rank out of 1, 75,000 members in EAMCET for engineering
entrance.

Professional Experience:

Experience : ~2 Years.

Company : Power Research and development Consultancy Pvt.


Ltd (http://www.prdcinfotech.com)

Designation : Software Engineer.


Project #1:

Title: Hydro Scheduling.

Client: ABB Bangalore-KPTCL.

Company: Power Research & Development Consultancy Pvt Ltd.

• Project Type : R&D [Research & Development]


• Team Size : 3
• Operating System : WINDOWS
• Environment : VC++ with MFC.
• Programming Languages : C, C++ and SQL.
• Data base : Oracle
• Duration : 21-07-2008 to till date.

Description:

Hydro scheduling deals with the optimal allocation or dispatch of hydro


reserves for each hydro unit\plant of a reservoir or river. To maximize the
hydro energy production using the allocated reserves for a given time horizon
in case of hydropower system. Based upon time horizon hydro scheduling
classified as long term hydro scheduling and short term hydro scheduling

• Work Done:

o Involved in Design and Analysis of Algorithms for Hydro scheduling


part of EMS.
o Involved in implementing User Interfaces.
o Involved in feature low-level design and coding.
o Involved in Unit testing.
o Responsible for code freeze before build.
o Responsible for code freezing and raising build requests.

Project #2:

Title: UNIT COMMITMENT FOR THERMAL PLANTS.

Client: ABB Bangalore - KPTCL.

Company: Power Research & Development Consultancy Pvt Ltd.

• Project Type : R&D [Research & Development]


• Team Size : 3
• Operating System : WINDOWS
• Environment : VC++ with MFC.
• Programming Languages : C, C++ and SQL.
• Data base : Oracle
• Duration : 17-03-2008 to 15-07-2008.

Description:

Unit commitment deals with the determine the how units of a thermal plant
that should operate for a particular load demand with the objective of
minimizing the system operating cost while meeting the system constraints.
Finally unit commitment gives optimal schedules of units of a thermal plant.

• Work Done:

o Involved in Design and Analysis of Algorithms for commitment part


of EMS.
o Involved in implementing User Interfaces.
o Involved in feature low-level design and coding.
o Involved in Unit testing.
o Responsible for code freeze before build.
o Responsible for code freezing and raising build requests.

Project #3:

Title: ANALYZING AND DESIGNING WIND ENERGY FORECASTING.

• Company : Power Research and Development Consultancy Pvt Ltd.


• Location : Bangalore.
• Duration : 15-11-2007 to 04-03-2008.
• Language : C, C++.
• Team Size : 3

Description :

Wind turbines make a major contribution to the production of renewable


energy. Developments in harnessing wind power continually improved and
during the last decennia a considerable scaling up has taken place in the wind
power industry. Turbines have become larger, efficiencies and availabilities
have improved and wind farms have become bigger. Wind turbines extract the
energy from the wind by transferring the thrusting force of the air passing
through the turbine rotor into the rotor blades. By using statistical methods
forecasting the wind generations and predict the wind source from previous
available generations and wind utilizations for generations.

• Work Done:

o Involved in Design and Analysis of Algorithms.


o Totally involved in Implementation.
o Involved in Unit testing.
Project #4:

Title: DESIGN OF POWER SYSTEM STABILIZER USING AUTOMATION


SYSTEMS

• Company : SIEMENS Information systems Ltd.


• Location : Bangalore.
• Duration : 1-9-2006 to 30-6-2007.
• Language : C, C++ and PLC Programming.

Description :

The problem of dynamic stability of power system has challenged power


system engineers since over three decades now. In a generator, the
electromechanical coupling between the rotor and the rest of the system
causes it to behave in a manner similar to a spring mass damper system,
which exhibits an oscillatory behavior around the equilibrium state, following
any disturbance, such as sudden change in loads, change in transmission line
parameters, fluctuations in the output of turbine and faults etc.

• Work Done:

o Involved in Design and Analysis of Algorithms.


o Totally involved in coding.
o Involved in Unit testing.

Project #5:

Title: Industrial Automation Training

• Company : SIEMENS Information systems Ltd.


• Location : Bangalore.
• Duration : 1-7-2006 to 1-9-2006.
• Language : C, C++ and PLC Programming.

Description:

Industrial automation (IA) is the automatically controlled operation of an


apparatus process or system by mechanical or electronic devices that replace
human control. The automation main task is “Measure, command & Control”.
Automation is use for any industries (ex. Power generation, process, storage
etc). In industry primarily to find the process information and integrates that
information. The control action is done through the programs.
Technology Expertise:

Programming Languages: C, C++, VC++, SQL and PLC Programming.

Revision Control : visual source safe.

Operating Systems : Windows.

Database System : Oracle.

Domain Knowledge : Power Systems, Industrial Automation and


Power Electronics.

EDUCATIONAL SUMMARY:

• Master of Technology in Power & Energy Systems from Visvesvaraya


University holds first Class with Distinction (71%).
• Bachelor of Technology in Electrical & Electronics Engineering from J.N.T.U
holds First Class (69.73%).
• Intermediate in Adithya junior college holds first Class with Distinction
(87.1%).
• SSC in ZP High School Rebala (Nellore) holds first Class with Distinction
(73.5%).

Personal Details:

Name : Sivakumarreddy. Musunuru

Father Name : Haranathreddy. Musunuru

Nationality : Indian

Sex : Male

Birth Date : 06-June-1984

Languages known : English, Telugu

Current Location : Bangalore

Declaration:

I hereby declare that all the statements made in the above application are correct
to the best of my knowledge and belief.
(Sivakumarreddy M)

You might also like