1. GENERAL 1.1 Introduction 1.2 Design Properties

2. STABILITY CHECK 2.1 Soil Bearing Capacity

3. STRUCTURAL ANALYSIS

4. REINFORCEMENT DESIGN

1. GENERAL 1.1 Introduction


These design calculation sheets cover the design of roughing filter structure. Unit of measurement in design shall be SI unit system. The strength of concrete structure will be designed in accordance with limit state design method and with factored load combination based on BS 8110, BS 8007 All design, details and materials will be in accordance with the following standards and other equivalent standards can be used where available. BS 8110 : Reinforced Concrete Framed Building Structure BS 8007 : Water Retaining Structure BS 6399 Part 1 : Design Loading for Buildings

1.2 Design Properties


Reinforced Concrete: Unit weight of concrete (c) Characteristic strength of concrete (fcu) Yield strength of reinforcing bar (fy) Elastic modulus of concrete (Ec) Elastic modulus of rebar (Es) = 24 kN/ = 35N/mm2 = 460 N/mm2 = 27,000 N/mm2 = 200,000 N/mm2

Partial safety factors for strength of material(m) = 1.50 (Concrete in flexure or axial load) = 1.25 (Shear strength without shear) The allowable crack widths = 0.2 mm

Applied soil parameters are referred from result of Geotechnical investigation report. Compacted soil density (t) = 20 kN/

At-rest earth pressure coefficient (K0) = 1 -sin (angle of friction = 30) = 0.5

Allowable soil bearing capacity (qa) Water table : Same as F.G.L Density of water () Density of contained liquid (L) Lateral surcharge from vehicles

= 100 kN/

= 10.00 kN/ = 10.00 kN/ = 20.00 kN/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/29/2012 Output

2.Stability Check: 2.1Check for bearing capasity:


Weight of walls : = 24x(0.45x11.45x5.85x3+0.45x11.1x5.85+0.45x11.45x6.8 5x2+0.45x2x6.85x3) = 5009.0 kN

Weight of base slab : = 24x(0.5x15x12.7) = 2286 kN Weight of water : = 10x(5.35x5.1x11.05)x2 + 2x(10x5.1x1.5x6) = 6948 kN Weight of filter media : = (20-10)x(4.35x5.1x11.05)x2 = 4902 kN Weight of channel : = 24x(0.3x1.95x6.9)+24x(0.25x2.5x10.275) = 251 kN Weight of water inside the channel: = 24x(1.7x1.7x6.4) = 444 kN Total weight = 5009+2286+6948+4902+251+444 = 19840 kN = 20830 kN

Total weight (with extra 5% for pipes ,walkways, etc..) Pressure due to load Just exeed the 100 kN/m
2

= 20830/(15x12.7+7x2) = 101 kN . Hence satisfactory.

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

3.Structural Analysis:
(1)a.Long wall-ULS Effective Length Effective Height k=lx/lz Hence wall is two way span slab.

lx lz

= 11450 = 6100 = 1.88

mm mm

5850

3850

Water Load

Filter Media Load

RHB,Tb.53

Water Load Maximum water pressure = 1.4x10x5.85 k = 1.88 Top edge unsupported & = 0.2 vs = 0.080 vm = 0.017 hs = 0.013 hm = 0.004 Mv =flz 2 Mh =flx Mvs Mvm Mhs Mhm Filter Media Load Maximum water pressure = 1.4x10x3.85/3 k = 1.88 Top edge unsupported & = 0.2 vs = 0.080 vm = 0.017 hs = 0.013 hm = 0.004 Mv =flz 2 Mh =flx Mvs Mvm Mhs Mhm
2 2

81.9

kN/m

= = = =

243.8 51.8 139.6 42.9

kNm/m kNm/m kNm/m kNm/m

= 17.9

kN/m

RHB,Tb.53

= = = =

53.3 11.3 30.5 9.4

kNm/m kNm/m kNm/m kNm/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Total Moments Mvs Mvm Mhs Mhm

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

= = = =

297.1 63.1 170.1 52.3

kNm/m kNm/m kNm/m kNm/m

Direct tension (carried by long wall). For horizontal direct tension(or reaction on short wall):

6100

5500 k = ly/lx w(average) R1 2 R2 = R4 = 1/2(k-1/4)wlx 2 R3 = 1/4wlx Force per unit length along vertical edge Force per unit length along bottom edge = 1.11 = 49.9 kN/m2 = 0 = 648.388 = 377.369 = 106.293 kN/m

RHB,Tb.63

= 68.6

kN/m

So horizontal direct tension on long = 106.293 wall

kN/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations (1)b.Long wall-SLS Effective Length Effective Height k=lx/lz Hence wall is two way span slab. lx lz

CHECKED

PWDS

DATE 5/30/2012 Output

= 11450 = 6100 = 1.88

mm mm

5350

3850

Water Load

Filter Media Load

RHB,Tb.53

Water Load Maximum water pressure = 1.0x10x5.35 k = 1.88 Top edge unsupported & = 0.2 vs = 0.080 vm = 0.017 hs = 0.013 hm = 0.004 Mv =flz2 2 Mh =flx Mvs Mvm Mhs Mhm Filter Media Load Maximum water pressure = 1.0x10x3.85/3 k = 1.88 Top edge unsupported & = 0.2 vs = 0.080 vm = 0.017 hs = 0.013 hm = 0.004 Mv =flz Mh =flx2 Mvs Mvm Mhs Mhm
2

53.5

kN/m

= = = =

159.3 33.8 91.2 28.1

kNm/m kNm/m kNm/m kNm/m

= 12.8

kN/m

RHB,Tb.53

= = = =

38.1 8.1 21.8 6.7

kNm/m kNm/m kNm/m kNm/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Total Moments Mvs Mvm Mhs Mhm

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

= = = =

197.4 41.9 113.0 34.8

kNm/m kNm/m kNm/m kNm/m

Direct tension (carried by long wall). For horizontal direct tension(or reaction on short wall):

6100

5500 k = ly/lx w(average) R1 2 R2 = R4 = 1/2(k-1/4)wlx 2 R3 = 1/4wlx Force per unit length along vertical edge Force per unit length along bottom edge = 1.11 = 33.2 kN/m2 = 0 = 430.743 = 250.697 = 70.61 kN/m

RHB,Tb.63

= 45.58

kN/m

So horizontal direct tension on long = 70.61 wall

kN/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations (2)a.Short wall-ULS Effective Length Effective Height k=lx/lz Hence wall is two way span slab. lx lz

CHECKED

PWDS

DATE 5/30/2012 Output

= 5550 = 6100 = 0.91

mm mm

5850

3850

Water Load

Filter Media Load

RHB,Tb.53

Water Load Maximum water pressure = 1.4x10x5.85 k = 0.91 Top edge unsupported & = 0.2 vs = 0.030 vm = 0.007 hs = 0.033 hm = 0.014 Mv =flz2 2 Mh =flx Mvs Mvm Mhs Mhm

81.9

kN/m

= = = =

91.4 21.3 83.2 35.3

kNm/m kNm/m kNm/m kNm/m

RHB,Tb.53

Filter Media Load Maximum water pressure = 1.4x10x3.85/3 k = 0.91 Top edge unsupported & = 0.2 vs = 0.030 vm = 0.007 hs = 0.033 hm = 0.014 Mv =flz 2 Mh =flx Mvs Mvm Mhs Mhm
2

= 17.9

kN/m

= = = =

20.0 4.7 18.2 7.7

kNm/m kNm/m kNm/m kNm/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Total Moments Mvs Mvm Mhs Mhm

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

= = = =

111.4 26.0 101.4 43.0

kNm/m kNm/m kNm/m kNm/m

Direct tension (carried by shortwall). For horizontal direct tension(or reaction on long wall):

6100

11450 k w R1 R2 R4 = ly/lx (average) 2 = R3 = 1/2k(1-1/4k)wlx = 2 2 = 1/4k wlx = = = = = 1.88 49.9 kN/m2 925 0 1635.5 kN/m

RHB,Tb.63

Force per unit length along vertical edge Force per unit length along bottom edge So horizontal direct tension on short wall

= 151.62

= 143

kN/m

= 151.62

kN/m

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations (2)b.Short wall-SLS Effective Length Effective Height k=lx/lz Hence wall is two way span slab. lx lz

CHECKED

PWDS

DATE 5/30/2012 Output

= 5550 = 6100 = 0.91

mm mm

5350

3850

Water Load

Filter Media Load

RHB,Tb.53

Water Load Maximum water pressure = 1.0x10x5.35 k = 0.91 Top edge unsupported & = 0.2 vs = 0.040 vm = 0.012 hs = 0.027 hm = 0.012 Mv =flz 2 Mh =flx Mvs Mvm Mhs Mhm Filter Media Load Maximum water pressure = 1.0x10x3.85/3 k = 0.91 Top edge unsupported & = 0.2 vs = 0.040 vm = 0.012 hs = 0.027 hm = 0.012 Mv =flz 2 Mh =flx Mvs Mvm Mhs Mhm
2 2

53.5

kN/m

= = = =

79.6 23.9 53.7 23.9

kNm/m kNm/m kNm/m kNm/m

= 12.8

kN/m

RHB,Tb.53

= = = =

19.1 5.7 45.3 20.1

kNm/m kNm/m kNm/m kNm/m

10

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Total Moments Mvs Mvm Mhs Mhm

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

= = = =

98.7 29.6 99.1 44.0

kNm/m kNm/m kNm/m kNm/m

Direct tension (carried by short wall). For horizontal direct tension(or reaction on long wall):

6100

11450 k w R1 R2 R4 = ly/lx (average) 2 = R3 = 1/2k(1-1/4k)wlx = 2 2 = 1/4k wlx = = = = = 1.88 33.2 kN/m2 614 0 1086.51 kN/m

RHB,Tb.63

Force per unit length along vertical edge Force per unit length along bottom edge So horizontal direct tension on short wall

= 100.725

= 94.9

kN/m

= 100.725

kN/m

11

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference (3)a.Base slab-ULS

DESIGNED NR Calculations

CHECKED

PWDS

DATE 5/30/2012 Output

Weight of the walls = 1.4{24x0.45x[(11.45x3+11.2x2)x5.85+ (5.6x4+2x3)x6.85]+24x0.25x(1.85x2+6.7)x2.5 +24x0.3x7x2+10x6.4x1.7x1.7} = 8580 kN Pressure on base Ly Lx = 8580/(15.5x12.7) = 11.45 = 5.55 m m = 43.6

Ly/Lx = 2.1 Base slab is one way. Tb.3.13 M V = 0.086FL = 0.6F = 20.7 = 26 = 68.6 kNm kN kN/m

So direct tension in long direction of base slab

So direct tension in short direction = 143 of base slab ULS moment: Short spanMoment at mid span Moment at support Long spanMoment at mid span Moment at support

kN/m

= 20.7 = 297.1

kNm/m kNm/m

= 0.0 = 111.4

kNm/m kNm/m

(3)b.Base slab-SLS Weight of the walls = 24x0.45x[(11.45x3+11.2x2)x5.85+ (5.6x4+2x3)x6.85]+24x0.25x(1.85x2+6.7)x2.5 +24x0.3x7x2+10x6.4x1.7x1.7 = 6128 Pressure on base Ly Lx = 6128/(15.5x12.7) = 11.5 = 5.55 m m = 31.1

12

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Ly/Lx = 2.1 Base slab is one way.

CHECKED

PWDS

DATE 5/30/2012 Output

Tb.3.13

M V SLS moment: Short spanMoment at mid span Moment at support Long spanMoment at mid span Moment at support

= 0.086FL = 0.6F

= 14.7 = 18.6

kNm kN

= 14.7 = 197.4

kNm/m kNm/m

= 0 = 98.7 = 45.6

kNm/m kNm/m kN/m

So direct tension in long direction of base slab

So direct tension in short direction = 94.9 of base slab

kN/m

13

4. REINFORCEMENT DESIGN

14

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED Calculations

DATE 5/29/2012 Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35 fy Characteristic strength of steel = 460 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 40 Fall in temperature due to seasonal variations T2 = 24 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 450 bt Reinforcement design width, = 1000 Vertical reinforcement: R/F diameter R/F spacing Type of Section Vertical Design Bending Moment(ULS) Vertical Design Bending Moment(SLS) 25 100 = Wall T = 297 = 197

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

kNm/m kNm/m

15

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F) CHECKED = 143 kN/m

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Design shear force at long edge(ULS)

DATE 5/29/2012 Output

As provided (Vertical R/F)

= 4909

mm

Effective depth for verticall r/f(d) 1.R/F to carry ULS Vertical direction: d = 359 M = 297 K' = 0.156 b = 1000 fcu = 35 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 359

mm

BM. mm kNm No redistribution. mm N/mm2 N/mm2 = 0.06584


0.5

< K'

Hence no compression r/f is reqd.

= d{0.5+(0.25-K/0.9) } = 330.5 mm = M/(0.87*fy*Z) = 2246

mm2/m

2 2246 mm /m

16

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED Calculations

DATE 5/29/2012 Output

Calculation of crack width due to flexural action: (without considering effect of compression r/f) Calculation of crack width due to vertical bending moment: Ms As h d b = As/bd a' Es Ec = = = = = = = 197 4909 450 359 1000 0.01367 450 kNm mm2 mm mm mm mm N/mm N/mm
2

= 2.00E+05 = 1/2 x Static Modulus = 1.4E+04 = 1.48E+01 = 2.03E-01


0.5

e = Es/EC e

x/d = e[(1+2/ e) = 0.465 x z

-1]

= 167.076 mm = d - x/3 = 303.308

mm fs< 0.8fy fcb< 0.45fcu Ok Ok

fs=Ms/zAs = 132.316 fcb=2Ms/zbx = 7.77 1= fs/Es{(h-x)/(d-x)}

N/mm2 N/mm2

= 0.00098 = 1.42E-04

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 cmin acr = 8.34E-04

= 66.0 = 78.8316

Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.181 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

Ok 4909

mm2/m

17

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F)

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED CHECKED Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 450 = 1000 mm mm

DATE 5/29/2012 Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Wall mm mm 2 mm /m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 225 h'b = 225 As = 787.5

Minimum steel area in each surface zone

788

mm /m per each layer

788

mm /m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R ver = Smax R (T1+T2) = 40.0 = 24.0
o o

C o C = 1.0E-05 = 0.5 (for rigid end restraints) = 25

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax ver

3.20E-04 Steel ratio based on surface zone.

= fct/fb x /2 = 0.67 = 0.2 = 625 = 0.0134 mm mm

> crit

18

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Minimum required reinforcement area per , Each surface zone Vertically

DATE 5/29/2012 Output

= 3015

mm2

3015

mm2

5.Summary of R/F Provided: Vertical R/F provided = T 25 @ 100

Cl.3.5.5

6.Check for ULS shear a).Shear at horizontal edge of wall b d As Vuls v = = = = = = < 1000 mm 359 mm 2 4909 mm 143 kN/m V/bd 2 0.39833 N/mm 0.5 5 or 0.8(fcu) = 1.37 = 1.11 = 1.4 > v Ok < > 3 1 = 143 kN/m

Cl.3.4.5.2 Cl.3.4.5.4

Ok

100As/(bd) 400/d m vc

= 0.64423

Hence shear r/f are not required

19

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER LONG WALL (Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED Calculations

DATE 5/29/2012 Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars) a).For vertical r/f fy = 25 = 460 mm N/mm2
2

fb fbu l 844 mm Provided anchorage length = 1250 mm Hence ok Ok

20

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED NR Calculations

DATE 5/29/2012 Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35.0 fy Characteristic strength of steel = 460.0 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 40.0 Fall in temperature due to seasonal variations T2 = 24.0 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 450.0 bt Reinforcement design width, = 1000.0 Horizontal reinforcement: R/F diameter R/F spacing Type of Section 16 125 = Wall T

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

Horizontal Design Bending Moment(ULS) Horizontal Design Bending Moment(SLS)

= 170 = 113

kNm/m kNm/m

Horizontal direct tension(ULS) Horizontal direct tension(SLS)

= 106 = 70

kN/m kN/m

21

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Design shear force at vertical edge(ULS) As provided (Horizontal R/F) = 1608

DATE 5/29/2012 Output

= 152 mm
2

kN/m

Effective depth for horizontal r/f

= 392

mm

1.R/F to carry ULS BM. Horizontal direction: d = 392 mm M = 170 kNm K' = 0.156 No redistribution. b = 1000 mm N/mm2 fcu = 35 N/mm2 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 0.03161

< K'

Hence no compression r/f is reqd.

0.5 = d{0.5+(0.25-K/0.9) } = 372.4 mm = M/(0.87*fy*Z) = 1141

mm2/m

2 1141 mm /m

22

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations 2.R/F to carry ULS direct tension Horizontal direction: T = 106 kN/m 2 N/mm fy = 460 mm2/m As = T/(0.87*fy) = 265

DATE 5/29/2012 Output

2 265 mm /m

23

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED NR Calculations

DATE 5/29/2012 Output

For horizontal reinforcement e= M/Nc = 1614.29 mm g=h/2 = 225 mm m=Es/Ec = 7.41 d' = 58 mm d = 392 mm mm2 A s' = 1608 mm2 As = 1608 x = 75 mm M/(Th) = 3.59 0.5(1-2a/h)2 = 0.275 2 M/(Nch) > 0.5(1-2a/h) Section is under both tension and compression,Hence following equations are valied. k1=[(e+g)/d -1] k2=(x/2d)(1-x/3d) k3=(m-1)(1-d'/x) fc fs x = k1Nc/ [k3(1-d'/d)As' + k2bd] = [fc(k3As' + 0.5bx)+Nc]/ As = d/(1+fs/mfc) = 0.00128 = 4.59E-04 = 3.69206 = 0.08956 = 1.45 = 6.96636 = 216.048 = 76 mm mm

1= fs/Es{(h-x)/(d-x)}

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 = 8.19E-04 cmin = 50.0 acr = 74.8969

fcb< 0.45fcu fs< 0.8fy Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.16 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

Ok 1608

mm2/m

24

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F)

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR CHECKED PWDS Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 450 = 1000 mm mm

DATE 5/29/2012 Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Wall mm mm mm2/m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 225 h'b = 225 As = 787.5

Minimum steel area in each surface zone

788

mm2/m per each layer

788

mm2/m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R hor = Smax R (T1+T2) = = = = = 40.0 24.0 1.0E-05 0.5 (for 16
o o

C C o C rigid end restraints)

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax

3.20E-04 Steel ratio based on surface zone.

= fct/fb x /2 = 0.67 = 0.2 = 625 mm mm

hor

0.0086

> crit

25

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Minimum required reinforcement area per ,

DATE 5/29/2012 Output

Each surface zone Horizontally

= 1930

mm /m

1930

mm /m

5.Summary of R/F Provided: Horizontal R/F provided = T 16 @ 100

Cl.3.5.5

6.Check for ULS shear

Shear at short edge of wall b d As Vuls v Cl.3.4.5.2 Cl.3.4.5.4 v = = = = = = < 1000 mm 392 mm 2 1930 mm 152 kN/m V/bd 2 0.38776 N/mm 0.5 5 or 0.8(fcu) = 0.49 = 1.02 = 1.46 > v < > 3 1

= 152

kN/m

Ok

100As/(bd) 400/d m vc

= 0.42881

Hence shear r/f are not required

Ok

26

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER LONG WALL (Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED NR Calculations

DATE 5/29/2012 Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars)
2

b).For long span r/f fy = 16 = 460 mm N/mm2

fb fbu l 540 mm Provided anchorage length = 800 Hence ok

mm Ok

27

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED Calculations

DATE 5/29/2012 Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35 fy Characteristic strength of steel = 460 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 40 Fall in temperature due to seasonal variations T2 = 24 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 450 bt Reinforcement design width, = 1000 Vertical reinforcement: R/F diameter R/F spacing Type of Section Vertical Design Bending Moment(ULS) Vertical Design Bending Moment(SLS) 16 125 = Wall T = 111 = 99

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

kNm/m kNm/m

28

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F) CHECKED = 68.6 kN/m

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Design shear force at long edge(ULS)

DATE 5/29/2012 Output

As provided (Vertical R/F)

= 1608

mm

Effective depth for verticall r/f(d) 1.R/F to carry ULS Vertical direction: d = 368 M = 111 K' = 0.156 b = 1000 fcu = 35 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 368

mm

BM. mm kNm No redistribution. mm N/mm2 N/mm2 = 0.02342


0.5

< K'

Hence no compression r/f is reqd.

= d{0.5+(0.25-K/0.9) } = 349.6 mm = M/(0.87*fy*Z) = 793

mm2/m

2 793 mm /m

29

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED Calculations

DATE 5/29/2012 Output

Calculation of crack width due to flexural action: (without considering effect of compression r/f) Calculation of crack width due to vertical bending moment: Ms As h d b = As/bd a' Es Ec = = = = = = = 99 1608 450 368 1000 0.00437 450 kNm mm2 mm mm mm mm N/mm N/mm
2

= 2.00E+05 = 1/2 x Static Modulus = 1.4E+04 = 1.48E+01 = 6.48E-02


0.5

e = Es/EC e

x/d = e[(1+2/ e) = 0.301 x z

-1]

= 110.73 mm = d - x/3 = 331.09

mm fs< 0.8fy fcb< 0.45fcu Ok Ok

fs=Ms/zAs = 185.896 fcb=2Ms/zbx = 5.40 1= fs/Es{(h-x)/(d-x)}

N/mm2 N/mm2

= 0.00123 = 4.64E-04

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 cmin acr = 7.62E-04

= 66.0 = 87.1031

30

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F)

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED CHECKED Calculations Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.177 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

DATE 5/29/2012 Output

Ok 1608

mm /m

31

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F)

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED CHECKED Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 450 = 1000 mm mm

DATE 5/29/2012 Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Wall mm mm 2 mm /m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 225 h'b = 225 As = 787.5

Minimum steel area in each surface zone

788

mm /m per each layer

788

mm /m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R ver = Smax R (T1+T2) = 40.0 = 24.0
o o

C o C = 1.0E-05 = 0.5 (for rigid end restraints) = 16

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax ver

3.20E-04 Steel ratio based on surface zone.

= fct/fb x /2 = 0.67 = 0.2 = 625 = 0.0086 mm mm

> crit

32

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Minimum required reinforcement area per , Each surface zone Vertically

DATE 5/29/2012 Output

= 1930

mm2

1930

mm2

5.Summary of R/F Provided: Vertical R/F provided = T 16 @ 100

Cl.3.5.5

6.Check for ULS shear a).Shear at horizontal edge of wall b d As Vuls v = = = = = = < 1000 mm 368 mm 2 1608 mm 68.6 kN/m V/bd 2 0.18641 N/mm 0.5 5 or 0.8(fcu) = 0.44 = 1.09 = 1.4 > v Ok < > 3 1 = 68.6 kN/m

Cl.3.4.5.2 Cl.3.4.5.4

Ok

100As/(bd) 400/d m vc

= 0.43778

Hence shear r/f are not required

33

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILINOCHCHI WATER SUPPLY SCHEME ROUGHING FILTER Short Wall(Vertical R/F) CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED Calculations

DATE 5/29/2012 Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars) a).For vertical r/f fy = 16 = 460 mm N/mm2
2

fb fbu l 540 mm Provided anchorage length = 800 Hence ok

mm Ok

34

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED NR Calculations

DATE 5/29/2012 Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35.0 fy Characteristic strength of steel = 460.0 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 40.0 Fall in temperature due to seasonal variations T2 = 24.0 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 450.0 bt Reinforcement design width, = 1000.0 Horizontal reinforcement: R/F diameter R/F spacing Type of Section 16 125 = Wall T

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

Horizontal Design Bending Moment(ULS) Horizontal Design Bending Moment(SLS)

= 170 = 113

kNm/m kNm/m

Horizontal direct tension(ULS) Horizontal direct tension(SLS)

= 152 = 100

kN/m kN/m

35

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Design shear force at vertical edge(ULS) As provided (Horizontal R/F) = 1608

DATE 5/29/2012 Output

= 106 mm
2

kN/m

Effective depth for horizontal r/f

= 392

mm

1.R/F to carry ULS BM. Horizontal direction: d = 392 mm M = 170 kNm K' = 0.156 No redistribution. b = 1000 mm N/mm2 fcu = 35 N/mm2 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 0.03161

< K'

Hence no compression r/f is reqd.

0.5 = d{0.5+(0.25-K/0.9) } = 372.4 mm = M/(0.87*fy*Z) = 1141

mm2/m

2 1141 mm /m

36

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations 2.R/F to carry ULS direct tension Horizontal direction: T = 152 kN/m 2 N/mm fy = 460 mm2/m As = T/(0.87*fy) = 380

DATE 5/29/2012 Output

2 380 mm /m

37

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED NR Calculations

DATE 5/29/2012 Output

For horizontal reinforcement e= M/Nc = 1130 mm g=h/2 = 225 mm m=Es/Ec = 7.41 d' = 58 mm d = 392 mm As' = 1608 mm2 As = 1608 mm2 x = 73 mm M/(NcT) = 2.51 0.5(1-2a/h)2 = 0.28 2 M/(Nch) > 0.5(1-2a/h) Section is under both tension and compression,Hence following equations are valied. k1=[(e+g)/d -1] k2=(x/2d)(1-x/3d) k3=(m-1)(1-d'/x) fc fs x = k1Nc/ [k3(1-d'/d)As' + k2bd] = [fc(k3As' + 0.5bx)+Nc]/ As = d/(1+fs/mfc) = 0.00133 = 4.63E-04 = 2.45663 = 0.08733 = 1.32 = 6.81666 = 225.828 = 72 mm mm mm

1= fs/Es{(h-x)/(d-x)}

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 = 8.71E-04 cmin = 50.0 acr = 74.8969

fcb< 0.45fcu fs< 0.8fy Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.172853 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

Ok 1608

mm2/m

38

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F)

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR CHECKED PWDS Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 450 = 1000 mm mm

DATE 5/29/2012 Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Wall mm mm mm2/m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 225 h'b = 225 As = 787.5

Minimum steel area in each surface zone

788

mm2/m per each layer

788

mm2/m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R hor = Smax R (T1+T2) = = = = 40.0 24.0 1.0E-05 0.5 (for
o o

C C o C rigid end restraints)

= 16 = 3.20E-04 Steel ratio based on surface zone.

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax

= fct/fb x /2 = 0.67 = 0.2 = 625 mm mm

hor

0.0086

> crit

39

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Minimum required reinforcement area per ,

DATE 5/29/2012 Output

Each surface zone Horizontally

= 1930

mm2/m

1930

mm2/m

5.Summary of R/F Provided: Horizontal R/F provided = T 16 @ 100

Cl.3.5.5

6.Check for ULS shear

Shear at short edge of wall b d As Vuls v Cl.3.4.5.2 Cl.3.4.5.4 v = = = = = = < 1000 mm 392 mm 2 1930 mm 106 kN/m V/bd 2 0.27041 N/mm 0.5 5 or 0.8(fcu) = 0.49 = 1.02 = 1.46 > v < > 3 1

= 106

kN/m

Ok

100As/(bd) 400/d m vc

= 0.42881

Hence shear r/f are not required

Ok

40

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER Short Wall(Horizontal R/F) CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED NR Calculations

DATE 5/29/2012 Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars)
2

b).For long span r/f fy = 16 = 460 mm N/mm2

fb fbu l 540 mm Provided anchorage length = 800 Hence ok

mm Ok

41

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED Calculations

DATE

5/30/2012

Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35.0 fy Characteristic strength of steel = 460.0 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 34.0 Fall in temperature due to seasonal variations T2 = 24.0 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 500.0 bt Reinforcement design width, = 1000.0 Long span reinforcement: R/F diameter R/F spacing Short span reinforcement: R/F diameter R/F spacing Type of Section Short Span Design Bending Moment(ULS) Short Span Design Bending Moment(SLS) T 16 100

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

20 100 = Base Slab T = 297 = 197

Bars

kNm/m kNm/m

Short span direct tension force(ULS) Short span direct tension force(SLS)

= 116 = 77

kN/m kN/m

42

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED = 26 kN/m

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Design shear force at long edge(ULS)

DATE

5/30/2012

Output

As provided (short Span)

= 3142

mm2

Effective depth for short span r/f 1.R/F to carry ULS BM. Short span direction: d = 414 mm M = 297 kNm K' = 0.156 No redistribution. b = 1000 mm N/mm2 fcu = 35 N/mm2 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 414

mm

= 0.04951

< K'

Hence no compression r/f is reqd.

0.5 = d{0.5+(0.25-K/0.9) } = 389.8 mm = M/(0.87*fy*Z) = 1904

mm2/m

2 1904 mm /m

2.R/F to carry ULS direct tension Short span direction: T = 116 kN/m N/mm2 fy = 460 As = T/(0.87*fy) = 290

mm2/m

2 290 mm /m

43

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED Calculations

DATE

5/30/2012

Output

Calculation of crack width due to combined tension and bending Uniaxial bending and tension. For short span reinforcement: e= M/Nc = 2558.44 mm g=h/2 = 250 mm m=Es/Ec = 7.41 d' = 76 mm d = 414 mm mm2 As' = 3142 mm2 As = 3142 x = 106 mm M/(Th) = 5.12 0.5(1-2a/h)2 = 0.24 2 M/(Th) > 0.5(1-2a/h) Section is under both tension and compression,Hence following equations are valied. Following Eq's are valied k1=[(e+g)/d -1] = 5.78 mm k2=(x/2d)(1-x/3d) k3=(m-1)(1-d'/x) fc fs x = k1Nc/ [k3(1-d'/d)As' + k2bd] = [fc(k3As' + 0.5bx)+Nc]/ As = d/(1+fs/mfc) = 0.00116 = 2.68E-04 = 0.11709 = 1.81 = 8.38248 = 181.127 = 106 mm mm

1= fs/Es{(h-x)/(d-x)}

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 = 8.91E-04 cmin = 66.0 acr = 79.4786

44

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations

DATE

5/30/2012

Output

fcb< 0.45fcu fs< 0.8fy Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.199 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

Ok 3142

mm /m

45

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED CHECKED Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 500 = 1000 mm mm

DATE

5/30/2012

Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Base Slab mm mm mm2/m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 250 h'b = 100 As = 875

Minimum steel area in each surface zone

875

mm2/m per each layer

875

mm2/m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R short long = Smax R (T1+T2) = = = = = = 34.0 24.0 1.0E-05 0.5 (for 20 16 =
o o

C C o C rigid end restraints)

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax short long

2.90E-04 Steel ratio based on surface zone.

= fct/fb x /2 = 0.67 = 0.2 = 690 = = 0.0097 0.0078 mm mm

> crit > crit

46

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED Calculations Minimum required reinforcement area per ,

DATE

5/30/2012

Output

Top surface zone in short span

= 1943

mm2/m

1943

mm2/m

5.Summary of R/F Provided: Short span R/F provided = T 20 @ 100

Cl.3.5.5

6.Check for ULS shear a).Shear at long edge of wall b d As Vuls v = = = = = = < 1000 mm 414 mm 2 3142 mm 26 kN/m V/bd N/mm2 0.0628 0.5 5 or 0.8(fcu) = 0.76 = 1 = 1.4 > v Ok < > 3 1 = 26 kN/m

Cl.3.4.5.2 Cl.3.4.5.4

Ok

100As/(bd) 400/d m vc

= 0.5153

Hence shear r/f are not required

47

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Short Direction CHECKED

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED Calculations

DATE

5/30/2012

Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars) a).For short span r/f fy = 20 = 460 mm N/mm2
2

fb fbu l 675 mm Provided anchorage length = 1000 mm Hence ok Ok

48

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference Design Data:

DESIGNED NR Calculations

DATE

5/29/2012

Output

Tb.7.2 BS8110

Material Properties fcu Characteristic strength of concrete = 35.0 fy Characteristic strength of steel = 460.0 Ec Young's modulus of concrete = 2.7E+04 Es Young's modulus of steel = 2.0E+05 Density of water, = 10.0 w ct Density of concrete, = 24.0 Soil properties soil Density of soil, = 20.0 Cohesiveness, C = 0.0 Friction angle, = 30.0 Bearing capacity = 100.0 Durability Requirement Exposure condition - Severe Clear cover to r/f = 50.0 Allowable crack width = 0.2 Thermal Requirement Fall in temperature between the hydration peak and ambient T1 = 34.0 Fall in temperature due to seasonal variations T2 = 24.0 Coefficient of thermal expansion of mature concrete = 1.0E-05 Restraint factor, R = 0.5 Sizes Thickness of Section, h = 500.0 bt Reinforcement design width, = 1000.0 Long span reinforcement: R/F diameter R/F spacing Type of Section 16 200 = Base Slab T

N/mm 2 N/mm 2 N/mm 2 N/mm kN/m3 3 kN/m kN/m 2 kN/m Degrees kN/m
2 3

mm mm

C C
o

-1

mm mm Bars

Long Span Design Bending Moment(ULS) Long Span Design Bending Moment(SLS)

= 111 = 99

kNm/m kNm/m

Long span direct tension(ULS) Long span direct tension(SLS)

= 68 = 46

kN/m kN/m

49

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Design shear force at short edge(ULS) As provided (Long Span) = 1005

DATE

5/29/2012

Output = 0 mm
2

kN/m

Effective depth for long span r/f

= 442

mm

1.R/F to carry ULS BM. Long span direction: d = 442 mm M = 111 kNm K' = 0.156 No redistribution. b = 1000 mm N/mm2 fcu = 35 N/mm2 fy = 460 BS. 8110 Cl.3.4.4.4 K Z As = M/(bd fcu)
2

= 0.01623

< K'

Hence no compression r/f is reqd.

0.5 = d{0.5+(0.25-K/0.9) } = 419.9 mm = M/(0.87*fy*Z) = 661

mm2/m

2 661 mm /m

50

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations 2.R/F to carry ULS direct tension Long span direction: T = 68 kN/m 2 N/mm fy = 460 mm2/m As = T/(0.87*fy) = 170

DATE

5/29/2012

Output

2 170 mm /m

51

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 3.R/F to carry SLS BM.

DESIGNED NR Calculations

DATE

5/29/2012

Output

For long span reinforcement: e= M/Nc = 2152.17 mm g=h/2 = 250 mm m=Es/Ec = 7.41 d' = 58 mm d = 442 mm mm2 As' = 1005 mm2 As = 1005 x = 67 mm M/(NcT) = 4.30 0.5(1-2a/h)2 = 0.29 2 M/(Nch) > 0.5(1-2a/h) Section is under both tension and compression,Hence following equations are valied. k1=[(e+g)/d -1] k2=(x/2d)(1-x/3d) k3=(m-1)(1-d'/x) fc fs x = k1Nc/ [k3(1-d'/d)As' + k2bd] = [fc(k3As' + 0.5bx)+Nc]/ As = d/(1+fs/mfc) = 0.0015 = 8.29E-04 = 4.43478 = 0.07196 = 0.86 = 6.26554 = 259.937 = 67 mm mm mm

1= fs/Es{(h-x)/(d-x)}

2=bt(h-x)(a'-x)/3EsAs(d-x) m=1-2 = 6.72E-04 cmin = 50.0 acr = 103.817

fcb< 0.45fcu fs< 0.8fy Crack width = w= 3acrm/(1+2*((acr-cmin)/(h-x)) = 0.17 mm Allowable crack width = 0.2 mm Crack width due to flexural bending is satisfactory

Ok 1005

mm2/m

52

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR CHECKED PWDS Calculations 4.R/F to resist shrinkage and thermal movement in immature concrete. h b = 500 = 1000 mm mm

DATE

5/29/2012

Output

Cl.2.6.2.3 A.2 Tb. A.1

Minimum steel ratio in each surface zone is given by,

crit

= fct/fy = As/(bh')

= 0.0035 = 0.0035 = Base Slab mm mm mm2/m per each layer =

where h' - depth of surface zone

Fig. A.1

Type of Section h't = 250 h'b = 100 As = 875

Minimum steel area in each surface zone

875

mm2/m per each layer

875

mm2/m

R/F in controlling crack spacing has to be provided according to Cl. A.3(8007) Wmax T1 T2 R long = Smax R (T1+T2) = = = = = 34.0 24.0 1.0E-05 0.5 (for 16 =
o o

C C o C rigid end restraints)

Wmax/Smax A.3 T A.1 2.2.3.3 Smax fct/fb Use Wmax Smax long

2.90E-04 Steel ratio based on surface zone.

= fct/fb x /2 = 0.67 = 0.2 = 690 = 0.0078 mm mm

> crit

53

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference

DESIGNED NR Calculations Minimum required reinforcement area per ,

DATE

5/29/2012

Output

Top surface zone in long span

= 1943

mm /m

1943

mm /m

5.Summary of R/F Provided: Long span R/F provided = T 16 @ 100

Cl.3.5.5

6.Check for ULS shear

Shear at short edge of wall b d As Vuls v Cl.3.4.5.2 Cl.3.4.5.4 v = = = = = = < 1000 442 1943 0 V/bd 0 5 or mm mm mm2 kN/m N/mm2 0.5 0.8(fcu) = 0.44 = 1 = 1.38 > v < > 3 1

= 0

kN/m

Ok

100As/(bd) 400/d m vc

= 0.43373

Hence shear r/f are not required

Ok

54

CEYWATER CONSULTANT (PVT) LTD.

PROJECT STRUCTURE COMPONENT

REHABILITATION OF KILLINOCHCHI WATER S/S ROUGHING FILTER BASE SLAB(Top R/F)Long Direction CHECKED PWDS

REF. NO.

INFRASTRUCTURE & ENVIRONMENTAL ENGINEERS AND PLANNERS Reference 7.Other considerations: Anchorage Bond Cl.3.12.8.3 Cl.3.12.8.4

DESIGNED NR Calculations

DATE

5/29/2012

Output

fb fbu where fb = Design anchorage bond stress fbu = Design ultimate anchorage bond stress fb = Fs/(l) = (0.87fy /4)/(l) = 0.217fy/l 0.5 fbu = (fcu) = 3 (for tension bars)
2

b).For long span r/f fy = 16 = 460 mm N/mm2

fb fbu l 540 mm Provided anchorage length = 800 Hence ok

mm Ok