6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

Pl Please Turn T off ff your mobile! Or Switch to vibration mode!

Check! Right Now!


BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

SCREEN

1 2 3 4 5

Dont Panic Switch Off All Electrical Equipment Dont Run, Walk Fast! Go to the Assembly Point Wait for the Final Instruction

BARAKAH NUCLEAR POWER PLANT PROJECT

1. Safety Moment 2. Previous Meeting 3 HSE Programs 3. P 4. HSE Statistics


Performance per Area and Total

6. Weekly Inspection
Committee Inspection Weekly Inspection

7. Medical Cases 8. Environmental Issues 9. Action Plans


Seoyong Infra Younchang (Infra)

5. HSE Findings Summary


Findings Analysis- cause wise, i Company, C and d Area A HSE Findings by Company Evaluation by Findings Score

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

NO.

ITEMS

ACTION PLANS
Younchang Infra Subcontractor of HSJV acquired high number of HSE findings with score of 5.5. This rating is based on established scoring by HSE Department that is having value equivalent to severity of given risk. Younchang Infra will present on next meeting their corrective actions. Seoyong Infra submitted low HSE findings compare to the combine findings from KEPCO and HSJV. Seoyong will revert back on next meeting its corrective actions.

ACTION BY

DUE DATE

STATUS

High HSE Findings

Younchang Infra

Next Meeting

Low HSE Findings

Seoyong Infra

Next Meeting

The scheduled emergency drill planned this month with Emergency Drill scenario involving incident of heat stress and rescue is postponed.

KEPCO HSJV

June 2013

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

Description :
- Every month HSE team recognizes individual and organization who has contributed to the improvement of HSE. This activity y p promotes HSE good g practices and programs at site.

Date :
- 02 June 2013

Time
- 6:30 AM

Participants
- HSJV Site Manager, Discipline Managers, Subcontractors Site Manager, HSE Personnel

Awardees ( 30 Awards)
- Individual and Spot Awards, Best Subcontractor Award (Younchang ( Younchang PB)
BARAKAH NUCLEAR POWER PLANT PROJECT

Description
Workers were checked by Subcontractors as per checklist in procedure. Those found failing are further evaluated by KEPCO medical team.
BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

What is MidMid - day Break Rule


- The local federal government of Abu Dhabi imposed measures to prevent possible injuries during summer due to high temperature and humid environment. A mandatory break enforced that prohibits outdoor works.

Effectivity :
- 15 June to September 15, 2013

Time
- 12:30 PM ~ 03:00 PM

BARAKAH NUCLEAR POWER PLANT PROJECT

ScaffoldingFindingsApril2013
Unsafe Unsecured Dismantling g Scaffold 8% 2% Substandard Components 15% Loose Components 10%

Corrective Actions Thorough inspection of scaffold by Supervisor A f S i Awareness of Supervisor on standard of scaffolding Workers awareness of basic scaffolding.

NoTag 13% NoInspection 8%

MissingParts 44%

Evaluation of scaffolding inspectors Review of third party providers for scaffolders, scaffolders , and inspectors. Training of all involved personnelpersonnel workers using scaffold scaffolders, scaffolders , inspectors, and supervisors

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

AccessLadderFindingsApril2013
Corrective Actions
Loose Clamp/Fitting 43% NotInspected 14% NoLadder 7%

Use of approved ladders as per type and specifications. Provide firm landing and provision of fall protection Use of appropriate clamps and fastening devices.
Unsafe landingarea 14%

Close access before inspection is performed. Prohibits use of substandard ladder.

Substandard Ladder 22%

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

(This Week From May 25 May 31, 2013)

Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property/Vehicle Accidents Environmental Release

Ancillary Area For the Cum Week

Camp Area For the Cum Week

Office Area For the Cum Week

Power Block For the Cum Week

Village 1 For the Cum Week

Village 2 For the Cum Week

HSJV Total For the Cum Week

0 0 0 0 0 0 0 0

0 0 4 1 2 0 3 0

0 0 0 0 0 0 0 0

0 0 0 1 1 0 1 0

0 0 0 0 0 0 0 0

2 0 6 5 0 0 4 0

0 0 3 1 1 0 0 0

16 0 42 10 5 3 7 0

0 0 1 0 0 0 0 0

0 1 6 0 0 0 1 0

0 0 0 0 0 0 0 0

0 0 3 1 0 0 1 0

0 0 4 1 1 0 0 0

18 1 61 18 8 3 17 0

Forthisweek OneStrike Policy 3

Cumulative 129*

Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 24 (2013)
BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

(This Week From May 25 May 31, 2013)

Issued Findings
K E P C O H S J V
S U B C O N

Status
Total

Open
KEPCO HSJV Subcon KEPCO

Closed
HSJV Subcon

NearMiss CAR OC&WF TOTAL

0 0 0 0

0 0 0 0

0 15 0 15

0 0 0 0

0 0 0 0

0 27 26 53

0 176 402 578

42 176 218 26 402 428 68 578 646

BARAKAH NUCLEAR POWER PLANT PROJECT

(This Week From May 25 May 31, 2013)


FallProtection MaterialManagement FirePrevention PPE Signs,Barriers&barricades HotWorks Health&Welfare ElectricalSafety WorkingatHeight Plant&Equipment WasteManagement Lifting Access&Egress Scaffolding Hand&PowerTools ColorCoding PoorIllumination Environmental PTW Documents Training Excavation ConfinedSpace Supervision ManualHandling

2 2
0

10

12

15 14

23

28 27 26 26 25 25

34 33 32 31 31

42

49 48 47

Source: CAR, Near Miss, Walkthrough and Observation Card

10

20

30

40

50

60

BARAKAH NUCLEAR POWER PLANT PROJECT

6/2/2013

1
Install temporary hand rail at the first floor of constructed building b ildi ( Village Vill 1 1, Towers T Tech) Warn workers not to seat on side railings of Manbasket (Village 2, Hanlim Hanlim) ) Install barriers within endpoint of slabs (O&M, Seobon) Seobon) Ensure guardrails are provided for steel fixers (GIB, Hilalco) Hilalco) Proper storage of paint should be established. 1 Towers Tech) (Village 1, Empty gallons from chemicals must have proper storage. (AB Unit 1, Advan Advan) ) Practice correct storage of hazardous materials as stated in MSDS. (AB Unit 1, DOW) R Removal l of f stack t k carpentry t materials from edge of excavation (Office Area, Seobon Seobon) )

2
Ensure trash bin are free of cigarette butts Block Samjin (Power Block, Samjin) ) Set storage area for gas cylinder tanks (TGB2, D&I) Safekeeping flammable materials with protection from direct sunlight, and bunding (CWDC, Al Raeel Raeel) ) Construction chemicals should be under h ld b d a roof f or with protection from direct sunlight (Village 1, Towers Tech)

Fall Protection

Material Management
BARAKAH NUCLEAR POWER PLANT PROJECT

Fire Prevention

BARAKAH NUCLEAR POWER PLANT PROJECT

10

6/2/2013

120 112 100 80 60 40 20 0


33 23 8 32 23 2 39 19 3 10 1 38 17 20 11 4 3 16

BARAKAH NUCLEAR POWER PLANT PROJECT

120 100 80 60 40 20 0

10,HotWorks

3,PPE 7,Housekeeping 3,FallProtection 6,FirePrevention 5,FallProtection

5,AccessandEgress

3,Environmental 3 MaterialManagement 3,

4,Housekeeping

5 Housekeeping 5,

ManualHandling Hou ConfinedSpace Excavation Supervision Training Documents Plant&Equipment PTW ColorCoding Environmental Hand&PowerTools PoorIllumination Scaffolding Access&Egress WasteManagement ElectricalSafety Signs Barriers&Barricades Signs, Health&Welfare Lifting HotWorks WorkingatHeight FirePrevention PPE MaterialManagement FallProtection Housekeeping

BARAKAH NUCLEAR POWER PLANT PROJECT

11

6/2/2013

(This Week From May 25 May 31 , 2013)

TowersTech

100 90 80 70 60 50 40 30 20 10 0
Seoyong Seoyong(PB)

KEPCO/HSJV SUBCON Manpower

800 700 600 500 400 300 200 100 0


Seobon D&I AlRaeel Samho DOW

Hwachon

Advan

Hanlim

Samjin

WBG

Jonghap(PB)

YounChang(PB)

YounChang

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

HyundaiC&I

Daemyung

Uwell

Eunmin

Hilalco

Gusan

YooA

Jonghap

Eugene

12

6/2/2013

FindingsScore=NumberofCausalxRisk(FactorScore)
Source: CAR, Near Miss, Walkthrough and Observation Card reported by KEPCO & HSJV

10.0 8.0 6.0 4.0 2.0 0.0


2.4 0.5 70 7.0 4.4 6.3

3.6 1.0 0.4

3.2 1.0

Legend : (I) Infra, (PB) Power Block

ActionPlan forCompanyrequiringassistanceandsupportfromthesystem 1.JointInspection willbecarriedoutbyAreaManagementTeam. 2.SpotTrainingwillbegiven toworkersaboutmajorfindings 3.Actionplanwillbe submittedtoHSJVHSETeamdevelopbySeoyong (PB)


BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

13

6/2/2013

Environmental,1 Training,2

Poor Illumination,1 Health& Manual Handling,1 Welfare,1

FallProtection,16

Total No. of Findings: 99


Top Hazards

PTW,2

Plant& Equipment,1

ColorCoding,1

Cause FallProtection Housekeeping

Nos 16 13

HotWorks,3 FirePrevention,3 Lifting,4 Signs,Barriers& Barricades,4 Electrical Safety,4 Access& Egress,4

Housekeeping,13

Control Measure

Due Date

Supervisorstomonitor personneltoensurethat harnessarehookedduring working atheight. Properarrangementof constructionmaterials during andafterworking time

Done

Always

Material Management,4 Workingat Height,5 PPE,6

Waste Management,10 Scaffolding,7 Hand&Power Tools,6

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

Total No. of Findings: 68


Top Hazards Cause WorkingatHeight Fi Prevention P ti Fire Nos 9 7
Environmental,2 Waste Management,2 Health& Welfare,3 PPE,3

Training,2

ColorCoding,1 Documents,1 Scaffolding,1 Workingat Height,9

Hand&Power Tools,1

FirePrevention,7

Control Measure Provideproperworking platformonheights &use ofproperaccess.

Due Date

Always

Signs,Barriers& Barricades,3

Fireextinguishersshould beinspected regularlyand provideduringhotworks.

Housekeeping, p g,4

Done
HotWorks,4 Poor Illumination,4 Electrical Safety,4

FallProtection, Protection 6

Lifting,6 Material Management,5

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

14

6/2/2013

Total No. of Findings : 53


Top Hazards Cause Fall Protection Access&Egress Nos 10 6

Workingat Height,2 Scaffolding,2

ColorCoding,1

Poor Illumination,1

HotWorks,1

Poor Illumination,1 FirePrevention,1 Fall Protection,10

Housekeeping,2

Access& Egress,6

Control Measure Supervisorstomonitor personneltoensurethat harnessarehookedduring working atheight. Inspectionofladdersand ensurethatitisproperly attachedforsafeuse.

Due Date Done

Environmental,2

Health& Welfare,2 Plant& Equipment,2 Equipment

Done

Signs,Barriers& Barricades,2 Excavation,2 PPE,3 Material Management,3 Waste Management,3

Lifting,4

Scaffolding,3

Source: CAR, Near Miss, Walkthrough and Observation Card


BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

15

6/2/2013

Inspection Committee Inspection Weekly Inspection

Date None 2013-05-29

Attendees HSJV, KEPCO, HSE Management Team HSJV HSE Team

Remark 16 Findings

BARAKAH NUCLEAR POWER PLANT PROJECT

FindingsperCompany
5 4 3 2 3 1 0
Advan D&I Gusan Seobon Seoyong(PB) TowersTech

4 2 2

FindingsperCausal
Noproperplatform NoHarness Nothookinglanyard Substandardscaffold Nohardbarricade Noproperaccess Noassistance Usingunsafeladder 0 1 1 1 1 1 2 3 2 2 3 5

Key item : Working at Height


4 5 6

BARAKAH NUCLEAR POWER PLANT PROJECT

16

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

May29,20131720hrs, Mr.Shake Shohorab Hossen Kuti (IP)was Injuryleft SteelStr.Worker AssessedbyDr. workinginthebending foot;swelling Kim machinewhensuddenlya fromfalling RebarShop Analgesiccream 1 pieceofbendedrebar(36 object applied Ancillaryarea mm.diameter)from about3040 Elasticbandage bendingmachineplaced Kgs. applied 29052013 ongroundaccidentallyhit IPsleftfeet. 17:20

Seoyong

BARAKAH NUCLEAR POWER PLANT PROJECT

17

6/2/2013

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Advan
RebarForeman Injuredperson(IP)wanted toplacewoodensupport Injuryleft PowerBlock; underarebarthatwasto smallfinger TowerCraneNo. beliftedbyaforkliftand gothislittlefingerstuckin laceration 7 betweenthewoodand therebar. 28052013 16:30

AssessedbyDr. Kim Woundcleansing done Compression dressingdone Tetanustoxoid injectiongivenat rightdeltoid muscle Referredto Gayathi Hospital forXRay.

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Seoyong
Theaccident happenedon25th May2013,injured Injury Left AssessedbyDr.Kim persontriedtodrive Thumb Nailpuncturedone nailsinthe PowerBlockAB Contusion Dressingapplied formworkswhenhe 1 hithisleftthumbby hammer. 25052013 Carpenter Helper 16:45

BARAKAH NUCLEAR POWER PLANT PROJECT

18

6/2/2013

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

HyundaiC&I
ElectHelper
4

InjuryPainin theleft Forearm

Village1 Building05 25052013 15:10

Whilepackingupfrom AssessedbyDr. work,hewasunfolding Kim theAtypeladderandat Analgesic thatmomentlockof ointmentapplied laddercaughthislefthand Elasticbandage forearmcausingminor applied pain

BARAKAH NUCLEAR POWER PLANT PROJECT

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Seoyong CommonLabor
5

Injury Right indexfinger RCBAB1 hitbyascrew PowerBlock NearTC1 25052013 14:30

Theinjuredperson Steristrip performscuttingof applied exposedscrewsandnails Wounddressing onrebarwall,whenat done onemomenthisright Tetanusinjection indexandmiddlefinger wasgiven. hitsanexposedscrews.

BARAKAH NUCLEAR POWER PLANT PROJECT

19

6/2/2013

No.

Source of Injury

Area

Description

Immediate Action

Planned Supervisor Preventive Action

Gusan FormCarpenter LowBack Painafter Lifting Equipment AssessedbyDr. Injuredpersonvisited Kim CWDCPower clinicadayafterliftingtie Analgesic Block rodduringliftingwork. ointment SeasideArea Patientsufferedpainat appliedand lowerback massagethe 28052013 affectedarea 14:00

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

20

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

AFTER

BEFORE
Location Description Action taken Status
Samjin Laydown Area Power Block Poor Waste management and segregation, hazardous cans and plastic mixed with metal scrap. Ensure to follow and comply continuously on waste management and segregation system. CLOSED

BARAKAH NUCLEAR POWER PLANT PROJECT

BEFORE

AFTER
Location Description Action taken Status
D & I Laydown Area Power Block While relocating chemical storage, drip tray was observed gap on base plate which is inefficient to contain in case of spillage of hazardous materials. Drip tray base already fully welded to ensure the integrity in case of spillage. CLOSED

21

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

AFTER

BEFORE
Location Description Action taken Status
Shinwoo Laydown Area Power Block Full hazardous skip bin with contaminated paint cans/pails. Coordinated to ESP for proper handling, hauling, storage and transport for disposal. CLOSED

BARAKAH NUCLEAR POWER PLANT PROJECT

No.0

Date

Action by Company

Description

Status

Closing Date

Expiration Date

Ref. No. CAR

Main Area

Sub-Area

Issued By

Issuer Company

30 May 2013 30 May 2013 30 May 2013

Samjin

Metal skip bin mixed with contaminated hazardous cans/pails and plastic waste.

CLOSED

31 May 2013 31 May 2013 31 May 2013

30 May 2013 30 May 2013 30 May 2013

1437

PB

Laydown Renato Area Ponce Laydown Renato Area Ponce Laydown Renato Area Ponce

HSJV

Shinwoo

D&I

Full hazardous skip bin with CLOSED contaminated paint cans/pails observed. While relocating chemical storage, drip tray observed gap on base plate CLOSED which is inefficient to contain hazmat in case of spillage.

1439

PB

HSJV

1465

PB

HSJV

22

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

WASTETYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal Hazardous TotalSolidWaste

WASTEMANAGEMENTUPDATE Week=23/05/2013 29/05/2013 Thisweek


Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

Lastweek
Recycle(%)

Collected(m3) Disposal(m3) Recycled(m3)

64 64 152 0 0 400 144 0 0 824

0 0 405 0 0 405 0 320 0 1,130

45 0 0 0 45 0 45 0 0 135 10.67%

80 32 144 0 0 232 112 0 8 608

0 0 675 0 0 270 0 312 8 1,265

0 90 0 0 0 0 0 0 0 90 6.64%

Legend: Collected WastefromSitetoTemporaryStorageArea Disposal WastefromTemporaryStorageAreatoLandfillArea Recycle Treatedwaste(GMET)toRecyclingPlants

BARAKAH NUCLEAR POWER PLANT PROJECT

23

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

BARAKAH NUCLEAR POWER PLANT PROJECT

24

6/2/2013

BARAKAH NUCLEAR POWER PLANT PROJECT

25