ITEMS
ACTION PLANS
ACTION BY
DUE DATE
STATUS
Advan
Next Meeting
Next Meeting
4/7/2013
Description :
Dark/Shaded Glass
S f t Glass Gl St d d by b OSHA and d ANSISafety Standard ANSI Z87.1, 1. Glasses must have side shields 2. Tinted lenses are not allowed unless Combination Glass required (for example, welding works)
Clear Glass
3. Frames must bear manufacturers identification trademark for both fronts and temple. 4. Lenses made of 3 mm. thick 5. Lenses must be marked with the letter H and CE.
Reading Glass
Using sunglasses
4/7/2013
Description :
Monthly HSE and Quality Recognition Ceremony, awards given to Best Subcontractor, Individual and Spot Awards, Slogan and Poster contest awards. Total of 35 awards given this month.
BARAKAH NUCLEAR POWER PLANT PROJECT
Description :
The Subcontractor should correct unsafe conditions present in their workplace. Findings related to scaffolding nonconformance (incomplete platform, open edge, no toe boards, & others). Structure open edge and housekeeping are another concerns which the organization need to act.
BARAKAH NUCLEAR POWER PLANT PROJECT
4/7/2013
Description :
1. Gas fueled and electrically powered stoves are strictly prohibited inside the room accommodations to ensure that no occupants will attempt to cook inside their rooms. 2. Any one found with cooking utensils shall be questioned if they have cooking stoves inside their oo s rooms.
Description :
Date : 2013 April 4 ~ 15 Time : 16:30 PM Location : HSE Training Center Attendee Sub Contractor Foreman Site Manager Trainer ENEC Safety Culture(SC) Team ( (Mr Mr. . Christopher) Christopher ) HSJV HSE Trainer Topic Safety Awareness
BARAKAH NUCLEAR POWER PLANT PROJECT
4/7/2013
DAILYNOISELEVELMONITORING@POWERBLOCK
Measurement,dB(A)intheselocations
No. Date L3RCB1 L1 L2 L4 AB2/4 AB1/3 Outside Topside Inside TGB1 L5 TGB1 L6 CPB L7 CPB
1 2 3
67.7
75.1 75.8
79.5
82.5
HearingProtectionProgram
According to HSEP53 Noise procedure, when employees are exposed to noise levels of 85dB 85dB and above, hearing protection and suitable warning signs should be provided. provided. The noise levels of 85dB 85dB is similar with below 1. Hair drier 2. City Traffic (inside car)
BARAKAH NUCLEAR POWER PLANT PROJECT
DailyNoiseLevelMonitoring
4/7/2013
Item
Near Misses
Over speeding
First Aid Cases (FA) Medical Treatment Cases (MTC) Restricted Work Cases (RWC) LTIs Property/Vehicle Accidents Environmental Release
0 0 1 0 0 0 0 0
0 0 2 1 1 0 2 0
0 0 0 0 0 0 0 0
0 0 0 1 1 0 1 0
0 0 0 0 0 0 0 0
2 0 1 4 0 0 2 0
1 0 3 0 0 0 0 0
11 0 16 4 2 3 6 0
0 0 0 0 0 0 0 0
0 1 4 0 0 0 1 0
0 0 0 0 0 0 0 0
0 0 2 1 0 0 1 0
1 0 4 0 0 0 0 0
13 1 25 11 4 3 13 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
Cumulative 115*
Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop Power Block Cut Off Wall, Wharf Area, Concrete Block Area * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 10 (2013)
BARAKAH NUCLEAR POWER PLANT PROJECT
4/7/2013
Issued Findings
K E P C O H S J V
S U B C O N
Status
Total
Open
KEPCO HSJV Subcon KEPCO
Closed
HSJV Subcon
0 0 0 0
0 0 0 0
0 8 0 8
0 0 0 0
0 0 0 0
1 60 30 91
4/7/2013
1 1
0
10
14 13 13 12
20 20
25 24
27
31 30 30
39
45 44 43
50 49
57
10
20
30
40
50
60
1
Arrangement of welding cable obstructing pathway ( Power Block, , Youn Chang g PB) Proper keeping of protruding nails scattered on ground (Power Block, Advan Advan) ) Practice proper cable management. (CWDC, Gusan) Gusan) Observe good housekeeping at floor areas (ADB, Hyundai C&I) Securing ladder with approved clamps ( CPB, Advan Advan) ) Scaffold should have the appropriate handrails (Power Block, Samjin) Samjin) Close the gap on access located across a concrete slab. (CWDC, Gusan) Gusan) Provide access for carpenters working in vertical form erection. (TGB, D & I)
2
Damaged and rusted scaffold used pipes should not be used. (Power Block, Samjin Samjin) ) Toe boards should be installed in any scaffold (TGB, Isam Kabbani) Kabbani) Workers will use only inspected scaffold (RCB/AB1, Jonghap) Jonghap) Scaffold tag should be inspected and updated in timely manner. (Village 2, Hanlim Hanlim) )
PPE
BARAKAH NUCLEAR POWER PLANT PROJECT
Scaffolding
10
4/7/2013
60 50 40 30 20 10 0
2 13
61 51 48
31
6 1
10 2
6 1 1
11 1 2 1 1 1 6
9 2
11
4/7/2013
70 60 50 40 30 20 10 0
PoorIllumination3 Supervision2 Emergency&Evacuation RoadSafety Supervision ManualHandling Environmental PoorIllumination PTW Documents Health&Welfare HotWorks FallProtection Hand&PowerTools Training ColorCoding Excavation LIfting FirePrevention Plant&Equipment WasteManagement WorkingatHeight ElectricalSafety MaterialManagement Signs,Barriers&Barricades PPE Scaffolding Housekeeping Access&Egress
Seoyong Seoyong(PB) TowersTech Gusan Gusan(PB) Eunmin Jonghap Jonghap(PB) YounChang YounChang(PB) Hwachon WBG Hilalco Advan Hanlim Uwell YooA HyundaiC&I Samjin Eugene Daemyung Seobon D&I AlRaeel DOW Samho Sungchang Seil
BARAKAH NUCLEAR POWER PLANT PROJECT
80 70 60 50 40 30 20 10 0
12
4/7/2013
83 8.3
8.6
2.9 1.0
2.5
1.5 0.2
2.0
13
4/7/2013
PTW,1 Lifting,1
Nos 11 6
Control Measure
Always
Always
Hand&Power Tools,5
Plant& Equipment,1
Workingat Height,1
FirePrevention,7
Control Measure Properhandlingand inspectionofcylindergas regularly. Protrudingrebars and sharpedgesshouldbe providedwithproper protection andprecaution.
Scaffolding,3
PPE,4
Always
Housekeeping,5 LIfting,5
Access& Egress,6
14
4/7/2013
Waste Management,1
Material Management,5
ConfinedSpace,1
Always
15
4/7/2013
April 4, 2012
CORRECTIVE ACTION:
16
4/7/2013
FindingsperCompany
6 5 4 3 5 2 1 1 0
Advan D&I Geumhwa Seoyong(PB) YooA YounChang
Total
4 2 1 1 1
YounChang(PB)
FindingsperCausal
PoorManagement p p Storage g Improper PoorHousekeeping NoFireExtinguisher NoPTW DamagedRegulator DamagedHose NoColorCoding 0 0.5 1 1 1 1 1 1.5 2 2 2 3 4
17
4/7/2013
No.
Source of j y Injury
Area
Description
Immediate Action
Pain,low back
donebyDr.Kim withthecleaningofhis ConcretePump Concretepumpusinga TopicalAnalgesic applied Operator hose.Hewasbending OralAnalgesic forwardwhileholdingthe given W k h A Workshop Area hosewhenfeltasudden Instructedof painonhisbackandthus properbody 31032013 broughttotheclinic. mechanics 13:30
18
4/7/2013
No.
Source of j y Injury
Area
Description
Immediate Action
Whileperformingasa steelfixerhelperwhen accidentlyhisfingerwas Cleaningand pinchinbetweenrebar dressingdone Carpenter size32mmthatresult Analgesicspray Painand hisfingertogetswollen swellingin given RCBABUNIT2 hewasrushtosafety Referralto theleftring finger officecabinforfirstaid, hospital 02042013 firstaidgivenandwas orthopedic broughttoKepco Clinic surgeon 08:30am fortreatment
Seoyong
No.
Source of j y Injury
Area
Description
Immediate Action
Woundon leftarm
Whileperformingfrom dismantlingonRCBAD3 areatogetherwithhis Cleaningand Carpenter foremanwhenaccidently wounddressing hislefthandfinger done RCBAB3 puncturewithnailthat InjectionTetanus POWERBLOCK resulttosetwound. wound toxoid given Safetyofficerstookhimto 02042013 siteofficeforfirstaidand rushhimtoKepco Clinic. 10:30am
Seoyong
19
4/7/2013
No.
Source of Injury
Area
Description
Immediate Action
Advan
HSESupervisor
4
20
4/7/2013
TGB Unit 2, Power Block Hazardous substances not contained in a safe and standard storage area. No Spill kit and no drip tray available. Installed drip tray in chemical storage and placed spill kits according to HSE P41 Hazardous Material Handling CLOSED
MetallicWaste SkipBin
WoodWaste insidethe MetalSkipBin
Uncontained MetallicWaste
Laydown Area, Power Block Assorted metal waste was not contained inside a metal skip, but on the ground. Skip intended for metal waste contained wood waste. Conducted waste management spot training and segregated wood waste from metal waste. CLOSED
21
4/7/2013
No.0
Date
Action by Company
Description
Status
Closing Date
Expiration Date
Ref. No.
Main Area
Sub-Area
Issued By
Issuer Company
01-April-13 Seoyong
Hazardous substances not contained in CLOSE 06-April-13 06-April-13 2013-0821 a safe and standard storage area. No Spill kit and Fire Extinguisher available. Assorted metallic waste were not contained inside an intended skip and 2013-0845 CLOSE 06-April-13 06-April-1 left unattended. Skip intended for metallic waste contain ed waste wooden materials.
PB
TGB 2
HSJV
Renato Ponce
01-April-13
Advan
PB
Laydown
HSJV
Renato Ponce
WASTETYPE
Paper Metal Construction Concrete Wood(Good) Wood(Bad) Plastic Municipal H Hazardous d TotalSolidWaste
Lastweek
Recycle(%)
0 0 0 0 0 0 45 0 0 45 2.51%
64 64 88 0 0 272 96 0 8 592
45 45 0 0 0 0 0 0 0 90 6.75%
22