Planilla de Sustentacin de Metrados.

TOMAS LATERALES
1
Item

Partida / Detalle
TOMAS LATERALES =
H= 0.90 - 0.80 M

4.01

4.02

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

3 Und

Excavacion manual para obras de arte

M3

7.29

Base

1.50

1.00

0.25

0.38

1.13

Lados

1.50

0.25

0.50

0.38

1.13

Friso

1.50

0.20

0.10

0.06

0.18

1.00

1.00

0.50

0.50

1.50

1.50

0.50

0.75

2.25

Muros

2.00

0.15

0.75

0.45

1.35

Losa fondo

2.00

0.80

0.15

0.24

0.72

Relleno compactado para obras de arte

M3

4.50

1.5
1.00

4.03

Concreto Simple f'c = 175 Kg/cm2


L=

4.04

1.50

M3

m.

Grava Gruesa con Concreto f'c = 140 kg/cm2 (Proteccin salida)

0.90

###
h = 0.70
###
2.00

M3

6.21

Planilla de Sustentacin de Metrados.


TOMAS LATERALES
0

Item
4.05

4.06

Item

N de
Veces

Base

1.50

1.00

0.08

0.11

0.34

Lados

II

1.50

0.075

0.50

0.11

0.34

Frisos

III

1.50

0.20

0.075

0.05

0.14

Partida / Detalle

Unidad

Concreto f'c = 210 Kg/cm2

Kg

Zona de ingreso

3
2
h = 0.630.525

0.8
L = 1.50

1.90

0.8

5
2

0.2

6
2
L=

(m)

(kg / ml)

175.95

(kg / ml)

3/8"

1.90

14.00

0.560

7.84

23.52

3/8"

1.30

9.50

12.35

0.560

6.92

20.75

3/8"

1.50

7.50

0.560

4.20

12.60

3/8"

1.20

6.00

0.560

3.36

10.08

4
2
5
2

1/2"

3.60

2.16

0.994

2.15

6.44

1/2"

-0.08

19

-1.52

0.994

-1.51

-4.53

6
2
7
2

3/8"

1.00

9.00

0.560

5.04

15.12

3/8"

0.90

9.00

0.560

5.04

15.12

3/8"

3.88

19.40

0.560

10.86

32.59

3/8"

0.92

19

17.85

0.560

9.99

29.98

3/8"

1.70

8.50

0.560

4.76

14.28

1
2
2
2
3
Chaflanes
2

7
2

1.00

L=

3.60

-0.08

Proteccin salida

0.90

Refuerzos
1.0

10

8
2

0.35

9
2
L = 3.88

N de vec Long. Pza N de Elem. Long. Total Peso Unit.Peso Parcial

0.9

2
0.8

0.9

0.1

Total

L =1,20

2
2

Alcantarilla

Parapetos

Fierro

(m)

1.00

1.30

Parcial

2.43

0.35

0.35

L=

L=

Factor

M3

Acero de refuerzo fy = 4,200 Kg/cm2

1
2

Dimensiones
Largo
Ancho
Altura

L=
0.92

1.70

8
2
9
2

10

Planilla de Sustentacin de Metrados.


TOMAS LATERALES
0

Item
4.07

Partida / Detalle

Unidad

Encofrado y Desencofrado Caravista

Compuerta Metlica Tipo Armco 0.60 x 0.70 Mod.5.00

4.10

Juntas water stop 6"

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

M2
Muros entrada

4.08

Item

N de
Veces

Total
27.00

UND

1.50

1.50

0.50

3.00

9.00

3.00

1.50

4.50

PLANILLA DE METRADOS

RETENCIONES TIPO 1
1
Item

Partida / Detalle

Unidad

Tipo

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

RETENCIONES =
3
2 Unid
Altura de canal=
0.50 m (promedio)
5.01

Excavacin manual para obras de arte

M3

Exvacion masiva de caja, en metrados de canal


Solo se considera excavacion en sobre ancho
5.02

Poza central

48.54
1

1.00

1.23

1.15

1.415

2.00

1.20

1.15

5.52

2.00

1.00

1.00

4.00

Transiciones

3.00

0.82

4.89

Poza central

1.23

1.00

1.23

Transic.

3.00

5.22

0.15

4.69

Poza cent

1.00

5.85

0.15

0.88

Losa man

1.23

1.00

0.15

Verteder.

0.20

1.00

0.70

Columna cent

0.20

0.25

1.05

0.05

Uas

5.22

0.20

0.25

0.52

Largo = 2

Relleno compactado para obras de arte

M3

28.00

Largo = 2
5.03

Concreto simple f'c = 175 kg/cm2

M3
1.0

0.40

42.84

1.23
1.23

Largo =
5.04

Concreto f'c = 210 kg/cm2

M3

Transiciones
1.00

0.2

2.00

2.00
Perimetro=

5.22

0.4 1.23
0.815

Poza central

L=

1.00

2.00

Columna Central
2.00

1.85

Permetro=

5.85

a=

0.25

h=

1.05

Losa de maniobras
1.0

L = 0.2
1.23

Vertederos

1
0.70

45.29

0.18
0.50

0.14

PLANILLA DE METRADOS

RETENCIONES TIPO 1
0

Item
5.05

Partida / Detalle
Acero de Refuerzo, fy = 4,200 kg/cm2

Unidad

Tipo

Kg

Fierro

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

N de vec Long. Pza N de Elem. Long. Total Peso Unit. Peso Parcial
(m)

(m)

(kg / ml)

1052.65

(kg / ml)

Transiciones
1

0.67 1.77

L=

Longit. Prom=

2.92

3/8"

5.52

16

172.22

0.589

101.44

2
2

3/8"

2.92

29

167.02

0.589

98.38

3
2
4
2

1/2"

6.07

15

89.84

0.994

89.30

1/2"

2.76

31

86.53

0.994

86.01

5
62
2

1/2"

1.08

12.10

0.994

12.02

1/2"

0.92

11.78

0.994

11.71

7
2
8
29

1/2"

1.52

6.08

0.994

6.04

3/8"

0.80

6.88

0.589

4.05

1/2"

2.42

24

57.96

0.994

57.61

1/2"

4.59

13

60.13

0.994

5.52

1.22

Poza central
3
4
1.00

1.77

Verterderos

L=

1.08

5
2

L=

Longit. Prom.=

6
2

2.76

6.07

Columna central
L= 0.92

Losa de maniobras
9
2
5.06

0.72
L=

2.42

59.77
526.32

4.59

10

Encofrado y desencofrado caravista

M2
Vertederos

8.53
4

0.68

0.60

1.63

0.20

0.60

0.24

Columnas

0.25

0.80

0.80

Losa de maniobras

1.23

1.23

0.15

0.37

0.80

0.15

0.24

0.80

0.98

4.27
5.07

Compuerta metlica Tipo Armco, 0.80 x 0.70

und

5.08

Carton embreado

und

0.80

0.30

4.00

0.24

0.48

Planilla de Sustentacin de Metrados.


RETENCIONES TIPO 2
0

Item

Partida / Detalle

Unidad

Tipo

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

RETENCIONES TIPO 2=
2
Unid
Altura de canal =
0.5
m
m
Ancho de compuerta =
0.9
Ancho de muro =
0.075 m
5.01

Excavacin manual de obras de arte

1.5

M3

1.0

1.80

1.50

0.20

0.20

0.24

0.48

Transiciones

1.50

0.20

0.70

0.84

1.68

Poza central

1.00

0.20

0.90

0.18

0.36

1.00

0.50

0.50

0.50

Transiciones - Muros

1.50

0.80

4.80

9.60

Transiciones - Losa

1.50

0.65

1.95

3.90

Poza central

1.00

0.90

0.90

1.80

Uas transiciones

2.20

0.08

0.20

0.07

0.13

Transiciones - Muros

1.50

0.40

0.08

0.18

0.36

1.50

0.08

0.50

0.23

0.45

Transiciones - Losa

1.50

0.65

0.08

0.15

0.29

Poza central

Muros

1.00

0.20

0.65

0.26

0.52

Losa

1.00

0.90

0.08

0.07

0.14

1.30

0.08

0.08

0.01

0.01

1.5

0.90

2.52

Uas Transicion (entrada y salida)

Perimetro canal=

2.2

Ancho prom. Caja

1.35

canal

5.02

Relleno compactado de obras de arte

M3
Poza central

5.03

Concreto f'c = 100 kg/cm2 para solado, e=0.05 m

1.5

Costados

1.00

M2

1.00
15.30

1.0
0.90

0.8
0.4

5.04

Concreto f'c = 210 kg/cm2

M3

Losa de maniobras

1.90

Planilla de Sustentacin de Metrados.


RETENCIONES TIPO 2
0

Item
5.05

Partida / Detalle
Acero fy = 4,200 kg/cm2

Unidad

Tipo

Kg

Fierro

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

N de vec Long. Pza N de Elem. Long. Total Peso Unit. Peso Parcial

231.43

Recubrimiento = 4 cm

1.42
1
0 - 0.72

Transiciones

2
0.97 - 0

L=

Long.

1/2"

1.42

26.41

0.989

26.12

52.24

Transv.

1/2"

1.66

26.89

0.989

26.60

53.19

1/2"

3.58

27.21

0.989

26.91

53.82

1/2"

1.32

19

24.95

0.989

24.67

49.35

1/2"

1.32

6.07

0.989

6.01

12.01

1/2"

0.72

5.47

0.989

5.41

10.82

1.50

0.40

4.80

9.60

1.50

0.50

6.00

12.00

Muros centrales

1.00

1.00

4.00

8.00

Losa de maniobras

1.10

0.88

1.76

1.50

0.075

0.23

0.45

0.80

0.075

0.12

0.24

2.00

0.16

0.32

1.66

0.52 - 1.12
3

Poza central

1.18
L=

3.58

1.22

1.32

Losa de maniobras
1.32

6
0.72

5.06

Encofrado y desencofrado caravista

M2
Transiciones

2.00
1.50

32.05

0.075

5.09

Compuerta metlica tipo Armco 0.90 x 0.50 x 1.50 m, Mod. 5 - 00

Und

5.10

Cartn embreado

M2

0.80

0.80

0.20

Planilla de Sustentacin de Metrados.


BOTADOR
1
Item

Partida / Detalle
TOMAS LATERALES =
H= 0.90 - 0.80 M

6.01

6.02

Unidad

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

3 Und

Excavacion manual para obras de arte

Relleno compactado para obras de arte

Item

N de
Veces

M3

5.60

Base

1.50

0.50

0.25

0.19

0.56

Lados

1.50

0.25

0.50

0.38

1.13

Friso

1.50

0.20

0.10

0.06

0.18

1.50

0.50

0.50

0.38

1.13

1.50

0.50

0.75

2.25

M3

1.13

0.5
1.50

6.03

Concreto Simple f'c = 175 Kg/cm2


L=

1.50

m.

Planilla de Sustentacin de Metrados.


BOTADOR
0

Item
6.04

6.05

Item

N de
Veces

Base

1.50

0.5

0.08

0.06

0.17

Lados

II

1.50

0.075

0.50

0.11

0.34

Frisos

III

1.50

0.20

0.075

0.05

0.14

Partida / Detalle

Unidad

Concreto f'c = 210 Kg/cm2

Kg

Zona de ingreso

3
2

L = 1.50

1.90

0.85

4
20.8

0.9
0.8

5
2
0.1
0.2

6
2
L=

N de vec Long. Pza N de Elem. Long. Total Peso Unit.Peso Parcial


(m)

(kg / ml)

175.95

(kg / ml)

3/8"

1.90

14.00

0.560

7.84

23.52

3/8"

1.30

9.50

12.35

0.560

6.92

20.75

3/8"

1.50

7.50

0.560

4.20

12.60

3/8"

1.20

6.00

0.560

3.36

10.08

4
2
5
2

1/2"

3.60

2.16

0.994

2.15

6.44

1/2"

-0.08

19

-1.52

0.994

-1.51

-4.53

6
2
7
2

3/8"

1.00

9.00

0.560

5.04

15.12

3/8"

0.90

9.00

0.560

5.04

15.12

3/8"

3.88

19.40

0.560

10.86

32.59

3/8"

0.92

19

17.85

0.560

9.99

29.98

3/8"

1.70

8.50

0.560

4.76

14.28

1
2
2
2
3
Chaflanes
2

7
2

1.00

0.9
L=

3.60

-0.08

Proteccin salida

0.90

Refuerzos
1.0

10

8
2

0.35

9
2
L = 3.88

Total

L =1,20

2
2

Alcantarilla

Parapetos

Fierro

(m)
0.8

0.35

L=

1.30

Parcial

1.92

0.35

h = 0.630.525

L=

Factor

M3

Acero de refuerzo fy = 4,200 Kg/cm2

1
2

Dimensiones
Largo
Ancho
Altura

L=
0.92

1.70

8
2
9
2

10

Planilla de Sustentacin de Metrados.


BOTADOR
0

Item
6.06

Partida / Detalle

Unidad

Encofrado y Desencofrado Caravista

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

M2
Muros entrada

Total
9.00

1.50

0.50

3.00

9.00
0.00

6.07

Compuerta Metlica Tipo Armco 0.60 x 0.70 Mod.5.00

6.08

Juntas water stop 6"

UND

1.50

3.00

1.50

4.50

Planilla de Sustentacin de Metrados.


AFORADOR
1
Item

Partida / Detalle
AFORADOR =

7.01

1 Und

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

Excavacion manual para obras de arte

M3
Uas - Seccion 1

3.50
2

5.00

1.40

0.25

3.50

3.50

2.00

0.50

0.25

0.50

0.50

2.00

0.50

0.25

0.25

0.25

1.20

0.50

0.20

0.24

0.24

1.20

0.50

0.20

0.12

0.12

0.30

0.50

0.25

0.08

0.08

0.30

0.50

0.25

0.04

0.04

0.60

0.50

0.25

0.15

0.15

0.60

0.50

0.25

0.08

0.08

0.90

0.50

0.25

0.23

0.23

0.90

0.50

0.25

0.11

0.11

5.00

1.00

0.075

0.38

0.38

Seccion 4
5.00
1.40

7.02

Relleno compactado para obras de arte

M3
sec 1
sec 2
sec 3

1.40

sec 4
2

7.03

1.2

0.3

Concreto Simple f'c = 175 Kg/cm2 (SOLADO)


L=

5.00

m.

0.6

0.9

sec 5

M3

1.79

Planilla de Sustentacin de Metrados.


AFORADOR
0

Item
7.04

Paos laterales

2.00

Base

0.90

Base

II

1.20

1.20

Paos laterales

II

1.20

0.08

Frisos

II

1.20

Base

III

Paos laterales

III

Frisos

III

Base
Paos laterales

Partida / Detalle

Unidad

Concreto f'c = 210 Kg/cm2

Sec II

Sec III

Sec IV

Sec V

0.60
1.80

0.08

0.11

0.11

0.50

0.09

0.09

0.20

0.08

0.04

0.04

1.00

3.00

0.08

0.23

0.23

0.30

0.08

0.50

0.02

0.02

0.30

0.20

0.08

0.01

0.01

IV

1.10

0.60

0.08

0.05

0.05

IV

0.60

0.08

0.50

0.05

0.05

Frisos

IV

0.60

0.20

0.08

0.02

0.02

Base

0.80

0.90

0.72

0.72

Pao lateral

2.00

2.00

0.60

0.60

0.35
L=

L = 1.50

1.90

0.30

0.8

5
2

0.2

6
2
L=

N de vec Long. Pza N de Elem. Long. Total Peso Unit.Peso Parcial


(m)

(kg / ml)

69.68

(kg / ml)

3/8"

1.90

14.00

0.560

7.84

7.84

3/8"

1.30

9.50

12.35

0.560

6.92

6.92

3/8"

1.50

7.50

0.560

4.20

4.20

3/8"

1.20

6.00

0.560

3.36

3.36

4
2
5
2

1/2"

3.60

7.56

0.994

7.51

7.51

1/2"

0.22

19

4.18

0.994

4.15

4.15

6
2
7
2

3/8"

1.00

9.00

0.560

5.04

5.04

3/8"

0.90

9.00

0.560

5.04

5.04

3/8"

3.88

19.40

0.560

10.86

10.86

3/8"

0.92

19

17.85

0.560

9.99

9.99

3/8"

1.70

8.50

0.560

4.76

4.76

1
2
2
2
3
Chaflanes
2

7
2

1.00

L=

3.60

0.22

Proteccin salida

0.90
Refuerzos
1.0

10

8
2

0.35

9
2
L = 3.88

0.08

0.9

4
2
0.8

0.9

0.1

0.08

L =1,20

2
2

Alcantarilla

Parapetos

Fierro

(m)
0.8

h = 0.63 0.525

Total
4.32

0.35

3
2

1.30

Parcial

1.80

Kg

Zona de ingreso

L=

Factor

0.60

Acero de refuerzo fy = 4,200 Kg/cm2

1
2

Dimensiones
Largo
Ancho
Altura

M3
Sec I

7.05

Item

N de
Veces

L=
0.92

1.70

8
2
9
2

10

Planilla de Sustentacin de Metrados.


AFORADOR
0

Item
7.06

7.07

Partida / Detalle

Unidad

Encofrado y Desencofrado Caravista

Juntas de dilatacin con material elastomtrico

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

M2

Total
10.00

Sec I

2.00

0.50

4.00

4.00

Sec II

1.20

0.50

2.40

2.40

Sec III

0.30

0.50

0.60

0.60

Sec IV

0.60

0.50

1.20

1.20

Sec V

0.90

0.50

1.80

1.80

5.00

5.00

5.00

Planilla de Sustentacin de Metrados.


PUENTE VEHICULAR
1
Item

Partida / Detalle
PUENTE VEHICULAR =
H= 0.15

8.01

8.02

Und

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Limpieza y desbroce de terreno

M2

Trazo y repanteo preliminar

27.00
1

3.00

3.00

0.00

2.20

9.00

KM

0.15

Total

0.07
1.10

0.01

0.02

0.00

0.00

0.00

8.03

Excavacion de caja de canal con maquinaria

M3

Seccion 4
2,90
1.20

20.62

Uas - Seccion 1

0.90

0.20

0.15

0.05

0.16

Seccin 2

0.15

0.90

1.10

0.15

0.45

Seccin 3

0.35

0.90

1.10

0.35

1.04

Seccion 4

2.00

2.20

1.10

4.84

14.52

Seccin 5

1.00

1.20

1.10

1.32

3.96

Muros de salida

0.50

0.15

1.10

0.17

0.50

4.00

3.00

0.15

1.80

5.40

1,50

8.04

Concreto ciclpeo Simple f'c = 175 Kg/cm2 + 30% PM


L=

4.00

m.

M3

Planilla de Sustentacin de Metrados.


PUENTE VEHICULAR
0

Item
8.05

Partida / Detalle

Unidad

Concreto f'c = 210 Kg/cm2

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

M3

4
0.15

0.2

3.00

Losa de fondo

4.00

3.00

0.15

1.80

5.40

0.20

3.00

0.20

0.24

0.72

4.00

0.20

0.15

0.24

0.72

0.00

0.00

4.00

Parapetos

Acero de refuerzo fy = 4,200 Kg/cm2

Kg

Fierro

N de vec Long. Pza N de Elem. Long. Total Peso Unit.Peso Parcial

Zona de ingreso
1
2

(m)

h = 0.630.150
L=

4.30

4.00
L=

Total
20.52

Muros de entrada

8.06

Parcial

1.30

(m)

(kg / ml)

211.43

(kg / ml)

3/8"

4.30

14.00

0.560

7.84

23.52

3/8"

1.30

21.50

27.95

0.560

15.65

46.96

3/8"

0.560

0.00

0.00

3/8"

0.560

0.00

0.00

2
2

Planilla de Sustentacin de Metrados.


PUENTE VEHICULAR
0

Item
8.07

8.08

Partida / Detalle
Encofrado y Desencofrado (obras de arte)

Curado de Concreto

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

M2

M2

Total
14.88

4.00

0.15

2.40

7.20

0.20

0.20

0.16

0.48

4.00

0.15

2.40

7.20

4.00

12.00

36.00

Planilla de Sustentacin de Metrados.


PUENTE PEATONAL
1
Item

Partida / Detalle
PUENTE VEHICULAR =
H= 0.15

9.01

9.02

Und

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Limpieza y desbroce de terreno

M2

Trazo y repanteo preliminar

6.00
1

2.00

3.00

0.00

2.20

6.00

KM

0.15

Total

0.02
1.10

0.00

0.02

0.00

0.00

0.00

9.03

Excavacion de caja de canal con maquinaria

M3

Seccion 4
2,90
1.20

27.50

Uas - Seccion 1

0.90

0.20

0.15

0.05

0.22

Seccin 2

0.15

0.90

1.10

0.15

0.59

Seccin 3

0.35

0.90

1.10

0.35

1.39

Seccion 4

2.00

2.20

1.10

4.84

19.36

Seccin 5

1.00

1.20

1.10

1.32

5.28

Muros de salida

0.50

0.15

1.10

0.17

0.66

2.00

3.00

0.15

0.90

3.60

1,50

9.04

Concreto ciclpeo Simple f'c = 175 Kg/cm2 + 30% PM


L=

2.00

m.

M3

Planilla de Sustentacin de Metrados.


PUENTE PEATONAL
0

Item
9.05

Partida / Detalle

Unidad

Concreto f'c = 210 Kg/cm2

Item

Dimensiones
Largo
Ancho
Altura

Factor

0.15

0.2

3.00

Losa de fondo

2.00

3.00

0.15

0.90

3.60

0.20

0.20

0.24

0.96

2.00

0.20

0.15

0.12

0.48

0.00

0.00

2.00

Parapetos

Acero de refuerzo fy = 4,200 Kg/cm2

Kg

Fierro

N de vec Long. Pza N de Elem. Long. Total Peso Unit.Peso Parcial

Zona de ingreso
1
2

(m)

h = 0.630.150
L=

2.30

2.00
L=

Total
20.16

9.06

Parcial

M3
Muros de entrada

N de
Veces

1.30

(m)

(kg / ml)

259.39

(kg / ml)

3/8"

2.30

14.00

0.560

7.84

31.36

3/8"

1.30

11.50

14.95

0.560

8.37

33.49

3/8"

0.560

0.00

0.00

3/8"

0.560

0.00

0.00

2
2

Planilla de Sustentacin de Metrados.


PUENTE PEATONAL
0

Item
9.07

9.08

Partida / Detalle
Encofrado y Desencofrado (obras de arte)

Curado de Concreto

Unidad

Item

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

M2

M2

Total
40.96

2.00

0.15

1.20

4.80

0.20

0.20

0.16

0.64

2.00

0.15

1.20

4.80

2.00

6.00

24.00

3.00

PLANILLA DE METRADOS

RETENCIONES TIPO 1
1
Item

Partida / Detalle
RETENCIONES =
Altura de canal=

10.01

Unidad

Tipo

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

Total

18 Unid
0.50 m (promedio)

Excavacin manual para obras de arte

M3

Exvacion masiva de caja, en metrados de canal

Poza central

Solo se considera excavacion en sobre ancho


10.02

Relleno compactado para obras de arte

10.03

Concreto simple f'c = 175 kg/cm2 (SOLADO)

198.72
1

6.00

0.60

0.40

1.440

6.00

2.00

0.40

9.60

2.00

6.00

0.40

9.60

Transiciones

6.00

0.60

0.075

0.27

Poza central

6.00

0.40

0.075

0.18

Transic.

6.00

5.00

0.08

4.50

Poza cent

1.50

2.40

0.08

0.27

Largo = 6
M3

172.80

Largo = 6
M3
6
0.40

8.10

0.8

0.4
Largo =
10.04

Concreto f'c = 210 kg/cm2

M3

Transiciones
1.00

0.2

2.00

2.00
Perimetro=
0.4

5.00

Columna cent

0.8

Uas

0.6

Poza central
1.00

L=

1.5

1.00

1.00

0.4

Permetro=

2.40

85.86

PLANILLA DE METRADOS

RETENCIONES TIPO 1
0

Item
10.05

Partida / Detalle
Acero de Refuerzo, fy = 4,200 kg/cm2

Unidad

Tipo

Kg

Fierro

N de
Veces

Dimensiones
Largo
Ancho
Altura

Factor

Parcial

N de vec Long. Pza N de Elem. Long. Total Peso Unit. Peso Parcial
(m)

(m)

(kg / ml)

Total
7952.77

(kg / ml)

Transiciones
1

0.5

0.7

0.80 0.40

L=

Longit. Prom=

5.84

3/8"

2.30

30

138.92

0.589

81.82

2
2

3/8"

5.84

13

146.00

0.589

85.99

3
2
4
2

1/2"

2.10

29

60.06

0.994

59.70

1/2"

5.52

12

63.48

0.994

63.10

5
62
2

1/2"

1.08

12.10

0.994

12.02

1/2"

0.92

11.78

0.994

11.71

7
2
8
29

1/2"

1.52

6.08

0.994

6.04

3/8"

0.80

6.88

0.589

4.05

1/2"

2.42

24

57.96

0.994

57.61

1/2"

4.59

13

60.13

0.994

2.30

0.6

Poza central
3
4
0.50

0.7

0.40

Verterderos

L=

1.08

5
2

L=

Longit. Prom.=

6
2

5.52

2.1

Columna central
L= 0.92

Losa de maniobras
9
2
10.06

0.72
L=

2.42

59.77
441.82

4.59

10

Encofrado y desencofrado caravista

M2

33.70

Vertederos

Poza central

0.68
0.20

0.60

1.63

0.60

0.24
1.87

10.07

Carton embreado

und

0.80

0.30

0.24

4.32

RESUMEN DE METRADOS OBRAS DE ARTE - TALLA


Item

Partida

Unid

Sub-total

4.00

TOMAS LATERALES = 9 UNID

4.01

Excavacion manual para obras de arte

M3

7.29

4.02

Relleno compactado para obras de arte

M3

4.50

4.03

Concreto Simple f'c = 175 Kg/cm2

M3

2.25

4.04

Grava Gruesa con Concreto f'c = 140 kg/cm2 (Proteccin salida)

M3

6.21

4.05

Concreto f'c = 210 Kg/cm2

M3

2.43

4.06

Acero de refuerzo fy = 4,200 Kg/cm2

Kg

175.95

4.07

Encofrado y Desencofrado Caravista

M2

27.00

4.08

Compuerta Metlica Tipo Armco 0.60 x 0.70 Mod.5.00

UND

3.00

4.09

Juntas water stop 6"

4.50

5.00

RETENCIONES = 5 UNID

5.01

Excavacin manual para obras de arte

M3

48.54

5.02

Relleno compactado para obras de arte

M3

28.00

5.03

Concreto simple f'c = 175 kg/cm2

M3

42.84

5.04

Concreto f'c = 210 kg/cm2

M3

45.29

5.05

Acero de Refuerzo, fy = 4,200 kg/cm2

Kg

1052.65

5.06

Encofrado y desencofrado caravista

M2

8.53

5.07

Compuerta metlica Tipo Armco, 0.80 x 0.70

und

4.00

5.08

Carton embreado

und

0.48

6.00
6.01
6.02
6.03
6.04
6.06
6.07
6.08

BOTADOR = 3 UNID
Excavacion manual para obras de arte
Relleno compactado para obras de arte
Concreto Simple f'c = 175 Kg/cm2
Concreto f'c = 210 Kg/cm2
Acero de refuerzo fy = 4,200 Kg/cm2
Encofrado y Desencofrado Caravista
Juntas water stop 6"

M3
M3
0
M3
Kg
M2
M

5.6025
1.125
2.25
1.92375
175.95312
9
4.5

7.00

AFORADOR = 1 UNID

7.01

Excavacion manual para obras de arte

M3

3.50

7.02

Relleno compactado para obras de arte

M3

1.79

7.03

Concreto Simple f'c = 175 Kg/cm2 (SOLADO)

M3

0.38

7.04
7.05
7.06
7.07

Concreto f'c = 210 Kg/cm2


Acero de refuerzo fy = 4,200 Kg/cm2
Encofrado y Desencofrado Caravista
Juntas de dilatacin con material elastomtrico

M3
Kg
M2
M

4.32
69.68
10.00
5.00

8.00

PUENTE VEHICULAR = 3 UNID

8.01

Limpieza y desbroce de terreno

M2

27.00

8.02

Trazo y repanteo preliminar

KM

0.07

8.03

Excavacion de caja de canal con maquinaria

M3

20.62

8.04

Concreto ciclpeo Simple f'c = 175 Kg/cm2 + 30% PM

M3

5.40

8.05

Concreto f'c = 210 Kg/cm2

M3

20.52

8.06

Acero de refuerzo fy = 4,200 Kg/cm2

Kg

211.43

8.07
8.08

Encofrado y Desencofrado (obras de arte)


Curado de Concreto

M2
M2

14.88
36.00

9.00
9.01
9.02
9.03
9.04
9.05
9.06
9.07
9.08

PUENTE PEATONAL = 4 UNID


Limpieza y desbroce de terreno
Trazo y repanteo preliminar
Excavacion de caja de canal con maquinaria
Concreto ciclpeo Simple f'c = 175 Kg/cm2 + 30% PM
Concreto f'c = 210 Kg/cm2
Acero de refuerzo fy = 4,200 Kg/cm2
Encofrado y Desencofrado (obras de arte)
Curado de Concreto

M2
KM
M3
M3
M3
Kg
M2
M2

6
0.01936
27.496
3.6
20.16
259.392
40.96
24

TRANSICIN ALABEADA = 18 UNID


Excavacin manual para obras de arte
Relleno compactado para obras de arte
Concreto simple f'c = 175 kg/cm2 (SOLADO)
Concreto f'c = 210 kg/cm2
Acero de Refuerzo, fy = 4,200 kg/cm2
Encofrado y desencofrado caravista
Carton embreado

M3
M3
M3
M3
Kg
M2
und

10.00
10.01
10.02
10.03
10.04
10.05
10.06
10.07

198.72
172.80
8.10
85.86
7952.77
33.70
4.32