You are on page 1of 4

LEED for New Construction and Major Renovation 2009 Project Scorecard

Project Name: Project Address:


Yes ? No

Sustainable Sites Prereq 1 Credit 1 Credit 2 Credit 3 Construction Activity Pollution Prevention Site Selection Development Density & Community Connectivity Brownfield Redevelopment

26 Required 1 5 1 6 1 3 2 1 1 1 1 1 1 1

Po i n t s

Credit 4.1 Alternative Transportation, Public Transportation Access Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles Credit 4.4 Alternative Transportation, Parking Capacity Credit 5.1 Site Development, Protect or Restore Habitat Credit 5.2 Site Development, Maximize Open Space Credit 6.1 Stormwater Design, Quantity Control Credit 6.2 Stormwater Design, Quality Control Credit 7.1 Heat Island Effect, Non-Roof Credit 7.2 Heat Island Effect, Roof Credit 8
Yes ? No

1 1 1 1 1 1

Light Pollution Reduction

Water Efficiency Y Prereq 1 Water Use Reduction, 20% Reduction

10 Required 2 2 2 2 to 4 2 3 4 35

Po i n t s

Credit 1.1 Water Efficient Landscaping, Reduce by 50% Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation Credit 2 Credit 3 Innovative Wastewater Technologies Water Use Reduction 30% Reduction 35% Reduction 40% Reduction Energy & Atmosphere Y Y Y Prereq 1 Prereq 2 Prereq 3 Fundamental Commissioning of the Building Energy Systems
Minimum Energy Performance: 10% New Bldgs or 5% Existing Bldg Renovations

2 2 2 2 3 4
Points

Required Required Required

Fundamental Refrigerant Management

Credit 1

Optimize Energy Performance 12% New Buildings or 8% Existing Building Renovations 14% New Buildings or 10% Existing Building Renovations 16% New Buildings or 12% Existing Building Renovations 18% New Buildings or 14% Existing Building Renovations 20% New Buildings or 16% Existing Building Renovations 22% New Buildings or 18% Existing Building Renovations 24% New Buildings or 20% Existing Building Renovations 26% New Buildings or 22% Existing Building Renovations 28% New Buildings or 24% Existing Building Renovations 30% New Buildings or 26% Existing Building Renovations 32% New Buildings or 28% Existing Building Renovations 34% New Buildings or 30% Existing Building Renovations 36% New Buildings or 32% Existing Building Renovations 38% New Buildings or 34% Existing Building Renovations 40% New Buildings or 36% Existing Building Renovations 42% New Buildings or 38% Existing Building Renovations 44% New Buildings or 40% Existing Building Renovations 46% New Buildings or 42% Existing Building Renovations 48% New Buildings or 44% Existing Building Renovations

1 to 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 to 7 1 2 3 4 5 6 7 2 2 3 2

12

Credit 2

On-Site Renewable Energy 1% Renewable Energy 3% Renewable Energy 5% Renewable Energy 7% Renewable Energy 9% Renewable Energy 11% Renewable Energy 13% Renewable Energy

Credit 3 Credit 4 Credit 5 Credit 6


Yes ? No

Enhanced Commissioning Enhanced Refrigerant Management Measurement & Verification Green Power

36

LEED for New Construction and Major Renovation 2009 Project Scorecard
Project Name: Project Address:

Yes
Y

No

Materials & Resources Prereq 1 Storage & Collection of Recyclables Credit 1 Building Reuse Credit 1.1 Credit 1.2 Credit 1.3 Maintain 55% of Existing Walls, Floors & Roof Maintain 75% of Existing Walls, Floors & Roof Maintain 95% of Existing Walls, Floors & Roof

14 Required 1 to 3 1 2 3 1 1 1 1 1 1 1 1 1 1 1

Po i n t s

1 2 1 1 1 1 1 1 1

Credit 1.4 Building Reuse, Maintain 50% of Interior Non-Structural Elements Credit 2.1 Construction Waste Management, Divert 50% from Disposal Credit 2.2 Construction Waste Management, Divert 75% from Disposal Credit 3.1 Materials Reuse, 5% Credit 3.2 Materials Reuse, 10% Credit 4.1 Recycled Content, 10% (post-consumer + pre-consumer) Credit 4.2 Recycled Content, 20% (post-consumer + pre-consumer) Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally Credit 6 Credit 7
Yes ? No

Rapidly Renewable Materials Certified Wood

Indoor Environmental Quality Y Y Prereq 1 Prereq 2 Credit 1 Credit 2 Minimum IAQ Performance Environmental Tobacco Smoke (ETS) Control Outdoor Air Delivery Monitoring Increased Ventilation

15

Po i n t s

Required Required 1 1 1 1 1 1 1 1 1 1

Credit 3.1 Construction IAQ Management Plan, During Construction Credit 3.2 Construction IIAQ Management Plan, Before Occupancy Cons uc on A anagement Pl Be re Credit 4.1 Low-Emitting Materials, Adhesives & Sealants Credit 4.2 Low-Emitting Materials, Paints & Coatings Credit 4.3 Low-Emitting Materials, Flooring Systems Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products Credit 5 Indoor Chemical & Pollutant Source Control

1 1 1 1

Credit 6.1 Controllability of Systems, Lighting

1 1

Credit 6.2 Controllability of Systems, Thermal Comfort Credit 7.1 Thermal Comfort, Design Credit 7.2 Thermal Comfort, Verification Credit 8.1 Daylight & Views, Daylight 75% of Spaces Credit 8.2 Daylight & Views, Views for 90% of Spaces Innovation & Design Process Credit 1.1 Innovation in Design: Provide Specific Title Credit 1.2 Innovation in Design: Provide Specific Title Credit 1.3 Innovation in Design: Provide Specific Title Credit 1.4 Innovation in Design: Provide Specific Title Credit 1.5 Innovation in Design: Provide Specific Title Credit 2
LEED Accredited Professional

1 1 1 1 1 6 1 1 1 1 1 1 Po i n t s

1 1 1 1 1

Yes

No

Yes

No
Regional Priority Credits Credit 1.1 Regional Priority Credit: Region Defined Credit 1.2 Regional Priority Credit: Region Defined Credit 1.3 Regional Priority Credit: Region Defined Credit 1.4 Regional Priority Credit: Region Defined 4 1 1 1 1 110 Po i n t s Points

Yes
Not Certified

No Project Totals (Certification Estimates)


Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points

21 36+ 21 = 57

You might also like