CONSTRUCTION PERIOD
NO. ITEM Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7
1 2
1980
1984
1994
26.05.84
11.03.85
28.05.88
04.02.89
22.06.96
26.01.97
14.07.97
Synchronize
Commercial Operation
24.08.84
11.06.85
25.08.88
22.04.89
16.12.96
26.03.97
19.09.97
04.04.85
26.03.86
06.02.89
06.11.89
25.06.97
11.09.97
19.12.97
CILEGON
PLTG SUNYARAGI
PLTGU GRESIK
GANDUL
CILBINONG
GRESIK
PLTG PEMARON
PLTP KAMOJANG
Power Plant
Heat Canal
WWTP
: 4 X 400 MW : 3 X 600 MW
STEAM TURBINE Manufacturer : Mitsubishi Heavy Industries GENERATOR Manufacturer : Mitsubishi Electric Company BOILER Manufacturer : Babcock & Wilcox COAL HANDLING SYSTEM Manufacturer : - Samsung - Flender
7
ORGANIZATION
PT. PLN (Persero)
GENERATING UNIT (Unit Induk pembangkitan) LOAD TRANSMISS ION AND CONTROL UNIT (Unit Induk Penyaluran dan pengaturan Beban) PT. Pembangkitan Jawa Bali PT. PJB
OTHERS (lain-lain)
SURALAYA CFPP
MRICA (HYDRO PP)
ORGANIZATION : Suralaya
GENERAL MANAGER
AUDIT SPECIALIST OPERATION MANAGER UNIT 1-4 OPERATION MANAGER UNIT 5-7 MAINTENANCE MANAGER UNIT 1-4 MAINTENANCE MANAGER UNIT 5-7 ENGINEERING & ASSET MANAGEMENT MANAGER SPECIALIST HR & PR MANAGER IT & FINANCE MANAGER LOGISTIC MANAGER PLANNING & INVENTORY OF PRIMARY ENERGY MANAGER COAL HANDLING MANAGER ASH HANDLING MANAGER CIVIL MANAGER LAW & CONTRACT SPECIALIST HSE, QUALITY & ENVIRONMENT MANAGER
Based on age
2012
22.351 GWh
39.449 GWh
145.545 GWh
11
12
PRODUCTION
25,000
20,000
15,000
10,000
5,000
13
SALES
25,000
20,000
15,000
10,000
5,000
2007
11,039 10,901 21,941
2008
10,705 9,693 20,398
2009
9,597 11,756 21,353
2010
9,421 12,333 21,754
2011
9,060 13,079 22,139
2012
8,671 12,449 21,120
14
COAL CONSUMPTION
14,000
12,000
10,000
8,000
6,000
4,000
2,000
COAL CONSUMPTION [mil Ton] U1-4 COAL CONSUMPTION [mil Ton] U5-7 COAL CONSUMPTION [mil Ton] U1-7
15
19
SURALAYA
20
Subject : Unit 4
NO.
1
ITEM
Construction
TIMELINE
1984
First Firing Synchronize Commercial Operation Partially Retubing Retrofit (JBIC) : Control System modification from Panel to Computer Based
04 February 1989 22 April 1989 06 November 1989 23 May 4 August 2009 9 April 2010 17 May 2010 (commercial OP)
21
Subject : Unit 4
EAF
100.00 90.00 80.00 70.00 60.00 50.00 % % 18.00 16.00 14.00 12.00 10.00 8.00 6.00 30.00 20.00 10.00 0.00 EAF Year 2009 2010 2012 2009 67.09 2010 84.00 Inspection Periodic Serious Inspection & Retubing Boiler Retrofit DCIS Program JBIC Mean Inspection 2011 94.49 2012 80.46 Duration (Day) 73 38
25
EFOR
40.00
4.00 2.00 0.00 EFOR
2009 16.13
2010 6.14
2011 3.47
2012 4.20
2009 EFOR high cause by Boiler leak and Boiler partial retubing. 2010 EFOR decrease cause we had done retrofit DCIS to minimize EFOR and boiler leak
22
Subject : Unit 4
SdOF
25.00 20.00 15.00 X 10.00 5.00
%
THERMAL EFFICIENCY
35.00
30.00
25.00
20.00
15.00
0.00
2010 9.00
2011 5.00
2012 3.00
10.00
2010 33.02
2011 32.95
2012 31.52
Thermal Efficiency Timeline activities : Improve Coal Calorific Value 2009 : Partial Boiler Retubing and Air Heater Outage 2010 : Retrofit System Control DCIS 2011 : Replace motor coal feeder using VFD motor 2012 : Air Heater Outage 2012 : Low Load Operation (Efficiency decreased)
23
POST OUTAGE 100 % MCR 11 Mei 2012 398,82 375,06 1.950,16 44,10 82,43 5,96 2.365,77 3,46 2,61 -53,49 1,18 -1,21 0,17 -29,81 DIFFERENTIAL
DIFFERENTIATI ON PERCENTAGE
0,88% 0,70% -2,67% 2,74% -1,45% 2,94% -1,24%
GROSS GENERATOR OUTPUT NETT GENERATOR OUTPUT TURBINE HEAT RATE TURBINE EFFICIENCY BOILER EFFICIENCY (Heat Loss) AUXILIARY POWER GROSS PLANT HEAT RATE (Heat Loss)
MW MW kCal/kWh % % % kCal/kWh
8 9 10 11 12
NETT PLANT HEAT RATE (Heat Loss) PLANT EFFICIENCY (Heat Loss) NET PLANT EFFICIENCY (Heat Loss) COAL CALORIFIC VALUE SPECIFIC FUEL CONSUMPTION (Heat Loss)
kCal/kWh % % kCal/kg
13
93,26
89,61
-3,65
-3,91%
24
Coal Supply
Suralaya coal-fired power plant was built based on coal specification from Bukit Asam (Sumatera Island), which categorized as sub-bituminous coal rank
Bukit Asam
PKP2B KP
SURALAYA
PT. Indonesia Power Coal Stock Policy : The quantity of coal in the stock pile is between 20 35 day coal consumption Equal to 660.000 1.155.000 MT (average of coal consumption is 33.000 MT/Day)
Note : Coal Stockyard Capacity is about 21 ha (volume about 1.500.000 MT )
COAL SPECIFICATION
PARAMETER Spesifikasi Calorific Value Total Moisture Ash Content Sulfur Content Nitrogen Content Ash Fusion Temperature HGI Slagging Index Fouling Index Coal Size 2.38 mm Coal Size 50/70 mm max 45,00 32 min 97 % Contract
MID CONTRACT Contract 4.800 kcal/kg 30% 8% 1% 1,10% 1150c 50% > medium > medium 25% 3% Rejection Level Contract
5.100 kcal/kg > 7.000 kcal/kg - <4.700 kcal/kg 4,700 - 5,200 > 4.700 kcal/kg 4,700 - 5,100 < 4.700 kcal/kg max 28,00 max 8,00 max 0,80 0.70 - 1.10 1010 - 1500 55 - 64 > 31 % > 13 % > 1,2 % > 1,1% < 1.200 c < 48 % maks 30 maks 8 maks 1,05 Min. 1010 Min. 48 > 45 % >3% maks 32,5 maks 7,5 > 32,5% > 7,5% > 32,5% > 10% > 1,1% > 1,2% > 1.010 > 48% maks 35 maks 10 maks 32 maks 8 maks 1,00 Min. 1010 Min. 48 > 35% > 10% > 30 % >8% > 1,00 % > 1,1% < 1.010 c < 48
>4.800 Kcal/kg 5.000 kcal/kg <4.800 Kcal/kg > 30 % > 8% > 1% >1,1% < 1,150c < 50 > medium > medium > 25% > 3% 28 % 6 % 0.80 % 1 % 1150c 50-60 medium medium 20 2 > 30 % > 8% > 1% >1% < 1,150c < 50 atau > 60 > medium > medium > 25% > 5%
29
BS.34/35
Coal Ship
RH.A & BF.03/04 BS.02
JH. G & HG36/37, HG40/02 JH.B & C S. & MS.03/04 BS.36/37 BC. 02
Telescopic Chute
Alat Berat
CHCR
JH. J & HG. A/B BC. 15
Telescopic Chute
JH. C & MCC, BF.11/12, MS.09/10
BC. 11 BC. 12
JH.F
BC. 16 BC. 17
Unit 7
Unit 5
TL 02
Unit 4
Unit 3
Unit 2
COAL BUNKER
Unit 1
Settling basin
2 1
31
32