Professional Documents
Culture Documents
77-82
PLC
PLC
116029
PLC PLC ,,
PLC
PLC
FP1-C72PLC
Abstract: This paper explores the way to improve PLC timer precision, to get PLCs delayed on of normally open contact, delayed off
of normally closed contact, delayed off normally open contact, delayed on of normally closed contact, to realize on/off delay control[1],
expand and change the set value of timer, and to realize the square-wave generator method. After analyzing, designing, and summarizing,
a number of small modules, which could be an on-demand integration to form a project management in practice, are formed. The ladder
diagrams and waveforms have been verified in Panasonic FP1-C72PLC control unit, and are also verified in practice and application.
Key words: Panasonic Programmable Logic Controller; Ladder Diagram; Boolean; Time Relay; Timer; Relay- contactor
PLC SVSet Value
EVElapsed Value 1 EV 0
PLC
[2]
1.1
77
PLC
1a SB2KM1
KT 5S 5S KM2
SB1 KM1 KT KM2
2 X2R0 R0 T1 5S Y2
X2 5S Y2
Y2 5S Y2 R0
3
2
PLC
[2]
2.1
4
78
SJCE 2012.4
PLC
4 X2R0 T1 R0
Y2 Y2 X1R0 R0 R0
R0 Y2 Y2
5S T1 Y2
2.2
5 PLC R9013
PLC Y2 X2
R0 Y2 X1R0
5S T1 Y2
3
6 X2 R0
T1 5S T1 Y0 Y0
X1 R0 T1 Y0
Y0 R1
T2 5S T2 YO
4 PLC
PLC SV 132767
[4]
PLC
7
Scientific Journal of Control Engineering
79
PLC
X2Y1 T1 2S
Y2 T2 3S T2 Y3 X2 Y3
T1 T2 [5]
8
X2T1 5S T1 CT100 EV 2 1
T1 T1 T1 T1 5S
T1 CT100 EV 1 0CT100 Y3 X2
Y3 T1 CT100 5*2=10S X1 Y3
9 F0MV X0 K20
80
SJCE 2012.4
PLC
10b X0 Y1 T1 1S Y2 T2 T1
Y1 T2 1S T1 T1 Y2T2 T1
T2 Y1 T1 10c X0 T1T2
Y1 T1 1S Y1 T1 Y2 T2
2S Y2 1S T2 T1T2 Y1 Y2 PLC
T2 T1T2
10
PLC
PLC
PLC [6] PLC
PLC PLC
[7] FP1-C72PLC
[1]
Panasonic Programmable controller FP0 Programming Manual. Matsushita Electric Works, Ltd.
[2]
. [M]., 2002 .
[3]
[4]
[5]
[6]
. [M]. 3 ., 2008 .
[7]
. [M]. , 2008 .
81
PLC
1963-
PLC
Emailzjmilk@126.com
82
SJCE 2012.4