You are on page 1of 41

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL


CLIENTE / Customer ORDINE CLIENTE / Purchase order N.

2975
Fg - Sh./ di-of

2975 MP18
Rev.

1 / 41

LOCALITA / Plant Location

ROCKSON ENGINEERING
IMPIANTO / Plant

/
EQUIPAGGIAMENTO / Equipment

ALAOJI (NIGERIA)

ALAOJI POWER PLANT PROJECT

ISOLATED PHASE BUS DUCT (GAS TURBINE)

0
Rev

Emissione / Issue
Descrizione / Description

Chiodi
Comp./Prep. d

Redaelli
Ver / Chkd

Abbiati
App. / Apprd

15.10.07
Data / Date

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

2 / 41

INDICE 1. GENERAL CHARACTERISTICS ............................................................................................................. 3 2. DATA SHEET ........................................................................................................................................... 5 2.1 Main Bus Duct ....................................................................................................................................... 5 2.2 Auxiliary Bus Duct ................................................................................................................................. 6 3. DOCUMENT LIST..................................................................................................................................... 7 4. ARRIVAL - CHECKING - OPERATION ................................................................................................... 8 5. STORAGE............................................................................................................................................... 10 5.1 Arrival material..................................................................................................................................... 10 5.2 Periodically checks .............................................................................................................................. 10 6. WELDING PROCEDURE ....................................................................................................................... 11 6.1 General ................................................................................................................................................ 11 6.2 Material ................................................................................................................................................ 11 6.3 Welding function .................................................................................................................................. 11 6.4 Welding process .................................................................................................................................. 11 6.5 WPS table concerning welding position .............................................................................................. 12 7. INSTALLATION...................................................................................................................................... 21 8. CONTROL FOR STARTING .................................................................................................................. 23 8.1 General and seal check....................................................................................................................... 23 8.2 Insulators check................................................................................................................................... 23 8.3 Earthing check..................................................................................................................................... 23 9. COMMISSIONING TEST ........................................................................................................................ 24 9.1 Bus duct main data.............................................................................................................................. 24 9.2 Dielectric test ....................................................................................................................................... 24 9.2.1 Insulation Resistance Measurement .............................................................................................................. 24 9.2.2 Power Frequency Dry Test............................................................................................................................ 24 9.3 External inspection .............................................................................................................................. 25 10. MAINTENANCE ................................................................................................................................. 26 10.1 Introduction .......................................................................................................................................... 26 10.2 Cyclic maintenance ............................................................................................................................. 27 11 COMPONENTS .................................................................................................................................. 28 11.1 Insulator ............................................................................................................................................... 28 11.1.1 Assembly ................................................................................................................................................... 29 Dismantle.................................................................................................................................................. 29 11.1.2 11.2 Flexible joint......................................................................................................................................... 30 11.2.1 Assembly ................................................................................................................................................... 31 11.2.2 Dismantle.................................................................................................................................................. 31 11.3 Bushing insulator ................................................................................................................................. 32 11.3.1 Assembly ................................................................................................................................................... 33 11.3.2 Dismantle.................................................................................................................................................. 33 11.4 Condensate discharge ........................................................................................................................ 34 11.5 Instruction for the application of seal on inspection doors and flanges .............................................. 35 12 CONTACTS ........................................................................................................................................ 36 13. PRESSURIZATION ............................................................................................................................ 37 13.1 Introduction .......................................................................................................................................... 37 13.2 Equipment............................................................................................................................................ 37 13.3 Operations ........................................................................................................................................... 39 13.4 Procedure for setting up the pressurization system ............................................................................ 40 13.5 Quick duct pressurization .................................................................................................................... 41
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

3 / 41

1.

GENERAL CHARACTERISTICS

The bus duct are Isolated Phases Bus type, this means that each phase conductor is enclosed in an individual, non magnetic metal housing, separated from the housing of the adjacent conductor by an air gap. The conductors are cylinders made of pure aluminium and are supported in a radial way by insulators. The enclosures are electrically bonded together at the extremities and earthed (normally in only one point). This design permits the induced currents to flow in each enclosure with an intensity close to the one of the phase current of the conductor (90 98%), but in the opposite direction. This reduces the flux outside the enclosure by about 95% both under normal and fault conditions and therefore: Eliminates the forces between conductors of adjacent phases and reduces the forces in bends and other discontinuities. Cancels the induction effect of the currents i.e. heating and losses in the nearby components such as steelworks, cables, pipes... Associated to the fully welded design of enclosure and the conductors, this type of bus duct also offers other advantages such as: - Possibility of large unsupported spans due to the high moment of inertia of the cylindrical shaped, seams welded aluminium enclosure.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

4 / 41

- Impossibility that a phase to phase fault occurs. - Reduction of the risk of a phase earth fault and impossibility of transmit this fault to other phases. - The personnel can easily reach the bus bars because all the accessible parts are grounded and the voltage rise in the enclosure is very little, having a resistive origin only.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

5 / 41

2. 2.1

DATA SHEET Main Bus Duct

CONDUCTOR / CONDUTTORE : Material /Materiale Diameter / Diametro (d) Thickness/Spessore (S1)


Cross section/Sezione Trasversale

Weight / Peso Painting / Verniciatura External / Esterna ENCLOSURE / INVOLUCRO Material /Materiale Diameter / Diametro (D) Thickness/Spessore (S2)
Cross section/Sezione Trasversale

: : : : : :

ALUMINIUM / ALLUMINIO 99,5%

mm mm mm2 Kg/m

300 10 9111 24,60

BLACK DULL / NERO OPACO : : : : :


ALUMINIUM / ALLUMINIO 99,5%

Weight / Peso Painting / Verniciatura Internal / Interna : BLACK DULL / NERO OPACO External / Esterna : GREY / GRIGIO INSULATORS / ISOLATORI Material : Porcelain brown glazed Materiale Porcellana smaltata marrone INSULATION / ISOLAMENTO RMS dry test 50 Hz x 1 min : kV 50 Tens. a freq. Ind. 50Hz x 1 min. Impulse Voltage Dry (1,2/50 us) : kV 110 Tens. Di tenuta ad impulso (1,2/50 us) Clearance min. Phase/Earth : mm 220 Distanza min. fase/terra (h) RATING / PRESTAZIONI Corrente (50 Hz) 8000 : A Current Losses one phase conductor Perdite monofase conduttore : w/m 275 Losses one phase enclosure Perdite monofase involucro : w/m 200 Capacit Capacitance : (pF/m) 55,86 63 (1 sec) Short circuit capability Corrente ammissib. di breve durata : kA 107 Short circuit capability (peak) Corrente ammissib. di picco kA Protection degree (IEC 529) Grado di protezione (IEC 529) : IP 65 TEMPERATURES / TEMPERATURE Ambient / Ambiente 45 : C Conductor / Conduttore < 105 : C Enclosure / Involucro < 80 : C STANDARDS / NORME ANSI C37-23 ISOLATED PHASE BUS SERIES "COAXIAL-MP" 24kV.A.300.10.4 CONDOTTO A FASI ISOLATE "COAXIAL-MP" 24kV.A.300.10.4
The given values of temperatures and losses, are valid with a maximum variation of +/- 5%. I sopra indicati valori di temperature e perdite sono da intendersi validi con una tolleranza del +/- 5%

mm mm mm2 Kg/m

812 4 10254 27,69

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

6 / 41

2.2

Auxiliary Bus Duct

CONDUCTOR / CONDUTTORE : Material /Materiale Diameter / Diametro (d) Thickness/Spessore (S1)


Cross section/Sezione Trasversale

Weight / Peso Painting / Verniciatura External / Esterna ENCLOSURE / INVOLUCRO Material /Materiale Diameter / Diametro (D) Thickness/Spessore (S2)
Cross section/Sezione Trasversale

: : : : : :

ALUMINIUM / ALLUMINIO 99,5%

mm mm mm2 Kg/m

100 10 2827 7,63

BLACK DULL / NERO OPACO : : : : :


ALUMINIUM / ALLUMINIO 99,5%

Weight / Peso Painting / Verniciatura Internal / Interna : BLACK DULL / NERO OPACO External / Esterna : GREY / GRIGIO INSULATORS / ISOLATORI Material : Porcelain brown glazed Materiale Porcellana smaltata marrone INSULATION / ISOLAMENTO RMS dry test 50 Hz x 1 min : kV 50 Tens. a freq. Ind. 50Hz x 1 min. Impulse Voltage Dry (1,2/50 us) : kV 110 Tens. Di tenuta ad impulso (1,2/50 us) Clearance min. Phase/Earth : mm 220 Distanza min. fase/terra (h) RATING / PRESTAZIONI Corrente (50 Hz) : A 1200 Current Losses one phase conductor Perdite monofase conduttore : w/m 15 7 Losses one phase enclosure Perdite monofase involucro : w/m Capacit Capacitance : (pF/m) 31,22 Short circuit capability Corrente ammissib. di breve durata : kA 100 (1 sec) 170 Short circuit capability (peak) Corrente ammissib. di picco kA 65 Protection degree (IEC 529) Grado di protezione (IEC 529) : IP TEMPERATURES / TEMPERATURE Ambient / Ambiente 45 : C Conductor / Conduttore < 55 : C Enclosure / Involucro < 48 : C STANDARDS / NORME ANSI C37-23 ISOLATED PHASE BUS SERIES "COAXIAL-MP" 24kV.A.100.10.3 CONDOTTO A FASI ISOLATE "COAXIAL-MP" 24kV.A.100.10.3
The given values of temperatures and losses, are valid with a maximum variation of +/- 5%. I sopra indicati valori di temperature e perdite sono da intendersi validi con una tolleranza del +/- 5%

mm mm mm2 Kg/m

594 3 5627 15,19

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

7 / 41

3.

DOCUMENT LIST

POS.

DESCRIPTION

A.S. N

1 2 3 4 5 6 7 8 9 10 11 12

GENERAL ARRANGEMENT (GAS TURBINE) ANDAMENTO GENERALE CTG CIVIL WORK DISPOSITION (GAS TURBINE) DISPOSIZIONE OPERA CIVILE CTG CONNECTION TO MAIN TRANSFORMER COLLEGAMENTO AL TRASF. PRINCIPALE CONNECTION TO AUX. TRANSFORMER COLLEGAMENTO AL TRASF. AUSILIARIO CONNECTION TO CIRCUIT BREAKER COLLEGAMENTO ALLINTERRUTTORE PRESSURIZATION SYSTEM SISTEMA DI PRESSURIZZAZIONE SUPPORT STEEL WORK TRANSFORMER SIDE CARPENTERIA ZONA TRASFORMATORE SUPPORT STEEL WORK CIRCUIT BREAKER SIDE CARPENTERIA ZONA INTERRUTTORE TYPICAL DETAILS DETTAGLI TIPICI ISOMETRIC GENERAL ARRANGEMENT DRAWING (3D) ANDAMENTO GENERALE IN 3D MATERIAL LIST LISTA MATERIALI SPARE PARTS PARTI DI RICAMBIO

2975 MP5 2975 MP6 2975 MP7 2975 MP8 2975 MP9 2975 MP10 2975 MP11 2975 MP12 2975 MP13 2975 MP14 2975 MP15 2975 MP16

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

8 / 41

4.

ARRIVAL - CHECKING - OPERATION

All the material regarding the bus bars is held in cases for transport.

The materials have the identification number as shown on the relevant drawings. For each case there is a relevant packing list that sums up the contained materials. All the positions referring to every design are compiled in the document named Material List. All the cases for transport enclose a Packing List, in witch its referred the contents of the case. For the material reception go on with the following points: - Verify the integrity of the packing and the materials. - Verify that the Packing List corresponds with the goods inside the cases. - Verify the disponibility of the technical documents necessary for the work, in the suitable issue.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

9 / 41

For placing: - Use only suitable hoisting equipment to replace and lift the cases or the material.

- Each case is provided by suitable points of lifting.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

10 / 41

5. 5.1

STORAGE Arrival material

The material that can arrive on site will be of the following type: Foto n1

Pieces of bus duct (photo n1). Cubicles (painted steel) (photo n2) Accessories: bolts, nut, flexibles, braids, bushing, insulators (photo n3) Steel work (galvanized).
Foto n2

Foto n3

All the material will arrive into the cases. These cases will be stored indoor or outdoor but protected against rain. The cases containing cubicles and / or equipment (i.e., PTs, CTs, etc.) must be stored indoor. It is not necessary conditioning air or similar, the material into the cases is protect against corrosion. 5.2 Periodically checks

If the material must be stored outdoor for a long period, it is recommended to check the integrity of the cases (every 6 - six - months).
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

11 / 41

6.

WELDING PROCEDURE

6.1

General

The scope of this procedure is to assure the constant quality and electric conductivity of weldings on Aluminium pipes as enclosure and / or conductor of bus duct.

6.2

Material

The material to be welded can be: - Aluminium 99,5 (UNI 9001 - ISO 1050 / A) - Copper 99,9 % (UNI 5649) for conductors (if applicable).

6.3

Welding function

The welding function is to assure the electric continuity and the mechanical strength, however the welding section must be not less than 100% of the conductor/enclosure nominal square section. - Ensuring the Quality of welding work, supplier and on site. Weldig work shall only be carried out by welders qualified in accordance with ASME code qualification as per section 9, QW-461. - Checks Complete welded seams are to be visually checked that they conform to the drawings. They are also to be checked that they conform to item 6.5 Acceptability criteria of this specification.

6.4

Welding process

The welding process to be used will be the Metal Inert Gas (MIG) with filler metal wire equal to the base metal. Welding machine : DC current reversed polarity Inert Gas : Argon

The data for the welding are: - for conductor : Aluminium WPS Al118/05, Al 119/05, Al 121/05 - for enclosure : Aluminium WPS Al 107/05, Al 110/05, Al 111/05, Al 115/05, Al 123/05

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

12 / 41

6.5
5F V

WPS table concerning welding position


1G V 5F V 5G V

2F V 2G V 5G V
Figura 1 Enclosure: Front view Figura 2 Conductor: Front view

4F V

(WPS) Welding position 3 6

5F

Al 123/05 Al 110/05 Al 107/05 Al 111/05 Al 115/05 820

- For enclosure (see figure1)

2F 1G 4F 5G

- For conductor (see figure2)

5G
Al 118/05 Al 121/05

2G

Al 119/05

Note:

1)

= welding grafic sign.

2) For WPS, see attached on this manual.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

13 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

14 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

15 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

16 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

17 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

18 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

19 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

20 / 41

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

21 / 41

7.

INSTALLATION

1 - Verify: the accessibility of the area of installation. the position and the level of the lay out elements. (machine connections, )

2 - Place the cases for transport near the installation area. 3 - Disassembly the material. 4 - Control the integrity of the components. 5 - Identify the components (type, material, dimensions) as are based on current designs. 6 - Outline as design 2975 MP5, 2975 MP14 the position where will be placed the trunks. 7 - Select the suitable components. 8 - Located the bus duct support steel work as dwg. 2975 MP6 Install the bus duct support steel work as dwg. 2975 MP11, 2975 MP12 9 - Apply over the main generator/transformer flange surface, the seal; see dwg. 2975 MP7, 2975 MP8, 2975 MP9 and the procedure reported in point 11.5 of the current manual. 10- Place the bus duct trunks on the support steel work and the cubicle on the machines following the next order: T101T130 (GTG1), T201T230 (GTG2), T301T330 (GTG3), T401T430 (GTG4) Ref. Dwg. 2975 MP5 2975 MP14 11 - Line up the bus duct trunks and fix them as showed in the suitable design 2975 MP5 12- Before assembling two consecutive bus duct trunks, place the joint sleeve on one of them. 13- Protect the insulators when welding is close. 14- Proceed with the assembly of the bus duct trunks, as referred on design 2975 MP13 - Enclosure joints - Conductor joints And the welding procedure (point 6 of this manual) 15- Weld the conductors first. 16- If the welding makes drips or balls, remove with a brush, take off the insulators protection and control that no strange element has gone inside the bus duct. 17- After the conductors welding, slide the joint sleeve over the other enclosure and weld it. 18- Weld the suitable shunt on the following machines (generator, main transformer, auxiliary transformer). 19- Main connections. All the connections (main transformer, auxiliary transformer, generator, swicth) are done following dwg. 2975 MP7, 2975 MP8, 2975 MP9.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

22 / 41

20- Auxiliary connections. The eventual connections relating to the auxiliary elements will be done as procedure provide on details of the assembly designs. For example: condensate discharge other electrical components

Make sure that the auxiliary connections doesnt reduce the insulation distance. 21- Apply electrical jumper when needed. 22 For pressurization system see dwg. 2975 MP10 and chapter 13 of this manual. 22- Continue with the earth connection as dwg. 2975 MP13. 23- Proceed with the final control to start up. 24 The spare parts of bus duct are indicate in the list n 2975 MP16

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

23 / 41

8.

CONTROL FOR STARTING

All the sections of the bus duct have been dielectric tested in factory before dispatch at power frequency for 1 min. It is advisable to repeat the above mentioned tests before the connection of the complete copper plait. For a correct bus duct installation it is necessary to follow all the operations indicated on the relevant drawings and the instructions indicated in this manual.

8.1

General and seal check

A visual inspection on all sealings and on tightness of bolts have to be carried out at the erection completion.

8.2

Insulators check

Care have to be taken handling the insulators. A porcelain insulator which has received a violent knock or has been dropped must be rejected even if it doesnt show any defects.

8.3

Earthing check

- Of the sheath at only one point. - Of all parts of the steel work. Check that the extremities shunt of enclosure are thoroughly welded along the entire contact length with the sheath.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

24 / 41

9. 9.1

COMMISSIONING TEST Bus duct main data - Rated Voltage - Rated Current - BIL Dielectric test Insulation Resistance Measurement - Equipment type: MEGGER 1 kV

: : :

17,5 kV 8000 A 24 kV/50 kV/110 kV

9.2 9.2.1

PHASE U V W PHASE U V W
9.2.2
-

RESISTANCE
(Phase/Earth) M-OHM

APPLIED VOLTAGE
(Enclosure/Earth) M-OHM

Power Frequency Dry Test Equipment type Manufacturer Applied Voltage


: : : 0,80 x Vn = 40 KV

Duration: 60 sec. (between phase and earthed enclosure)

PHASE
(Conductor)

APPLIED VOLTAGE
(KV)

U Grounding earth V Grounding earth W - Grounding earth


Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

25 / 41

9.3

External inspection

Supporting structure integrity galvanizing/painting anchoring thermal expansion joints

Bus duct enclosure secured properly properly isolated wall plates/installed properly

Grounding assembly/connected to grid (in 1 point)

Cubicles integrity galvanizing/painting anchoring ground connection

Emissione / Issue
Rev Descrizione / Description
Comp./Prep. d

Ver / Chkd

App. / Apprd

DATA

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

26 / 41

10. 10.1

MAINTENANCE Introduction

At factory, before bus duct system packing and shipment, all the bus duct spools are cleaned inside and plugged at the extremity using a polyethylene sheet clamped on the bus duct enclosure. For this type of bus ducts is not required any maintenance, anyway we recommend to avoid as much as possible to open the inspection hatches (where applicable) and to dismantle the extremity. Cares are to be taken when it is recommended to dismantle the followings: Current transformers - for maintenance and/or substitution Links - for equipment isolation.

The inspection hatches must be closed immediately after the operations in order to avoid massive dust entrance. In the event of disassembly and reassemble of any part of the conductor, it is recommended the use of dynamometric spanner to assure the torque setting on the bolts, as shown in the attached table. In the subsequent pages are briefly described the operations to disassemble and reassemble the major parts of the bus duct such as: Insulators Enclosure flexible joint Extremity bushing Bolted conductor connections

Before carrying out any operation it is suggested to review the relevant detailed drawings. If some components have to be substituted, its necessary to request Alfa Standard using the number position and, if exists, the reference. Example: If the insulator box cover has to be substituted, the requisition of spare part will shown the following: No. 12 cover item Pos. 4 code MP2.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

27 / 41

10.2

Cyclic maintenance

For this type of bus ducts is not required any maintenance, anyway we recommend to proceed, every 2 3 years making the most of the stop of the plant, with the following procedures: 12345Control the tighten of the contacts (chapter 12). Check the status of the bushing insulator and the flexible joints. Check the efficiency of the earth connections. Control the treated surfaces (painted, silvery, ecc.) Control the integrity of the auxiliary elements (if supplied), (heating, condensate discharge, current transformers, ecc.) Check the insulation with eventually dielectric tests.

6-

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

28 / 41

11 11.1

COMPONENTS Insulator

5 6

4 2 3

INSULATOR SUPPORT (weld to the conductor)

POS.

DESCRIPTION
INSULATOR HEAD SHOCK ABSORBER SEAL COVER GROWER WASHER BOLT NUT MP7 MP-19 MP-34 MP-2 M6 M6X25 M6

CODE

MATERIAL
PORCELAIN NEOPRENE NEOPRENE G-Al-Si.9-Mn-Mg STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL

1 2 3 4 5 6 7

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

29 / 41

4 3

3 1

11.1.1 123411.1.2

Assembly Assemble the components item 1-2-3 Fit carefully the insulator inside the box Lean the shock absorber till item 2 and the cover item 4. Tight the cover with bolts, nuts and washer item 5-6-7 Dismantle

1 - The insulator disassembly will be carried out following backwards the insulator assembly instructions.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

30 / 41

11.2

Flexible joint

POS.

DESCRIPTION
FLEXIBLE JOINT BAND IRON + CLIP BAND IRON L=100 mm PROTECTION SHORT CIRCUIT SHUNT SEAL

CODE/DIMENSION
/ 19 x 0,76 19 x 0,76 SP. 3 mm SP. 4/8 mm /

MATERIAL
NEOPRENE STAINLESS STEEL STAINLESS STEEL ALUMINIUM ALUMINIUM SILICONE

1 2 3 4 5 6

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

31 / 41

11.2.1 1. 2. 3. 4.

Assembly Fit the flexible joint (item 1) inside the enclosure (see the above dotted figure) Bolt the conductor connections Connect the flexible joint (item 1) to its final position Fix the band (item 2) to the outline of the flexible joint and insert the ends into the clip of the enclosure. Before tightening the band with the relevant tool, the band iron (item 3 ) should be arranged. If the bus duct is pressurized arranged outdoor apply a bead of silicone as item 6 othe internal corner if possible or on the internal corner between enclosure and rubber. Fit the protective cover (item 4), if applicable, with the proper bolts.

5.

6. 1. 11.2.2

Dismantle

The flexible joint disassembly has to be carried out following the above mentioned instructions in reverse order.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

32 / 41

11.3

Bushing insulator

REMOVE AFTER ASSEMBLY

POS.

DESCRIZIONE
END BUSHING FLANGE SHUNT BOLT PLAIN WASHER GROWER WASHER NUT BAND IRON + CLIP SEAL BAND IRON L=100 mm

CODICE DIMENSIONE
CX 531 Sp.=5 mm Sp.= 4/8 mm M8 x 35 M8 M8 M8 19x0,76 / 19 x 0,76

MATERIALE
SILICONE ALUMINIUM ALUMINIUM STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL STAINLESS STEEL SILICONE STAINLESS STEEL

1 2 3 4 5 6 7 8 9 10

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

33 / 41

11.3.1 NOTE:

Assembly

To avoid breakage of end silicone bushing during installation, we recommend to protect the extremities of conductor plates with aluminium sleeve (A) greasy with Vaseline. 1. 2. If required, apply the gasket (item 1) on the bus duct shunt (item 3). Fit the end bushing (item 1) on the conductor, laying the flange on the shunt and check that the location is in accordance with the relevant drawing. Place the flange (item 2) holes in correspondence to the shunt holes and after having temporary clamped the flange, drill the end bushing flange holes. Bolt with bolts, washers and nuts (item 4, 5, 6 &7). If necessary, trim the bushings with protrudes from the enclosure flange. Fix the band iron (item 8) with the clip, before tightening the band with the relevant tool, the equipotential connection should be arranged (item 10), see detail A-A of paragraph 9.3. If the bus duct is pressurized apply a bead of silicone (item 9) along all the perimeter, of neoprene end bushing. Bolt the conductor connections.

3.

4. 5. 6.

7.

8.

11.3.2

Dismantle

1. To dismantle the end bushing, follow the above mentioned instructions in reverse order.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

34 / 41

11.4

Condensate discharge

The condensate dischargers installed on the bus ducts are of automatic discharge type, so a cyclic maintenance is not foreseen, also because the liquid formation of the condensate is not considerable. Alfa Standard recommends to effect a control verification of the dischargers any on occasion of the stops programmed for the plant. Execute the verification in the following way: - open (screw out in clockwise direction of rotation) the discharge valve 5 blow air for same minutes.

Pos.
1 2 3* 4* 5 6 7 8 9 10

Code Codice 324557-BSPT / 324558NPT 241150 556640 378785 + 241681

Description Descrizione Complete drain casing Connection nipple (if supplied) Body gasket Floa t+ lever Manual discharge manual + O-ring

Installed quantity Quantit installata 1 1 1 1 1 1 4 1 1 1

325662-BSPT/ 325663-NPT External pressure equalizing plug 391614 + 393042 241680 390265 556630 Nuts + bolts M6x35 O-ring OR 108 Screw M5x12 Seal

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

35 / 41

11.5

Instruction for the application of seal on inspection doors and flanges

Bus ducts are supplied without gasket on inspection doors and flanges. To apply follow the instructions below.

OVERLAP

FIG.1

OVERLAP

2030mm

FIG.2

1)

Apply a final strip of gasket along the edge with an overlap on corner (as in fig. 1) for inspection doors and rectangular flanges or with a little overlap (as in fig. 2) for circular flanges. Drill the seal in correspondence with holes with a punch or graver. Position and screw the panels.

2) 3)

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

36 / 41

12

CONTACTS COAXIAL AND STANDARD BUS BAR CONTACT ASSEMBLY WITH NON MAGNETIC STAINLESS STEEL BOLTS

1. 2. 3.

Clean contact surfaces with a soft non-metallic brush or a cloth soaked in solvent Spread neutral Vaseline on contact If surfaces are copper tinned or made of aluminium, clean the contact surfaces with a soft wire brush and Vaseline to obtain a shiny surface (to remove Al-oxide film), then protect this with Vaseline. Assembly bolt, washers and nuts as indicated in the drawing below. Before assembling it is very important to grease bolts, washers and nuts with Vaseline.

4.

5.

Tighten each bolt with a dynamometric spanner with a driving torque setting of A daN x m (see table) Check that this driving torque is suitable for all bolts; then tighten each bolt with a driving torque setting of B daN x m (see table) Pal lock nut must be screwed manually until it fits against the nut and then with a spanner from 1/4 to 1/3 turn. Remove excess Vaseline with a cloth.

6.

7.

8.

of Bolt mm A driving torque daN.m B driving torque daNm

10 2 3

12 3,5 5

14 6 8

16 8 12

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

37 / 41

13. 13.1

PRESSURIZATION Introduction

Given that: - the pressurization represents the second level of bus duct inner part protection from the external ambient and atmosphere; - the first bus duct protection level is constituted by a series of condensate dischargers which discharge outside all the condensate that can appear inside the same bus ducts, as consequence of air entry from outside up to ambient thermal range. the condensate dischargers are a standard complement of bus ducts and so are always present, also when the pressurization system is realized; - the first bus duct protection level grants the full operative efficiency of bus ducts, even if it is not able to avoid the entry of polluting / corrosive agents in them, or also the entry of dust eventually present in the atmosphere; - the pressurization, providing to put inside the bus ducts air previously dehydrated and keeping it in conditions of a light overpressure, realizes a barrier against the entry of ambient air, avoiding in this case the inconveniences cause by ambient air.

13.2

Equipment

- A pressurization system is dedicated to every unit of a plant, consisting of 3 single-phase bus ducts, it is able to supply a minimum of 1.5 times the amount of air needed to restore theoretical maximum physiological leakage in a unit; - Every pressurization system consists of a pressurization panel and the relevant material necessary for realizing bus duct connection. - The pressurization panel is made up of the following components (see Fig. 1): 1) Pressure switch for high pressure; 2) Pressure switch for low pressure; 3) Relief valve; 4) Manometer air feeding pressure; 5) Automatic condensate discharge; 6) Manometer pressure 1st reduction step; 7) Pressure reducing valve - 1st reduction step; 8) Pressure reducing valve 2nd reduction step; 9) Manometer bus duct pressure; 10) Electric panel for signals interfacing. PA electric feeding present PAH bus duct high pressure alarm light PAL bus duct low pressure alarm light Q1 line disconnecting switch 11) Exit for quick IPB pressurization

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

38 / 41

FIGURE 1

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

39 / 41

13.3

Operations

Each pressurization system acts as follows: the pressurization panel receives the air at a pressure of 4-7 BAR, that is read on the manometer in position 4. Passing through the filter and the 1st reduction stage it is cleaned and reduced at 1,7 bar (group in position 7), on the manometer in position 6the pressure of the air exit after the first reduction step is visible. - The air will arrive in the second reduction group (position 8). At the exit of the same, the pressure of the fluid will be reduced to the foreseen value to be put inside the conductors 5mbar. - The value read on the manometer in position 9 is the pressure obtained directly on the exit of reducing valve in position 8 and its the same of IPB pressure. The ensemble of assembled equipments can grant that to the bus ducts doesnt arrive a pressure superior to the maximum foreseen, even in the event of a simultaneous damage of the two pressure reducing valves. Once the pressurization system is activated following the procedures listed below, and reached the balance conditions, three following cases can be supposed: Pressurization system activated/efficient instruments

CASE A:

The leaks occurred in the bus ducts remain into the foreseen limits, the system is in balance at a pressurization of 5 mbar and any signalling/safety device is activated. CASE B: Pressurization system activated/efficient instruments /bus ducts with seal anomalies

The leaks occurred in the bus ducts up to anomalies, exceed also the limits of pressurization panel restoring, the pressure inside bus ducts decreases, and when it reach the value of 2,5 mbar the pressure switch for low pressure starts (pos. 2). The anomaly is signalled on the pressurization panel by the light PAL and eventually in the control room so that the operator can take the necessary actions. CASE C: Pressurization system activated/instruments with anomalies occurred

Possible causes are: - Breaking of pressure reducer - 1st reduction step in position 7 The air doesnt pass, the fluid doesnt arrive to the conductors and the pressure switch in pos. 2 signals low pressure alarm (PAL light on), on manometers in pos. 9 there is no reading. - The air passes at the conductors with a pressure superior to 8mbar given by the reducing valve in pos. 8, the pressure switch in pos. 1 signals high pressure alarm (PAH light on) and the relief valve (pos. 3) acts discharging the exceeding pressure. - In the over mentioned case, check the correct adjustment of reducing valve in pos. 8 regulating it again at the work pressure (5mbar)

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

40 / 41

13.4

Procedure for setting up the pressurization system

Starting from the completion of the plant inspection (*), functionally and mechanically, carry out the following steps: - Verify that the two interception valves placed under the first reduction stage (pos. 7)are closed - Operate the manometer (pos. 4, 9) opening the manual interception valve near to the same - Check that no obstacles are present for the use of the relief valve (pos. 3) - Ask the operator of control room to activate the electric circuits of feed and signalling relevant to the pressurization panel. As a consequence the low pressure signals (PAL light) in the bus ducts result activated both on the panel and in the control room. Gradually open the interception manual valve of air feeding of pressurization panel, keeping closed the air interception manual valve at bus ducts. Regulate the first reduction stage acting directly on the reducing valve grip in pos. 7 and take the exit pressure at 1,7 bar read on manometer in pos. 6. Regulate the second reduction stage acting directly on the reducing valve in pos. 8 and take the exit pressure at 5mbar read on the manometer in pos. 9

Gradually open the manual valve of bus duct air interception. When the pressure in the bus ducts reaches 2,5 mbar, the low pressure signalling lamp (PAL) turns off on the panel and in the control room the anomaly signal is lost. The pressure inside the bus ducts continues gradually to increase till stabilize at the foreseen value of 5 mbar. - The procedure of starting/setting is completed.

(*) The pressurization panel supplied by Alfa Standard will reach the site already tested/inspected and regulated for the running following the optimal operating pressure (5 mbar)

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.

COMMESSA / Job N.

SPC N.

INSTALLATION OPERATING & MAINTENANCE MANUAL

2975
Fg - Sh./ di-of

2975 MP18
Rev.

41 / 41

13.5

Quick duct pressurization

If the Committee intends to carry out a quick bus duct pressurization it is necessary to predispose the relevant circuit. 1. Correctly carry out the starting procedure 2. Close the manual valve of bus duct air interception 3. Regulate the second reduction stage acting directly on the reducing valve in pos. 8 and take the exit pressure at a value included between 15 and 20mbar maximum (pressure read on the manometer in pos. 9) 4. Gradually open the manual valve of bus duct air interception 5. It is obliged for the technical personnel who carry out this operation, to constantly check the bus duct loading 6. When the technical personnel who carry out this operation verify that the pressure read on the manometer in pos. 9 is close to the work pressure (5mbar) or exceed it, must immediately close the manual valve of bus duct air interception 7. Regulate again the second reduction stage acting directly on the reducing valve in pos. 8 and take the exit pressure at 5mbar read on the manometer in pos. 9 8. Gradually open the manual valve of bus duct air interception 9. The procedure of rapid starting/setting is completed. 10. The conductor pressure could be superior to 8mbar, the pressure switch in pos. 1 signs high pressure alarm (PAH light on) and the relief valve (pos. 3) acts discharging the excess pressure.

Bus ducts pressure continues gradually to equilibrate till stabilize to the foreseen value of 5mbar.

NOTES 1. in order to check the eventual leaks on the bus duct, it is necessary to use a nebulizer containing water and soap. If such leaks are discovered, they must be plugged. 2. Never exceed the pressure of 20 mbar otherwise Alfa Standard will not be responsible in case of manometers, bushing and coupling breaking present on the bus duct, and interested by air pressure.

Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge. This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.