STORM WATER DRAIN CALCULATION SHEET

Prepared by:

Date: 4-Oct-13

Checked by:

Rain water Calculation for Phu My Hung Apartment


- Determination of design flow:

For roofed area


Q = Cr.Ar.It
Cr = Run-off coefficient for a roofed area =
Ar = Total roofed catchment area, in square metres
It = Rainfall intensity =

1.0
m2
200.0 mm/h for 5 minutes

Maximum flow for downpipe diameter

80mm
100mm
125mm
150mm
200mm

5.7
11.8
22.2
34.7
74.5

l/s
l/s
l/s
l/s
l/s

Maximum flow for roof outlet


Note outlet is 150% of nominal size.

80mm
100mm
125mm
150mm
200mm

4.5
7.5
10.0
13.0
16.0

l/s
l/s
l/s
l/s
l/s

Maximum flow for roof scupper

50mm
80mm
100mm

1.00 l/s
1.80 l/s
3.00 l/s

1.00 For a roofed area - above level 17 floor plan


a Tower
a1 Total area
S=

15.7*14 =

219.80 m2

S1 =

15.7*14/2 =

109.90 m2

S2 =

15.7*14/2 =

109.90 m2

a2 Area No.1
a3 Area No.2

b Design flow:
b1 Total area
Q1 =

12.211 l/s

Q2 =

6.106 l/s

Q3 =

6.106 l/s

b2 Area No.1
b3 Area No.2

c Selection of roof drain


c1 Total area
Select 4 roof drain ( scupper type) DN100
c2 Area No.1
Select 2 roof drain ( dome type) DN150
c3 Area No.2
Select 2 roof drain ( dome type) DN150

2.00 For a roofed area - Level 17 floor


a Area
a1 Total area
S=

22.8*21.3 =

485.64 m2

S2 =

10.5*8 + (8*3/2) =

96.00 m2

S3 =

4*23 =

92.00 m2

S4 =

3*5 =

15.00 m2

S5 =

15*3 =

45.00 m2

S6 =

13 *3 =

39.00 m2

S7 =

3.5*27 + 4*7 + 16*4.5 =

194.50 m2

S8 =

7*15.5 + (15.5*16/2) =

232.50 m2

S9 =

16*8 + 4*10 + (16*3/2) =

192.00 m2

S10 =

15*14 + 8*3.5 + 8*6 + (15*16/2) =

406.00 m2

a2 Area No.2
a3 Area No.3
a4 Area No.4
a5 Area No.5
a6 Area No.6
a7 Area No.7
a8 Area No.8
a9 Area No.9
a10 Area No.10
a11 Area No.11

Form G-005 Rev B Aug 00

Page 1 of 7

10/4/2013

S11 =

22.5*9 + 6*15 + (22.5*16/2)+100=

572.50 m2

S12 =

7*3 + 22.5*13 + (22.5*16/2) =

493.50 m2

S13 =

24*12 + (24*3/2) =

324.00 m2

S14 =

24*13.5 + (24*3/2) =

360.00 m2

a12 Area No.12


a13 Area No.13
a14 Area No.14

b Design flow:
b1 Area No.1
Q1 =

21.584 l/s

Q2 =

4.267 l/s

Q3 =

4.089 l/s

Q4 =

0.667 l/s

Q5 =

2.000 l/s

Q6 =

1.733 l/s

Q7 =

6.483 l/s

Q8 =

7.750 l/s

Q9 =

10.667 l/s

Q10 =

22.556 l/s

Q11 =

31.806 l/s

Q12 =

27.417 l/s

Q13 =

18.000 l/s

Q14 =

20.000 l/s

b2 Area No.2
b3 Area No.3
b4 Area No.4
b5 Area No.5
b6 Area No.6
b7 Area No.7
b8 Area No.8
b9 Area No.9
b10 Area No.10
b11 Area No.11
b12 Area No.12
b13 Area No.13
b14 Area No.14

c Selection of roof drain


c1 Area No.1
Select 4 planter drain ( scupper type) DN65
c2 Area No.2
Select 2 planter drain (scupper type) DN65
c3 Area No.3
Select 2 planter drain (scupper type) DN65
c4 Area No.4
Select 1 planter drain (scupper type) DN65
c5 Area No.5
Select 2 planter drain (scupper type) DN65
c6 Area No.6
Select 2 planter drain (scupper type) DN65
c7 Area No.7
Select 4 planter drain (scupper type) DN65
c8 Area No.8
Select 4 planter drain (scupper type) DN65
c9 Area No.9
Select 1 roof drain (dome type) DN150
c10 Area No.10
Select 1 roof drain (dome type) DN150 & 1 DN100
c11 Area No.11
Select 1 roof drain (dome type) DN150 & 1 DN100
c12 Area No.12
Select 1 roof drain (dome type) DN150 &1 DN100
c13 Area No.13 & Area No.14
Select 2 roof drain (dome type) DN150 & 1 DN100

d Design of pipe drain:


- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
d1 Area No.9
1 pipe DN200
Q9= 10.67

i=1%

d2 Area No.10

1 pipe DN200

Q10= 22.56

i=1%

1 pipe DN200

Q = 33.22

i=1%

d3 Area No.11

1 pipe DN200

Q11= 31.81

i=1%

d4 Area No.12

1 pipe DN200

Q12= 27.42

i=1%

1 pipe DN200

Q = 59.22

Total:

Total:

Form G-005 Rev B Aug 00

Q9 + Q10

Q11 + Q12

Page 2 of 7

i=1.65%

10/4/2013

d5 Area No.13

1 pipe DN200

Q13= 18.00

i=1%

d6 Area No.14

1 pipe DN200

Q14= 20.00

i=1%

1 pipe DN200

Q = 38.00

i=1%

Total:

Q11 + Q12

3.00 For a roofed area - Plant room


a Area
S=

61*12.5 +(61*1.45/2) = 806.73

m2

b Design flow:
Q = 44.818

l/s

c Selection of roof drain


Select 3 box gutter drain - 3 downpipe DN150
d Design of pipe drain:
- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
1 pipe DN200

Q1= 44.82

i=1.65%

4.00 For a roofed area - Nuclear area


a Area
S=

30*20 = 600.00

m2

b Design flow:
Q = 33.333

l/s

c Selection of roof drain


Select 8 scupper drain DN100
d Design of pipe drain:
- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
8 pipe DN100

Q1= 4.17

i=1.65%

5.00 For a roofed area - Substation area


a Area
S=

11*18 =

198.00

m2

b Design flow:
Q = 11.000

l/s

c Selection of roof drain


Select 4 scupper drain DN100
d Design of pipe drain:
- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
2 pipe DN100
Q1= 2.75

i=1.65%

6.00 For a roofed area - B1 Housing


a Area
Area No.1
S1 =

13*9 = 117.00

m2

S2 =

8*14 = 112.00

m2

Area No.2
Area No.3
S3 =

13*4 + (13*3/2) = 71.50

m2

S4 =

4.5*4 + (4.5*3/2) = 24.75

m2

Area No.4
Area No.5
S5 =

13*9 + 6.5*2.5 + (10.5 + 6.5)*3/2 = 158.75

m2

Area No.6
S6 =

5.5*2 + (5.5*3/2) = 19.25

m2

S7 =

8*5 + (8*3/2) = 52.00

m2

Area No.7
b Design flow:
Q1 =
Q2 =
Q3 =
Q4 =
Q5 =
Q6 =
Q7 =

6.500
6.222
3.972
1.375
8.819
1.069
2.889

l/s
l/s
l/s
l/s
l/s
l/s
l/s

c Selection of roof drain


S1 =
S2 =
S3 =

Form G-005 Rev B Aug 00

Select 1 roofdrain DN100 ( dome type)


Select 1 roofdrain DN100 ( dome type)
Select 1 roofdrain DN100 ( dome type)

Page 3 of 7

10/4/2013

S4 =
S5 =
S6 =
S7 =

Select 1 roofdrain DN100 ( dome type)


Select 3 roofdrain DN100 ( dome type)
Select 1 roofdrain DN100 ( dome type)
Select 1 roofdrain DN100 ( dome type)

d Design of pipe drain:


- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
d1 Area No.1
1 pipe DN100
Q1= 6.50
d2 Area No.2
1 pipe DN100
Q2= 6.22
d3 Area No.3
1 pipe DN100
Q3= 3.97
d4 Area No.4
1 pipe DN100
Q4= 1.38
d5 Area No.5
3 pipe DN100
Q5= 8.82
d6 Area No.6
1 pipe DN100
Q6= 1.07
d7 Area No.7
1 pipe DN100
Q7= 2.89

i=1.65%
i=1.65%
i=1.65%
i=1.65%
i=1.65%
i=1.65%
i=1.65%

7.00 For a roofed area - B2 Housing


a Area
Area No.1
S1 =

12*8 = 96.00

m2

S2 =

12*5.5= 66.00

m2

S3 =

11*4 + 7*1 + 5*1 + (18*3/2) = 83.00

m2

Area No.2
Area No.3

b Design flow:
Q1 = 5.333
Q2 = 3.667
Q3 = 4.611
c Selection of roof drain
Area No.1
Area No.2
Area No.3

l/s
l/s
l/s

Select roof drain DN100 (dome type)


Select roof drain DN100 (dome type)
Select roof drain DN100 (dome type)

d Design of pipe drain:


- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
d1 Area No.1
1 pipe DN100

Q1= 5.33

i=1.65%

1 pipe DN100

Q2= 3.67

i=1.65%

1 pipe DN100

Q3= 4.61

i=1.65%

d2 Area No.2
d3 Area No.3

8.00 For a roofed area - B3 Housing


a Area
Area No.1
S1 =

14*7 = 98.00

m2

S2 =

6.5*3.5 = 22.75

m2

S3 =

4.5*7 + 1.5*6 + (13*3/2) + 23 = 83.00

m2

Area No.2
Area No.3
b Design flow:
Q1 = 5.444
Q2 = 1.264
Q3 = 4.611
c Selection of roof drain
Area No.1
Area No.2
Area No.3

l/s
l/s
l/s

Select roof drain DN100 (dome type)


Select roof drain DN100 (dome type)
Select roof drain DN100 (dome type)

d Design of pipe drain:


- All plastic pipelines usage: k = 0.015
- Velocity in the pipelines not to exceed 1.5m/s
- Detemine from Figure 5.1 ( AS/AZN 3500.3.2-1998) the hydraulic capacity of the pipe drain for the selected DN
6 pipe DN100 ( Q1 = 8 l/s)
d1 Area No.1
1 pipe DN100
Q1= 5.44
d2 Area No.2
1 pipe DN100
Q2= 1.26

Form G-005 Rev B Aug 00

Page 4 of 7

i=1.65%
i=1.65%

10/4/2013

d3 Area No.3
1 pipe DN100

Form G-005 Rev B Aug 00

Page 5 of 7

Q3= 4.61

i=1.65%

10/4/2013

STORM WATER DRAIN CALCULATION SHEET


Prepared by:

Date

4-Oct-13

Checked by:
II

For site drainage area


Based on formular:

Q=
CIA/3600
l/s
C = Run-off coefficient (Surface runoff)
I = Rainnfall intensity, ( 220 mm/h )
A = Drainage area
( m2 )
Q = Rainfall runoff
( l/s )
C.B.
No.

Total area
m2

Rainfall Total flow


( mm/h )
l/s

Outlet
ELEV.

To MH
or CB No.

Slope
%

Drop
(m)

Inlet EL. of
enter MH/CB

Size (Cal.)
DN (dm)

Size (Act.)
DN (mm)

Housing area
CB1
CB2
CB01
CB3
CB4
CB5
CB6
CB7
CB8
CB9
CB10
CB11
CB12
CB13
CB14
CB15
CB16
CB17
CB18
CB19
CB20

352
736
272
1033
1170
442
1940
2240
2640
2870
400
650
220
1080
1460
1840
650
1040
1520
1820
3650

180
180
180
180
180
180
180
180
180
180
180
160
160
160
160
160
160
160
160
160
160

14.08
29.44
10.88
41.32
46.8
17.68
77.6
89.6
105.6
114.8
16
23.11
7.82
38.40
51.91
65.42
23.11
36.98
54.04
64.71
129.78

0.33
CB 2
0.23
CB 3
0.35
CB 3
0.09
CB 4
0.02
CB 6
0.12
CB 6
-0.01
CB 7
-0.13
CB 8
-0.21
CB 9
-0.29 Exist. MH
0.46
CB 11
0.36
CB 13
0.36
CB 13
0.26
CB 14
0.19
CB 15
0.11
CB 19
0.35
CB 17
0.23
CB 18
0.11
CB 19
0.03
CB 20
-0.03 Exist. MH

0.75
1.00
1.00
0.40
0.40
0.40
0.40
0.30
0.30
0.40
0.75
0.75
0.75
0.40
0.40
0.40
0.40
0.40
0.30
0.30
0.40

0.09
0.23
0.24
0.06
0.02
0.12
0.12
0.07
0.07
0.40
0.09
0.09
0.09
0.06
0.07
0.07
0.11
0.11
0.07
0.05
0.07

0.24
0.00
0.11
0.03
0.00
0.00
-0.13
-0.20
-0.28
-0.69
0.37
0.27
0.27
0.20
0.12
0.04
0.24
0.12
0.04
-0.02
-0.10

1.4
1.8
1.2
2.4
2.5
1.8
3.1
3.4
3.6
3.6
1.5
1.7
1.2
2.4
2.6
2.9
1.9
2.3
2.8
3.0
3.7

200
200
200
300
300
300
300
400
400
400
200
200
200
300
300
300
300
300
400
400
400

160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160

23.47
42.67
168.33
12.67
188.33
22.00
32.00
234.33
300.00
14.67
358.33
14.67
20.00
47.67
416.67
11.33
430.00
22.04
137.96
149.69

0.03
CB 2
-0.07
CB 3
-0.11
CB 5
-0.05
CB 5
-0.16
CB 8
0.00
CB 7
-0.08
CB 8
-0.09
CB 9
-0.25
CB 11
-0.10
CB 11
-0.35
CB 15
-0.20
CB 15
-0.10
CB 14
-0.25
CB 15
-0.46
MHs 6
-0.35
MHs 6
-0.57 Exist. MH
-0.24
CB 18
-0.34
CB 19
-0.38
CB 23

0.40
0.40
0.25
0.40
0.25
0.50
0.50
0.30
0.25
0.40
0.30
0.50
0.50
0.60
0.30
0.50
0.30
0.40
0.25
0.25

0.09
0.04
0.04
0.08
0.03
0.09
0.09
0.05
0.09
0.10
0.08
0.07
0.14
0.15
0.10
0.07
0.04
0.09
0.04
0.04

-0.06
-0.11
-0.15
-0.13
-0.19
-0.09
-0.17
-0.14
-0.34
-0.20
-0.43
-0.27
-0.24
-0.40
-0.56
-0.42
-0.61
-0.33
-0.38
-0.42

2.0
2.5
4.5
1.6
4.7
1.8
2.1
4.9
5.6
1.6
5.7
1.6
1.8
2.4
6.1
1.4
6.1
1.9
4.2
4.3

400
400
500
300
500
300
300
500
600
300
600
300
300
400
600
300
600
400
500
500

Main building
CB1
CB2
CB3
CB4
CB5
CB6
CB7
CB8
CB9
CB10
CB11
CB12
CB13
CB14
CB15
CB16
MHs06
CB17
CB18
CB19

660
1200
5050
380
5650
660
960
7030
9000
440
10750
440
600
1430
12500
340
12900
620
3880
4210

CB20
CB21
CB22
CB23
CB24
CB25
CB26
CB27
CB28
CB29
CB30
CB31
CB32
CB33
CB34
MHs07

480
980
1470
5870
6150
800
7350
700
9300
640
1030
11400
380
1140
12600
12600

160
160
160
160
160
160
160
160
160
160
160
160
160
160
160
160

17.07
34.84
52.27
208.71
218.67
28.44
261.33
24.89
330.67
22.76
36.62
405.33
13.51
40.53
448.00
448.00

-0.25
-0.30
-0.35
-0.42
-0.48
-0.12
-0.53
-0.12
-0.06
-0.50
-0.55
-0.70
-0.50
-0.60
-0.76
-0.79

CB 21
CB 22
CB 23
CB 24
CB 26
CB 26
CB 28
CB 28
CB 31
CB 30
CB 31
CB 34
CB 33
CB 34
MHs 7
MHs 7

0.30
0.40
0.40
0.30
0.30
0.60
0.25
0.60
0.25
0.40
0.50
0.30
0.40
0.50
0.40
0.40

0.04
0.05
0.05
0.05
0.04
0.08
0.06
0.10
0.09
0.05
0.06
0.05
0.09
0.10
0.03
0.03

-0.29
-0.35
-0.40
-0.47
-0.52
-0.20
-0.59
-0.22
-0.15
-0.55
-0.61
-0.75
-0.59
-0.70
-0.79
-0.82

1.8
2.3
2.6
4.7
4.8
2.0
5.3
1.9
5.8
1.9
2.2
6.0
1.6
2.3
5.9
5.9

300
300
400
500
500
300
600
300
600
400
400
600
400
400
600
600