Professional Documents
Culture Documents
More laurels
In 2003, Toyota recalled 79% fewer vehicles in US than Ford and 92% fewer than Chrysler. According to Consumer Reports, 15 out of the 38 most reliable models from any manufacturer over the last seven year came from Toyota/Lexus. According to J.D. Powers ranking for initial quality and long-term durability, Lexus was #1 most reliable car in 2003 followed by Porsche, BMW and Honda. Not a single Toyota car is on the dreaded vehicles to avoid list published by Consumer Reports. About 50% of the GMs and more than 50% of the Chryslers are to be avoided.
zaib919
The Toyota Way
4P model Philosophy (Long-term thinking) Process (eliminate waste) Kaizen People and partners (Respect, Challenge them to achieve more, Grow leaders) Problem-solving (Continuous improvement and learning) Genchi genbutsu
Taiichi Ohno (founder of TPS) All we are doing is looking at the time line from the moment the customer gives us an order to the point when we collect the cash. And we are reducing that time line by removing the non-value-added waste.
Identify activities that add value to raw material, and get rid of everything else. Start with the customer, by asking yourself what value are we adding from the customers perspective? The only thing that adds value in any type of process, is the physical or information transformation of that product, service or activity into something the customer wants.
zaib919
Comparison of people and material in your shop dont make them wait. Because it transforms into your internal and external customer becoming impatient.
Toyota story
The mistake-proof loom became Toyodas most popular model and in 1929, his son Kichiro, negotiated the sale of patent rights to Platt Brothers of England for 100,000. In 1930, these funds were used to start building the Toyota Motor Corp. Kichiros contribution to the Toyota philosophy JIT. What is JIT? marriage between the Fords idea of assembly line and US supermarket system of replacing products on the shelves just in time as customer purchased them. Not much later WWII started. Post-WWII, rampant inflation meant getting paid by customers was very difficult. Cash-flow problems lead to pay cuts. When situation worsened, 1600 workers were asked to retire voluntarily. The resultant work stoppages and public demonstrations by workers led to resignation of Kichiro. Eiji Toyoda took over as president. Eijis main contribution leadership towards development of the TPS. Eiji hired Taiichi Ohno as the plant manager and asked him to improve Toyotas manufacturing process so that it equals the productivity of Ford. Deming told the Japanese industry about meeting and exceeding customer satisfaction. Also broadened the definition of customer to include both internal as well as external customers.
zaib919
The next process is the customer became the most significant expression for JIT, because in a pull system it means the proceeding process must always do what the subsequent process says. Otherwise JIT wont work. Demings PDCA cycle led to Kaizen.
Shortening lead time by eliminating waste in each step of a process leads to best quality and lowest cost, while improving safety and morale. Toyota system demonstrates that focusing on quality actually reduced cost more than focusing only on cost.
14 Toyota-Way Principles
Section I Long-term philosophy Principle 1: Base your management decisions on a long-term philosophy, even at the expense of short-term financial goals.
Section II The Right processes will produce the right results Principle 2: Create continuous process flow to bring problem to the surface.
zaib919
Principle 3: Use pull system to avoid overproduction. Principle 4: Level out the workload (heijunka). (work like a tortoise not the hare.) Principle 5: Build the culture of stopping to fix problems to get quality right the first time. Principle 6: Standardize tasks are the foundation for continuous improvement and employee empowerment. Principle 7: Use visual control so no problems are hidden. Principle 8: Use only reliable, thoroughly tested technology that serves your people and processes.
Section III Add value to the organization by developing your people and partners Principle 9: Grow leaders who thoroughly understand the work, live the philosophy, and teach it to others. Principle 10: Develop exceptional people and teams who follow your companys philosophy. Principle 11: Respect your extended network of partners and suppliers by challenging them and helping them improve.
Section IV Continuously solving root problem drives organizational learning Principle 12: Go and see for yourself to thoroughly understand the situation (genchi genbutsu). Principle 13: Make decisions slowly by consensus, thoroughly considering all options, implement decisions rapidly. Principle 14: Become a learning organization through relentless reflection (hensei) and continuous improvement (kaizen). So we see that the JIT, Lean, 5S etc. are just tools that enable quality and productivity. TPS is much more than that!
zaib919
Types of waste
Overproduction: Producing items for which there are no orders, which generates such wastes as overstaffing and storage and transportation costs because of excess inventory. Waiting: Workers having to stand around waiting for the next processing step, tool, part etc. Or no work because of stock-outs, lot processing delays, equipment downtime, and capacity bottlenecks. Unnecessary transport: Carrying WIP long distances, creating inefficient transport, or moving parts in and out of storage facility. Over-processing or incorrect processing: Taking unneeded steps to process the parts. Inefficient processing due to poor tools and product design, causing unnecessary motion and producing defects. Waste generated when providing higher-quality products than is necessary. Excess inventory: Excess raw material, WIP or finished goods causing longer lead times, obsolescence, damaged goods. Extra inventory hides problems such as production imbalances, late deliveries from suppliers, defects, equipment downtime, and long set-ups. Unnecessary movements: Any wasted motion employees have to perform during the course of their work, such as looking for, reaching for, or stacking parts, tools etc. Walking is a waste. Defects: Production of defective parts or correction. Repair or rework, scrap, replacement production, and inspection mean wasteful handling, time and efforts. Unused employee creativity: Losing ideas, skills, improvements, and learning opportunities by not engaging or listening to your employees.
Eliminating Waste
First step in removing non-value added steps from a process is to map the process. Map the value stream following the actual path taken by the part in the plant. Walk the full path yourself (genchi genbutsu). One can draw the path on a layout and calculate the time and distances traveled (spaghetti diagram). Traditional cost saving focuses on value-added items and try to improve those. TPS focuses on the entire value stream to eliminate the non-value adding items.
zaib919
Traditional process improvement vs. TPS
Traditional approach focuses on identifying local efficiencies. Go to the equipment, the valueadded processes, and improve uptime, or make the cycle faster, or replace the person with automated equipment. In TPS, large numbers of non-value-added steps are squeezed out. One way to achieve this is through cell formation (cellular manufacturing), which should ideally result in one-piece flow of products or services.