PROPOSED VANS WAREHOUSE AND OFFICE BUILDING DIVISION 3 CONCRETE SECTION 03 35 23 - Exposed Aggregate Concrete Finishing

July 2013

Project : Location : DIVISION 3

Proposed Vans Warehouse and Office Building San Vicente, San Pedro, Laguna CONCRETE Exposed Aggregate Concrete Finishing / Sand Blasted Finish

SECTION 03 35 23 PART 1 1.1

GENERAL

PROJECT INCLUDES: A B Plaster for exterior and interior walls Sandblasting Equipment

1.2 QUALITY ASSURANCE A B Performance: Fire, structural and seismic performance should meet requirements of national building code and local authorities. Conform to the following provisions: ASTM C150 Portland Cement ASTM C631 Bonding Compound for Interior Plastering ASTM C926 Application of Portland Cement based Plaster ASTM E119 Methods for Fire Test of Building Construction and Materials ASTM C33 / C33M - 13 Standard Specification for Concrete Aggregates 1.3 SUBMITTALS A. Samples: Submit sample of coarse aggregate for approval of architect D. Field Sample: Prepare concrete wall sample to indicate range of sandblast finish textures for preliminary selection by Architect. Upon approval, produce final 4 square meters sample on concrete wall for final approval by Architect

PART 2 2.1

PRODUCTS

MATERIALS A Plaster

Exposed Aggregate Concrete Finishing 03 35 23

Page 1 of 3

PROPOSED VANS WAREHOUSE AND OFFICE BUILDING DIVISION 3 CONCRETE SECTION 03 35 23 - Exposed Aggregate Concrete Finishing
1 2 3 4 B Portland Cement Fine Aggregates Coarse Aggregates : 1/4" Maximum Finish: Troweled finish

July 2013

Auxiliary materials 1 2 3 Plasterbond: Use N&H Plasterbond, apply on wall areas prior to plastering. Application shall be as per manufacturer recommendation. Bonding compounds and agents to conform to ASTM C631 Corner Bead for all openings, corners, and per Architects and/or Project Managers requirement. EXECUTION

PART 3

3.1 ABRASIVE-BLAST FINISH A. Abrasive-Blast Finish: Provide abrasive-blast finish where indicated on the Drawings. Abrasive-blast finish is noted as "sandblast" or "sandblasted" on the Drawings. 1. Perform abrasive blasting 24 to 72 hours after casting when concrete strength ranges between 1000 and 1500 psi (6.9 and 10.3 MPa). 2. Coordinate with formwork construction, concrete placement schedule, and formwork removal to ensure that surfaces to be abrasive blasted are treated at the same age for uniform results. B. Surface Continuity: Perform abrasive-blast finishing in as continuous an operation as possible, utilizing same work crew to maintain continuity of finish on each surface or area of Work. Maintain required patterns or variances in depths of blast to match design reference sample or mockup. C. Depth of Cut: Use an abrasive grit of proper type and gradation to expose aggregate and surrounding matrix surfaces to match design reference sample or mockup, as follows: 1. Brush: Remove cement matrix to eliminate surface sheen and expose face of fine aggregate. No reveal. 2. Light: Expose fine aggregate with occasional exposure of coarse aggregate and uniform color. Maximum reveal 1/16-inch (1.5 mm). 3. Medium: Generally expose coarse aggregate with slight reveal. Maximum reveal 1/4-inch (6 mm). 4. Heavy: Expose and reveal coarse aggregate to a maximum projection of one-third of its diameter; reveal 1/4- to 1/2-inch (6 to 12 mm). D. Abrasive Blasting: Abrasive blast corners and edges of patterns carefully, using backup boards, to maintain uniform corner or edge line. Determine type of nozzle, nozzle

Exposed Aggregate Concrete Finishing 03 35 23

Page 2 of 3

PROPOSED VANS WAREHOUSE AND OFFICE BUILDING DIVISION 3 CONCRETE SECTION 03 35 23 - Exposed Aggregate Concrete Finishing

July 2013

pressure, and blasting techniques required to match design reference sample or mockup. E. Concrete Cleaning: After abrasive blasting to required depth is completed, clean surface with commercial concrete cleaner, as produced by ProSoCo or equal, according to the manufacturer's instructions and recommendations. 1. Thoroughly neutralize and flush cleaning solution from finished surfaces with water under pressure. 2. Protect adjacent materials and finishes from washing and run-off. End of Section 03 35 23

Exposed Aggregate Concrete Finishing 03 35 23