Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


CHECK LIST FOR TESTING OF CP & RP EHV Sub Stn Panel Make Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12

132 KV NIWALI AREVA

Bay Type -

TRAFO-2 1T2A,1T2B

Date DC Voltage -

16/02/2012

220 V

Particulars of the test Check and confirm CP / RP wiring as per the schematic Check and confirm condition of all Relays / MFM / Meters in CP / RP Check the wiring between CP and RP as per the schematic Check the condition of TBs / TTBs / Fuses / MCBs in CP / RP Check and confirm earthing of CP / RP Check and confirm connection of 1ph AC supply and illumination in CP / RP Check and confirm Insulation of wiring in CP / RP with 500V Insulation tester Check and confirm sufficient insulation between AC and DC terminals before connecting AC / DC supply with 500V Insulation tester in CP / RP Check and confirm operation of all DC supervision relays by either switching OFF of respective MCB or removal of fuses Check and confirm presence of DC voltage in concerned circuit only after switching ON of respective MCB / Fuse Check and confirm connection of 48V DC supply Check and confirm DC fail annunciation along with operation of respective Relays after switching OFF of MCB / Fuse of each circuit in CP / RP

Whether carried out

Check List for TBC Operations

Where ever No or Not Applicable (NA) selected, mention specific remarks on attached sheet

Page 1 of 3

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


13 14 15 16 17 18 19 20 Check and confirm operation of Annunciation windows along with respective Bell / Hooter Check and confirm operation of Indication lamps and semaphores with the operation of respective Isolator / CB Check and confirm wiring of PT selection scheme / TBC Check and confirm wiring between CP / RP and respective CB / CT / Isolators Check and confirm operation of respective CMR during the operation of CB / Isolators in CP

Dy. Ex. Engineer EHV Testing Unit Testing Division -

PROJECT LATUR

Check List for TBC Operations

Where ever No or Not Applicable (NA) selected, mention specific remarks on attached sheet

Page 2 of 3

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


Remarks about check point where No or NA selected SrNo 1. 2. 3. 4. 5. 6. 7. 8. 9. Short Description of Check Point Remarks

Check List for TBC Operations

Where ever No or Not Applicable (NA) selected, mention specific remarks on attached sheet

Page 3 of 3