You are on page 1of 4

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


CHECK LIST FOR TESTING OF BACKUP PROTECTION RELAY EHV Sub Station Relay Make Direction Sr. No. 1 2 3 4 5 6 7 8 9 10 11 12 Particulars of the test Pickup Test for Ph O/C Element ( R, Y & B ) Pickup Test for E/F Element IDMT Ph O/C Time of Operation for 2xIn, 3xIn, 4xIn IDMT E/F Time of Operation for 2xIe, 3xIe, 4xIe DMT(HS) Ph O/C Operational Current & Timing (R, Y & B) DMT(HS) E/F Operational Current & Timing Ph O/C Maximum Torque Angle (Characteristic Angle ) E/F Maximum Torque Angle (Characteristic Angle ) Configuration of LEDs as per schematic Ph O/C Operation Indications R Ph, Y Ph, B Ph (Flag / LED ) E/F Operation Indication ( Flag / LED ) DMT(HS) Ph O/C Operation ( Flag / LED )
Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet Page 1 of 4

Bay Type -

Date Sr. No. -

Whether carried out

Check List for Testing of B/U Relay

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 DMT(HS) E/F Operation ( Flag / LED ) Communication with relay through laptop Setting changes through laptop / HMI Output Contact Configuration through lap top / HMI Input (opto-coupler) Configuration through lap top / HMI Checking of all Inputs by external simulation on relay display Checking of all Output contacts / relay during testing DR trigger settings adopted as per standard practice DR Trigger checking as per settings adopted DR downloading and conversion to CFG format Calculation and settings of Ph O/C PSM, TMS and DMT (HS) Calculation and settings of E/F PSM, TMS and DMT (HS) Operation of Master Trip Relay by Backup Protection Confirm CT star point towards object to be protected is set in the relay.(Confirm P1
terminal is towards Bus)

Annunciation confirmation on control panel Confirmation of Load current and angle on relay display Confirmation of PT voltages and angle on relay display
Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet Page 2 of 4

Check List for Testing of B/U Relay

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


30 31 32 33 34 35 36 37 38 39 40 Confirmation of PT neutral connection to relay by removing 1ph PT fuse Confirmation of Direction with available load current for O/C element Confirmation of Direction with available load current for E/F element Confirm testing of relay through TTB, if provided. Confirm blocking of Tripping and CT shorting while testing the relay through TTB

Dy. Ex. Engineer EHV Testing Unit -

Project

Testing Division -

LATUR

Check List for Testing of B/U Relay

Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet

Page 3 of 4

Maharashtra State Electricity Transmission Company

Testing & Communication Circle, Aurangabad


Remarks about check point where No or NA selected Sr. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Short Description of Check Point Remarks

Check List for Testing of B/U Relay

Where ever No or Not Applicable (NA) selected, mention specific remarks on separate sheet

Page 4 of 4