Professional Documents
Culture Documents
Agenda
History of the API nuclear calibration pits Introduction to the pits The purpose of the facility Usage and maintenance Operation of the pits
API Nuclear Calibration Facility Gamma Ray and Neutron Porosity Gamma Ray Spectroscopy
(POTASSIUM-URANIUM-THORIUM, K-U-Th)
K-U-Th
54 Years Ago
Core Preparation
Construction
Neutron pit
Technical Information
API RP 33 Web site:
http://welllogging.egr.uh.edu/Information.html
K-U-Th Pits
Constructed in 1983 Agreement between API and U of Houston (1982-1983)
API provided funds UH provided land and maintenance Treated as an addition to the gamma ray and neutron pits
K-U-Th
Technical Information
API RP 65
has not been officially endorsed by API Presented in Well Logging Laboratory Technical Report No. 23 (2002)
Web site:
http://welllogging.egr.uh.edu/Information.html
20 15 10 5 0 00 01 02 03 04 05 Year 06 07 08 09 10 11
Annual Reports
Before 1995: Mr. C. O. Liles American Petroleum Institute 700 North Pearl Street, Suite 1840 Dallas, TX 75201-2845 1995-2000
Mr. Tim Sampson American Petroleum Institute 1220 L street, NW Washington, DC 20005