Componente / Subproyecto
PPTO
S/.
6,857,734.79
PIP Viable
Imprevistos
S/.
835,569.92
Total PPTO
S/.
7,693,304.71
PIP a Verificar
Total PPTO
S/.
29,440,066.29
Diferencia
S/.
21,746,761.58
%
282.7%
1,869,468.21
686,056.49
224,294.75
82,311.57
2,093,762.96
768,368.06
8,349,106.79
1,981,404.97
6,255,343.83
1,213,036.91
298.8%
157.9%
960,360.74
884,505.48
1,523,756.19
933,587.68
532,161.16
401,426.52
12,677,784.17
373,385.48
6,260,549.04
610,139.58
1,012,387.17
0.00
1,981,001.07
2,657,021.22
6,043,849.65
1,075,197.76
993,838.06
1,789,037.69
2,185,776.14
118,869.37
109,480.33
188,604.07
112,009.83
63,847.55
48,162.28
1,119,895.83
30,991.00
554,041.06
53,995.64
89,593.43
0.00
175,313.05
235,138.94
534,863.77
95,151.99
87,951.88
158,324.83
193,435.07
1,079,230.11
993,985.81
1,712,360.26
1,045,597.51
596,008.71
449,588.80
13,797,680.00
404,376.48
6,814,590.10
664,135.22
1,101,980.60
0.00
2,156,314.12
2,892,160.16
6,578,713.42
1,170,349.75
1,081,789.94
1,947,362.52
2,379,211.21
6,258,537.95
3,830,659.43
3,547,324.52
5,473,032.63
2,811,242.57
2,661,790.06
21,621,583.12
1,671,270.10
8,713,082.83
1,666,058.83
2,383,672.17
728,948.91
1,064,116.74
2,870,286.18
11,237,230.19
1,629,204.01
3,540,315.01
2,443,022.66
3,624,688.51
5,179,307.84
2,836,673.62
1,834,964.26
4,427,435.12
2,215,233.86
2,212,201.26
7,823,903.12
1,266,893.62
1,898,492.73
1,001,923.61
1,281,691.57
728,948.91
-1,092,197.38
-21,873.98
4,658,516.77
458,854.26
2,458,525.07
495,660.14
1,245,477.30
479.9%
285.4%
107.2%
423.4%
371.7%
492.0%
56.7%
313.3%
27.9%
150.9%
116.3%
19,535,518.96
1,955,465.75
21,490,984.71
51,061,649.41
29,570,664.70
137.6%
-50.7%
-0.8%
70.8%
39.2%
227.3%
25.5%
52.3%
Partida
Und
Metrado
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.01.03
01.01.01.04
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.03.04
01.02.03.05
01.02.03.06
01.02.03.07
01.02.04
01.02.04.01
mes
m2
und
und
m2
222.33
PIP Viable
Precio
S/.
1.63
100.00
12.25
KM
KM
KM
3.00
10,098.90
2.00
2,390.62
m
m3
150.00
1,000.00
24.85
2.68
Parcial
S/.
1,366,071.04
43,072.84
1,587.40
Metrado
PIP a Verificar
Precio
S/.
6.00
8,815.14
1.00
1.00
30.00
3,356.39
6,253.01
24.47
2.00
2.00
5.00
21,439.17
11,563.11
6,554.83
3,356.39
6,253.01
734.10
98,778.71
42,878.34
23,126.22
32,774.15
617.29
742.62
1,644.30
3,905.53
3.88
9.68
46.60
24.64
4,646,912.02
182,440.29
2,395.09
7,188.56
76,624.38
96,232.26
4,107.85
76.33
4,306,782.37
313,552.19
25,667.88
8,127.27
4.86
370.79
124,745.90
3,013,510.44
1,362.15
1,966.73
1,934.18
3,900.91
504.29
32.53
21.19
9.62
686,918.62
63,977.73
40,985.27
37,526.75
315.98
64.36
20,336.47
362.40
1,225.00
35,077.94
30,296.70
4,781.24
6,407.50
3,727.50
2,680.00
1,320,407.52
28,605.57
7,282.59
14,761.61
m3
m3
m3
m3
m3
1,759.08
1,465.90
4.14
10.07
439.77
14.92
m2
1,541.15
19.44
6,561.37
1,267,751.40
29,959.96
kg
m3
m3
m3
m2
m2
m2
m3
m
m
m
m
m
3,384.12
3.62
12,250.51
8,765.76
175.22
1,752.20
123.66
356.15
15.76
1,083,973.88
62,404.60
27,614.67
839.87
32.52
27,312.57
200.00
200.00
22.75
3.48
4,550.00
696.00
222.33
85.41
18,989.21
35.00
149.40
5,229.00
22,947.60
3,064.00
129.16
212.72
4,780.36
11,015.95
112,495.39
3,013,510.44
-1,083,973.88
624,514.02
36,363.06
40,985.27
37,526.75
-27,312.57
20,336.47
-4,550.00
-696.00
5,229.00
-18,989.21
22,947.60
3,064.00
129.16
212.72
4,780.36
11,015.95
3,028.11
717.30
14,322.14
1,968.55
3,028.11
717.30
13,877.69
1,968.55
m
und
und
m3
m2
200.00
2.00
4.00
20.74
144.32
15.32
64.58
53.18
230.49
76.33
m3
m2
6.34
90.00
477.62
7.97
25.79
76.33
444.45
m2
Parcial
S/.
5,689,465.18
162,013.05
63,234.34
52,890.84
-100.0%
-100.0%
-100.0%
-100.0%
3122.4%
Item
Partida
Und
Metrado
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.05
01.02.05.01
01.02.05.01.01
01.02.05.01.02
01.02.05.01.03
01.02.05.01.04
01.02.05.01.05
01.02.05.01.06
01.02.05.02
01.02.05.02.01
01.02.05.02.02
01.02.05.02.03
01.02.05.02.04
01.02.05.02.05
01.02.05.02.06
01.02.05.02.07
01.02.05.03
01.02.05.03.01
01.02.05.03.02
01.02.05.03.03
01.02.05.03.04
01.02.05.03.05
01.02.05.04
01.02.05.04.01
01.02.05.04.02
01.02.05.04.03
01.02.05.04.04
01.02.05.04.05
01.02.05.05
01.02.05.05.01
01.02.05.05.02
01.02.05.05.03
01.02.05.05.04
01.02.05.05.05
01.02.05.05.06
01.02.05.06
01.02.05.06.01
01.02.05.06.02
01.02.05.06.03
01.02.05.07
01.02.05.07.01
01.02.05.08
01.02.05.08.01
01.02.05.08.02
01.02.05.09
m3
m2
m2
und
und
und
und
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
20.11
57.44
57.44
2.00
1.00
1.00
1.00
180.78
263.67
PIP a Verificar
Precio
S/.
477.62
32.53
9.62
60.64
206.28
180.78
263.67
23,606.10
m3
m3
m3
m2
m3
kg
2.42
2.91
6.44
11.76
10.58
58.80
35.87
54.79
115.37
36.05
477.62
4.86
m3
m3
m3
m2
0.71
0.85
1.88
11.10
35.87
54.79
115.37
76.33
m3
m2
m2
4.83
11.10
11.10
410.13
32.53
9.62
m2
20.24
76.33
kg
m3
m2
m2
221.50
1.69
20.24
20.24
4.86
504.29
32.53
9.62
m2
14.40
76.33
kg
m3
m2
m2
158.10
0.90
7.20
7.20
4.86
504.29
32.53
9.62
m2
22.97
76.33
kg
m3
und
m2
m2
189.01
1.16
231.00
30.31
30.31
4.86
477.62
2.00
32.53
9.62
m2
m2
m2
47.62
98.05
98.05
105.40
32.53
7.19
m3
3.45
432.67
und
und
1.00
1.00
1,064.06
555.34
Parcial
S/.
9,604.94
1,868.52
552.57
121.28
206.28
120,419.62
6,752.17
86.81
159.44
742.98
423.95
5,053.22
285.77
3,584.99
25.47
46.57
216.90
847.26
1,980.93
361.08
106.78
4,326.78
1,544.92
1,980.93
361.08
106.78
4,326.78
1,544.92
1,076.49
852.25
658.41
194.71
2,624.86
1,099.15
1,076.49
852.25
658.41
194.71
2,624.86
1,099.15
768.37
453.86
234.22
69.26
4,965.49
1,753.30
768.37
453.86
234.22
69.26
4,965.49
1,753.30
918.59
554.04
462.00
985.98
291.58
8,913.70
5,019.15
3,189.57
704.98
1,492.71
1,492.71
1,619.40
1,064.06
555.34
4,599.32
918.59
554.04
462.00
985.98
291.58
8,913.70
5,019.15
3,189.57
704.98
1,492.71
1,492.71
1,619.40
1,064.06
555.34
4,599.32
Item
Partida
Und
Metrado
01.02.05.09.01
01.02.05.09.02
01.02.05.09.03
01.02.05.09.04
01.02.05.09.05
01.02.05.09.06
01.02.05.10
01.02.05.10.01
01.02.05.10.02
01.02.05.10.03
01.02.05.10.04
01.02.05.10.05
01.02.05.10.06
01.02.05.11
01.02.05.11.01
01.02.05.11.02
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.02.05
01.03.02.06
01.03.02.07
01.03.02.08
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.01.04
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.02.05
01.04.02.06
01.04.02.07
01.04.02.08
01.04.03
PIP Viable
Precio
S/.
Parcial
S/.
m2
PIP a Verificar
Metrado
Precio
S/.
10.82
76.33
m3
m2
m2
m2
und
2.58
14.42
14.42
0.90
12.00
477.62
32.53
9.62
238.46
143.23
m2
21.02
76.33
kg
m3
m2
m2
m2
112.49
13.26
16.76
16.76
0.80
4.86
477.62
32.53
9.62
238.46
1,232.26
469.08
138.72
214.61
1,718.76
9,381.60
1,604.46
1,232.26
469.08
138.72
214.61
1,718.76
9,381.60
1,604.46
551.20
546.70
6,333.24
545.20
161.23
190.77
72,158.60
9,921.60
62,237.00
62,237.00
122,558.39
4,656.25
208.01
389.23
624.44
3,434.57
117,902.14
14,148.53
546.70
6,333.24
545.20
161.23
190.77
48,552.50
9,921.60
-7,429.24
62,237.00
-12,106.46
-3,872.88
-197.52
122,558.39
4,656.25
208.01
389.23
624.44
3,434.57
117,902.14
14,148.53
18.00
1.00
4,939.17
65,785.91
23,948.73
3,883.76
1,763.43
1,949.11
1,483.50
556,717.26
20,280.27
906.37
1,695.16
2,720.04
14,958.70
483,613.94
57,995.53
4,939.17
65,785.91
23,948.73
3,883.76
1,763.43
1,949.11
1,483.50
556,717.26
20,280.27
906.37
1,695.16
2,720.04
14,958.70
483,613.94
57,995.53
24,269.28
297,772.25
73,747.37
14,642.40
4,324.24
6,293.31
4,569.56
9,570.73
24,269.28
297,772.25
73,747.37
14,642.40
4,324.24
6,293.31
4,569.56
9,570.73
23,606.10
m
m
Glb
und
und
und
14.00
2.00
4.00
1.00
530.66
6,053.23
968.22
197.52
Parcial
S/.
825.89
7,429.24
12,106.46
3,872.88
197.52
m3
m3
m3
m3
53.61
40.21
13.40
139.39
3.88
9.68
46.60
24.64
m2
185.36
76.33
kg
m3
m3
m2
m2
m2
m
1,016.29
193.87
47.49
119.39
83.22
202.61
23.05
4.86
339.33
504.29
32.53
21.19
9.62
64.36
m3
m3
m3
m3
233.60
175.12
58.37
607.09
3.88
9.68
46.60
24.64
m2
759.80
76.33
kg
m3
m3
m2
m2
m2
m
4,993.68
877.53
146.24
450.12
204.07
654.19
71.00
4.86
339.33
504.29
32.53
21.19
9.62
64.36
205.7%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
01.04.03.01
01.04.03.02
01.04.03.03
01.04.03.04
01.04.03.05
01.04.03.06
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.04
01.04.04.05
01.04.04.06
01.04.04.07
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.05.04
01.04.05.05
01.04.05.06
01.04.05.07
01.04.05.08
01.04.05.09
01.05
01.05.01
01.05.02
01.05.03
01.06
01.06.01
PIP Viable
Precio
S/.
Parcial
S/.
m2
PIP a Verificar
Metrado
Precio
S/.
9.72
76.33
kg
m3
m2
m2
m
61.23
15.09
10.41
10.41
7.50
4.86
504.29
32.53
9.62
64.36
m3
m3
m2
15.77
12.90
42.56
35.87
54.79
76.33
kg
m3
m2
m2
143.25
17.49
51.35
51.35
4.86
504.29
32.53
9.62
m3
m3
m3
m2
m2
40.35
33.01
45.16
90.33
11.96
35.87
54.79
370.79
23.81
76.33
kg
m3
m2
m2
221.80
4.60
13.96
13.96
4.86
504.29
32.53
9.62
und
und
und
6.00
72.00
1.00
1,697.49
594.25
2,232.52
1.00
146,061.00
2,590.68
und
und
m2
m3
und
Glb
2.00
1.00
0.50
1.50
3.00
823.69
0.64
62.03
7.76
300.00
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
Parcial
S/.
741.93
297.58
7,609.74
338.64
100.14
482.70
16,201.70
565.67
706.79
3,248.60
297.58
7,609.74
338.64
100.14
482.70
16,201.70
565.67
706.79
3,248.60
696.20
8,820.03
1,670.42
493.99
27,050.62
1,447.35
1,808.62
16,744.88
2,150.76
912.91
696.20
8,820.03
1,670.42
493.99
27,050.62
1,447.35
1,808.62
16,744.88
2,150.76
912.91
1,077.95
2,319.73
454.12
134.30
55,203.46
10,184.94
42,786.00
2,232.52
146,061.00
146,061.00
1,077.95
2,319.73
454.12
134.30
55,203.46
10,184.94
42,786.00
2,232.52
143,470.32
146,061.00
-1,647.38
-0.64
-31.02
-11.64
-900.00
1,647.38
0.64
31.02
11.64
900.00
1,366,071.04
136,607.10
68,303.55
1,570,981.69
298,486.52
1,869,468.21
46,736.71
102,779.31
74,778.73
2,093,762.96
14.36%
10.00%
18.00%
5,689,465.18
817,102.53
568,946.52
7,075,514.23
1,273,592.56
8,349,106.79
8,349,106.79
4,323,394.14
680,495.43
500,642.97
5,504,532.54
975,106.04
6,479,638.58
-46,736.71
-102,779.31
-74,778.73
6,255,343.83
5537.9%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
316.5%
498.1%
733.0%
350.4%
326.7%
346.6%
-100.0%
-100.0%
-100.0%
298.8%
Partida
Und
Metrado
02
02.01
02.01.01
02.01.01.01
02.01.01.02
02.01.01.03
02.01.02
02.01.02.01
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.02.06
02.02.02.07
02.02.02.08
02.02.02.09
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.02.03.04
02.02.03.05
02.02.03.06
02.02.04
02.02.04.01
02.02.04.02
02.02.04.03
02.02.04.04
PIP Viable
Precio
S/.
Parcial
S/.
259,525.28
83,241.33
1,360.29
mes
m2
und
m2
83.00
1.63
135.29
100.00
12.25
KM
KM
7.00
2.00
10,098.90
2,390.62
m
m3
150.00
1,000.00
24.85
2.68
1,225.00
75,473.54
70,692.30
4,781.24
6,407.50
3,727.50
2,680.00
173,693.27
4,124.51
1,050.03
2,128.40
m3
m3
m3
m3
m3
253.63
211.36
4.14
10.07
63.41
14.92
m2
351.25
19.44
946.08
161,367.67
6,828.30
kg
m3
m3
m3
m2
m2
m2
m3
m
m
m
m
m
738.86
3.62
2,674.67
1,022.24
32.25
322.46
123.66
356.15
15.76
126,410.20
11,485.84
5,081.97
10.11
32.52
328.78
56.00
56.00
22.75
3.48
1,274.00
194.88
83.00
85.41
7,089.03
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
720,281.40
64,599.11
21,720.77
17,630.28
2.00
8,815.14
1.00
30.00
3,356.39
24.47
2.00
21,439.17
3,356.39
734.10
42,878.34
42,878.34
45.16
4.18
17.36
86.71
3.88
9.68
46.60
24.64
527,677.52
3,161.19
175.22
40.46
808.98
2,136.53
548.48
76.33
454,891.87
41,865.48
5,116.34
819.00
4.86
339.33
24,865.41
277,911.27
158.09
333.66
236.53
570.18
504.29
32.53
21.19
9.62
79,723.21
10,853.96
5,012.07
5,485.13
49.71
64.36
3,199.34
40.00
149.40
5,976.00
10,231.42
1,206.01
22,190.74
277,911.27
-126,410.20
68,237.37
5,771.99
5,012.07
5,485.13
-328.78
3,199.34
-1,274.00
-194.88
5,976.00
-7,089.03
10,231.42
1,206.01
545.54
7,302.12
536.42
158.63
482.70
2,605.56
712.92
512.20
695.92
528.29
m2
15.80
76.33
kg
m3
m2
m2
m
112.25
14.48
16.49
16.49
7.50
4.86
504.29
32.53
9.62
64.36
m2
9.34
76.33
545.54
7,302.12
536.42
158.63
482.70
2,605.56
712.92
kg
m3
m2
105.39
1.38
16.24
4.86
504.29
32.53
512.20
695.92
528.29
829.7%
-100.0%
594.1%
113.6%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
02.02.04.05
02.02.05
02.02.05.01
02.02.05.02
02.02.05.03
02.02.05.04
02.02.05.05
02.02.05.06
02.02.05.07
02.02.06
02.02.06.01
02.02.06.02
02.02.06.03
02.02.06.04
02.02.06.05
02.02.06.06
02.02.06.07
02.02.07
02.02.07.01
02.02.07.02
02.02.07.03
02.02.07.04
02.02.07.05
02.02.08
02.02.08.01
02.02.08.02
02.02.08.03
02.02.08.04
02.02.08.05
02.02.08.06
02.02.08.07
02.02.08.08
02.02.08.09
02.02.09
02.02.09.01
02.02.09.02
02.02.09.03
02.02.09.04
02.02.09.05
02.02.09.06
02.02.09.07
PIP Viable
Precio
S/.
Parcial
S/.
m2
PIP a Verificar
Metrado
Precio
S/.
16.24
9.62
m
und
und
m3
m2
39.00
1.00
2.00
3.57
25.12
15.32
64.58
53.18
230.49
76.33
m3
m2
1.09
16.00
477.62
7.97
m3
m3
m2
14.33
7.72
45.14
35.87
54.79
76.33
kg
m3
m2
m2
183.47
10.85
50.54
50.54
4.86
504.29
32.53
9.62
m2
3.75
m3
m2
m2
und
und
und
0.68
5.02
5.02
1.00
520.61
127.52
12,876.01
514.02
422.98
3,445.54
520.61
127.52
12,876.01
514.02
422.98
3,445.54
76.33
891.66
5,471.55
1,644.07
486.19
883.25
286.24
891.66
5,471.55
1,644.07
486.19
438.80
286.24
477.62
32.53
9.62
60.64
324.78
163.30
48.29
60.64
9,971.29
526.93
433.39
5,394.99
693.11
833.52
324.78
163.30
48.29
60.64
-180.78
-263.67
9,971.29
526.93
433.39
5,394.99
693.11
833.52
485.76
1,059.01
420.29
124.29
21,143.48
3,306.62
1,506.50
3,023.33
1,621.95
479.65
3,507.70
-1,068.80
15,454.37
-3,625.84
-2,864.48
-197.52
-2,590.68
-1,647.38
-0.64
-31.02
444.45
1.00
1.00
180.78
263.67
Parcial
S/.
156.23
4,156.81
597.48
64.58
106.36
822.85
1,917.41
180.78
263.67
m3
m3
m3
m2
m2
14.69
7.91
14.55
29.11
10.92
35.87
54.79
370.79
23.81
76.33
kg
m3
m2
m2
99.95
2.10
12.92
12.92
4.86
504.29
32.53
9.62
m2
43.32
76.33
485.76
1,059.01
420.29
124.29
28,900.12
3,306.62
kg
m3
m2
m2
m
m
und
und
und
und
309.98
6.33
49.86
49.86
14.00
4.86
477.62
32.53
9.62
250.55
1,506.50
3,023.33
1,621.95
479.65
3,507.70
1.00
15,454.37
15,454.37
7,756.64
und
m2
m3
8.00
133.60
2.00
4.00
1.00
1,812.92
716.12
197.52
2.00
1.00
0.50
823.69
0.64
62.03
1,068.80
3,625.84
2,864.48
197.52
2,590.68
1,647.38
0.64
31.02
98.7%
-100.0%
-100.0%
272.6%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.03.06
02.03.07
02.03.08
02.03.09
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.04.05
02.04.06
02.04.07
02.04.08
02.04.09
02.04.10
02.05
02.05.01
02.05.02
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.01.03
03.01.02
03.01.02.01
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
03.02.02.06
03.02.02.07
und
Glb
1.50
3.00
PIP Viable
Precio
S/.
7.76
300.00
Parcial
S/.
11.64
900.00
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
51,229.47
723.14
123.28
4,271.00
954.55
14,548.31
3,818.00
3,188.00
644.19
22,959.00
55,893.86
516.53
262.99
5,502.00
1,074.39
22,438.59
2,099.90
1,753.40
783.82
20,203.92
1,258.32
20,881.44
10,184.94
10,696.50
561,989.61
61,910.30
19,031.96
17,630.28
m3
m3
m3
m3
m3
m2
m2
kg
und
20.16
2.25
37.02
38.63
30.46
200.00
400.00
132.55
25.00
35.87
54.79
115.37
24.71
477.62
19.09
7.97
4.86
918.36
m3
m3
m3
m3
m3
m2
m2
kg
und
und
14.40
4.80
47.69
43.48
46.98
110.00
220.00
161.28
22.00
2.00
35.87
54.79
115.37
24.71
477.62
19.09
7.97
4.86
918.36
629.16
und
und
6.00
18.00
1,697.49
594.25
2.00
8,815.14
1.00
30.00
667.58
24.47
2.00
21,439.17
667.58
734.10
42,878.34
42,878.34
40.73
26.33
108.49
228.22
3.88
9.68
46.60
24.64
297,481.91
11,091.87
158.03
254.87
5,055.63
5,623.34
322.13
76.33
224,371.32
24,588.18
2,515.94
342.87
4.86
339.33
12,227.47
116,346.08
99.20
222.67
154.03
376.71
504.29
32.53
21.19
9.62
50,025.57
7,243.46
3,263.90
3,623.95
241,794.77
83,234.81
1,353.77
mes
m2
und
m2
79.00
1.63
128.77
100.00
12.25
KM
KM
7.00
2.00
10,098.90
2,390.62
m
m3
150.00
1,000.00
24.85
2.68
1,225.00
75,473.54
70,692.30
4,781.24
6,407.50
3,727.50
2,680.00
155,969.28
3,810.18
970.00
1,966.17
m3
m3
m3
m3
m3
234.30
195.25
4.14
10.07
58.58
14.92
m2
208.00
19.44
874.01
130,231.19
4,043.52
kg
m3
m3
m3
m2
m2
m2
473.21
3.62
1,713.02
847.86
20.43
204.29
123.66
356.15
15.76
104,846.37
7,276.14
3,219.61
613.8%
-100.0%
587.5%
125.0%
Item
Partida
Und
15.27
PIP Viable
Precio
S/.
32.52
Parcial
S/.
496.58
72.00
72.00
22.75
3.48
1,638.00
250.56
79.00
85.41
6,747.39
Metrado
03.02.02.08
03.02.02.09
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.02.03.04
03.02.03.05
03.02.03.06
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.04.04
03.02.04.05
03.02.05
03.02.05.01
03.02.05.02
03.02.05.03
03.02.05.04
03.02.05.05
03.02.05.06
03.02.05.07
03.02.06
03.02.06.01
03.02.06.02
03.02.06.03
03.02.06.04
03.02.06.05
03.02.06.06
03.02.06.07
03.02.07
03.02.07.01
03.02.07.02
03.02.07.03
03.02.07.04
03.02.07.05
03.02.08
03.02.08.01
03.02.08.02
03.02.08.03
03.02.08.04
03.02.08.05
03.02.08.06
m3
m
m
m
m
m
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
35.30
64.36
2,271.91
32.00
149.40
4,780.80
m2
13.72
76.33
6,095.62
1,047.25
kg
m3
m2
m2
m
89.16
7.54
16.38
16.38
1.90
4.86
504.29
32.53
9.62
64.36
m2
6.24
76.33
kg
m3
m2
m2
64.19
0.86
10.56
10.56
4.86
504.29
32.53
9.62
m
und
und
m3
m2
36.00
1.00
2.00
3.52
24.72
15.32
64.58
53.18
230.49
76.33
m3
m2
1.08
16.00
477.62
7.97
m3
m3
m2
9.25
7.56
19.73
35.87
54.79
76.33
kg
m3
m2
m2
83.15
4.64
23.92
23.92
4.86
504.29
32.53
9.62
m2
3.66
m3
m2
m2
und
und
und
1.07
5.48
5.48
1.00
433.32
3,802.35
532.84
157.58
122.28
1,667.06
476.30
433.32
3,802.35
532.84
157.58
122.28
1,667.06
476.30
311.96
433.69
343.52
101.59
4,064.01
551.52
64.58
106.36
811.32
1,886.88
311.96
433.69
343.52
101.59
4,064.01
551.52
64.58
106.36
811.32
1,886.88
515.83
127.52
6,004.25
331.80
414.21
1,505.99
515.83
127.52
6,004.25
331.80
414.21
1,505.99
76.33
404.11
2,339.91
778.12
230.11
1,082.04
279.37
404.11
2,339.91
778.12
230.11
637.59
279.37
477.62
32.53
9.62
60.64
511.05
178.26
52.72
60.64
444.45
m3
m3
m3
m2
m2
24.22
19.82
15.48
30.96
15.27
35.87
54.79
370.79
23.81
76.33
13,152.51
868.77
1,085.94
5,739.83
737.16
1,165.56
511.05
178.26
52.72
60.64
-180.78
-263.67
13,152.51
868.77
1,085.94
5,739.83
737.16
1,165.56
kg
254.24
4.86
1,235.61
1,235.61
1.00
1.00
180.78
263.67
180.78
263.67
143.5%
-100.0%
-100.0%
Item
Partida
Und
Metrado
03.02.08.07
03.02.08.08
03.02.08.09
03.02.09
03.02.09.01
03.02.09.02
03.02.09.03
03.02.09.04
03.02.09.05
03.02.09.06
03.02.09.07
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.03.06
03.03.07
03.03.08
03.03.09
03.04
03.04.01
03.04.02
03.04.03
03.04.04
03.04.05
03.04.06
03.04.07
03.04.08
03.04.09
03.04.10
03.05
03.05.01
03.05.02
PIP Viable
Precio
S/.
Parcial
S/.
PIP a Verificar
Metrado
Precio
S/.
2.99
504.29
19.26
32.53
19.26
9.62
m2
43.70
76.33
Parcial
S/.
1,507.83
626.53
185.28
29,953.23
3,335.62
kg
m3
m2
m2
m
m
und
und
und
und
309.98
6.36
50.04
50.04
18.00
4.86
477.62
32.53
9.62
250.55
1,506.50
3,037.66
1,627.80
481.38
4,509.90
1.00
15,454.37
15,454.37
m3
m2
m2
21,483.46
und
m2
m3
und
Glb
10.00
530.66
2.00
4.00
1.00
6,053.23
968.22
197.52
2.00
1.00
0.50
1.50
3.00
823.69
0.64
62.03
7.76
300.00
5,306.60
12,106.46
3,872.88
197.52
2,590.68
1,647.38
0.64
31.02
11.64
900.00
m3
m3
m3
m3
m3
m2
m2
kg
und
151.81
14.77
40.51
134.61
83.45
200.00
400.00
312.48
56.00
35.87
54.79
115.37
24.71
477.62
19.09
7.97
4.86
918.36
m3
m3
m3
m3
m3
m2
m2
kg
und
und
46.98
5.90
20.82
47.90
58.77
110.00
220.00
171.36
23.00
13.00
35.87
54.79
115.37
24.71
477.62
19.09
7.97
4.86
918.36
629.16
und
und
6.00
18.00
1,697.49
594.25
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
501,320.05
50,132.01
25,066.00
576,518.06
109,538.43
686,056.49
17,151.41
37,717.90
27,442.26
20.95%
10.00%
18.00%
114,064.72
5,445.42
809.25
4,673.64
3,326.21
39,857.39
3,818.00
3,188.00
1,518.65
51,428.16
67,651.24
1,685.17
323.26
2,402.00
1,183.61
28,069.73
2,099.90
1,753.40
832.81
21,122.28
8,179.08
20,881.44
10,184.94
10,696.50
1,282,271.01
268,658.64
128,227.10
1,679,156.75
302,248.22
1,981,404.97
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
155.8%
435.9%
411.6%
191.3%
175.9%
188.8%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
Total Presupuesto
PIP Viable
Precio
S/.
Parcial
S/.
768,368.06
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
1,981,404.97
Partida
Und
Metrado
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.02.07
01.01.02.08
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02.01.06
01.02.01.07
01.02.01.08
01.02.01.09
01.02.01.10
01.02.01.11
01.02.01.12
01.02.01.13
01.02.01.14
01.02.02
01.02.02.01
01.02.02.02
m2
und
100.00
PIP Viable
Precio
S/.
12.25
Parcial
S/.
701,761.59
6,006.24
1,225.00
1,225.00
und
m3
kg
bls
p2
m
m
m
mes
4,781.24
4,781.24
164,857.16
71,657.83
1,226.20
371.52
684.84
574.31
565.64
KM
2.00
2,390.62
m
m2
m3
m3
m3
m3
m3
m3
m3
m2
20.00
580.50
108.36
30.96
15.48
61.31
0.64
6.32
18.55
36.54
40.00
374.35
11.82
18.75
472.80
7,019.06
kg
m3
m3
m3
m3
m3
m2
m3
m3
und
m3
m
m
m2
590.41
3.62
2,137.28
184.40
1.22
42.00
5.00
196.21
361.99
333.28
301.98
36,181.12
441.63
13,997.76
1,509.90
15.00
22.80
93.80
27.10
26.94
15.19
11.44
10.72
m
m2
m3
20.00
606.00
113.12
61.31
0.64
6.32
156.00
27.96
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
5,577,777.29
205,614.37
3,812.58
1,212.60
2,599.98
162,799.55
1,782.55
119,521.00
5,460.00
20,944.00
5,220.00
70.00
60.00
1.00
20.21
2,599.98
1.00
4,700.00
78,000.00
23,800.00
58,000.00
200.00
1,782.55
25.43
0.07
0.88
0.09
0.35
2,900.00
3.38
4.00
6,550.43
2.00
6,400.26
40.00
160.34
9,802.00
26,201.72
26,201.72
12,800.52
12,800.52
369,338.05
117,181.47
6,413.60
70.94
30.40
16.30
31.78
1,156.32
966.11
57.45
24.62
34.20
39.60
228.06
21.32
37.94
20.74
28.95
48.58
1,224.83
934.08
709.31
1,146.42
11,079.15
3,803.24
145.44
4.67
374.05
17,761.13
54,401.83
12.48
534.56
6,671.31
133.13
249.66
8.88
37.04
1,182.19
9,247.41
2.00
2,143.89
4,287.78
4,361.76
404.10
346.33
1,073.07
290.51
86,912.70
1,226.20
387.84
714.92
40.00
160.34
125,679.74
6,413.60
66.41
16.30
1,082.48
167.7%
167.7%
124.0%
63.5%
423.0%
-100.0%
68.8%
68.2%
-100.0%
142.5%
57.8%
731.0%
-100.0%
1410.6%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
44.6%
423.0%
-100.0%
51.4%
Item
Partida
Und
Metrado
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.02.10
01.02.02.11
01.02.02.12
01.02.02.13
01.02.02.14
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.03.04
01.02.03.05
01.02.03.06
01.02.03.07
01.02.03.08
01.02.03.09
01.02.03.10
01.02.03.11
01.02.03.12
01.02.03.13
01.02.03.14
01.02.03.15
01.02.03.16
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.04.09
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m3
m3
m3
m2
m2
m3
m3
und
m3
m
m2
32.32
16.16
PIP Viable
Precio
S/.
18.55
36.54
Parcial
S/.
599.54
590.49
33.00
433.47
11.82
18.75
390.06
8,127.56
784.17
3.62
2,838.70
236.20
2.40
56.00
5.00
196.21
361.99
333.28
301.98
46,344.80
868.78
18,663.68
1,509.90
10.00
11.96
119.60
130.00
15.00
11.20
30.00
27.96
26.94
15.19
10.72
PIP a Verificar
Metrado
Precio
S/.
28.46
31.78
Parcial
S/.
904.46
61.74
26.46
43.40
61.35
279.76
21.32
37.94
20.74
28.95
48.58
1,316.30
1,003.89
900.12
1,776.08
13,590.74
3,668.58
160.45
4.67
374.05
17,132.27
60,016.32
15.58
534.56
8,328.44
160.91
8.88
1,428.88
202.44
37.04
7,498.38
2.00
2,143.89
4,287.78
78,152.43
6,413.60
652.98
545.66
1,232.08
639.67
540.07
469.57
11,994.89
14,293.57
60,016.32
-46,344.80
7,459.66
-18,663.68
-1,509.90
1,428.88
-119.60
7,498.38
-3,634.80
4,287.78
-404.10
-170.13
-321.60
78,152.43
6,413.60
652.98
545.66
1,232.08
639.67
540.07
469.57
11,994.89
6,479.77
33,758.01
8,784.80
2,255.84
1,688.09
854.88
1,000.24
842.28
16,918.80
4,495.82
63.18
354.64
3,265.06
6,479.77
33,758.01
8,784.80
2,255.84
1,688.09
854.88
1,000.24
842.28
16,918.80
4,495.82
63.18
354.64
3,265.06
109.23
6,551.21
1,749.89
16.64
313.13
16,025.57
4,224.97
57.94
340.74
109.23
6,551.21
1,749.89
16.64
313.13
16,025.57
4,224.97
57.94
340.74
3,634.80
404.10
170.13
321.60
m
m3
m3
m3
m3
m3
m3
m2
40.00
40.06
17.17
57.79
16.86
26.04
16.22
246.91
160.34
16.30
31.78
21.32
37.94
20.74
28.95
48.58
kg
m3
m3
m3
m2
m3
und
und
1,387.53
90.25
17.62
4.22
190.10
23.08
1.00
1.00
4.67
374.05
498.57
534.56
8.88
37.04
1,000.24
842.28
m3
m2
m3
m2
97.27
9.66
12.25
67.21
46.22
6.54
28.95
48.58
kg
m3
m2
m3
und
23.39
13.14
92.44
0.32
1.00
4.67
498.57
18.93
52.00
313.13
m3
m2
m3
91.41
8.86
11.77
46.22
6.54
28.95
Item
Partida
Und
Metrado
01.02.05.04
01.02.05.05
01.02.05.06
01.02.05.07
01.02.05.08
01.02.05.09
01.02.06
01.02.06.01
01.02.06.02
01.02.06.03
01.02.06.04
01.02.06.05
01.02.06.06
01.02.06.07
01.02.06.08
01.02.06.09
01.02.07
01.02.07.01
01.02.07.02
01.02.07.03
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.01.05
01.03.01.06
01.03.01.07
PIP Viable
Precio
S/.
Parcial
S/.
m2
PIP a Verificar
Metrado
Precio
S/.
63.71
48.58
kg
m3
m2
m3
und
22.30
12.47
87.47
0.32
1.00
4.67
498.57
18.93
52.00
313.13
m3
m2
m3
m2
79.34
7.74
10.16
60.48
kg
m3
m2
m3
und
21.76
11.42
79.98
0.32
1.00
46.22
6.54
28.95
48.58
104.14
6,217.17
1,655.81
16.64
313.13
14,541.65
3,667.09
50.62
294.13
2,938.12
104.14
6,217.17
1,655.81
16.64
313.13
14,541.65
3,667.09
50.62
294.13
2,938.12
4.67
498.57
18.93
52.00
265.74
101.62
5,693.67
1,514.02
16.64
265.74
3,987.92
83.86
555.21
101.62
5,693.67
1,514.02
16.64
265.74
-3,987.92
-83.86
-555.21
-100.0%
-100.0%
-100.0%
269.91
1,099.82
143.52
1,835.60
2,298.71
34.56
142.69
91.08
11.66
-269.91
-1,099.82
-143.52
-1,835.60
-1,460.32
-34.56
-142.69
-91.08
27.69
-100.0%
-100.0%
-100.0%
-100.0%
-63.5%
-100.0%
-100.0%
-100.0%
237.5%
143.72
-907.76
-455.64
2,661,845.53
2,378,780.73
-350.00
19,121.21
-3,787.13
9,883.95
11,032.30
10,800.10
44.9%
-100.0%
-57.6%
619.2%
3161.1%
-100.0%
m3
m2
1.80
28.56
46.59
19.44
kg
m3
m2
und
74.56
3.30
12.00
8.00
3.62
333.28
11.96
229.45
m2
m2
m2
m2
54.00
75.90
75.90
0.60
0.64
1.88
1.20
19.44
m3
m2
und
0.96
75.90
3.00
333.28
11.96
263.67
m
m3
m2
m3
m3
m2
500.00
0.70
319.95
907.76
791.01
429,857.82
75,251.89
350.00
1,413.11
2.68
3,787.13
m3
m2
m3
m2
m2
m2
m2
und
m
m
22.93
422.42
236.93
236.93
1,413.11
42.00
118.46
17.94
7.09
1.88
1.20
47.01
11.28
0.63
Parcial
S/.
3,095.03
838.39
0.81
48.58
39.35
0.93
498.57
463.67
3.00
111.79
335.37
3,091,703.35
2,454,032.62
413.70
46.22
19,121.21
463.60
127.60
308.31
21.32
86.46
35.03
9,883.95
11,032.30
10,800.10
50.96
499.36
356.73
8.88
18,178.96
4,434.32
411.36
2,994.96
445.43
284.32
66,430.30
473.76
74.63
2,800.00
813.80
2,278,640.00
18,178.96
4,434.32
-411.36
-2,994.96
-445.43
-284.32
-66,430.30
-473.76
-74.63
2,278,640.00
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
01.03.01.08
01.03.01.09
01.03.01.10
01.03.01.11
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.02.05
01.03.02.06
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.05
01.03.05.01
01.03.05.02
01.03.05.03
01.03.05.04
01.03.05.05
01.03.05.06
01.03.05.07
01.03.05.08
PIP Viable
Precio
S/.
Parcial
S/.
m3
PIP a Verificar
Metrado
Precio
S/.
196.00
42.81
m3
m3
m
1,252.57
2,688.00
2,800.00
28.95
20.74
0.55
m3
m3
m2
35.91
35.87
218.68
46.22
21.32
48.58
m3
m2
kg
42.71
306.04
446.70
498.57
18.93
10.12
m3
m2
9.45
86.80
46.22
48.58
m3
m2
13.10
109.48
498.57
18.93
m3
m2
136.64
896.09
21.32
48.58
kg
m3
m2
3,632.49
125.54
530.09
4.67
498.57
18.93
m3
m3
m3
m3
m3
m2
und
und
160.00
1,354.60
16.00
192.00
1,330.60
4,531.72
24.00
8.00
13.03
21.32
37.94
4.38
86.46
8.55
811.71
1,136.82
m2
m3
m3
m3
m3
m2
und
und
und
und
1,160.00
2,784.00
1,392.00
348.00
2,428.75
290.00
225.00
225.00
225.00
225.00
0.64
6.32
7.76
6.12
11.82
3.86
362.03
316.78
209.78
160.49
m3
m3
m3
m3
3,673.84
918.46
510.26
200.10
6.32
18.55
12.04
26.94
m
m3
m3
60.00
68.04
29.16
0.70
7.76
6.12
297,139.19
742.40
17,594.88
10,801.92
2,129.76
28,707.83
1,119.40
81,456.75
71,275.50
47,200.50
36,110.25
51,790.32
23,218.67
17,037.43
6,143.53
5,390.69
5,270.19
42.00
527.99
178.46
2,520.00
1,080.00
16.30
31.78
Parcial
S/.
8,390.76
36,261.90
55,749.12
1,540.00
44,655.84
1,659.76
764.75
10,623.47
36,261.90
55,749.12
1,540.00
44,655.84
1,659.76
764.75
10,623.47
21,293.92
5,793.34
4,520.60
13,257.25
436.78
4,216.74
21,293.92
5,793.34
4,520.60
13,257.25
436.78
4,216.74
6,531.27
2,072.46
136,034.02
2,913.16
43,532.05
6,531.27
2,072.46
136,034.02
2,913.16
43,532.05
16,963.73
62,590.48
10,034.60
214,778.36
2,084.80
28,880.07
607.04
840.96
115,043.68
38,746.21
19,481.04
9,094.56
16,963.73
62,590.48
10,034.60
214,778.36
2,084.80
28,880.07
607.04
840.96
115,043.68
38,746.21
19,481.04
9,094.56
-297,139.19
-742.40
-17,594.88
-10,801.92
-2,129.76
-28,707.83
-1,119.40
-81,456.75
-71,275.50
-47,200.50
-36,110.25
23,608.08
17,857.33
17,284.97
-6,143.53
-5,390.69
-5,270.19
-42.00
-527.99
-178.46
75,398.40
41,076.00
34,322.40
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
45.6%
76.9%
101.5%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
97.20
PIP Viable
Precio
S/.
46.52
300.00
18.90
8.10
0.70
7.76
6.12
Metrado
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.01.04
01.04.01.05
01.04.01.06
01.04.01.07
01.04.01.08
01.04.01.09
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.02.05
01.04.02.06
01.04.02.07
01.04.02.08
01.04.02.09
01.04.02.10
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.03.04
1,080.00
0.12
Parcial
S/.
4,521.74
406.23
210.00
146.66
49.57
Metrado
197.10
1,238.85
21.32
35.03
4,202.17
43,396.92
196.89
1,968.85
372.30
356.73
8.88
48.96
70,236.57
17,483.39
18,227.81
1,820,705.52
41,934.61
101,040.37
19,355.21
129.60
13.23
3.78
1.89
18.90
166.50
7.76
6.12
46.59
23.52
19.44
102.66
23.13
88.06
444.53
3,236.76
1,233.75
18.90
18.23
3.62
219.47
333.28
4,466.18
4,147.98
6,075.69
41.40
11.96
495.14
640.00
360.00
26.94
0.12
0.64
21.32
37.94
89.18
48.58
7,664.47
750.91
65.93
20.37
142.38
4.67
254.88
498.57
8.88
3,506.75
16,804.24
10,155.87
1,264.33
193.68
7.19
1,392.56
255,021.88
310.08
88.59
44.30
7.76
6.12
46.59
23.52
19.44
59.91
14.57
82.93
279.42
3,926.88
1,394.32
11.88
27.11
3.62
219.47
333.28
5,047.44
2,607.30
9,035.22
269.40
27.60
5.22
68.20
1,406.27
1,882.32
63.75
27.96
1,782.45
544.30
276.58
325.51
157.77
145.48
26,431.91
76.80
230.40
7.72
2.38
1.78
11.88
202.00
Parcial
S/.
153,546.86
25.53
7.29
3.65
5.40
PIP a Verificar
Precio
S/.
21.32
37.94
89.18
6,610.91
3,361.10
3,950.67
786.07
48.58
38,187.28
2,976.03
94.86
224.59
1,557.33
4.67
254.88
498.57
18.93
13,898.06
24,177.92
111,973.84
29,480.26
1,557.33
234.32
7.19
52.00
98.50
77.68
22.19
11.10
46.22
21.32
37.94
89.18
11,197.20
12,184.64
187,442.03
4,552.67
1,656.14
841.89
989.90
1702.0%
116.7%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
136.8%
-21.5%
305.1%
67.2%
-100.0%
-100.0%
864.8%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
872.5%
175.3%
827.3%
1139.3%
-100.0%
-100.0%
583.6%
Item
Partida
Und
Metrado
01.04.03.05
01.04.03.06
01.04.03.07
01.04.03.08
01.04.03.09
01.04.03.10
01.04.03.11
01.04.03.12
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.04
01.04.04.05
01.04.04.06
01.04.04.07
01.04.04.08
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.05.04
01.04.05.05
01.04.05.06
01.04.05.07
01.04.05.08
01.04.06
01.04.06.01
01.04.06.02
01.04.06.03
01.04.06.04
01.04.06.05
01.04.06.06
01.04.06.07
01.04.06.08
01.04.06.09
01.04.06.10
01.04.06.11
PIP Viable
Precio
S/.
Parcial
S/.
m2
m2
kg
m3
m2
m3
und
m2
PIP a Verificar
Metrado
Precio
S/.
288.90
6.54
891.29
48.58
453.60
178.53
1,294.67
16.20
54.00
15.12
6,164.40
48.58
299,466.55
2,118.31
89,009.70
24,508.10
842.40
11,000.34
6,734.30
842,874.48
-1,346.32
287,503.76
23,207.20
604.35
6,164.40
6,164.40
237.00
1,896.00
237.00
4.67
498.57
8.88
7.19
21.32
6.54
254.88
m3
m3
m2
138.65
92.44
852.46
21.32
37.94
48.58
108,377.62
301,310.78
54,739.87
44,322.04
5,052.84
12,399.84
60,406.56
389,411.26
2,956.02
3,507.17
41,412.51
103,835.90
276,198.13
54,739.87
44,322.04
4,814.70
12,399.84
60,406.56
389,411.26
2,956.02
3,507.17
41,412.51
kg
m3
m3
m2
m
33,671.96
305.64
141.06
65.01
180.00
4.67
534.56
20.74
20.72
92.40
m3
m3
m3
m3
m2
m2
13.35
116.41
33.26
16.63
256.96
288.50
46.22
21.32
37.94
89.18
6.54
48.58
157,248.05
163,382.92
2,925.58
1,347.01
16,632.00
60,819.64
617.04
2,481.86
1,261.88
1,483.06
1,680.52
14,015.33
157,248.05
163,382.92
2,925.58
1,347.01
16,632.00
60,819.64
617.04
2,481.86
1,261.88
1,483.06
1,680.52
14,015.33
kg
m3
m2
m3
und
96.46
56.23
399.59
1.95
5.00
4.67
498.57
18.93
52.00
625.85
450.47
28,034.59
7,564.24
101.40
3,129.25
450.47
28,034.59
7,564.24
101.40
3,129.25
-4,811.67
-211.61
-222.67
-142.13
-185.81
-2,632.91
-1,416.54
-7,239.96
-140.84
-34.15
-195.21
-656.68
m2
m2
502.36
615.37
2.68
19.44
43,201.62
1,346.32
11,962.79
kg
m3
m2
m2
m3
m2
m3
1,254.62
75.35
3.62
333.28
4,541.72
25,112.65
37.68
6.32
238.14
m2
m2
m2
m3
m3
m2
78.96
118.44
118.44
7.90
7.90
118.44
2.68
1.88
1.20
23.52
333.28
11.96
m3
m3
m3
m3
18.15
5.58
4.19
27.92
7.76
6.12
46.59
23.52
4,811.67
211.61
222.67
142.13
185.81
2,632.91
1,416.54
7,239.96
140.84
34.15
195.21
656.68
4.67
498.57
18.93
52.00
203.71
445.39
Parcial
S/.
1,889.41
43,298.87
2,118.31
89,009.70
24,508.10
842.40
11,000.34
6,734.30
886,076.10
1951.0%
-100.0%
2403.3%
2286.3%
1099.8%
2021.8%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
m2
29.05
PIP Viable
Precio
S/.
19.44
kg
m3
m3
m3
m2
302.52
2.62
2.45
11.72
24.48
3.62
361.99
301.98
219.47
11.96
Metrado
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
PLAN DE MANEJO AMBIENTAL
Plan de manejo ambiental - Obras de mitigacin de impactos ambientales
Costo Directo
Gastos Generales
Utilidad
Sub total
I.G.V.
Total Presupuesto
Imprevistos de orden fisico
Riesgo de Inflacin
Riesgo de conversin
Total Presupuesto
Parcial
S/.
564.73
1,095.12
948.41
739.85
2,572.19
292.78
und
Metrado
1.00
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
701,761.59
70,176.16
35,088.08
807,025.83
153,334.91
960,360.74
24,009.02
56,445.92
38,414.43
1,079,230.11
PIP a Verificar
Precio
S/.
90,416.00
12.20%
Parcial
S/.
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
4,876,015.70
610,584.50
-35,088.08
5,451,512.12
-153,334.91
5,298,177.21
-24,009.02
-56,445.92
-38,414.43
5,179,307.84
694.8%
870.1%
-100.0%
675.5%
-100.0%
551.7%
-100.0%
-100.0%
-100.0%
479.9%
90,416.00
90,416.00
5,577,777.29
680,760.66
6,258,537.95
6,258,537.95
6,258,537.95
Partida
Und
Metrado
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.07
01.01.03
01.01.03.01
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.02.04
01.05.02.05
01.05.02.06
01.05.02.07
01.05.02.08
01.05.03
01.05.03.01
01.05.03.02
01.05.03.03
01.05.03.04
01.05.03.05
01.05.03.06
01.05.03.07
01.05.03.08
01.05.03.09
PIP Viable
Precio
S/.
Parcial
S/.
128,135.95
Metrado
PIP a Verificar
Precio
S/.
m2
und
30.00
1.00
24.16
3,310.68
m3
kg
bls
p2
m
1,800.00
27,000.00
12,200.00
9,000.00
5,900.00
42.74
0.11
1.48
0.16
1.09
1.00
8,798.78
60.69
1,619.05
6.42
37.59
mes
128,135.95
5,151.72
m2
m
m3
m3
m2
1.88
0.81
23.30
7.76
6.12
19.44
14.59
4.96
452.95
m3
m3
m2
kg
und
1.20
6.92
52.35
255.67
2.00
301.98
333.28
11.96
3.62
229.45
362.38
2,306.30
626.11
925.53
458.90
Parcial
S/.
1,408,557.86
118,663.26
4,035.48
724.80
3,310.68
105,829.00
76,932.00
2,970.00
18,056.00
1,440.00
6,431.00
8,798.78
8,798.78
1,289,894.60
61,249.72
389.63
60,860.09
m3
m2
2.96
33.58
35.87
52.87
10,628.58
106.18
1,775.37
-362.38
-2,306.30
-626.11
-925.53
-458.90
10,628.58
106.18
1,775.37
kg
m3
m2
und
und
194.64
4.78
28.89
1.00
1.00
4.81
555.17
22.66
4,100.41
283.17
936.22
2,653.71
654.65
4,100.41
283.17
936.22
2,653.71
654.65
4,100.41
283.17
13.02
9.13
118.87
203,230.13
kg
m2
m2
m3
m3
m3
m2
m3
420.00
0.64
19,022.19
268.80
340.42
97.26
48.63
300.75
30.08
7.76
6.12
46.59
7.09
14.92
2,641.66
595.23
2,265.67
2,132.32
448.79
m
m3
m3
m
401.00
389.96
15.00
11.82
6,015.00
4,609.33
0.40
113.48
45.39
696.00
380.94
108.84
54.42
0.41
35.87
54.78
115.33
285.36
13,664.32
5,962.26
6,276.26
65.96
69.75
4,600.71
118.87
184,207.94
-268.80
285.36
11,022.66
5,367.03
4,010.59
-2,132.32
4,151.92
870.00
278.44
354.55
870.00
168.43
47.63
34.07
0.65
146,534.10
13,262.10
12,079.52
565.50
140,519.10
8,652.77
12,079.52
520.11
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
968.4%
-100.0%
417.3%
901.7%
177.0%
-100.0%
925.1%
2336.1%
187.7%
1145.9%
Item
Partida
Und
Metrado
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.04.04
01.05.04.05
01.05.05
01.05.05.01
01.05.05.02
01.05.05.03
01.05.05.04
01.05.05.05
01.05.05.06
01.05.05.07
01.05.05.08
01.05.05.09
01.05.06
01.05.06.01
01.05.06.02
01.05.06.03
01.05.06.04
01.05.06.05
01.05.06.06
01.05.06.07
01.05.06.08
01.05.06.09
01.05.06.10
01.05.06.11
01.05.06.12
01.05.06.13
01.05.06.14
01.05.06.15
01.05.06.16
01.05.06.17
01.05.06.18
01.05.06.19
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.05.07.04
01.05.07.05
01.05.07.06
01.05.07.07
PIP Viable
Precio
S/.
12.00
35.87
80.17
52.87
4,238.59
414.28
12.36
4.81
555.17
1,992.69
6,861.90
31.17
22.66
m
m3
m3
m2
20.00
153.64
40.08
25.05
205.29
13.71
54.78
52.87
706.31
46,660.19
4,105.80
2,106.40
2,195.58
1,324.39
-213.00
1,720.65
-17,800.82
-1,715.83
605.85
46,660.19
4,105.80
2,106.40
2,195.58
1,324.39
kg
m3
m3
2,260.15
25.05
2.00
4.81
586.03
69.75
10,871.32
14,680.05
139.50
10,871.32
14,680.05
139.50
m3
m3
61.46
196.08
34.07
46.63
257.29
110.27
883.17
378.50
1,629.23
31.16
151.12
700.93
374.70
35.87
54.78
3.88
9.68
6.72
47.63
94.93
38.10
52.87
2,093.94
9,143.21
725,701.82
9,228.99
6,040.59
3,426.70
3,663.88
10,948.43
1,484.15
14,345.82
26,705.43
19,810.39
2,093.94
9,143.21
681,870.60
8,759.67
5,881.96
3,426.70
3,663.88
10,948.43
526.73
14,345.82
26,705.43
18,607.83
14,462.00
4.81
69,562.22
728.40
46.60
170.68
20.65
206.51
586.03
425.08
116.20
357.87
11.85
426,864.25
19,808.73
19,833.02
7,390.02
2,447.14
853.40
853.40
1,038.01
1,038.01
19.08
7.96
21.24
37.59
m3
m2
2.96
33.58
35.87
52.87
16,282.87
6,793.06
22,047.33
39,018.80
10,628.58
106.18
1,775.37
65,542.54
-362.38
-2,083.00
421,390.96
19,808.73
19,833.02
7,390.02
2,447.14
-909.92
16,282.87
6,793.06
22,047.33
10,823.78
10,169.68
106.18
1,775.37
kg
m3
m2
und
und
194.64
4.78
28.89
1.00
1.00
4.81
555.17
22.66
4,100.41
283.17
936.22
2,653.71
654.65
4,100.41
283.17
936.22
2,653.71
654.65
4,100.41
283.17
2.72
1.17
und
kg
m3
m3
m2
5.00
75.15
74.00
4.74
8.40
7.76
6.12
42.60
3.62
333.28
361.99
11.96
213.00
272.04
24,662.72
1,715.83
100.46
m3
m3
m3
m3
m3
m3
m3
m3
m2
60.48
25.92
7.76
6.12
43,831.22
469.32
158.63
81.00
11.82
957.42
61.86
19.44
1,202.56
kg
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m
m
1,110.41
1.20
6.25
15.12
3.62
301.98
333.28
361.99
4,019.68
362.38
2,083.00
5,473.29
76.08
11.96
909.92
2,464.60
11.44
28,195.02
458.90
Metrado
Parcial
S/.
14,229.93
430.44
m3
m3
m2
Parcial
S/.
26,992.32
21.11
7.16
PIP a Verificar
Precio
S/.
-100.0%
632.5%
-72.2%
-100.0%
603.1%
1555.7%
1866.5%
3708.0%
55.0%
1547.4%
1630.5%
-100.0%
-100.0%
7699.0%
-100.0%
38.4%
2216.1%
Item
Partida
Und
Metrado
01.05.07.08
01.05.08
01.05.08.01
01.05.08.02
01.05.08.03
01.05.08.04
01.05.08.05
01.05.08.06
01.05.09
01.05.09.01
01.05.09.02
01.05.09.03
01.05.09.04
01.05.09.05
01.05.09.06
01.05.09.07
01.05.09.08
01.05.10
01.05.10.01
01.05.10.02
01.05.10.03
01.05.10.04
01.05.10.05
01.05.10.06
01.05.10.07
01.05.10.08
01.05.10.09
01.05.10.10
01.05.10.11
01.05.10.12
01.05.10.13
01.05.11
01.05.11.01
01.05.11.02
01.05.11.03
01.05.11.04
01.05.11.05
01.05.11.06
01.05.11.07
01.05.11.08
02
02.01
02.01.01
kg
und
2.00
PIP Viable
Precio
S/.
229.45
Parcial
S/.
PIP a Verificar
Metrado
Precio
S/.
13.02
9.13
Parcial
S/.
118.87
458.90
m2
m
m3
m2
79.56
1,988.89
86.07
151.00
6.42
37.59
35.87
52.87
m3
m2
29.45
294.45
357.87
11.85
2.96
33.58
100,372.36
510.78
74,762.38
3,087.33
7,983.37
35.87
52.87
10,539.27
3,489.23
12,264.39
106.18
1,775.37
10,539.27
3,489.23
9,188.06
106.18
1,616.74
194.64
4.78
4.81
555.17
936.22
2,653.71
28.89
1.00
1.00
22.66
5,736.22
283.17
654.65
5,736.22
283.17
862.88
1,540.55
-362.38
-255.27
5,736.22
283.17
13.02
9.13
118.87
31.86
13.65
180.92
3.96
35.87
54.78
78.27
6.42
96,606.38
1,142.82
747.75
14,160.61
25.42
81.70
8.41
10.38
222.86
6.72
47.63
94.93
52.87
549.02
400.57
985.37
11,782.61
3,809.07
61.61
4.81
586.03
18,321.63
36,105.31
148.00
177.55
57.70
21.24
37.59
44.50
m3
m2
2.96
33.58
35.87
52.87
3,143.52
6,674.10
2,567.65
8,322.52
106.18
1,775.37
kg
m3
m2
und
und
und
194.64
4.78
28.89
1.00
4.81
555.17
22.66
1,794.35
936.22
2,653.71
654.65
1,794.35
1.00
283.17
283.17
936.22
2,653.71
654.65
1,794.35
-458.90
283.17
13.02
9.13
118.87
1,185,582.05
50,488.96
966.40
118.87
667,385.90
46,516.46
353.90
3,076.33
m3
m2
kg
m3
m3
m2
und
und
kg
und
m3
m3
m3
m2
m2
m3
m3
m3
m2
kg
m3
m3
m2
m
m
m2
8.16
19.44
158.63
20.26
3.34
1.20
76.08
3.62
333.28
301.98
11.96
73.34
1,113.16
362.38
909.92
2.00
229.45
1.08
46.59
458.90
29,144.37
50.32
22.40
22.40
1.88
1.20
42.11
26.88
35.06
19.44
681.57
1,582.74
51.00
1.20
74.80
176.00
147.40
3.62
333.28
301.98
11.96
15.19
11.44
5,729.52
16,997.28
362.38
894.61
2,673.44
1,686.26
458.90
2.00
229.45
458.90
kg
518,196.15
3,972.50
612.50
118.87
-458.90
67,462.01
1,092.50
747.75
14,160.61
-16.69
-26.88
549.02
400.57
985.37
11,101.04
12,592.11
19,108.03
-362.38
-894.61
470.08
4,987.84
2,567.65
7,863.62
106.18
1,775.37
298.7%
1019.2%
1176.5%
138.4%
-100.0%
-28.1%
-100.0%
231.5%
2171.1%
-39.6%
-100.0%
1628.7%
219.8%
112.4%
-100.0%
-100.0%
17.6%
295.8%
1713.6%
-100.0%
128.8%
1171.0%
57.8%
Item
Partida
Und
m2
50.00
PIP Viable
Precio
S/.
12.25
mes
m
4,800.00
0.70
Metrado
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.01.05
02.02.01.06
02.02.01.07
02.02.01.08
02.02.01.09
02.03
02.03.01
Parcial
S/.
612.50
3,360.00
PIP a Verificar
Metrado
Precio
S/.
40.00
24.16
3.00
8,798.78
2.00
11,563.11
3,456.00
1,701.68
486.19
243.10
308.88
0.41
35.87
54.78
115.33
69.75
23,126.22
23,126.22
788,417.42
720,151.93
1,416.96
61,039.26
26,633.49
28,036.72
21,544.38
4,320.00
107.58
464,745.60
1,254.07
1,590.73
4,320.00
47.63
34.07
0.65
1.35
78.27
59,731.35
54,196.17
2,808.00
2,153.82
105.66
3,360.00
KM
253,916.44
221,326.88
m2
m3
m3
m3
m3
m
m
m3
m3
m
1,380.00
1,260.00
120.00
7.76
6.12
46.59
10,708.80
7,711.20
5,590.80
4,600.00
39.35
181,010.00
1,932.00
8.44
16,306.08
481.69
m3
m3
m3
m2
2.37
0.79
3.75
7.76
6.12
19.44
18.39
4.83
72.90
kg
m3
m3
m2
11.15
0.67
0.10
9.16
3.62
301.98
333.28
11.96
m3
m3
m3
m3
und
m2
192.28
7.76
40.36
202.33
33.33
109.55
31,901.58
1,492.09
kg
m3
m3
m3
m2
359.72
57.04
5.52
5.52
499.56
3.62
301.98
333.28
26.94
11.96
1,302.19
17,224.94
1,839.71
148.71
5,974.74
206.29
m3
m3
m3
0.53
0.17
7.76
6.12
4.11
1.04
m2
2.03
19.44
39.46
m3
m3
m3
m2
kg
0.33
0.14
2.89
301.98
196.21
11.96
99.65
27.47
34.56
92.00
42.60
Parcial
S/.
966.40
26,396.34
26,396.34
12.40
52.87
655.59
1.87
15.64
555.17
22.66
1,038.17
354.40
58,915.00
71.44
20.41
10.21
35.87
54.78
115.33
2,562.55
1,118.06
1,177.52
270.00
52.87
14,274.90
17.47
4.81
84.03
57.51
555.17
31,927.83
342.90
22.66
5.13
78.27
7,770.11
7,196.67
401.53
3,919.20
92,215.95
34,832.72
5.12
31.24
35.87
52.87
183.65
1,651.66
6.10
555.17
3,386.54
43.72
63.81
22.66
9.13
990.70
582.59
246,087.51
138,900.88
-100.0%
232.4%
347.1%
-100.0%
-100.0%
799.3%
-40.36
-202.33
1,004.84
244.85
27,013.42
-1,492.09
2,562.55
1,118.06
1,177.52
-3,919.20
14,274.90
-100.0%
-100.0%
3014.8%
223.5%
84.7%
-100.0%
-1,218.16
-17,224.94
30,088.12
-148.71
1,795.37
6,990.38
401.53
-4.11
-1.04
183.65
1,612.20
-93.5%
-100.0%
1635.5%
-100.0%
30.0%
3388.6%
3,386.54
-99.65
-27.47
956.14
582.59
153,871.56
104,068.16
-100.0%
-100.0%
-100.0%
4085.7%
-100.0%
-100.0%
2766.6%
166.9%
298.8%
Item
Partida
Und
Metrado
02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.01.05
02.03.01.06
02.03.01.07
02.03.01.08
02.03.01.09
02.03.01.10
02.03.01.11
02.03.01.12
02.03.01.13
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.02.04
02.03.02.05
02.03.02.06
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.03.04
02.03.03.05
02.03.03.06
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.04.04
02.03.04.05
02.03.04.06
02.03.04.07
02.03.04.08
02.03.04.09
02.03.04.10
02.03.04.11
02.03.04.12
02.03.05
02.03.05.01
02.03.05.02
02.03.05.03
02.03.05.04
m3
m3
m3
m3
m
m
m
und
und
und
m3
m3
m3
m
54.00
54.00
432.00
PIP Viable
Precio
S/.
7.76
6.12
46.59
Parcial
S/.
419.04
330.48
20,126.88
200.00
53.83
10,766.00
378.00
8.44
3,190.32
Metrado
425.79
255.47
170.32
25.76
PIP a Verificar
Precio
S/.
35.87
54.78
115.33
69.75
116.10
129.72
105.75
3.00
1.00
4.00
677.10
191.81
119.72
155.36
196.22
119.60
119.60
119.60
34.07
47.63
13,899.49
20,153.30
20,750.27
358.80
119.60
478.40
23,068.80
9,135.91
352.00
0.65
51.21
30.73
20.48
206.27
35.87
54.78
115.33
52.87
228.80
44,893.15
1,836.90
1,683.39
2,361.96
10,905.49
13,899.49
20,153.30
9,984.27
358.80
119.60
478.40
23,068.80
9,135.91
-3,190.32
228.80
26,944.59
1,836.90
1,683.39
2,361.96
10,450.59
27,060.39
1,045.02
26,452.54
786.63
9,558.90
-4,997.77
-12,495.89
27,060.39
1,045.02
1,879.07
699.11
9,402.99
1,236.41
-15,629.60
654.16
5,516.00
9,896.21
213.23
298.55
156.85
968.20
454.77
398.94
1,659.60
6,663.16
727.43
332.18
486.95
68.11
-1,927.10
-99.95
-504.71
3,330.66
39.85
77.24
40.37
1,458.68
17,948.56
m3
m3
m3
m2
23.40
19.44
454.90
kg
m3
m3
m2
1,380.60
34.52
3.62
361.99
4,997.77
12,495.89
m3
m2
14.30
8.02
6.12
19.44
24,573.47
87.52
155.91
124.00
196.21
24,330.04
4.00
7.76
4,202.30
31.04
41.44
19.44
805.59
kg
m2
m3
m3
m2
m2
und
kg
und
und
und
31.03
3.62
112.33
2.00
333.28
666.56
4.60
11.96
55.02
1.00
1.00
1.00
1,927.10
99.95
504.71
m3
m3
m3
m2
3.00
7.76
1,927.10
99.95
504.71
2,697.10
23.28
kg
m3
m2
und
m3
m3
m3
m2
Parcial
S/.
15,273.09
13,994.65
19,643.01
1,796.76
102.42
108.63
264.21
9.62
21.93
180.80
35.87
52.87
257.05
32.93
68.00
50.00
4.81
264.21
9.62
110.32
6.81
5.45
1.36
33.55
35.87
54.78
115.33
52.87
1,236.41
8,700.44
654.16
5,516.00
14,098.51
244.27
298.55
156.85
1,773.79
117.90
12.84
4.19
11.37
34.53
34.53
1.00
7.46
4.81
31.07
555.17
586.03
22.66
9.62
486.95
9.13
567.10
398.94
2,326.16
6,663.16
782.45
332.18
486.95
68.11
1.76
1.41
0.35
27.59
35.87
54.78
115.33
52.87
6,027.76
63.13
77.24
40.37
1,458.68
92.7%
-100.0%
150.1%
2297.3%
-100.0%
-100.0%
7.6%
798.8%
6031.0%
-64.2%
235.5%
687.0%
120.2%
404.9%
249.0%
1322.1%
-100.0%
-100.0%
-100.0%
123.5%
171.2%
Item
Partida
Und
184.00
PIP Viable
Precio
S/.
3.62
Parcial
S/.
666.08
0.70
5.09
301.98
333.28
211.39
1,696.40
1.00
99.95
99.95
5,876.36
Metrado
02.03.05.05
02.03.05.06
02.03.05.07
02.03.05.08
02.03.05.09
02.03.05.10
02.03.05.11
02.03.06
02.03.06.01
02.03.06.02
02.03.06.03
02.03.06.04
02.03.06.05
02.03.06.06
02.03.06.07
02.03.06.08
02.03.06.09
02.03.06.10
02.03.06.11
02.03.06.12
02.03.06.13
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.01.04
02.04.01.05
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.02.05
02.04.02.06
02.04.02.07
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.03.04
02.04.03.05
02.04.03.06
02.04.04
kg
m2
m3
m3
m3
m2
m2
m2
und
PIP a Verificar
Metrado
Precio
S/.
137.68
4.81
2.88
31.07
Parcial
S/.
662.24
89.48
1.15
2.88
26.59
26.59
0.96
555.17
586.03
22.66
9.62
470.91
638.45
1,687.77
602.53
255.80
452.07
m3
m3
m3
m2
4.07
3.25
0.81
63.46
35.87
54.78
115.33
52.87
15,714.67
145.99
178.04
93.42
3,355.13
kg
m2
m3
m3
m2
m2
m2
kg
und
und
m3
237.98
8.20
2.24
4.87
63.59
63.59
0.96
4.17
1.00
4.81
31.07
264.21
586.03
22.66
9.62
470.91
9.13
4,554.01
1,144.68
254.77
591.83
2,853.97
1,440.95
611.74
452.07
38.07
4,554.01
1.00
130.00
2,241.56
27.96
m3
m3
m2
12.60
1.89
42.00
6.12
17.94
47.01
m2
87.50
19.44
2,241.56
3,634.80
2,085.44
77.11
33.91
1,974.42
58,134.21
57,687.90
1,701.00
kg
m3
m2
m2
m3
m3
2,450.00
61.25
3.62
356.15
8,869.00
21,814.19
93.00
175.00
219.47
27.96
m3
m3
m3
m3
m2
kg
m3
20.25
47.25
7.76
6.12
20,410.71
4,893.00
446.31
157.14
289.17
m3
m3
m3
m2
m3
kg
28.00
52.87
100,588.16
8,647.13
1,480.36
710.81
4.80
28.96
28.96
4.81
586.03
22.66
9.62
3,419.00
2,812.94
656.23
278.60
24.00
14.40
9.60
6.40
19.20
141.59
40.32
35.87
54.78
115.33
47.63
31.07
4.81
586.03
18.00
10.80
7.20
66.00
35.46
18.63
35.87
54.78
115.33
10.99
446.68
4.81
27,968.03
860.88
788.83
1,107.17
304.83
596.54
681.05
23,628.73
18,721.88
645.66
591.62
830.38
725.34
15,839.27
89.61
10,482.41
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
73.0%
-85.0%
-13.0%
-61.4%
-87.1%
-100.0%
-100.0%
6166.5%
447.8%
172.8%
Item
Partida
Und
Metrado
02.04.04.01
02.04.04.02
02.04.04.03
02.04.04.04
02.04.04.05
02.04.04.06
02.04.05
02.04.05.01
02.04.05.02
02.04.06
02.04.06.01
02.04.06.02
02.04.06.03
02.04.06.04
02.04.06.05
02.04.06.06
02.04.06.07
02.04.06.08
02.04.06.09
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
PIP a Verificar
Precio
S/.
35.87
54.78
115.33
10.99
446.68
4.81
m3
m3
m3
m2
m3
kg
9.60
5.76
3.84
56.80
19.20
37.25
kg
kg
64.04
46.90
28.46
32.17
kg
und
und
und
m2
und
und
und
m
35.34
7.00
8.00
29.00
1.80
2.00
2.00
4.00
32.00
34.80
153.81
119.51
74.13
554.15
1,553.39
1,915.84
1,474.27
381.00
m3
m3
m2
120.00
30.00
300.00
7.76
6.12
19.44
109,957.05
109,957.05
931.20
183.60
5,832.00
m3
525.00
196.21
103,010.25
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
646,332.10
64,633.21
32,316.61
743,281.92
141,223.56
884,505.48
22,112.64
51,987.47
35,380.22
993,985.81
15.14%
10.00%
18.00%
Parcial
S/.
344.35
315.53
442.87
624.23
8,576.26
179.17
3,331.35
1,822.58
1,508.77
31,437.36
1,229.83
1,076.67
956.08
2,149.77
997.47
3,106.78
3,831.68
5,897.08
12,192.00
2,594,139.91
392,767.65
259,413.99
3,246,321.55
584,337.88
3,830,659.43
3,830,659.43
-100.0%
1,947,807.81
328,134.44
227,097.38
2,503,039.63
443,114.32
2,946,153.95
-22,112.64
-51,987.47
-35,380.22
2,836,673.62
301.4%
507.7%
702.7%
336.8%
313.8%
333.1%
-100.0%
-100.0%
-100.0%
285.4%
Partida
Und
Metrado
01
03.01
03.01.01
03.01.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.02.04
03.01.02.05
03.01.03
03.01.03.01
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04
03.02.01.05
03.02.01.06
03.02.01.07
03.02.01.08
03.02.01.09
03.02.01.10
03.02.01.11
PIP Viable
Precio
S/.
Parcial
S/.
1,113,449.90
34,866.74
Metrado
PIP a Verificar
Precio
S/.
m2
220.00
20.21
m3
kg
bls
p2
m
m
255.00
5,350.00
2,350.00
8,700.00
42,400.00
2,500.00
25.43
0.07
0.88
0.09
0.35
0.66
12.00
6,550.43
4.50
6,400.26
34,866.74
mes
m
49,809.63
0.70
Parcial
S/.
3,161,470.99
138,052.68
4,446.20
4,446.20
26,200.15
6,484.65
374.50
2,068.00
783.00
14,840.00
1,650.00
78,605.16
78,605.16
34,866.74
m2
m3
14,830.15
7.76
115,081.96
21,232.90
17,835.67
0.25
21.32
28,801.17
28,801.17
3,023,418.31
2,435,249.93
5,308.23
380,256.48
m3
6,355.77
6.12
38,897.31
5,095.90
37.94
193,338.45
154,441.14
397.0%
2,547.95
2,547.95
89.18
42.81
227,226.18
109,077.74
227,226.18
77,149.09
241.6%
114.86
281.87
177.68
958.71
502.08
317.38
3,802.85
726.88
290.60
2,593.85
1,576.19
533.51
2,942.30
154.87
96.06
181.89
61.77
87.73
116.56
40.88
56.38
74.79
18.95
27.12
34.92
12.92
17,788.37
27,076.43
32,318.22
59,219.52
44,047.48
36,993.81
155,460.51
40,981.49
21,733.97
49,153.46
42,746.27
18,630.17
38,014.52
-151,813.22
27,076.43
32,318.22
59,219.52
44,047.48
36,993.81
155,460.51
40,981.49
21,733.97
49,153.46
42,746.27
18,630.17
38,014.52
1,467.79
1,067.79
1,957.63
2,091.46
712.43
6,761.28
6,840.83
4,743.94
1,196.62
407.77
184.24
19.33
23.71
9.28
13.02
16.67
6.92
9.32
11.96
15.15
5.65
5.09
28,372.38
25,317.30
18,166.81
27,230.81
11,876.21
46,788.06
63,756.54
56,737.52
18,128.79
2,303.90
937.78
28,372.38
25,317.30
18,166.81
27,230.81
11,876.21
46,788.06
63,756.54
56,737.52
18,128.79
2,303.90
-45,131.00
KM
1,078,583.16
858,977.85
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
2,139.99
14.92
31,928.65
14,760.80
11.49
169,601.59
12,552.80
3.67
46,068.78
-89.5%
-98.0%
Item
Partida
Und
Metrado
03.02.01.12
03.02.01.13
03.02.01.14
03.02.01.15
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
03.02.02.06
03.02.02.07
03.02.02.08
03.02.02.09
03.02.02.10
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.02.03.04
03.02.03.05
03.02.03.06
03.02.03.07
03.02.03.08
03.02.03.09
03.02.03.10
m
m
Glb
Glb
Glb
Glb
Glb
Glb
Glb
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m3
m2
m2
und
und
und
und
und
und
und
und
m2
m3
m3
m3
m2
m2
10,322.40
12,173.60
PIP Viable
Precio
S/.
5.18
10.71
Parcial
S/.
53,470.03
130,379.26
32.00
8,192.38
3,790.91
11.82
121,309.12
96,833.93
11,070.62
49,809.60
4.33
0.15
47,935.78
7,471.44
65,954.05
44.96
4.96
7.76
6.12
348.89
30.36
729.68
19.44
14,184.98
347.68
46.68
18.00
196.64
3.62
333.28
219.47
11.96
1,258.60
15,557.51
3,950.46
2,351.81
8.00
855.98
6,847.84
180.00
119.02
21,423.60
50,844.33
53.04
6.00
7.76
6.12
411.59
36.72
316.56
19.44
6,153.93
kg
m3
m2
m2
jgo
jgo
jgo
jgo
jgo
jgo
und
1,384.08
30.48
3.62
333.28
5,010.37
10,158.37
354.24
11.96
4,236.71
24.00
1,034.86
m3
4.72
7.76
24,836.64
30,017.55
36.63
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
1.00
1.00
1.00
1.00
1.00
1.00
2,323.05
10,318.50
2,940.35
7,991.71
9,514.96
20,543.23
2,323.05
10,318.50
2,940.35
7,991.71
9,514.96
20,543.23
10,191.79
12,739.74
28.95
20.74
295,052.32
264,222.21
42,465.81
0.55
87.27
59.07
16.88
8.44
200.24
408.41
0.25
21.32
37.94
89.18
6.54
48.58
23,356.20
99,158.69
21.82
1,259.37
640.43
752.68
1,309.57
19,840.56
1,939.73
33.09
4.67
498.57
9,058.54
16,497.68
435.58
5.00
1.00
3.00
3.00
7.00
2.00
1.00
20.88
1,176.57
851.73
1,361.16
1,681.61
1,822.53
2,779.17
6,504.19
9,094.91
5,882.85
851.73
4,083.48
5,044.83
12,757.71
5,558.34
6,504.19
107.79
71.05
20.29
10.15
204.46
213.38
0.25
21.32
37.94
89.18
6.54
48.58
111,293.79
26.95
1,514.79
769.80
905.18
1,337.17
10,366.00
2,442.31
39.42
494.53
4.67
534.56
20.88
11,405.59
21,072.36
10,325.79
2.00
1.00
5.00
12.00
3.00
4.00
1,414.08
1,027.62
1,467.29
1,776.14
2,361.19
3,495.17
2,828.16
1,027.62
7,336.45
21,313.68
7,083.57
13,980.68
619.7%
6.0%
-100.0%
-100.0%
-26.3%
-100.0%
118.9%
268.0%
1996.4%
68.4%
127.6%
107.4%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
m3
m2
1.12
123.84
PIP Viable
Precio
S/.
6.12
19.44
m3
und
und
9.36
24.00
32.00
333.28
716.27
226.77
Metrado
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.04.04
03.02.04.05
03.02.04.06
03.02.04.07
03.02.04.08
03.02.05
03.02.05.01
03.02.05.02
m2
m3
m3
m2
m2
m3
m3
m3
m3
m2
und
und
Parcial
S/.
6.85
2,407.45
3,119.50
17,190.48
7,256.64
56,451.99
38.88
4.32
7.76
6.12
301.71
26.44
691.20
19.44
13,436.93
36.72
333.28
12,238.04
21.60
219.47
4,740.55
216.00
119.02
m3
m3
m2
26.88
11.52
192.00
7.76
6.12
19.44
25,708.32
16,337.39
208.59
70.50
3,732.48
kg
m3
201.60
38.40
3.62
301.98
729.79
11,596.03
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
Metrado
PIP a Verificar
Precio
S/.
1,113,449.90
111,344.99
55,672.50
1,280,467.39
243,288.80
1,523,756.19
38,093.90
89,559.92
60,950.25
1,712,360.26
Parcial
S/.
143.75
3,231.19
0.25
21.32
363,866.82
35.94
68,888.97
382.80
825.64
6.54
48.58
2,503.51
40,109.59
20.36
26.10
498.57
254.88
10,150.89
6,652.37
15.35
757.63
435.00
356.73
18.93
495.88
5,475.81
14,341.94
215,707.80
-100.0%
-100.0%
-100.0%
544.6%
22732.8%
-100.0%
198.5%
167.00
48.58
8,112.86
-2,087.15
6,652.37
-4,740.55
5,475.81
14,341.94
215,707.80
-25,708.32
-2,488.31
-208.59
-70.50
4,380.38
16.08
356.73
5,736.22
-729.79
-5,859.81
-100.0%
-50.5%
2,048,021.09
274,508.54
-55,672.50
2,266,857.13
-243,288.80
2,023,568.33
-38,093.90
-89,559.92
-60,950.25
1,834,964.26
183.9%
246.5%
-100.0%
177.0%
-100.0%
132.8%
-100.0%
-100.0%
-100.0%
107.2%
13,849.08
12.20%
3,161,470.99
385,853.53
3,547,324.52
3,547,324.52
3,547,324.52
-17.1%
-100.0%
-100.0%
-15.2%
-100.0%
-100.0%
117.4%
Partida
Und
Metrado
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02.01.06
01.02.01.07
01.02.01.08
01.02.01.09
01.02.01.10
01.02.01.11
01.02.01.12
01.02.01.13
01.02.01.14
01.02.01.15
01.02.01.16
01.02.01.17
01.02.01.18
01.02.01.19
01.02.01.20
PIP Viable
Precio
S/.
Parcial
S/.
193,797.11
m2
und
60.00
1.00
24.21
3,304.64
und
m3
bls
p2
m
m
1.00
90.00
700.00
2,300.00
12,000.00
900.00
2,179.27
42.74
1.48
0.16
1.15
1.09
mes
2.00
8,800.62
1.00
11,563.11
6,256.47
0.41
Parcial
S/.
1,173,166.07
56,132.46
4,757.24
1,452.60
3,304.64
22,210.87
2,179.27
3,846.60
1,036.00
368.00
13,800.00
981.00
17,601.24
17,601.24
11,563.11
11,563.11
1,056,100.61
920,972.60
2,565.15
5,255.43
1,501.55
750.78
750.78
35.87
54.78
115.36
69.75
188,512.27
82,254.91
86,609.98
52,366.91
410.62
405.59
950.56
157.98
185.80
1,286.70
227.02
487.20
176.03
381.82
2,578.05
1,605.57
103.13
1,955.96
1,601.55
82.25
52.84
35.05
48.25
16.30
23.26
29.91
11.18
16.58
20.37
8.10
10.35
13.02
4.80
5.27
33,773.50
21,431.38
33,317.13
7,622.54
3,028.54
29,928.64
6,790.17
5,446.90
2,918.58
7,777.67
20,882.21
16,617.65
1,342.75
9,388.61
8,440.17
KM
Metrado
PIP a Verificar
Precio
S/.
193,797.11
156,097.41
m2
m
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
8,994.00
1,818.63
779.42
0.70
7.76
6.12
6,295.80
14,112.57
4,770.05
634.38
14.92
9,464.95
1,354.00
1,366.00
250.00
234.00
417.00
838.00
414.00
343.00
424.00
3.67
4.32
6.56
4.32
5.18
6.56
5.18
7.25
9.51
4,969.18
5,901.12
1,640.00
1,010.88
2,160.06
5,497.28
2,144.52
2,486.75
4,032.24
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
367.00
556.00
2,110.00
321.00
PIP Viable
Precio
S/.
10.71
13.66
11.21
11.49
Parcial
S/.
3,930.57
7,594.96
23,653.10
3,688.29
9.00
3,790.91
34,118.19
Metrado
01.02.01.21
01.02.01.22
01.02.01.23
01.02.01.24
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.02.10
01.02.02.11
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.03.04
01.02.03.05
01.02.03.06
01.02.03.07
01.02.03.08
01.02.03.09
01.02.03.10
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.04.04
01.02.04.05
01.02.04.06
01.02.04.07
01.02.04.08
01.02.04.09
01.02.04.10
01.02.04.11
01.02.04.12
01.02.04.13
01.02.04.14
01.02.04.15
m
m
m
m
Glb
Glb
m3
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
und
1,152.21
844.96
8,994.00
11.82
4.33
0.15
13,619.12
3,658.68
1,349.10
8,357.42
21.06
7.02
7.76
6.12
163.43
42.96
82.36
19.44
1,601.08
350.83
9.70
83.64
3.62
333.28
11.96
1,270.00
3,232.82
1,000.33
4.00
261.70
1,046.80
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
1.00
20,891.20
20,891.20
3,003.10
3,753.88
47.63
34.07
143,037.65
127,894.69
12,512.93
0.65
13.53
10.60
3.03
1.51
48.72
36.36
0.41
35.87
54.78
115.36
10.99
56.53
8,133.40
11,243.97
5.55
380.22
165.98
174.19
535.43
2,055.43
300.47
7.18
54.83
1.00
1.00
4.81
551.26
24.35
773.95
414.80
1,445.26
3,958.05
1,335.11
773.95
414.80
6,495.67
1.89
94.34
41.09
43.84
133.64
1,190.52
175.26
725.23
334.78
773.95
414.80
-1,046.80
6,495.67
1.89
94.34
41.09
43.84
133.64
1,190.52
1,135.64
2,311.97
410.54
1,132.20
60,120.00
10.79
868.65
382.88
409.53
2,176.46
8,667.08
1,383.45
10,531.15
4,675.87
3,632.68
2,348.94
5,815.28
9,035.40
8,745.84
2,343.08
-907.08
m2
m3
m3
m3
m2
m2
4.62
2.63
0.75
0.38
12.16
21.06
0.41
35.87
54.78
115.36
10.99
56.53
kg
m3
m2
jgo
236.10
3.97
16.86
2.00
4.81
582.36
24.35
566.10
26.32
24.87
7.11
3.55
198.04
157.72
0.41
35.87
54.78
115.36
10.99
56.53
1,135.64
2,311.97
410.54
1,132.20
62,845.38
10.79
892.09
389.49
409.53
2,176.46
8,915.91
287.62
19.66
207.08
1.00
1.00
4.00
10.00
12.00
11.00
4.81
551.26
22.58
3,632.68
2,348.94
1,453.82
903.54
728.82
325.08
1,383.45
10,837.77
4,675.87
3,632.68
2,348.94
5,815.28
9,035.40
8,745.84
3,575.88
2,725.38
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
und
und
und
und
und
3.02
1.08
7.76
6.12
23.44
6.61
12.80
19.44
248.83
0.92
333.28
306.62
4.00
4.00
308.20
226.77
1,232.80
907.08
-100.0%
2205.9%
3705.8%
5792.4%
3483.1%
3434.6%
190.1%
-100.0%
Item
Partida
Und
Metrado
01.02.05
01.02.05.01
01.02.05.02
01.02.05.03
01.02.05.04
01.02.05.05
01.02.05.06
01.02.05.07
01.02.06
01.02.06.01
01.02.06.02
01.03
01.03.01
02
02.01
02.01.01
02.01.01.01
02.01.02
02.01.02.01
02.01.02.02
02.01.02.03
02.01.02.04
02.01.02.05
02.01.03
02.01.03.01
02.01.04
02.01.04.01
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.01.05
02.02.01.06
02.02.01.07
02.02.01.08
02.02.01.09
02.02.01.10
02.02.01.11
02.02.01.12
02.02.01.13
02.02.01.14
02.02.01.15
02.02.01.16
HIDRANTES
Limpieza y Roce de Monte
Excavacin para estructuras material suelto a mano
Excavacin Caja Canal Roca Suelta a Mano
Refine de Piso y Paredes para estructuras de concreto (e = hasta 0.10 m)
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Colocacion de accesorios para hidrantes salida de 1" (inc. tapa)
Colocacion de Accesorios Para Hidrantes SP de 2" Salida de 1"
DADOS DE ANCLAJE
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
PLAN DE MANEJO AMBIENTAL
Plan de manejo ambiental - Obras de mitigacin de impactos ambientales
SISTEMA DE ASPERSION PACHACHACA C (SAN IGNACIO)
OBRAS PRELIMINARES
CAMPAMENTOS
Construccin de campamentos provisionales a pie de obra
MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO Y FLETES
Transporte de agregados con bugui (Hasta 0.30 Km)
Transporte de Cemento con Bugui (Distancia Hasta 0.30 Km)
Transporte de Madera a Mano (Distancia Hasta 0.30 Km)
Transporte de Tubera Hasta 6" a Mano (Distancia Hasta 0.30 Km)
Transporte de Tubera de 8" a 14" a Mano (Distancia Hasta 0.30 Km)
REPLANTEO DE CANALES Y OBRAS DE ARTE
Control Planimetrico y Altimtrico - Trabajos Topogrficos
CAMINOS DE ACCESO
Mejoramiento de Caminos de Acceso Existentes
MODULOS DE ASPERSION
RED DE ASPERSION
Replanteo de Canales y Obras de Arte
Limpieza y Roce de Monte
Excavacin de zanjas material suelto a mano
Excavacin de zanjas roca suelta a mano
Excavacin de zanjas roca fija a mano con compresora
Colocacin de Cama de Apoyo con Material Selecto Compactado a Mano en Capas
(Hasta e = 0.15 m)
Instalacin Tubera de PVC NTP ISO-4422 UF S-20 (C-5) de 250 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-20 (C-5) de 200 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-13.3 (C-7.5) de 200 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-13.3 (C-7.5) de 160 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-20 (C-5) de 110 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-13.3 (C-7.5) de 110 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-20 (C-5) de 90 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-13.3 (C-7.5) de 90 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-10 (C-10) de 90 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-13.3 (C-7.5) de 63 mm
Instalacin Tubera de PVC NTP ISO-4422 UF S-10 (C-10) de 63 mm
m2
m3
m3
m2
m2
m3
m3
m2
und
und
PIP Viable
Precio
S/.
Parcial
S/.
22,263.85
14.75
1.63
7.76
6.12
114.46
9.98
262.40
19.44
5,101.06
13.94
8.20
333.28
219.47
4,645.92
1,799.65
89.00
119.02
m3
m3
m2
7.16
3.07
51.18
7.76
6.12
19.44
10,592.78
4,353.05
55.56
18.79
994.94
kg
m3
53.73
10.23
3.62
301.98
194.50
3,089.26
und
Metrado
PIP a Verificar
Precio
S/.
23.29
9.32
0.41
35.87
Parcial
S/.
43,332.67
9.55
334.31
82.80
117.30
10.99
56.53
909.97
6,630.97
8.77
551.26
4,834.55
133.40
115.00
22.58
240.01
3,012.17
27,601.15
11,210.32
109.34
56.53
6,180.99
14.22
353.68
1.00
60,933.00
5,029.33
60,933.00
60,933.00
602,001.42
25,316.58
968.40
968.40
9,766.00
2,137.00
518.00
192.00
5,175.00
1,744.00
8,800.62
8,800.62
5,781.56
5,781.56
576,684.84
513,060.76
1,240.32
91,150.33
39,772.47
41,877.99
25,320.65
990.14
308.08
179.76
325.58
10.53
196.47
174.37
426.35
77.64
1,443.88
634.97
82.25
52.84
74.95
48.25
16.30
23.26
11.18
16.58
20.37
8.10
10.35
81,439.02
16,278.95
13,473.01
15,709.24
171.64
4,569.89
1,949.46
7,068.88
1,581.53
11,695.43
6,571.94
81,439.02
16,278.95
13,473.01
15,709.24
171.64
4,569.89
1,949.46
7,068.88
1,581.53
11,695.43
6,571.94
24.21
m3
bls
p2
m
m
50.00
350.00
1,200.00
4,500.00
1,600.00
42.74
1.48
0.16
1.15
1.09
mes
1.00
8,800.62
0.50
11,563.11
m
m
m
m
m
m
m
m
m
m
m
8,991.00
0.70
1,818.25
779.26
634.19
7.76
6.12
14.92
14,109.62
4,769.07
9,462.11
-100.0%
62.8%
0.41
35.87
54.78
115.36
69.75
40.00
m
m2
m3
m3
m3
m3
4.1%
-100.0%
3,025.16
2,541.13
726.04
363.02
363.02
m2
195,067.45
156,046.73
6,293.70
188.63
-1,799.65
3,012.17
27,601.15
-10,592.78
6,857.27
-55.56
-18.79
5,186.05
-194.50
1,940.07
60,933.00
60,933.00
406,933.97
25,316.58
968.40
968.40
9,766.00
2,137.00
518.00
192.00
5,175.00
1,744.00
8,800.62
8,800.62
5,781.56
5,781.56
381,617.39
357,014.03
-6,293.70
1,240.32
77,040.71
35,003.40
32,415.88
25,320.65
195,067.45
KM
-100.0%
157.5%
-100.0%
-100.0%
521.2%
208.6%
195.6%
228.8%
-100.0%
546.0%
734.0%
342.6%
Item
Partida
Und
Metrado
02.02.01.17
02.02.01.18
02.02.01.19
02.02.01.20
02.02.01.21
02.02.01.22
02.02.01.23
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
02.02.02.06
02.02.02.07
02.02.02.08
02.02.02.09
02.02.02.10
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.02.03.04
02.02.03.05
02.02.03.06
02.02.03.07
02.02.03.08
02.02.03.09
02.02.03.10
02.02.03.11
02.02.03.12
02.02.03.13
02.02.03.14
02.02.04
02.02.04.01
02.02.04.02
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Glb
Glb
m3
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
und
und
und
und
m2
m3
m3
PIP Viable
Precio
S/.
Parcial
S/.
1,354.00
1,365.00
250.00
235.00
417.00
838.00
415.00
342.00
423.00
366.00
555.00
2,110.00
321.00
3.67
4.32
6.56
4.32
5.18
6.56
5.18
7.25
9.51
10.71
13.66
11.21
11.49
4,969.18
5,896.80
1,640.00
1,015.20
2,160.06
5,497.28
2,149.70
2,479.50
4,022.73
3,919.86
7,581.30
23,653.10
3,688.29
9.00
3,790.91
34,118.19
1,151.85
844.69
8,991.05
11.82
4.33
0.15
13,614.87
3,657.51
1,348.66
10,445.18
26.33
8.78
7.76
6.12
204.32
53.73
102.95
19.44
2,001.35
438.54
12.12
104.55
3.62
333.28
11.96
1,587.51
4,039.35
1,250.42
5.00
261.70
1,308.50
2,647.34
3.02
1.09
7.76
6.12
23.44
6.67
12.80
19.44
248.83
0.93
333.28
309.95
3.00
5.00
308.20
226.77
924.60
1,133.85
21,430.71
14.75
1.63
7.76
6.12
114.46
9.98
PIP a Verificar
Metrado
Precio
S/.
33.24
13.02
323.31
4.80
925.99
5.27
Parcial
S/.
432.78
1,551.89
4,879.97
1.00
11,389.63
11,389.63
1,452.08
1,815.10
47.63
34.07
69,162.57
61,840.46
6,050.32
0.65
4.02
4.12
1.18
0.59
20.45
15.34
0.41
35.87
54.78
115.36
10.99
56.53
3,932.71
4,887.05
1.65
147.78
64.64
68.06
224.75
867.17
116.20
2.90
23.88
1.00
4.81
551.26
24.35
773.95
558.92
1,598.65
581.48
773.95
12.17
11.50
3.29
1.64
91.01
72.52
0.41
35.87
54.78
115.36
10.99
56.53
28,481.85
4.99
412.51
180.23
189.19
1,000.20
4,099.56
108.42
8.94
95.40
1.00
1.00
1.00
8.00
7.00
4.81
551.26
22.58
3,632.68
2,348.94
903.54
728.82
325.08
521.50
4,928.26
2,154.13
3,632.68
2,348.94
903.54
5,830.56
2,275.56
12.56
5.02
0.41
35.87
23,356.03
5.15
180.07
-64.8%
-60.4%
-53.5%
-100.0%
975.9%
1659.9%
2602.1%
1547.5%
1490.0%
146.1%
-100.0%
9.0%
57.3%
-100.0%
Item
Partida
Und
Metrado
02.02.04.03
02.02.04.04
02.02.04.05
02.02.04.06
02.02.04.07
02.02.05
02.02.05.01
02.02.05.02
03
03.01
03.01.01
03.01.01.01
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.02.04
03.01.03
03.01.03.01
03.01.04
03.01.04.01
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04
03.02.01.05
03.02.01.06
03.02.01.07
03.02.01.08
03.02.01.09
03.02.01.10
03.02.01.11
03.02.01.12
03.02.01.13
03.02.01.14
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
03.02.02.06
03.02.02.07
03.02.02.08
m2
m2
m3
m3
m2
und
und
PIP Viable
Precio
S/.
Parcial
S/.
262.40
19.44
5,101.06
13.94
8.20
333.28
219.47
4,645.92
1,799.65
PIP a Verificar
Metrado
Precio
S/.
44.64
10.99
63.24
56.53
Parcial
S/.
490.59
3,574.96
62.92
56.53
3,556.87
-2,038.46
-1,799.65
1,617.18
14,880.62
-9,759.64
2,401.66
-57.42
-19.40
2,529.08
9.45
353.68
m2
40.00
24.21
m3
bls
p2
m
20.00
120.00
450.00
850.00
42.74
1.48
0.16
1.15
mes
1.00
8,800.62
KM
1.00
11,563.11
m2
m3
m3
m3
m3
420.19
352.96
100.85
50.42
50.42
0.41
35.87
54.78
115.36
69.75
3,342.28
100,494.66
23,414.03
968.40
968.40
2,081.90
854.80
177.60
72.00
977.50
8,800.62
8,800.62
11,563.11
11,563.11
77,080.63
55,358.40
172.28
12,660.68
5,524.56
5,816.45
3,516.80
-200.95
150.35
100,494.66
23,414.03
968.40
968.40
2,081.90
854.80
177.60
72.00
977.50
8,800.62
8,800.62
11,563.11
11,563.11
77,080.63
55,358.40
172.28
12,660.68
5,524.56
5,816.45
3,516.80
m
m
m
m
m
Glb
m3
m3
m
26.58
295.34
39.16
260.89
218.42
1.00
201.69
252.12
840.39
23.26
11.18
16.58
8.10
4.80
1,194.11
47.63
34.07
0.65
m2
m3
m3
m3
m2
m2
4.02
4.12
1.18
0.59
20.45
15.34
0.41
35.87
54.78
115.36
10.99
56.53
618.25
3,301.90
649.27
2,113.21
1,048.42
1,194.11
9,606.49
8,589.73
546.25
4,629.57
1.65
147.78
64.64
68.06
224.75
867.17
618.25
3,301.90
649.27
2,113.21
1,048.42
1,194.11
9,606.49
8,589.73
546.25
4,629.57
1.65
147.78
64.64
68.06
224.75
867.17
kg
m3
116.20
2.90
4.81
551.26
558.92
1,598.65
558.92
1,598.65
82.00
119.02
m3
m3
m2
7.40
3.17
52.87
7.76
6.12
19.44
9,759.64
4,497.49
57.42
19.40
1,027.79
kg
m3
55.51
10.57
3.62
301.98
200.95
3,191.93
4.73
551.26
2,607.46
71.62
62.00
22.58
240.01
1,617.18
14,880.62
6,899.15
-43.9%
-100.0%
-100.0%
4.7%
-100.0%
53.4%
-100.0%
-100.0%
246.1%
Item
Partida
Und
Metrado
03.02.02.09
03.02.02.10
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.02.03.04
03.02.03.05
03.02.03.06
03.02.03.07
03.02.03.08
03.02.03.09
03.02.03.10
03.02.03.11
03.02.03.12
03.02.03.13
03.02.04
03.02.04.01
03.02.04.02
03.02.04.03
03.02.04.04
03.02.04.05
03.02.04.06
03.02.04.07
03.02.05
03.02.05.01
03.02.05.02
PIP Viable
Precio
S/.
Parcial
S/.
m2
und
PIP a Verificar
Metrado
Precio
S/.
23.88
24.35
1.00
516.47
m2
m3
m3
m3
m2
m2
5.27
4.98
1.42
0.71
45.77
37.30
0.41
35.87
54.78
115.36
10.99
56.53
kg
m3
m2
und
und
und
und
44.80
4.41
47.22
1.00
1.00
1.00
8.00
4.81
551.26
22.58
1,453.82
903.54
728.82
325.08
m2
m3
m2
m2
2.43
0.97
8.64
12.24
0.41
35.87
10.99
56.53
m3
m2
und
0.92
13.92
12.00
551.26
22.58
240.01
m2
2.52
m3
0.21
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
388,864.56
38,886.46
19,443.23
447,194.25
84,966.91
532,161.16
13,304.03
29,257.07
21,286.45
596,008.71
Parcial
S/.
581.48
516.47
12,351.67
2.16
178.63
77.79
81.91
503.01
2,108.57
215.49
2,431.06
1,066.23
1,453.82
903.54
728.82
2,600.64
4,524.26
1.00
34.79
94.95
691.93
215.49
2,431.06
1,066.23
1,453.82
903.54
728.82
2,600.64
4,524.26
1.00
34.79
94.95
691.93
56.53
507.16
314.31
2,880.12
216.73
142.46
507.16
314.31
2,880.12
216.73
142.46
353.68
74.27
74.27
1,875,662.15
319,180.59
187,566.22
2,382,408.96
428,833.61
2,811,242.57
1,486,797.59
280,294.13
168,122.99
1,935,214.71
343,866.70
2,279,081.41
-13,304.03
-29,257.07
-21,286.45
2,215,233.86
17.02%
10.00%
18.00%
2,811,242.57
382.3%
720.8%
864.7%
432.7%
404.7%
428.3%
-100.0%
-100.0%
-100.0%
371.7%
Partida
Und
Metrado
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.02.04
04.01.03
04.01.03.01
04.01.04
04.01.04.01
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.02.01.15
04.02.01.16
04.02.01.17
04.02.01.18
04.02.01.19
04.02.01.20
04.02.01.21
04.02.01.22
PIP Viable
Precio
S/.
Parcial
S/.
293,333.23
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
1,790,676.62
81,646.17
5,725.64
2,421.00
3,304.64
32,174.00
6,411.00
1,628.00
560.00
23,575.00
26,401.86
26,401.86
17,344.67
17,344.67
1,709,030.45
1,494,990.67
m2
und
100.00
1.00
24.21
3,304.64
m3
bls
p2
m
150.00
1,100.00
3,500.00
20,500.00
42.74
1.48
0.16
1.15
mes
3.00
8,800.62
1.50
11,563.11
10,202.00
8,569.68
2,448.48
1,224.24
1,224.24
0.41
35.87
54.78
115.36
69.75
4,182.82
307,394.42
134,127.73
141,228.33
85,390.74
2,684.83
1,175.56
215.58
839.54
393.88
362.13
2,202.80
1,019.28
876.33
2,622.66
2,234.57
756.39
2,843.65
2,176.79
35.05
48.25
63.93
16.30
23.26
29.91
11.18
16.58
20.37
8.10
10.35
13.02
4.80
5.27
94,103.29
56,720.77
13,782.03
13,684.50
9,161.65
10,831.31
24,627.30
16,899.66
17,850.84
21,243.55
23,127.80
9,848.20
13,649.52
11,471.68
1.00
30,610.44
30,610.44
4,896.96
6,121.20
47.63
34.07
233,242.20
208,549.28
KM
m
m2
m3
m3
m3
m3
11,652.00
0.70
293,333.23
231,804.93
8,156.40
2,385.56
1,022.39
7.76
6.12
18,511.95
6,257.03
501.63
14.92
7,484.32
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Glb
Glb
m3
m3
m3
447.00
23.94
10,701.18
321.00
1,116.00
1,671.00
11.21
11.49
20.94
3,598.41
12,822.84
34,990.74
1,011.00
1,314.00
1,884.00
378.00
1,317.00
534.00
702.00
156.00
801.00
3.67
4.32
6.56
5.18
6.56
7.25
9.51
10.71
13.66
3,710.37
5,676.48
12,359.04
1,958.04
8,639.52
3,871.50
6,676.02
1,670.76
10,941.66
12.00
3,790.91
45,490.92
1,841.07
11.82
21,761.45
779.4%
280.3%
-28.6%
-69.0%
267.9%
102.1%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
1,103.58
11,652.00
PIP Viable
Precio
S/.
4.33
0.15
15.80
5.27
7.76
6.12
122.61
32.25
61.77
19.44
1,200.81
263.12
7.27
62.73
3.00
3.62
333.28
11.96
642.88
952.49
2,422.95
750.25
1,928.64
4,680.45
10.94
3.65
7.76
6.12
84.89
22.34
44.55
19.44
866.05
186.82
3.62
676.29
5.13
44.82
333.28
11.96
1,709.73
536.05
3.00
261.70
785.10
6,135.52
Metrado
04.02.01.23
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.02.04
04.02.02.05
04.02.02.06
04.02.02.07
04.02.02.08
04.02.02.09
04.02.02.10
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.02.03.05
04.02.03.06
04.02.03.07
04.02.03.08
04.02.03.09
04.02.03.10
04.02.04
04.02.04.01
04.02.04.02
04.02.04.03
04.02.04.04
04.02.04.05
04.02.04.06
04.02.04.07
04.02.04.08
04.02.04.09
04.02.04.10
04.02.04.11
04.02.04.12
04.02.04.13
04.02.05
04.02.05.01
04.02.05.02
04.02.05.03
04.02.05.04
04.02.05.05
04.02.05.06
04.02.05.07
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
m2
m3
m3
m3
m2
m2
kg
m3
m3
m2
jgo
und
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
und
und
und
m2
m3
m3
m2
m2
m3
m3
m2
und
Parcial
S/.
4,778.50
1,747.80
7,410.00
6.80
2.44
7.76
6.12
52.77
14.93
28.80
19.44
559.87
2.08
333.28
693.22
9.00
9.00
308.20
226.77
2,773.80
2,040.93
38,418.44
26.44
2.92
7.76
6.12
205.17
17.87
470.40
19.44
9,144.58
24.99
14.70
333.28
219.47
8,328.67
3,226.21
13,262.61
23,154.33
8.25
738.20
322.11
339.16
1,123.73
4,334.72
193.4%
230.4%
287.5%
33.9%
277.1%
0.41
35.87
54.78
115.36
10.99
56.53
2,794.61
8,004.30
2,906.90
2,582.35
17,651.29
4.74
236.02
102.99
108.44
334.10
2,976.87
590.24
9.93
4.81
582.36
2,839.05
5,782.83
319.8%
42.16
5.00
24.35
847.93
1,026.60
4,239.65
27.49
25.98
7.42
3.71
194.89
152.00
0.41
35.87
54.78
115.36
10.99
56.53
68,089.12
11.27
931.90
406.47
427.99
2,141.84
8,592.56
2,162.76
5,782.83
-1,709.73
490.55
4,239.65
-785.10
61,953.60
11.27
879.13
391.54
427.99
2,141.84
8,032.69
672.00
21.17
199.65
15.00
8.00
8.00
4.00
4.81
551.26
22.58
1,453.82
903.54
728.82
325.08
3,232.32
11,670.17
4,508.10
21,807.30
7,228.32
5,830.56
1,300.32
49.41
19.76
0.41
35.87
91,941.39
20.26
708.79
175.68
248.88
10.99
56.53
1,930.72
14,069.19
18.61
551.26
10,258.95
283.04
244.00
22.58
240.01
6,391.04
58,562.44
Metrado
PIP a Verificar
Precio
S/.
20,404.01
0.65
20.11
20.58
5.88
2.94
102.25
76.68
0.41
35.87
54.78
115.36
10.99
56.53
581.00
14.52
119.38
5.00
4.81
551.26
24.35
516.47
11.55
6.58
1.88
0.94
30.40
52.66
Parcial
S/.
3,232.32
10,976.95
4,508.10
21,807.30
7,228.32
5,830.56
-1,473.48
-2,040.93
53,522.95
20.26
503.62
-17.87
1,930.72
4,924.61
1,930.28
-3,226.21
6,391.04
58,562.44
178.0%
361.0%
243.7%
-100.0%
91.5%
-100.0%
1009.8%
1666.0%
2622.5%
1434.7%
1583.5%
-53.1%
-100.0%
139.3%
245.5%
-100.0%
53.9%
23.2%
-100.0%
Item
Partida
Und
und
147.00
PIP Viable
Precio
S/.
119.02
m3
m3
m2
8.03
3.44
57.39
7.76
6.12
19.44
Parcial
S/.
17,495.94
4,883.89
62.31
21.05
1,115.66
kg
m3
60.26
11.48
3.62
301.98
218.14
3,466.73
Metrado
04.02.06
04.02.06.01
04.02.06.02
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
293,333.23
29,333.32
14,666.66
337,333.21
64,093.31
401,426.52
10,035.66
22,069.56
16,057.06
449,588.80
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
13,203.65
143.10
56.53
8,089.44
14.46
353.68
5,114.21
15.97%
10.00%
18.00%
1,790,676.62
286,010.01
179,067.66
2,255,754.29
406,035.77
2,661,790.06
2,661,790.06
-100.0%
47.5%
1,497,343.39
256,676.69
164,401.00
1,918,421.08
341,942.46
2,260,363.54
-10,035.66
-22,069.56
-16,057.06
2,212,201.26
510.5%
875.0%
1120.9%
568.7%
533.5%
563.1%
-100.0%
-100.0%
-100.0%
492.0%
Partida
Und
Metrado
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.01.03
04.01.02
04.01.02.01
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.02.04
04.02.02.05
04.02.02.06
04.02.02.07
04.02.02.08
04.02.02.09
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.02.03.05
04.02.03.06
04.02.04
04.02.04.01
04.02.04.02
04.02.04.03
PIP Viable
Precio
S/.
Parcial
S/.
272,842.88
113,549.90
1,372.16
mes
m2
und
m2
90.28
1.63
147.16
100.00
12.25
KM
KM
10.00
2.00
10,098.90
2,390.62
m
m3
150.00
1,000.00
24.85
2.68
m3
m3
m3
m3
m3
242.28
201.90
4.14
10.07
1,225.00
105,770.24
100,989.00
4,781.24
6,407.50
3,727.50
2,680.00
156,702.30
3,939.87
1,003.04
2,033.13
60.57
14.92
903.70
m2
323.11
19.44
144,628.14
6,281.26
kg
m3
m3
m3
m2
m2
m2
m3
m
m
m
m
m
346.61
3.62
1,254.73
911.35
28.55
285.54
123.66
356.15
15.76
112,697.54
10,168.08
4,500.11
5.52
32.52
179.51
70.00
70.00
22.75
3.48
1,592.50
243.60
90.28
85.41
7,710.81
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
1,081,566.48
115,508.23
19,031.96
17,630.28
2.00
8,815.14
1.00
30.00
667.58
24.47
4.50
21,439.17
667.58
734.10
96,476.27
96,476.27
768.68
768.68
393.42
3.88
9.68
46.60
941,611.31
90,603.81
2,982.48
7,440.82
18,333.37
2,510.03
24.64
827.38
76.33
61,847.14
797,480.96
63,153.92
6,043.83
1,493.78
4.86
339.33
29,373.01
506,884.37
293.39
467.97
515.11
983.09
504.29
32.53
21.19
9.62
147,953.64
15,223.06
10,915.18
9,457.33
79.37
64.36
5,108.25
63.00
149.40
9,412.20
6,479.08
976.26
28,118.28
506,884.37
-112,697.54
137,785.56
10,722.95
10,915.18
9,457.33
-179.51
5,108.25
-1,592.50
-243.60
9,412.20
-7,710.81
6,479.08
976.26
437.79
4,014.15
438.50
129.68
482.70
1,502.07
422.87
287.96
393.35
m2
12.79
76.33
kg
m3
m2
m2
m
90.08
7.96
13.48
13.48
7.50
4.86
504.29
32.53
9.62
64.36
m2
5.54
76.33
437.79
4,014.15
438.50
129.68
482.70
1,502.07
422.87
kg
m3
59.25
0.78
4.86
504.29
287.96
393.35
2241.0%
-100.0%
1355.1%
238.3%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
04.02.04.04
04.02.04.05
04.02.05
04.02.05.01
04.02.05.02
04.02.05.03
04.02.05.04
04.02.05.05
04.02.05.06
04.02.05.07
04.02.06
04.02.06.01
04.02.06.02
04.02.06.03
04.02.06.04
04.02.06.05
04.02.06.06
04.02.06.07
04.02.07
04.02.07.01
04.02.07.02
04.02.07.03
04.02.07.04
04.02.07.05
04.02.08
04.02.08.01
04.02.08.02
04.02.08.03
04.02.08.04
04.02.08.05
04.02.08.06
04.02.08.07
04.02.08.08
04.02.08.09
04.02.09
04.02.09.01
04.02.09.02
04.02.09.03
04.02.09.04
04.02.09.05
04.02.09.06
04.02.09.07
04.03
04.03.01
04.03.02
PIP Viable
Precio
S/.
Parcial
S/.
m2
m2
PIP a Verificar
Metrado
Precio
S/.
9.44
32.53
9.44
9.62
m
und
und
m3
m2
69.00
1.00
2.00
7.15
49.92
15.32
64.58
53.18
230.49
76.33
m3
m2
2.19
31.00
477.62
7.97
m3
m3
m2
1.76
1.06
15.47
35.87
54.79
76.33
kg
m3
m2
m2
63.19
2.80
18.15
18.15
4.86
504.29
32.53
9.62
m2
3.57
m3
m2
m2
und
und
Parcial
S/.
307.08
90.81
7,979.47
1,057.08
64.58
106.36
1,648.00
3,810.39
1,045.99
247.07
3,786.17
63.13
58.08
1,180.83
1,045.99
247.07
3,786.17
63.13
58.08
1,180.83
76.33
307.10
1,412.01
590.42
174.60
845.06
272.50
307.10
1,412.01
590.42
174.60
400.61
272.50
0.65
4.78
4.78
1.00
477.62
32.53
9.62
60.64
310.45
155.49
45.98
60.64
m3
m3
m3
m2
m2
10.43
6.31
7.23
14.45
5.46
35.87
54.79
370.79
23.81
76.33
5,251.19
374.12
345.72
2,680.81
344.05
416.76
310.45
155.49
45.98
-203.03
-180.78
5,251.19
374.12
345.72
2,680.81
344.05
416.76
kg
m3
m2
m2
55.08
1.04
7.06
7.06
4.86
504.29
32.53
9.62
m2
43.13
76.33
267.69
524.46
229.66
67.92
27,683.50
3,292.11
267.69
524.46
229.66
67.92
19,993.66
3,292.11
kg
m3
m2
m2
m
m
und
und
und
und
309.98
5.99
48.97
48.97
10.00
4.86
477.62
32.53
9.62
250.55
1,506.50
2,860.94
1,592.99
471.09
2,505.50
1.00
15,454.37
15,454.37
1,506.50
2,860.94
1,592.99
471.09
2,505.50
-1,002.00
15,454.37
-3,625.84
-2,864.48
-197.52
24,446.94
10,184.94
14,262.00
444.45
1.00
1.00
263.67
180.78
263.67
180.78
7,689.84
und
und
7.50
2.00
4.00
1.00
133.60
1,812.92
716.12
197.52
1,002.00
3,625.84
2,864.48
197.52
6.00
24.00
1,697.49
594.25
24,446.94
10,184.94
14,262.00
90.1%
-77.0%
-100.0%
260.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
und
m2
m3
und
Glb
2.00
1.00
0.50
1.50
3.00
PIP Viable
Precio
S/.
823.69
0.64
62.03
7.76
300.00
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
Parcial
S/.
2,590.68
1,647.38
0.64
31.02
11.64
900.00
272,842.88
27,284.29
13,642.14
313,769.31
59,616.17
373,385.48
9,334.64
6,720.94
14,935.42
404,376.48
Metrado
PIP a Verificar
Precio
S/.
20.95%
10.00%
18.00%
Parcial
S/.
1,081,566.48
226,607.46
108,156.65
1,416,330.59
254,939.51
1,671,270.10
1,671,270.10
296.4%
730.5%
692.8%
351.4%
327.6%
347.6%
-100.0%
-100.0%
-100.0%
313.3%
Partida
Und
Metrado
01
01.01
01.01.01
01.01.01.01
01.01.01.02
01.01.02
01.01.02.01
01.01.02.02
01.01.02.03
01.01.02.04
01.01.02.05
01.01.02.06
01.01.02.07
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.01.04.02
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.01.05
01.02.01.06
01.02.01.07
01.02.01.08
01.02.01.09
01.02.01.10
01.02.01.11
01.02.01.12
01.02.01.13
01.02.01.14
01.02.01.15
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
m2
m2
und
175.00
PIP Viable
Precio
S/.
12.25
Parcial
S/.
445,845.51
21,828.72
2,143.75
Metrado
PIP a Verificar
Precio
S/.
100.00
20.38
1.00
2,579.62
1.00
1,900.00
1,900.00
7,100.00
11,500.00
14,600.00
3,000.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
3.00
6,558.97
2.00
8.00
11,067.44
6,400.26
77.98
33.42
311.35
29.05
17.43
11.62
44.00
570.76
16.30
31.78
94.90
21.32
37.94
89.21
121.67
49.73
73,336.96
22,134.88
51,202.08
229,384.36
213,254.28
1,271.07
1,062.09
29,547.12
619.35
661.29
1,036.62
5,353.48
28,383.89
50.23
147.99
9.60
150.12
1,132.21
175.56
3.00
4.84
464.22
364.75
266.08
19.27
37.99
1,481.20
243.11
68,699.92
3,501.60
39,943.93
21,817.69
6,669.52
4,443.60
2.74
46.22
14,616.78
126.64
2,143.75
und
m3
m3
kg
bls
p2
m
560.01
mes
m
KM
KM
800.01
0.70
560.01
19,124.96
8.00
2,390.62
m3
m3
m3
m3
m3
m3
m
m2
253.27
18.23
33.69
6.32
18.55
14.92
19,124.96
71,404.90
53,933.28
1,600.67
338.17
502.65
10.00
546.21
61.31
18.75
613.10
10,241.44
kg
m3
m3
m3
m2
m3
und
m3
94.34
9.73
62.91
36.71
389.68
194.14
3.00
2.80
3.62
333.28
301.98
196.21
11.96
27.96
229.45
26.94
341.51
3,242.81
18,997.56
7,202.87
4,660.57
5,428.15
688.35
75.43
13,158.59
m3
m3
m3
m3
m3
m3
m3
m3
m2
17.04
7.14
34.59
7.50
6.32
18.55
7.76
6.12
Parcial
S/.
1,483,271.37
276,128.68
4,617.62
2,038.00
2,579.62
178,497.19
5,222.19
86,469.00
68,780.00
497.00
15,065.00
2,044.00
420.00
19,676.91
19,676.91
107.69
132.45
268.42
45.90
29.71
8.49
4.24
6.86
21.32
37.94
89.21
6.54
633.42
322.11
378.25
44.86
-28.8%
2018.5%
-81.6%
454.6%
368.1%
22.9%
545.5%
-100.0%
11.1%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
m2
110.50
PIP Viable
Precio
S/.
19.44
kg
m3
m3
m2
m3
und
24.00
4.16
17.89
165.06
3.62
333.28
301.98
11.96
86.88
1,386.44
5,402.42
1,974.12
7.00
229.45
m3
m2
5.60
16.80
7.76
19.44
1,606.15
4,313.03
43.46
326.59
m3
m2
m
und
5.69
16.80
333.28
11.96
1,896.36
200.93
7.00
263.67
m3
m3
m3
m3
m2
72.00
7.76
1,845.69
39,426.96
39,426.96
558.72
48.00
17.94
861.12
Metrado
01.02.02.06
01.02.02.07
01.02.02.08
01.02.02.09
01.02.02.10
01.02.02.11
01.02.03
01.02.03.01
01.02.03.02
01.02.03.03
01.02.03.04
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.01.04
01.03.01.05
01.03.01.06
01.03.01.07
01.03.01.08
01.03.01.09
01.03.01.10
01.03.01.11
01.03.01.12
01.03.01.13
01.03.01.14
01.03.02
01.03.02.01
01.03.02.02
01.03.02.03
01.03.02.04
01.03.02.05
01.03.02.06
01.03.02.07
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.03.04
01.03.03.05
01.03.03.06
01.03.04
01.03.04.01
Parcial
S/.
2,148.12
PIP a Verificar
Metrado
Precio
S/.
49.73
66.82
Parcial
S/.
3,322.96
39.76
11.15
4.84
464.22
192.44
5,176.05
98.60
0.60
4.00
19.27
37.99
624.31
1,900.02
22.79
2,497.24
1,513.30
7.26
49.73
361.04
1.62
464.22
752.04
16.02
6.00
5.11
53.06
1,008.88
288.25
144.13
120.68
1,118.20
m3
m2
m2
m3
m3
m
m3
m3
m
m2
m3
800.00
24.00
47.01
16.63
121.5%
273.3%
-100.0%
-3.8%
-60.3%
-100.0%
21.32
37.94
89.21
37.01
35.53
81.86
318.36
373,199.38
353,610.81
21,509.32
10,936.21
12,857.84
4,466.37
39,729.65
-1,144.32
-200.93
81.86
-1,527.33
333,772.42
314,183.85
20,950.60
10,936.21
12,857.84
3,605.25
39,729.65
297.09
1,852.65
1,852.65
6.72
141.62
380.04
9.03
7.20
768.46
42.82
112,906.08
16,729.43
13,339.08
5,164.05
6,064.17
112,906.08
16,729.43
13,339.08
5,164.05
6,064.17
2,529.00
459.00
509.85
2,529.00
33.47
28.96
20.75
0.55
84,645.63
13,292.64
10,579.39
1,390.95
1,309.05
39.44
20.11
23.19
340.15
84,645.63
13,292.64
10,579.39
1,390.95
-37,608.00
-399.12
1,309.05
39.44
20.11
23.19
340.15
561.71
220.83
103.62
756.98
22.81
11.76
13.38
205.88
561.71
220.83
103.62
756.98
22.81
11.76
13.38
205.88
362.09
141.06
17,522.54
473.94
362.09
141.06
17,522.54
473.94
37,608.00
399.12
m3
m3
m3
m2
1.85
0.53
0.26
6.84
21.32
37.94
89.21
49.73
m3
m2
kg
1.21
11.46
10.09
464.22
19.27
10.27
m3
m3
m3
m2
1.07
0.31
0.15
4.14
21.32
37.94
89.21
49.73
m3
m2
0.78
7.32
464.22
19.27
m3
22.23
21.32
55.5%
-64.9%
-100.0%
10.5%
-82.8%
846.6%
796.9%
3749.7%
418.7%
-100.0%
-100.0%
Item
Partida
Und
Metrado
01.03.04.02
01.03.04.03
01.03.04.04
01.03.04.05
01.03.04.06
01.03.04.07
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.01.03
01.04.01.04
01.04.01.05
01.04.01.06
01.04.01.07
01.04.01.08
01.04.01.09
01.04.01.10
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.02.05
01.04.02.06
01.04.02.07
01.04.02.08
01.04.02.09
01.04.02.10
01.04.03
01.04.03.01
01.04.03.02
01.04.03.03
01.04.03.04
01.04.03.05
01.04.03.06
01.04.03.07
01.04.03.08
01.04.03.09
01.04.04
PIP Viable
Precio
S/.
Parcial
S/.
m3
m3
m2
m3
m2
kg
PIP a Verificar
Metrado
Precio
S/.
6.35
37.94
3.18
89.21
115.92
49.73
16.76
151.20
13.50
464.22
19.27
4.84
56,565.72
16,975.17
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m3
m2
m2
m2
59.47
16.99
8.50
6.88
1.76
7.76
6.12
53.39
10.77
139.52
19.44
2,712.27
760.91
8.64
16.16
183.24
3.62
219.47
333.28
11.96
2,754.49
1,896.22
5,385.80
2,191.55
13.12
38.48
68.20
27.96
894.78
1,075.90
12,610.80
7.76
6.12
19.44
111.74
21.42
1,982.88
690.60
18.00
3.62
219.47
2,499.97
3,950.46
10.80
37.20
333.28
11.96
3,599.42
444.91
37.99
49.73
1,615.71
9,284.09
507.87
8.60
53.45
392.01
392.01
4.84
266.08
464.22
19.27
7.20
2,458.09
2,288.29
24,812.56
7,554.03
2,822.47
21.32
37.94
89.21
kg
m3
m3
m3
m2
m2
m2
32.32
8.08
51.80
7.76
6.12
19.44
250.80
49.45
1,006.99
1,278.80
22.68
5.64
4.00
59.80
3.62
219.47
361.99
301.98
11.96
4,629.26
4,977.58
2,041.62
1,207.92
715.21
20,919.94
98.50
50.08
58.88
79.52
49.73
3,954.53
208.32
11.88
22.74
5.46
4.84
307.10
364.75
464.22
1,008.27
3,648.35
8,294.42
2,534.64
58.80
102.96
9.03
7.20
6.71
1.92
0.96
21.32
37.94
89.21
530.96
741.31
5,528.96
143.06
72.84
85.64
14,878.83
m3
m3
m3
m3
m3
m2
7,780.33
2,913.62
65.34
152,371.59
53,506.03
1,267.90
644.60
758.29
42.53
186.69
4.62
1.32
0.66
14.40
3.50
102.00
21.32
37.94
89.21
Parcial
S/.
240.92
283.69
5,764.70
26.06
49.73
1,295.96
157.89
3.82
3.52
4.84
266.08
501.70
764.19
1,016.43
1,765.98
18.62
30.10
9.03
7.20
168.14
216.72
58,102.51
169.4%
215.2%
-100.0%
-100.0%
242.3%
-10.8%
20.7%
360.7%
244.7%
-100.0%
-100.0%
65.9%
-100.0%
-100.0%
99.4%
-59.7%
-7.6%
-29.6%
-100.0%
-62.8%
-100.0%
-100.0%
28.7%
-83.5%
-79.6%
-13.5%
-100.0%
-100.0%
Item
Partida
Und
m3
m3
m3
m2
m2
74.55
21.30
10.65
25.52
225.46
PIP a Verificar
Precio
S/.
21.32
37.94
89.21
6.54
49.73
kg
m3
m2
m3
und
119.95
45.13
452.32
9.96
83.00
4.84
464.22
19.27
37.99
153.62
16.51
4.72
2.36
21.32
37.94
89.21
Metrado
01.04.04.01
01.04.04.02
01.04.04.03
01.04.04.04
01.04.04.05
01.04.04.06
01.04.04.07
01.04.04.08
01.04.04.09
01.04.04.10
01.04.05
01.04.05.01
01.04.05.02
01.04.05.03
01.04.05.04
01.04.05.05
01.04.05.06
01.04.05.07
01.04.05.08
01.04.05.09
01.04.05.10
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.01.04
01.05.01.05
01.06
01.06.01
01.06.01.01
01.06.01.02
01.06.01.03
01.06.01.04
01.06.01.05
01.06.01.06
01.06.01.07
01.06.01.08
01.06.01.09
01.06.01.10
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
12,100.92
m3
m3
m3
m3
m3
m2
m2
29.88
7.38
7.76
6.12
231.87
45.17
86.40
19.44
1,679.62
kg
m3
m3
m2
m3
und
14.22
142.20
0.69
18.00
301.98
11.96
27.96
229.45
4,294.16
1,700.71
19.29
4,130.10
212,583.63
212,583.63
m3
m3
m3
m2
232.00
58.00
580.00
7.76
6.12
19.44
1,800.32
354.96
11,275.20
1,015.00
196.21
199,153.15
m3
m3
m3
6.54
49.73
34.53
2,765.98
49.73
10.15
4.84
464.22
240.69
4,711.83
102.72
1.62
12.00
19.27
37.99
314.88
156.00
21.32
1,979.41
61.54
3,778.56
85,968.13
85,968.13
3,325.92
542.40
49.73
26,973.55
197.63
68.50
113.75
266.08
20.75
14.61
52,585.39
1,421.38
1,661.89
326,399.23
326,399.23
11,623.87
2,680.14
m
m3
m3
m2
m2
kg
m3
m3
m3
m3
251.49
125.71
201.60
86.40
44.80
7.76
6.12
8.44
580.56
20,950.25
8,716.21
378.38
12,750.46
14,314.15
351.99
179.08
210.54
5.28
55.62
44,035.58
44,035.58
m3
m3
m3
m3
m3
Parcial
S/.
1,589.41
808.12
950.09
166.90
11,212.13
46.22
21.32
1,564.42
528.77
14.58
42.82
624.32
356.14
17.39
6,193.27
48.42
1,127.76
269.79
96.82
4.84
49.73
4,688.02
5,458.36
13,416.66
5,512.74
4.84
26,681.66
1.82
314.83
464.22
501.70
844.88
157,950.21
378.11
284.00
19.44
5,520.96
500.00
6.72
36.80
3.62
301.98
333.28
1,810.00
2,029.31
12,264.70
45.75
196.21
8,976.61
18.3%
-100.0%
-100.0%
64.7%
-100.0%
16.4%
219.0%
-8.5%
-59.6%
-59.6%
-100.0%
-100.0%
139.2%
-73.6%
641.2%
641.2%
-100.0%
-100.0%
-100.0%
143.0%
1374.1%
-100.0%
-93.1%
-100.0%
Item
Partida
Und
Metrado
01.06.01.11
01.06.01.12
01.06.01.13
01.06.01.14
01.06.01.15
01.06.01.16
01.06.01.17
01.06.01.18
01.06.01.19
01.06.01.20
01.07
01.07.01
m2
m2
m2
m
m2
m
m
m2
und
und
m
und
und
227.40
und
m2
m
5.00
25.00
90.00
90.00
15.00
5.00
PIP Viable
Precio
S/.
11.96
6.63
3.48
15.19
23.94
1,107.62
99.95
Parcial
S/.
2,719.70
19.00%
(anual)
2.50%
1.80%
4.00%
Parcial
S/.
1,381.61
96.81
836.40
9.03
80.98
65.57
12,475.94
7,839.67
54,842.75
124.16
6.00
4.00
12.00
36.21
707.60
1,466.63
40.88
4,495.83
4,245.60
5,866.52
490.56
4.00
255.26
1,021.04
11.51
115.12
3.85
42.70
1.00
39,820.00
44.31
4,915.62
39,820.00
39,820.00
165.75
313.20
1,367.10
359.10
5,538.10
499.75
und
10.00%
5.00%
Metrado
PIP a Verificar
Precio
S/.
445,845.51
44,584.55
22,292.28
512,722.34
97,417.24
610,139.58
15,253.49
14,336.57
24,405.58
664,135.22
12.32%
1,483,271.37
182,787.46
1,666,058.83
1,666,058.83
1,666,058.83
-100.0%
1,037,425.86
138,202.91
-22,292.28
1,153,336.49
-97,417.24
1,055,919.25
-15,253.49
-14,336.57
-24,405.58
1,001,923.61
232.7%
310.0%
-100.0%
224.9%
-100.0%
173.1%
-100.0%
-100.0%
-100.0%
150.9%
Partida
Und
Metrado
02
02.01
02.01.01
02.01.01.01
02.01.01.02
02.01.02
02.01.02.01
02.01.02.02
02.01.02.03
02.01.02.04
02.01.02.05
02.01.02.06
02.01.02.07
02.01.02.08
02.01.03
02.01.03.01
02.01.04
02.01.04.01
02.01.04.02
02.02
02.02.01
02.02.01.01
02.02.01.02
02.02.01.03
02.02.01.04
02.02.01.05
02.02.01.06
02.02.01.07
02.02.01.08
02.02.01.09
02.02.01.10
02.02.01.11
02.02.01.12
02.02.01.13
02.02.01.14
02.02.01.15
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.02.04
02.02.02.05
m2
und
350.00
PIP Viable
Precio
S/.
12.25
Parcial
S/.
739,778.71
26,142.48
4,287.50
4,287.50
und
m3
m3
kg
bls
p2
m
m
Metrado
PIP a Verificar
Precio
S/.
150.00
1.00
20.38
2,579.62
1.00
2,000.00
2,000.00
5,100.00
12,500.00
19,900.00
700.00
6,700.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
0.95
4.00
6,558.97
2.00
8.00
11,067.44
6,400.26
119.56
51.24
458.60
52.92
31.75
21.17
73.00
888.71
16.30
31.78
94.90
21.32
37.94
89.21
121.67
49.73
73,336.96
22,134.88
51,202.08
372,191.21
331,668.86
1,948.83
1,628.41
43,521.14
1,128.25
1,204.60
1,888.58
8,881.91
44,195.55
100.46
147.58
55.43
315.04
1,833.07
263.79
6.00
4.84
464.22
364.75
266.08
19.27
37.99
1,481.20
486.23
68,509.59
20,218.09
83,825.84
35,323.26
10,021.38
8,887.20
7.32
78.95
22.56
11.28
17.89
171.74
100.30
29.72
268.31
46.22
21.32
37.94
89.21
6.54
49.73
4.84
464.22
19.27
38,293.88
338.33
1,683.21
855.93
1,006.29
117.00
8,540.63
485.45
13,796.62
5,170.33
2,730.02
mes
m
KM
KM
3,900.03
0.70
2,730.02
19,124.96
8.00
2,390.62
m3
m3
m3
m3
m3
m3
m
m2
225.73
201.25
366.51
6.32
18.55
14.92
19,124.96
198,366.20
169,488.50
1,426.61
3,733.19
5,468.33
110.00
826.40
61.31
18.75
6,744.10
15,495.00
kg
m3
m3
m3
m2
m3
und
m3
283.78
101.06
12.51
382.10
1,351.48
130.39
11.00
30.80
3.62
333.28
301.98
196.21
11.96
27.96
229.45
26.94
1,027.28
33,681.28
3,777.77
74,971.84
16,163.70
3,645.70
2,523.95
829.75
22,715.75
m3
m3
m3
m3
m3
m3
m3
m3
m2
31.24
13.09
60.39
13.09
6.32
18.55
7.76
6.12
197.44
242.82
468.63
80.11
Parcial
S/.
2,122,153.56
299,832.65
5,636.62
3,057.00
2,579.62
194,623.19
5,222.19
91,020.00
72,400.00
357.00
16,375.00
2,786.00
98.00
6,365.00
26,235.88
26,235.88
-52.7%
103.4%
435.2%
11.8%
118.5%
174.9%
252.1%
-100.0%
68.6%
-40.7%
3417.3%
3.6%
17122.1%
Item
Partida
Und
m2
192.94
PIP Viable
Precio
S/.
19.44
kg
m3
m3
m2
m3
und
41.91
7.26
31.24
288.20
3.62
333.28
301.98
11.96
151.71
2,419.61
9,433.86
3,446.87
11.00
229.45
Metrado
02.02.02.06
02.02.02.07
02.02.02.08
02.02.02.09
02.02.02.10
02.02.02.11
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.02.03.04
02.03
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.01.04
02.03.01.05
02.03.01.06
02.03.01.07
02.03.01.08
02.03.01.09
02.03.01.10
02.03.01.11
02.03.01.12
02.03.01.13
02.03.01.14
02.03.01.15
02.03.01.16
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.02.04
02.03.02.05
02.03.02.06
Parcial
S/.
3,750.75
m3
m2
8.00
24.00
7.76
19.44
2,523.95
6,161.95
62.08
466.56
m3
m2
m
und
8.13
24.00
333.28
11.96
2,709.57
287.04
10.00
263.67
m3
m3
m3
m3
m2
m3
m2
m3
m2
m2
m3
m3
72.00
7.76
2,636.70
135,537.07
39,426.96
558.72
48.00
17.94
861.12
800.00
24.00
47.01
16.63
37,608.00
399.12
m
m
m
m3
m3
m
m3
m3
m3
m
m3
m3
m3
m3
m3
m2
m3
m3
m3
m2
1,178.00
310.00
1,054.00
3,100.00
7.76
6.12
8.44
16.75
PIP a Verificar
Metrado
Precio
S/.
37.99
1.50
10.00
Parcial
S/.
56.99
624.31
6,243.10
10.85
2.34
24.48
9.00
4015.2%
-100.0%
-100.0%
-100.0%
49.73
464.22
2,228.47
539.57
1,086.27
-2,523.95
-3,933.48
477.49
619.71
-100.0%
-63.8%
769.2%
132.8%
5.11
53.06
125.09
477.54
-2,584.48
190.50
-95.4%
66.4%
2,229.63
637.04
318.52
45.42
479.20
21.32
37.94
89.21
37.01
35.53
770,441.78
719,447.87
47,535.71
24,169.30
28,415.17
1,680.99
17,025.98
-2,636.70
634,904.71
680,020.91
46,976.99
24,169.30
28,415.17
819.87
17,025.98
-100.0%
468.4%
1724.8%
8408.0%
113.80
658.80
658.80
2.64
430.52
500.00
2,800.00
380.04
9.03
7.20
768.46
42.82
33.47
49.76
43,248.55
5,948.96
4,743.36
2,028.73
18,434.87
16,735.00
139,328.00
43,248.55
-31,659.04
4,344.24
2,028.73
18,434.87
16,735.00
139,328.00
3,608.00
1,553.02
1,828.14
6,908.00
78.56
28.96
20.75
0.55
283,444.48
44,975.46
37,933.91
3,799.40
283,444.48
44,975.46
37,933.91
3,799.40
2657.1%
17866.1%
86.5%
71,859.24
9,141.28
1,897.20
8,895.76
51,925.00
825.21
2.12
0.68
8.12
7.76
6.12
19.44
16.45
4.16
157.85
2.47
0.71
0.35
9.12
1.61
15.28
1.32
301.98
398.61
10.09
0.56
11.56
196.21
11.96
109.88
138.26
95.2%
-84.2%
1088.5%
21.32
37.94
89.21
49.73
464.22
19.27
1,709.82
52.66
26.94
31.22
453.54
747.39
294.45
-71,859.24
-9,141.28
-1,897.20
-8,895.76
-51,925.00
884.61
52.66
26.94
31.22
437.09
743.23
136.60
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
107.2%
10.27
103.62
-294.99
-74.0%
-109.88
-138.26
-100.0%
-100.0%
Item
Partida
Und
Metrado
02.03.02.07
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.03.03.04
02.03.03.05
02.03.03.06
02.03.04
02.03.04.01
02.03.04.02
02.03.04.03
02.03.04.04
02.03.04.05
02.03.04.06
02.03.04.07
02.04
02.04.01
02.04.01.01
02.04.01.02
02.04.01.03
02.04.01.04
02.04.01.05
02.04.01.06
02.04.01.07
02.04.01.08
02.04.01.09
02.04.01.10
02.04.02
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.02.05
02.04.02.06
02.04.02.07
02.04.02.08
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
kg
1,926.78
m3
m3
m3
m3
m3
m2
9.48
3.16
15.00
7.76
6.12
19.44
73.56
19.34
291.60
kg
m3
m3
m2
44.60
0.40
2.68
36.64
3.62
333.28
301.98
11.96
161.45
133.31
809.31
438.21
21,498.88
m3
m3
m3
m3
m2
und
m3
m3
m2
m3
kg
m3
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m3
m2
m2
129.58
7.76
1,005.54
62.00
38.44
3.72
336.66
3.72
242.42
42.60
301.98
333.28
11.96
26.94
3.62
2,641.20
11,608.11
1,239.80
4,026.45
100.22
877.56
70,877.82
28,110.50
11.18
2.86
62.53
21.32
226.72
7.76
6.12
27.96
68.20
19.44
86.76
17.50
1,748.34
1,454.02
4,407.44
1,382.81
26.26
14.04
3.62
333.28
219.47
5,005.77
8,751.93
3,081.36
297.44
11.96
3,557.38
1.43
0.41
0.20
5.52
1.04
9.76
21.32
37.94
89.21
49.73
464.22
19.27
kg
m3
m3
m3
23.40
5.85
165.75
7.76
6.12
19.44
181.58
35.80
3,222.18
1,122.22
29.25
3.62
219.47
4,062.44
6,419.50
17.55
333.28
5,849.06
-917.51
30.49
15.56
17.84
200.95
463.45
-103.52
-161.45
-133.31
-809.31
-438.21
26,775.94
1,308.83
665.47
782.37
14,916.02
21,484.10
61.39
17.54
8.77
320.16
46.28
21.32
37.94
89.21
49.73
464.22
48,274.82
1,308.83
665.47
782.37
15,921.56
21,484.10
417.60
13.50
19.27
4.84
8,047.15
65.34
84.08
24.02
12.01
62.87
301.93
802.61
10.00
75.24
21.32
37.94
89.21
37.99
49.73
4.84
266.08
464.22
199,613.27
77,876.55
1,792.59
911.32
1,071.41
2,388.43
15,014.98
3,884.63
2,660.80
34,927.91
575.16
575.16
19.27
7.20
11,083.33
4,141.15
20,493.54
m3
m3
m3
m3
m3
m2
1,009.27
30.49
15.56
17.84
274.51
482.79
188.08
-47.6%
273.2%
2396.3%
-35.5%
-100.0%
-100.0%
-100.0%
-100.0%
124.5%
1483.4%
5,405.95
-11,542.77
-1,239.80
-4,026.45
-100.22
-877.56
128,735.45
49,766.05
1,792.59
911.32
1,071.41
2,301.67
14,997.48
2,136.29
1,206.78
30,520.47
2652.9%
85699.9%
122.2%
83.0%
692.5%
6,077.56
-4,610.78
-3,081.36
121.4%
-52.7%
-100.0%
-3,557.38
-100.0%
-15.0%
4.66
1.33
0.67
68.10
181.52
10.56
21.32
37.94
89.21
49.73
4.84
266.08
17,419.92
99.35
50.46
59.77
3,386.61
878.56
2,809.80
-3,073.62
99.35
50.46
59.77
3,205.03
842.76
-412.38
18.69
4.80
50.44
88.12
364.75
464.22
9.03
7.20
6,817.18
2,228.26
455.47
634.46
2,754.74
-4,191.24
455.47
-5,214.60
204.7%
-99.4%
-100.0%
-100.0%
-100.0%
-100.0%
181.6%
177.0%
1765.1%
2354.1%
-12.8%
67.8%
-65.3%
-89.2%
Item
Partida
Und
Metrado
02.04.02.09
02.04.02.10
02.04.03
02.04.03.01
02.04.03.02
02.04.03.03
02.04.03.04
02.04.03.05
02.04.03.06
02.04.03.07
02.04.03.08
02.04.03.09
02.04.04
02.04.04.01
02.04.04.02
02.04.04.03
02.04.04.04
02.04.04.05
02.04.04.06
02.04.04.07
02.04.04.08
02.04.04.09
02.04.04.10
02.04.05
02.04.05.01
02.04.05.02
02.04.05.03
02.04.05.04
02.04.05.05
02.04.05.06
02.04.05.07
02.04.05.08
02.04.05.09
02.04.05.10
02.05
02.05.01
02.05.01.01
02.05.01.02
02.05.01.03
02.05.01.04
02.05.01.05
m2
m2
m2
60.45
PIP Viable
Precio
S/.
11.96
Parcial
S/.
722.98
Metrado
PIP a Verificar
Precio
S/.
14,878.83
Parcial
S/.
36.55
10.44
5.22
146.60
895.85
22.09
21.32
37.94
89.21
49.73
4.84
266.08
31,129.77
779.25
396.09
465.68
7,290.42
4,335.91
5,877.71
16,250.94
779.25
396.09
465.68
7,039.62
4,286.46
4,870.72
2806.9%
8668.3%
483.7%
19.58
103.54
170.34
501.70
9.03
7.20
9,823.29
934.97
1,226.45
5,194.03
-4,042.61
-815.17
-1,207.92
-715.21
112.2%
-81.2%
-39.9%
-100.0%
-100.0%
m3
m3
m3
m2
m2
77.52
22.15
11.07
25.78
226.95
21.32
37.94
89.21
6.54
49.73
57,682.51
1,652.73
840.37
987.55
168.60
11,286.22
57,682.51
1,652.73
840.37
987.55
168.60
11,286.22
kg
m3
m2
m3
und
49.98
45.56
451.53
9.60
80.00
4.84
464.22
19.27
37.99
153.62
18.07
5.16
2.58
5.73
59.71
53.87
11.02
21.32
37.94
89.21
6.54
49.73
4.84
464.22
241.90
21,149.86
8,700.98
364.70
12,289.60
15,504.52
385.25
195.77
230.16
37.47
2,969.38
260.73
5,115.70
241.90
21,149.86
8,700.98
364.70
12,289.60
8,109.57
385.25
195.77
230.16
-104.23
2,941.78
260.73
4,089.27
111.56
1.76
13.00
19.27
37.99
314.88
2,149.76
66.86
4,093.44
2,149.76
-2,557.35
4,093.44
-1,039.32
-11.74
-2,523.95
20,495.87
20,495.87
8,498.15
63,956.91
128,805.06
-6,270.05
3962.4%
40474.2%
-62.0%
-174,494.20
-97.7%
m3
m3
m3
m3
m3
m2
kg
m3
m3
m3
m2
m2
m2
32.32
8.08
51.80
7.76
6.12
19.44
250.80
49.45
1,006.99
1,278.80
22.68
5.64
4.00
59.80
3.62
219.47
361.99
301.98
11.96
4,629.26
4,977.58
2,041.62
1,207.92
715.21
7,394.95
m3
m3
m3
m3
m3
m2
m2
kg
m3
m3
m2
m3
und
m3
m3
m3
m2
m3
m3
m3
18.26
4.51
7.76
6.12
141.70
27.60
52.80
19.44
1,026.43
8.69
301.98
2,624.21
86.90
0.42
11.00
11.96
27.96
229.45
1,039.32
11.74
2,523.95
190,592.22
190,592.22
208.00
52.00
520.00
7.76
6.12
19.44
1,614.08
318.24
10,108.80
398.60
1,318.54
485.28
185.00
21.32
49.73
266.08
20.75
211,088.09
211,088.09
8,498.15
65,570.99
129,123.30
3,838.75
910.00
196.21
178,551.10
277.68
14.61
4,056.90
109.2%
109.7%
-73.6%
10658.6%
398.4%
-97.5%
-100.0%
-100.0%
-100.0%
10.8%
10.8%
Item
Partida
Und
Metrado
02.06
02.06.01
02.06.01.01
02.06.01.02
02.06.01.03
02.06.01.04
02.06.01.05
02.06.01.06
02.06.01.07
02.06.01.08
02.06.01.09
02.06.01.10
02.06.01.11
02.06.01.12
02.06.01.13
02.06.01.14
02.06.01.15
02.06.01.16
02.06.01.17
02.06.01.18
02.06.01.19
02.06.01.20
02.06.02
02.06.02.01
02.06.02.02
02.06.02.03
02.06.02.04
02.06.02.05
02.06.02.06
02.06.02.07
02.06.02.08
02.06.02.09
02.06.02.10
02.06.02.11
02.09
02.09.01
OBRAS DE REGULACION
MEJORAMIENTO DE RESERVORIOS
Demolicion de estructuras de concreto existentes a Mano
Excavacin para estructuras material suelto a mano
Excavacin Plataforma Material Suelto a Mano
Excavacin Plataforma Roca Suelta a Mano
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Colocacin de Cama de Apoyo con Material Selecto Compactado a Mano en Capas
(Hasta e = 0.15 m)
Instalac. de Tub. de Drenaje ISO-4435 UF S-20 (R-4) de 110 mm
Relleno con Material Propio Compactado con Equipo en Capas (e = 0.25 m)
Relleno con Material de Filtro acomodado
Compactado de Suelo de Fundacin a Mano (Hasta e = 0.15 m)
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
CC: f'c=140 kg/cm2 + 30% Piedra - Masivo
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Frotachado en concreto Caravista con mortero cemento/arena 1:1 - Canales
Revestido de Canal con CS: f'c = 140 Kg/cm2, e = 0.10 m - Encof. Madera Aguano
Juntas con Water Stop de PVC Tipo O de 15 cm + sellado con material elastomrico
Junta de Tecnoport de e = 1" - Reservorios
Junta Asfltica de 1" x 2"
Junta con Water Stop, e = 6"
Aditivo adherente para concreto y morteros
Suministro y Colocacin de Valvula Compuerta Tipo Masa de 6"
Suministro y Colocacin de Tapa Metlica
Suministro y Colocacin de Drenes Secos con Piedra y Grava
Suministro y colocacin de compuerta metlica de 0.35 x 0.25 m segn diseo
Vlvula DN 150 mm, manual PN 10
Instalacin Tubera de PVC NTP ISO-4422 UF S-20 (C-5) de 160 mm
Suministro y Colocacin de Tapa Metlica de 0.90 x 0.70 m, plancha acero estriado 3/16",
pint. anticorrosiva
Picado de Concreto y Mampostera
Juntas con material elastomrico
DESARENADORES
Demolicion de estructuras de concreto existentes a Mano
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Refine de Piso y Paredes para estructuras de concreto (e = hasta 0.10 m)
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Enrocado con Piedra Pesada (Zampeado), e = 0.30 m a Mano
Suministro y colocacin de compuerta metlica segn diseo - Desarenador
PLAN DE MANEJO AMBIENTAL
Plan de manejo ambiental - Obras de mitigacin de impactos ambientales
m3
m3
m3
m3
m3
m3
m3
m
m3
m3
m2
m2
kg
m3
m3
m3
m3
m2
m2
m2
m
m2
m
m
m2
und
und
m3
und
und
m
und
PIP Viable
Precio
S/.
Parcial
S/.
118,262.92
118,262.92
Metrado
PIP a Verificar
Precio
S/.
27.39
185.33
3.46
84.60
11.50
276.31
244.49
46.22
21.32
42.82
17.39
96.82
4.84
49.73
Parcial
S/.
229,166.56
221,382.04
1,265.97
3,951.24
148.16
1,471.19
1,113.43
1,337.34
12,158.49
2,555.42
1.82
167.53
504.87
144.65
4.84
464.22
501.70
9.03
80.98
12,368.23
844.88
84,049.80
4,558.98
11,713.76
12,368.23
466.77
84,049.80
4,558.98
2,361.18
505.33
33.05
14.00
9.00
27.00
9.00
59.40
593.29
65.57
36.21
707.60
1,466.63
40.88
255.26
3.85
42.70
33,134.49
1,196.74
9,906.40
13,199.67
1,103.76
2,297.34
228.69
25,333.48
29,203.53
-1,714.35
-16,889.31
13,199.67
-38,805.35
-6,021.32
228.69
25,333.48
742.9%
-58.9%
-63.0%
133.45
109.20
667.01
224.35
6.32
18.55
7.76
6.12
843.40
2,025.66
5,176.00
1,373.02
44.80
8.44
378.11
481.10
19.44
9,352.58
1,085.90
9.64
80.40
3.62
301.98
333.28
3,930.96
2,911.09
26,795.71
203.40
695.54
196.21
11.96
39,909.11
8,318.66
40.20
216.00
216.00
6.63
3.48
15.19
266.53
751.68
3,281.04
-266.53
-751.68
-3,281.04
-100.0%
-100.0%
-100.0%
9.00
9.00
29.30
1,107.62
99.95
46.52
9,968.58
899.55
1,363.04
-9,968.58
-899.55
-1,363.04
-100.0%
-100.0%
-100.0%
30.00
23.94
718.20
-718.20
-100.0%
m2
m
m3
m3
m3
m3
m2
m2
1.40
15.52
4.43
2.22
3.58
34.84
46.22
21.32
37.94
89.21
6.54
49.73
kg
m3
m2
m3
und
20.18
6.09
56.15
0.30
2.00
4.84
464.22
19.27
37.99
624.31
und
1.00
39,820.00
7,784.52
64.71
330.89
168.07
198.05
23.41
1,732.59
7,784.52
64.71
330.89
168.07
198.05
23.41
1,732.59
97.67
2,827.10
1,082.01
11.40
1,248.62
39,820.00
39,820.00
97.67
2,827.10
1,082.01
11.40
1,248.62
39,820.00
39,820.00
123.4%
25.2%
-97.2%
-72.4%
Item
Partida
Und
Metrado
Costo Directo
Gastos Generales
Utilidad
Sub total
I.G.V.
Total Presupuesto
Imprevistos de orden fisico
Riesgo de Inflacin
Riesgo de conversin
Total Presupuesto
PIP Viable
Precio
S/.
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
Parcial
S/.
739,778.71
73,977.87
36,988.94
850,745.52
161,641.65
1,012,387.17
25,309.68
23,788.26
40,495.49
1,101,980.60
Metrado
PIP a Verificar
Precio
S/.
12.32%
Parcial
S/.
2,122,153.56
261,518.61
2,383,672.17
2,383,672.17
2,383,672.17
Partida
Und
Metrado
02
02.01
02.01.01
02.01.01.01
02.01.01.02
02.01.02
02.01.02.02
02.01.02.03
02.01.02.04
02.01.02.05
02.01.02.06
02.01.02.08
02.01.03
02.01.03.01
02.07
02.07.01
02.07.01.01
02.07.01.02
02.07.01.03
02.07.01.04
02.07.01.05
02.07.01.06
02.07.01.07
02.07.01.08
02.07.01.09
02.07.01.10
02.07.01.11
02.07.01.12
02.07.01.13
02.07.02
02.07.02.01
02.07.02.02
02.07.02.03
02.07.02.04
02.07.02.05
02.07.02.06
02.07.02.07
02.07.02.08
02.07.03
02.07.03.01
02.07.03.02
02.07.03.03
02.07.03.04
02.07.03.05
02.07.03.06
02.07.03.07
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
PIP a Verificar
Precio
S/.
m2
und
25.00
1.00
24.33
3,253.32
m3
m3
kg
bls
p2
m
300.00
300.00
2,300.00
2,200.00
3,400.00
550.00
38.70
60.85
0.11
2.19
0.24
1.60
mes
1.00
8,807.49
m3
m3
m3
m3
553.58
332.15
221.43
40.17
35.87
54.78
115.36
69.80
m
m
und
und
und
m3
m3
m3
m
210.00
324.00
1.00
3.00
4.00
807.56
259.79
51.76
534.00
155.36
197.46
101.75
120.11
120.11
34.10
47.68
24.71
0.65
m3
m3
m3
m3
m2
61.06
36.64
24.42
158.76
224.95
35.87
54.78
115.36
24.71
53.93
m3
m2
kg
122.12
111.59
62.09
272.21
9.62
4.84
m3
m3
m2
41.71
54.22
328.28
kg
m3
m2
und
483.08
60.85
118.32
87.00
Parcial
S/.
493,647.50
49,301.06
3,861.57
608.25
3,253.32
36,632.00
11,610.00
18,255.00
253.00
4,818.00
816.00
880.00
8,807.49
8,807.49
349,110.75
205,495.96
19,856.91
18,195.18
25,544.16
2,803.87
32,625.60
63,977.04
101.75
360.33
480.44
27,537.80
12,386.79
1,278.99
347.10
57,685.27
2,190.22
2,007.14
2,817.09
3,922.96
12,131.55
32,625.60
63,977.04
101.75
360.33
480.44
27,537.80
12,386.79
1,278.99
347.10
57,685.27
2,190.22
2,007.14
2,817.09
3,922.96
12,131.55
35.87
24.71
53.93
33,242.29
1,073.50
300.52
50,178.23
1,496.14
1,339.78
17,704.14
33,242.29
1,073.50
300.52
50,178.23
1,496.14
1,339.78
17,704.14
4.84
272.21
9.62
110.32
2,338.11
16,563.98
1,138.24
9,597.84
2,338.11
16,563.98
1,138.24
9,597.84
Item
Partida
Und
Metrado
02.07.04
02.07.04.01
02.07.04.02
02.07.04.03
02.07.04.04
02.07.04.05
02.07.04.06
02.07.04.07
02.07.04.08
02.07.04.09
02.07.04.10
02.07.04.11
02.07.04.12
02.07.04.13
02.07.05
02.07.05.01
02.07.05.02
02.07.05.03
02.07.05.04
02.07.05.05
02.07.05.06
02.07.05.07
02.07.05.08
02.07.05.09
02.07.05.10
02.07.05.11
02.07.06
02.07.06.01
02.07.06.02
02.07.06.03
02.07.06.04
02.07.06.05
02.07.06.06
02.07.06.07
02.07.06.08
02.07.06.09
02.07.06.10
02.07.06.11
02.07.06.12
02.07.06.13
02.08
02.08.01
02.08.01.01
02.08.01.02
02.08.01.03
02.08.01.04
02.08.01.05
02.08.02
02.08.02.01
02.08.02.02
02.08.02.03
ESTRUCTURA DE ENTRADA
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija con compresora
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Solado de concreto f'c = 100 kg/cm2
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Curado de Concreto con emulsin lquida - pelcula impermeable
Compuerta deslizante plana Tipo ARMCO Modelo 5 de 1.50 x 0.40 m
Compuerta deslizante plana Tipo ARMCO Modelo 5 de 0.50 x 0.35 m
Suministro y Colocacin de rejilla de acero empotrada
ESTRUCTURA DE SALIDA
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija con compresora
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Solado de concreto f'c = 100 kg/cm2
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Curado de Concreto con emulsin lquida - pelcula impermeable
Plancha metlica de proteccin en estructuras de 6 mm
ESTRUCTURA DE PURGA
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija con compresora
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Solado de concreto f'c = 100 kg/cm2
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Curado de Concreto con emulsin lquida - pelcula impermeable
Plancha metlica de proteccin en estructuras
Suministro y Colocacin de rejilla de acero empotrada
Colocacion de accesorios para purga de sifn de 200 mm
PASE AEREO MARCAMARCA
COLUMNAS DE CONCRETO ARMADO
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Curado de Concreto con emulsin lquida - pelcula impermeable
ESTRIBOS DE CONCRETO
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija con compresora
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
PIP a Verificar
Precio
S/.
m3
m3
m3
m2
4.57
2.74
1.83
32.21
35.87
54.78
115.36
53.93
kg
m2
m3
m3
m2
m2
und
und
kg
168.09
12.83
3.40
8.51
37.83
37.83
1.00
1.00
39.46
4.84
31.34
491.07
523.41
23.00
9.62
1,182.21
556.88
9.27
m3
m3
m3
m2
3.23
1.94
1.29
31.69
35.87
54.78
115.36
53.93
kg
m2
m3
m3
m2
m2
m2
198.11
3.84
1.15
4.36
29.57
29.57
0.96
4.84
31.34
491.07
523.41
23.00
9.62
471.07
m3
m3
m3
m2
3.79
2.27
1.51
61.46
35.87
54.78
115.36
53.93
kg
m2
m3
m3
m2
m2
m2
kg
und
237.98
8.20
1.12
4.87
63.59
63.59
0.96
4.17
1.00
4.84
31.34
272.21
523.41
23.00
9.62
471.07
9.27
4,810.95
m2
28.00
53.93
kg
m3
m2
m2
710.81
4.80
28.96
28.96
4.84
523.41
23.00
9.62
m3
m3
m3
26.52
15.91
10.61
35.87
54.78
115.36
Parcial
S/.
12,940.63
163.93
150.10
211.11
1,737.09
813.56
402.09
1,669.64
4,454.22
870.09
363.92
1,182.21
556.88
365.79
7,422.78
115.86
106.27
148.81
1,709.04
813.56
402.09
1,669.64
4,454.22
870.09
363.92
1,182.21
556.88
365.79
7,422.78
115.86
106.27
148.81
1,709.04
958.85
120.35
564.73
2,282.07
680.11
284.46
452.23
15,387.88
135.95
124.35
174.19
3,314.54
958.85
120.35
564.73
2,282.07
680.11
284.46
452.23
15,387.88
135.95
124.35
174.19
3,314.54
1,151.82
256.99
304.88
2,549.01
1,462.57
611.74
452.23
38.66
4,810.95
95,235.69
8,407.41
1,510.04
1,151.82
256.99
304.88
2,549.01
1,462.57
611.74
452.23
38.66
4,810.95
95,235.69
8,407.41
1,510.04
3,440.32
2,512.37
666.08
278.60
28,465.16
951.27
871.55
1,223.97
3,440.32
2,512.37
666.08
278.60
28,465.16
951.27
871.55
1,223.97
Item
Partida
Und
m3
m2
kg
m3
6.40
20.40
151.24
45.36
PIP a Verificar
Precio
S/.
47.68
31.34
4.84
523.41
m3
m3
m3
m2
m3
kg
18.00
10.80
7.20
66.00
35.46
18.63
35.87
54.78
115.36
10.99
402.85
4.84
m3
m3
m3
m2
m3
kg
9.60
5.76
3.84
56.80
19.20
37.25
35.87
54.78
115.36
10.99
402.85
4.84
kg
kg
56.05
41.44
28.63
32.34
kg
und
und
und
m2
und
und
und
m
30.96
8.00
4.00
28.00
1.80
2.00
2.00
4.00
26.00
34.84
153.82
119.52
74.13
555.23
1,553.56
1,916.25
1,474.48
381.07
Metrado
02.08.02.04
02.08.02.05
02.08.02.06
02.08.02.07
02.08.03
02.08.03.01
02.08.03.02
02.08.03.03
02.08.03.04
02.08.03.05
02.08.03.06
02.08.04
02.08.04.01
02.08.04.02
02.08.04.03
02.08.04.04
02.08.04.05
02.08.04.06
02.08.05
02.08.05.01
02.08.05.02
02.08.06
02.08.06.01
02.08.06.02
02.08.06.03
02.08.06.04
02.08.06.05
02.08.06.06
02.08.06.07
02.08.06.08
02.08.06.09
(anual)
PIP Viable
Precio
S/.
Parcial
S/.
Metrado
10.00%
5.00%
15.14%
10.00%
19.00%
18.00%
Parcial
S/.
305.15
639.34
732.00
23,741.88
17,168.44
645.66
591.62
830.59
725.34
14,285.06
90.17
9,642.10
344.35
315.53
442.98
624.23
7,734.72
180.29
2,944.88
1,604.71
1,340.17
28,607.70
1,078.65
1,230.56
478.08
2,075.64
999.41
3,107.12
3,832.50
5,897.92
9,907.82
493,647.50
74,741.06
49,364.75
617,753.31
111,195.60
728,948.91
493,647.50
74,741.06
49,364.75
617,753.31
111,195.60
728,948.91
728,948.91
728,948.91
2.50%
1.80%
4.00%
Partida
Und
Metrado
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.02.04
03.01.02.05
03.01.02.06
03.01.02.07
03.01.02.08
03.01.03
03.01.03.01
03.01.04
03.01.04.01
03.01.04.02
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04
03.02.01.05
03.02.01.06
03.02.01.07
03.02.01.08
03.02.01.09
03.02.01.10
03.02.01.11
03.02.01.12
03.02.01.13
03.02.01.14
03.02.01.15
03.02.02
03.02.02.01
03.02.02.02
03.02.02.03
03.02.02.04
03.02.02.05
m2
und
825.00
PIP Viable
Precio
S/.
12.25
Parcial
S/.
1,447,571.11
40,466.46
10,106.25
10,106.25
und
m3
m3
kg
bls
p2
m
m
Metrado
PIP a Verificar
Precio
S/.
175.00
1.00
20.38
2,579.62
1.00
800.00
800.00
3,700.00
5,200.00
9,700.00
2,300.00
1,600.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
0.95
2.00
6,558.97
2.00
8.00
11,067.44
6,400.26
16.38
7.02
46.80
3.53
2.12
1.41
10.00
136.43
16.30
31.78
94.90
21.32
37.94
89.21
121.67
49.73
73,336.96
22,134.88
51,202.08
74,168.85
40,414.68
266.99
223.10
4,441.32
75.26
80.43
125.79
1,216.70
6,784.66
16.74
0.23
7.15
62.89
286.65
4.84
464.22
364.75
266.08
19.27
81.02
106.77
2,607.96
16,733.77
5,523.75
17.53
1.00
37.99
1,481.20
5.93
63.12
18.04
9.02
46.22
21.32
37.94
89.21
665.96
1,481.20
31,900.78
274.08
1,345.72
684.44
804.67
14.63
6.54
95.68
6,454.01
mes
m
KM
KM
m3
m3
m3
m3
m3
m3
m
m2
m2
kg
m3
m3
m3
m2
m3
m3
und
m3
m3
m3
m3
m3
m3
m3
m3
m2
9,220.01
0.70
6,454.01
23,906.20
10.00
2,390.62
271.31
352.95
433.89
6.32
18.55
14.92
23,906.20
283,464.13
220,161.99
1,714.68
6,547.22
6,473.64
100.00
61.31
6,131.00
1,218.14
369.26
120.52
45.62
455.32
1,740.21
36.40
244.32
14.00
18.75
3.62
333.28
301.98
196.21
11.96
26.94
27.96
229.45
22,840.13
1,336.72
40,166.91
13,776.33
89,338.34
20,812.91
980.62
6,831.19
3,212.30
45,431.50
62.48
26.18
120.78
26.18
6.32
18.55
7.76
6.12
Parcial
S/.
947,369.84
173,462.21
6,146.12
3,566.50
2,579.62
80,861.19
5,222.19
36,408.00
28,960.00
259.00
6,812.00
1,358.00
322.00
1,520.00
13,117.94
13,117.94
394.87
485.64
937.25
160.22
Item
Partida
Und
m2
kg
m3
m3
m2
m3
und
385.88
83.82
62.48
14.52
576.40
PIP Viable
Precio
S/.
19.44
3.62
301.98
333.28
11.96
22.00
229.45
m3
m2
m3
m
m2
und
23.20
69.60
23.58
7.76
19.44
333.28
69.60
29.00
11.96
263.67
Metrado
03.02.02.06
03.02.02.07
03.02.02.08
03.02.02.09
03.02.02.10
03.02.02.11
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.02.03.04
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.01.04
03.03.01.05
03.03.01.06
03.03.01.07
03.03.01.08
03.03.01.09
03.03.01.10
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.02.04
03.03.02.05
03.03.02.06
03.03.02.07
03.03.03
03.03.03.01
03.03.03.02
03.03.03.03
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Enrocado con Piedra Pesada (Zampeado), e = 0.30 m a Mano
Suministro y colocacin de compuerta metlica segn diseo - Desarenador
MEDIDOR DE CAUDAL
Excavacin Caja Canal Material Suelto a Mano
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Instalacin de Tubera de PVC NTP 399.002 SP C-7.5 (S-13.3) de 1"
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Suministro y Colocacin Reglilla Graduada
CANALES PRINCIPALES
REVESTIMIENTO DE CANAL PRINCIPAL
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Excavacin Caja Canal Roca Fija a Mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Refine Caja Canal Para Efectos de Revestido
Colocacin de Cama de Apoyo con Material Selecto Compactado a Mano en Capas
Revestido de Canal con CS: f'c = 140 Kg/cm2, e = 0.10 m - Encof. Madera Aguano
Mejoramiento de bermas en Corte y Relleno
Instalacin Tubera de PVC NTP ISO-4435 UF S-20 (R-4) de 160 mm
Instalacin Tubera de PVC NTP ISO-4435 UF S-20 (R-4) de 200 mm
Instalacin Tubera de PVC NTP ISO-4435 UF S-20 (R-4) de 250 mm
Relleno con Material Selecto Compactado a Mano en Capas (e = 0.15 m)
Relleno con Material Propio Compactado a Mano en Capas (e = 0.25 m)
Prueba hidrulica en sistemas entubados a presin
ENTUBADO DE CANALES
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Relleno con Material Propio Compactado con Equipo en Capas (e = 0.25 m)
Instalacin Tubera de PVC NTP ISO-4435 UF S-20 (R-4) de 110 mm
Instalacin Tubera de PVC NTP ISO-4435 UF S-25 (R-2) de 160 mm
Instalacin Tubera de PVC NTP ISO-4435 UF S-25 (R-2) de 200 mm
TRANSICION TUBERIA - CANAL
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
CC: f'c=140 kg/cm2 + 30% Piedra - Masivo
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Suministro y Colocacin de rejilla de acero empotrada
TRANSICION CANAL - TUBERIA
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Parcial
S/.
7,501.51
303.43
18,867.71
4,839.23
6,893.74
5,047.90
17,870.64
180.03
1,353.02
7,858.74
832.42
7,646.43
357,390.44
145,386.92
m3
m3
m3
m3
m3
m3
m2
m3
m
m
m
m3
m3
m
265.50
177.00
7.76
17.94
2,060.28
3,175.38
2,950.00
88.50
47.01
16.63
138,679.50
1,471.76
m3
m3
m3
m
m
m
2,382.60
627.00
2,131.80
1,750.00
1,750.00
2,770.00
m3
m3
m3
m3
m3
m2
m3
m3
m3
m2
kg
7.76
6.12
8.44
11.22
16.75
25.51
PIP a Verificar
Metrado
Precio
S/.
142.15
49.73
88.26
4.84
24.32
220.03
1.35
9.00
464.22
19.27
37.99
624.31
11,289.83
4,239.98
51.29
5,618.79
1,853.39
8.55
1.92
22.00
49.73
464.22
5.11
425.19
891.30
112.42
8.00
53.06
951.13
271.75
135.88
21.32
37.94
89.21
424.48
269,557.55
239,045.47
20,278.09
10,310.20
12,121.85
211.24
42.82
9,045.30
2,115.00
1,525.00
20.00
706.82
798.23
3,660.00
33.47
49.76
78.56
28.96
20.75
0.55
70,789.05
75,884.00
1,571.20
20,469.51
16,563.27
2,013.00
4.32
1.23
0.62
21.32
37.94
89.21
2,911.13
92.10
46.67
55.31
15.96
49.73
793.69
2.81
464.22
1,304.46
26.74
10.09
19.27
10.27
2.49
0.71
0.36
21.32
37.94
89.21
515.28
103.62
1,766.55
53.09
26.94
32.12
159,928.81
18,488.98
3,837.24
17,992.39
19,635.00
29,312.50
70,662.70
2,681.95
6.89
2.21
26.39
4.29
7.76
6.12
19.44
301.98
53.47
13.53
513.02
1,295.49
1.82
37.57
196.21
11.96
357.10
449.34
6,048.23
m3
m3
m3
m3
m3
30.81
10.27
7.76
6.12
239.09
62.85
Parcial
S/.
7,069.12
427.18
Item
Partida
Und
Metrado
03.03.03.04
03.03.03.05
03.03.03.06
03.03.04
03.03.04.01
03.03.04.02
03.03.04.03
03.03.04.04
03.03.04.05
03.03.04.06
03.03.04.07
03.04
03.04.01
03.04.01.01
03.04.01.02
03.04.01.03
03.04.01.04
03.04.01.05
03.04.01.06
03.04.01.07
03.04.01.08
03.04.01.09
03.04.01.10
03.04.02
03.04.02.01
03.04.02.02
03.04.02.03
03.04.02.04
03.04.02.05
03.04.02.06
03.04.02.07
03.04.02.08
03.04.02.09
03.04.02.10
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
BUZONES DE INSPECCION
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Encofrado Metlico para Buzones (+ mantenimiento y limpieza) - Plancha de Acero
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Muro Seco de Piedra Acomodada a Mano
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Fierro doblado y colocado
OBRAS DE ARTE ESTNDAR
CANOAS
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Enrocado con Piedra Pesada (Zampeado), e = 0.30 m a Mano
Mampostera de Piedra Asentada en CS: f'c=140 kg/cm2 - Obras de Arte
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Fierro doblado y colocado
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Curado de Concreto con emulsin lquida - pelcula impermeable
PASARELAS
Excavacin para estructuras material suelto a mano
Excavacin para estructuras roca suelta a mano
Excavacin para estructuras roca fija a mano con compresora
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Fierro doblado y colocado
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 175 Kg/cm2 - Obras Arte
Tarrajeo con mortero cemento/arena 1:3, hasta e = 1"
Frotachado en concreto Caravista con mortero cemento/arena 1:1 - Canales
Curado de Concreto con emulsin lquida - pelcula impermeable
PASE VEHICULAR
Excavacin Caja Canal Material Suelto a Mano
Excavacin Caja Canal Roca Suelta a Mano
Encofrado y Desencofrado de Obras de Arte (+ mantenimiento y limpieza de tableros) Madera Aguano
Fierro doblado y colocado
Preparacin y Vaceado CS: f'c = 210 Kg/cm2 - Obras Arte
Preparacin y Vaceado CS: f'c = 140 Kg/cm2 - Obras Arte
CC: f'c=140 kg/cm2 + 30% Piedra - Obras de Arte
m2
kg
m3
m3
m2
m3
m3
m3
m3
und
m2
m3
m3
m3
m2
kg
m3
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m2
m2
37.75
144.95
8.71
1.30
119.08
PIP Viable
Precio
S/.
19.44
3.62
301.98
333.28
11.96
Parcial
S/.
733.86
524.72
2,630.25
433.26
1,424.20
43,344.53
261.25
125.00
7.76
42.60
2,027.30
5,325.00
77.50
7.50
7.50
678.75
488.75
301.98
333.28
26.94
11.96
3.62
23,403.45
2,499.60
202.05
8,117.85
1,769.28
135,713.82
73,509.74
29.24
7.48
163.54
55.76
592.96
3,616.57
36.72
68.65
777.92
7.76
6.12
27.96
68.20
19.44
3.62
219.47
333.28
11.96
226.90
45.78
4,572.58
3,802.83
11,527.14
13,091.98
8,058.94
22,879.67
9,303.92
PIP a Verificar
Metrado
Precio
S/.
9.66
49.73
1.82
17.08
464.22
19.27
32.81
9.37
4.69
21.32
37.94
89.21
844.88
329.13
25,834.40
699.51
355.50
418.39
171.12
49.73
8,509.80
24.74
464.22
11,484.80
223.20
13.50
19.27
4.84
45.89
13.11
6.56
21.32
37.94
89.21
4,301.06
65.34
123,345.73
38,596.67
978.37
497.39
585.22
34.25
37.99
1,301.16
144.72
178.17
6.20
38.71
285.44
285.44
49.73
4.84
266.08
464.22
19.27
7.20
4.58
1.31
0.65
21.32
37.94
89.21
7,196.93
862.34
1,649.70
17,969.96
5,500.43
2,055.17
20,200.57
97.65
49.70
57.99
77.24
199.70
11.76
21.66
5.28
49.73
4.84
307.10
364.75
464.22
3,841.15
966.55
3,611.50
7,900.49
2,451.08
55.96
99.88
9.03
7.20
505.32
719.14
26,799.24
m3
m3
m3
m3
m3
m2
kg
m3
m3
m3
m2
m2
m2
30.60
7.65
216.75
1,467.51
38.25
7.76
6.12
19.44
3.62
219.47
237.46
46.82
4,213.62
5,312.39
8,394.73
22.95
79.05
333.28
11.96
7,648.78
945.44
m3
m3
m2
40.40
10.10
64.75
7.76
6.12
19.44
18,598.53
313.50
61.81
1,258.74
kg
m3
m3
m3
1,598.50
7.05
5.00
28.35
3.62
361.99
301.98
219.47
5,786.57
2,552.03
1,509.90
6,221.97
Parcial
S/.
480.39
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
03.04.03
03.04.03.01
03.04.03.02
03.04.03.03
03.04.03.04
03.04.03.05
03.04.03.06
03.04.03.07
03.04.03.08
03.04.03.09
03.04.03.10
03.04.04
03.04.04.01
03.04.04.02
03.04.04.03
03.04.04.04
03.04.04.05
03.04.04.06
03.04.04.07
03.04.04.08
03.04.04.09
03.04.04.10
03.05
03.05.01
03.05.01.01
03.05.01.02
03.05.01.03
03.05.01.04
03.05.01.05
03.06
03.06.01
03.06.01.01
03.06.01.02
03.06.01.03
03.06.01.04
03.06.01.05
03.06.01.06
03.06.01.07
03.06.01.08
03.06.01.09
03.06.01.10
m2
74.75
PIP Viable
Precio
S/.
11.96
Parcial
S/.
894.01
Metrado
PIP a Verificar
Precio
S/.
m3
m3
m3
m2
m2
71.05
20.30
10.15
24.36
223.54
21.32
37.94
89.21
6.54
49.73
kg
m3
m2
m3
und
159.94
43.31
437.59
9.48
79.00
4.84
464.22
19.27
37.99
153.62
9.39
2.68
1.34
21.32
37.94
89.21
16,806.31
m3
m3
m3
m3
m3
m2
m2
kg
m3
m3
m2
m3
und
m3
m3
m3
m2
m3
m3
m3
41.50
10.25
7.76
6.12
322.04
62.73
120.00
19.44
2,332.80
19.75
301.98
5,964.11
197.50
0.94
25.00
11.96
27.96
229.45
2,362.10
26.28
5,736.25
498,471.96
498,471.96
544.00
136.00
1,360.00
2,380.00
7.76
6.12
19.44
196.21
4,221.44
832.32
26,438.40
466,979.80
m
m3
m3
m2
m2
kg
m3
m3
m3
m3
m2
22.40
7.76
6.12
8.44
774.11
20,105.37
8,432.36
360.15
12,135.98
8,274.12
200.19
101.68
119.54
6.54
49.73
4.84
19.88
1,601.31
140.41
5.84
59.15
0.95
7.00
464.22
19.27
37.99
314.88
226.25
21.32
2,711.04
1,139.82
36.09
2,204.16
123,706.83
123,706.83
4,823.65
778.36
284.50
101.50
162.18
40.84
49.80
685.44
293.76
56,274.37
1,514.79
770.18
905.48
159.31
11,116.64
3.04
32.20
29.01
49.73
266.08
20.75
14.61
132,064.30
132,064.30
m3
m3
m3
m3
m3
Parcial
S/.
46.22
21.32
38,707.84
75,699.76
2,106.13
2,369.45
143,308.67
120,912.14
1,887.62
1,061.74
5,319.01
1,797.81
2.35
42.82
100.63
57.50
17.39
999.93
7.82
193.65
106.38
2,776.22
96.82
4.84
49.73
4.84
757.13
937.27
5,290.28
13,436.90
1.22
77.62
464.22
501.70
566.35
38,941.95
189.06
426.20
1,700.00
3.36
125.12
19.44
3.62
301.98
333.28
8,285.33
6,154.00
1,014.65
41,699.99
155.55
1,204.96
196.21
11.96
30,520.47
14,411.32
-50.8%
-100.0%
-100.0%
-31.4%
-100.0%
-51.7%
37.3%
-61.6%
-75.2%
-75.2%
-100.0%
-100.0%
46.4%
-83.8%
8.5%
-8.4%
-100.0%
-100.0%
-100.0%
-36.1%
118.3%
-100.0%
-98.6%
-100.0%
-100.0%
Item
Partida
Und
289.41
88.96
258.47
85.20
4.00
6.00
18.00
PIP a Verificar
Precio
S/.
9.03
80.98
65.57
36.21
707.60
1,466.63
40.88
Parcial
S/.
2,613.37
7,203.98
16,947.88
3,085.09
2,830.40
8,799.78
735.84
6.00
30.60
255.26
3.85
1,531.56
117.81
306.01
42.70
m3
m3
m3
m3
m3
m3
m
m2
35.70
15.30
11.47
19.04
11.43
7.62
17.00
44.77
16.30
31.78
94.90
21.32
37.94
89.21
121.67
49.73
13,066.63
22,396.53
581.91
486.23
1,088.50
405.93
433.65
679.78
2,068.39
2,226.41
kg
m3
m3
m3
m2
m3
und
16.74
0.19
25.29
7.48
49.97
15.73
1.00
4.84
464.22
364.75
266.08
19.27
37.99
1,481.20
und
1.00
39,820.00
Metrado
03.06.01.11
03.06.01.12
03.06.01.13
03.06.01.14
03.06.01.15
03.06.01.16
03.06.01.17
03.06.01.18
03.06.01.19
03.06.01.20
03.06.02
03.06.02.01
03.06.02.02
03.06.02.03
03.06.02.04
03.06.02.05
03.06.02.06
03.06.02.07
03.06.02.08
03.06.02.09
03.06.02.10
03.06.02.11
03.06.02.12
03.06.02.13
03.06.02.14
03.06.02.15
03.07
03.07.01
m2
m2
m
m2
und
und
m
und
und
und
m2
m2
m
m
m
51.00
17.00
17.00
12.50
45.00
45.00
PIP Viable
Precio
S/.
23.94
1,107.62
99.95
6.63
3.48
15.19
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
Parcial
S/.
1,220.94
18,829.54
1,699.15
Metrado
82.88
156.60
683.55
1,447,571.11
144,757.11
72,378.56
1,664,706.78
316,294.29
1,981,001.07
49,525.03
46,547.98
79,240.04
2,156,314.12
12.32%
81.02
88.20
9,224.53
1,990.28
962.92
597.58
1,481.20
39,820.00
39,820.00
947,369.84
116,746.90
-500,201.27
-28,010.21
-72,378.56
1,064,116.74
-600,590.04
-316,294.29
1,064,116.74
-916,884.33
-49,525.03
-46,547.98
-79,240.04
1,064,116.74 -1,092,197.38
-34.6%
-19.3%
-100.0%
-36.1%
-100.0%
-46.3%
-100.0%
-100.0%
-100.0%
-50.7%
Partida
Und
Metrado
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.02.04
04.01.02.05
04.01.02.06
04.01.02.07
04.01.02.08
04.01.03
04.01.03.01
04.01.04
04.01.04.01
04.01.04.02
04.01.04.03
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.01.07
04.02.01.08
04.02.01.09
04.02.01.10
04.02.01.11
04.02.01.12
04.02.01.13
04.02.01.14
04.02.01.15
04.02.02
04.02.02.01
04.02.02.02
04.02.02.03
04.02.02.04
m2
und
550.00
PIP Viable
Precio
S/.
12.25
Parcial
S/.
1,941,557.34
46,313.11
6,737.50
6,737.50
und
m3
m3
kg
bls
p2
m
m
Metrado
PIP a Verificar
Precio
S/.
175.00
1.00
20.38
2,579.62
1.00
2,100.00
2,100.00
1,600.00
13,000.00
24,100.00
1,900.00
9,100.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
0.95
4.00
6,558.97
5.00
2.00
8.00
21,638.86
11,067.44
6,400.26
119.56
51.24
441.34
43.06
25.84
17.22
73.00
864.99
16.30
31.78
94.90
21.32
37.94
89.21
121.67
49.73
181,531.26
108,194.30
22,134.88
51,202.08
378,514.59
312,380.23
1,948.83
1,628.41
41,883.17
918.04
980.37
1,536.20
8,881.91
43,015.95
100.46
137.23
36.56
305.59
1,790.55
4.84
464.22
364.75
266.08
19.27
486.23
63,704.91
13,335.26
81,311.39
34,503.90
246.34
6.00
37.99
1,481.20
11.39
129.44
36.98
18.49
46.22
21.32
37.94
89.21
9,358.46
8,887.20
62,288.57
526.45
2,759.66
1,403.02
1,649.49
18,060.03
mes
m
KM
KM
KM
25,800.04
0.70
2,390.62
18,060.03
21,515.58
m3
m3
m3
m3
m3
m3
m
m2
224.07
663.17
526.19
6.32
18.55
14.92
21,515.58
303,502.01
266,393.96
1,416.12
12,301.80
7,850.75
70.00
1,702.52
61.31
18.75
4,291.70
31,922.25
kg
m3
m3
m3
m2
m3
m3
und
425.06
102.40
136.47
468.07
1,778.48
39.20
505.19
15.00
3.62
333.28
301.98
196.21
11.96
26.94
27.96
229.45
1,538.72
34,127.87
41,211.21
91,840.01
21,270.62
1,056.05
14,125.11
3,441.75
24,780.82
m3
m3
m3
m3
m3
m3
m3
m3
9.00
34.08
14.28
65.88
14.28
6.32
18.55
7.76
6.12
215.39
264.89
511.23
87.39
Parcial
S/.
2,555,379.94
420,153.45
6,146.12
3,566.50
2,579.62
206,240.19
5,222.19
95,571.00
76,020.00
112.00
17,030.00
3,374.00
266.00
8,645.00
26,235.88
26,235.88
-68.4%
86.7%
-67.6%
-11.5%
62.2%
-100.0%
-33.7%
158.2%
151.4%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
04.02.02.05
04.02.02.06
04.02.02.07
04.02.02.08
04.02.02.09
04.02.02.10
04.02.02.11
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.03.04
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.01.04
04.03.01.05
04.03.01.06
04.03.01.07
04.03.01.08
04.03.01.09
04.03.01.10
04.03.01.11
04.03.01.12
04.03.01.13
04.03.01.14
04.03.01.15
04.03.01.16
04.03.02
04.03.02.01
04.03.02.02
04.03.02.03
04.03.02.04
m2
m2
PIP Viable
Precio
S/.
Parcial
S/.
210.48
19.44
4,091.73
kg
m3
m3
m2
m3
und
45.72
7.92
34.08
314.40
3.62
333.28
301.98
11.96
165.51
2,639.58
10,291.48
3,760.22
12.00
229.45
m3
m2
16.00
48.00
7.76
19.44
2,753.40
12,327.23
124.16
933.12
m3
m2
m
und
16.27
48.00
333.28
11.96
5,422.47
574.08
20.00
263.67
m3
m3
m3
m3
m2
747.00
7.76
5,273.40
927,235.87
409,054.71
5,796.72
498.00
17.94
8,934.12
8,300.00
47.01
390,183.00
m3
m2
m2
m2
m3
m3
m3
249.00
16.63
6,650.00
1,750.00
5,950.00
4,500.00
12,500.00
500.00
7.76
6.12
8.44
11.22
16.75
25.51
Parcial
S/.
194.04
14,453.53
172.35
47.17
4.84
464.22
834.17
21,897.26
407.93
2.55
17.00
19.27
37.99
624.31
7,860.81
96.87
10,613.27
3,845.79
17.13
49.73
851.87
3.99
464.22
1,852.24
46.90
17.00
5.11
53.06
3,301.37
943.25
471.62
69.85
672.00
21.32
37.94
89.21
37.01
35.53
239.66
902.02
1,132,936.67
1,032,617.96
70,385.21
35,786.91
42,073.22
2,585.15
23,876.16
173.30
380.04
65,860.93
1,061.00
1,061.00
9.03
7.20
9,580.83
7,639.20
4.17
644.11
768.46
42.82
3,204.48
27,580.79
1,750.00
4,490.00
4,257.00
2,290.36
2,675.57
10,497.00
33.47
49.76
78.56
28.96
20.75
0.55
58,572.50
223,422.40
334,429.92
66,328.83
55,518.08
5,773.35
4,140.87
m
m
m
m3
m3
m
m3
m3
m3
m
m
m
PIP a Verificar
Metrado
Precio
S/.
29.67
6.54
290.64
49.73
385,152.00
51,604.00
10,710.00
50,218.00
50,490.00
209,375.00
12,755.00
1,650.44
m3
m3
m3
m3
m3
m2
26.55
7.59
3.79
4.24
1.36
16.24
7.76
6.12
19.44
32.90
8.32
315.71
m3
2.64
301.98
797.23
98.04
21.32
37.94
89.21
49.73
17,362.92
566.05
287.96
338.11
4,875.53
404.0%
729.6%
-100.0%
109.1%
-3,570.23
-574.08
239.66
-4,371.38
205,700.80
623,563.25
64,588.49
35,786.91
42,073.22
-6,348.97
23,876.16
-65.8%
-100.0%
65,860.93
-390,183.00
9,580.83
7,639.20
-4,140.87
3,204.48
27,580.79
285.5%
-68.8%
-100.0%
-8.7%
-82.9%
22.2%
152.4%
1114.2%
-71.1%
-100.0%
-100.0%
58,572.50
223,422.40
334,429.92
66,328.83
55,518.08
5,773.35
-385,152.00
-51,604.00
-10,710.00
-50,218.00
-50,490.00
-209,375.00
-12,755.00
15,712.48
566.05
287.96
338.11
-32.90
-8.32
4,559.82
-100.0%
-100.0%
1444.3%
-797.23
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
952.0%
Item
Partida
Und
Metrado
04.03.02.05
04.03.02.06
04.03.02.07
04.03.03
04.03.03.01
04.03.03.02
04.03.03.03
04.03.03.04
04.03.03.05
04.03.03.06
04.03.04
04.03.04.01
04.03.04.02
04.03.04.03
04.03.04.04
04.03.04.05
04.03.04.06
04.03.04.07
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.01.04
04.04.01.05
04.04.01.06
04.04.01.07
04.04.01.08
04.04.01.09
04.04.01.10
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.04.02.04
04.04.02.05
04.04.02.06
m3
m3
m2
kg
1.12
23.12
PIP Viable
Precio
S/.
196.21
11.96
Parcial
S/.
219.76
276.52
PIP a Verificar
Metrado
Precio
S/.
17.29
464.22
164.26
10.09
19.27
10.27
15.32
4.38
2.19
21.32
37.94
89.21
3,165.29
103.62
10,850.94
326.62
166.18
195.37
59.34
49.73
2,950.98
3,693.19
m3
m3
m3
m3
m3
m2
18.96
6.32
21.75
7.76
6.12
19.44
147.13
38.68
422.82
kg
m3
m3
m2
89.20
5.36
0.80
73.28
3.62
301.98
333.28
11.96
322.90
1,618.61
266.62
876.43
127,685.53
m3
m3
m3
m3
m2
und
m3
m3
m3
m2
kg
m3
m3
m3
m3
m3
m3
m2
kg
m3
m3
m2
m3
m2
767.03
377.00
227.54
22.02
22.02
1,992.81
1,434.97
7.76
42.60
301.98
333.28
26.94
11.96
3.62
Parcial
S/.
8,026.36
11.18
104.92
464.22
19.27
91.73
26.21
13.10
21.32
37.94
89.21
5,189.98
2,021.81
72,104.85
1,955.68
994.41
1,168.65
478.40
49.73
23,790.83
5,952.15
16,060.20
68,712.53
7,338.83
593.22
23,834.01
5,194.59
262,747.61
49,730.59
19.78
5.06
110.63
401.12
7.76
6.12
27.96
19.44
153.49
30.97
3,093.21
7,797.77
2,446.50
24.84
46.45
526.24
37.72
3.62
219.47
333.28
11.96
68.20
8,856.33
5,451.63
15,480.86
6,293.83
2,572.50
69.16
464.22
32,105.46
624.00
13.50
19.27
4.84
67.52
19.29
9.65
21.32
37.94
89.21
12,024.48
65.34
232,928.05
66,592.65
1,439.53
731.86
860.88
46.64
265.91
37.99
49.73
1,771.85
13,223.70
677.11
8.92
64.21
495.15
4.84
266.08
464.22
19.27
3,277.21
2,373.43
29,807.57
9,541.54
495.15
7.20
3.78
1.08
0.54
21.32
37.94
89.21
3,565.08
14,129.48
80.59
40.98
48.17
-100.0%
-100.0%
1846.6%
130.7%
-43.5%
-16,060.20
-68,712.53
24,766.63
-593.22
-11,809.53
-5,129.25
-29,819.56
16,862.06
1,439.53
731.86
860.88
-153.49
-30.97
-1,321.36
5,425.93
-100.0%
-100.0%
337.5%
-100.0%
-49.5%
-98.7%
-11.3%
33.9%
-63.0%
-56.5%
92.5%
51.6%
-100.0%
-100.0%
-100.0%
-55.5%
-91.1%
-79.5%
m3
m3
m3
m3
m3
m2
43.20
10.80
306.00
7.76
6.12
19.44
335.23
66.10
5,948.64
53.24
49.73
2,647.63
-5,579.12
-3,078.20
14,326.71
3,247.71
-2,572.50
3,565.08
-23,704.72
80.59
40.98
48.17
-335.23
-66.10
-3,301.01
kg
m3
2,071.78
54.00
3.62
219.47
7,499.84
11,851.38
137.54
7.92
4.84
307.10
665.69
2,432.23
-6,834.15
-9,419.15
37,834.20
-100.0%
-100.0%
-100.0%
-42.7%
69.6%
-62.7%
Item
Partida
Und
Metrado
04.04.02.07
04.04.02.08
04.04.02.09
04.04.02.10
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
04.04.03.04
04.04.03.05
04.04.03.06
04.04.03.07
04.04.03.08
04.04.03.09
04.04.03.10
04.04.04
04.04.04.01
04.04.04.02
04.04.04.03
04.04.04.04
04.04.04.05
04.04.04.06
04.04.04.07
04.04.04.08
04.04.04.09
04.04.04.10
04.05
04.05.01
04.05.01.01
04.05.01.02
04.05.01.03
04.05.01.04
m3
m3
m2
m2
m2
32.40
111.60
PIP Viable
Precio
S/.
333.28
11.96
Parcial
S/.
10,798.27
1,334.74
PIP a Verificar
Metrado
Precio
S/.
15.57
364.75
3.62
464.22
39.77
68.81
9.03
7.20
191.71
54.77
27.39
21.32
37.94
89.21
359.12
495.43
147,585.97
4,087.26
2,077.97
2,443.46
66.40
578.08
6.54
49.73
434.26
28,747.92
19.99
4.84
96.75
116.28
1,143.06
25.56
464.22
19.27
37.99
53,979.50
22,026.77
971.02
213.00
153.62
32,721.06
141,794.66
m3
m3
m3
m3
m3
m2
m2
kg
m3
m3
m2
m3
und
und
399.90
102.30
7.76
6.12
3,103.22
626.08
1,030.09
19.44
20,024.95
222.37
301.98
67,151.29
2,223.64
46.50
465.00
11.96
27.96
49.45
26,594.73
1,300.14
22,994.25
18,598.53
313.50
61.81
1,258.74
m3
m3
m2
40.40
10.10
64.75
7.76
6.12
19.44
kg
m3
m3
m3
m2
1,598.50
7.05
5.00
28.35
74.75
3.62
361.99
301.98
219.47
11.96
m3
m3
m3
m3
m3
m2
m2
5,786.57
2,552.03
1,509.90
6,221.97
894.01
14,789.63
5.19
1.48
0.74
36.52
9.02
7.76
6.12
283.40
55.20
105.60
19.44
2,052.86
17.38
301.98
5,248.41
kg
m3
m3
m2
m3
und
173.80
0.83
22.00
11.96
27.96
229.45
2,078.65
23.21
5,047.90
337,201.62
337,201.62
m3
m3
m3
m2
368.00
92.00
920.00
7.76
6.12
19.44
2,855.68
563.04
17,884.80
1,610.00
196.21
315,898.10
m3
m3
Parcial
S/.
5,679.16
1,680.48
21.32
37.94
89.21
4,619.95
110.65
56.15
66.02
1.70
17.54
6.54
49.73
11.12
872.26
16.58
4.84
80.25
3.25
32.94
0.54
4.00
464.22
19.27
37.99
314.88
532.00
21.32
1,508.72
634.75
20.51
1,259.52
278,055.21
278,055.21
11,342.24
1,732.17
49.73
86,140.81
80.25
-5,248.41
1,508.72
-1,443.90
-2.70
-3,788.38
-59,146.41
-59,146.41
11,342.24
-2,855.68
-563.04
68,256.01
639.00
252.00
266.08
20.75
170,025.12
5,229.00
-145,872.98
5,229.00
-100.0%
-17.2%
-25.3%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
-68.8%
-100.0%
-100.0%
-57.5%
-100.0%
-69.5%
-11.6%
-75.0%
-17.5%
-17.5%
-100.0%
-100.0%
381.6%
-46.2%
Item
Partida
Und
Metrado
04.05.01.05
04.06
04.06.01
04.06.01.01
04.06.01.02
04.06.01.03
04.06.01.04
04.06.01.05
04.06.01.06
04.06.01.07
04.06.01.08
04.06.01.09
04.06.01.10
04.06.01.11
04.06.01.12
04.06.01.13
04.06.01.14
04.06.01.15
04.06.01.16
04.06.01.17
04.06.01.18
04.06.02
04.06.02.01
04.06.02.02
04.06.02.03
04.06.02.04
04.06.02.05
04.06.02.06
04.06.02.07
04.06.02.08
04.06.02.09
04.06.02.10
04.06.02.11
04.07
04.07.01
PIP Viable
Precio
S/.
Parcial
S/.
m3
PIP a Verificar
Metrado
Precio
S/.
364.00
14.61
30.37
95.83
46.22
21.32
Parcial
S/.
5,318.04
72,970.97
68,200.31
1,403.70
2,043.10
41.83
126.87
4.84
49.73
202.46
6,309.25
233.04
4.84
1,127.91
1.22
31.62
464.22
501.70
566.35
15,863.75
64,557.12
64,557.12
m3
m3
m3
m3
m3
m2
m2
kg
m3
m3
m3
m3
m2
m2
m2
m
m2
und
und
und
und
m
und
m2
m2
m
m
m
m3
282.24
119.96
67.20
7.76
6.12
8.44
2,190.18
734.16
567.17
416.20
19.44
8,090.93
700.00
10.08
51.52
3.62
301.98
333.28
2,534.00
3,043.96
17,170.59
64.05
496.16
196.21
11.96
12,567.25
5,934.07
158.08
42.00
44.93
19.80
7.00
7.00
1,107.62
99.95
9.03
80.98
65.57
36.21
7,753.34
699.65
21.00
23.94
502.74
37.50
135.00
135.00
6.63
3.48
15.19
248.63
469.80
2,050.65
4.00
3.00
9.00
9.00
707.60
1,466.63
40.88
255.26
2,830.40
4,399.89
367.92
2,297.34
54.33
3.85
209.17
498.39
22.50
42.70
35.83
m3
m3
m3
m3
m2
m2
0.87
10.19
2.91
1.46
2.24
22.63
46.22
21.32
37.94
89.21
6.54
49.73
kg
m3
m2
m3
und
11.58
3.83
34.69
0.15
1.00
4.84
464.22
19.27
37.99
624.31
und
1.00
39,821.00
10.00%
5.00%
19.00%
1,427.46
3,401.16
2,946.06
716.96
1,941,557.34
194,155.73
97,077.87
2,232,790.94
424,230.28
12.32%
21,281.25
806.18
4,770.66
40.21
217.25
110.41
130.25
14.65
1,125.39
209.17
-248.63
-469.80
-2,050.65
21,281.25
806.18
4,770.66
40.21
217.25
110.41
130.25
14.65
1,125.39
56.05
1,777.96
668.48
5.70
624.31
39,821.00
39,821.00
56.05
1,777.96
668.48
5.70
624.31
39,821.00
39,821.00
2,555,379.94
314,906.24
613,822.60
120,750.51
-97,077.87
637,495.24
-424,230.28
2,870,286.18
-55.5%
-100.0%
-96.7%
-100.0%
-100.0%
-100.0%
-100.0%
-26.8%
-100.0%
-100.0%
-100.0%
31.6%
62.2%
-100.0%
28.6%
-100.0%
Item
Partida
Und
Metrado
Total Presupuesto
Imprevistos de orden fisico
Riesgo de Inflacin
Riesgo de conversin
Total Presupuesto
(anual)
PIP Viable
Precio
S/.
2.50%
1.80%
4.00%
Parcial
S/.
2,657,021.22
66,425.53
62,432.56
106,280.85
2,892,160.16
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
2,870,286.18
2,870,286.18
Partida
Und
Metrado
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.02
05.01.02.01
05.01.02.02
05.01.02.03
05.01.02.04
05.01.02.05
05.01.02.06
05.01.02.07
05.01.03
05.01.03.01
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.01.03
05.02.01.04
05.02.01.05
05.02.01.06
05.02.01.07
05.02.01.08
05.02.01.09
05.02.01.10
05.02.01.11
05.02.01.12
05.02.01.13
05.02.01.14
05.02.01.15
05.02.01.16
05.02.01.17
05.02.01.18
05.02.01.19
05.02.01.20
05.02.01.21
05.02.01.22
05.02.01.23
05.02.01.24
PIP Viable
Precio
S/.
Parcial
S/.
785,676.11
25,973.95
Metrado
PIP a Verificar
Precio
S/.
m2
und
60.00
1.00
20.38
2,579.62
und
m3
m3
kg
bls
p2
m
1.00
260.00
260.00
4,100.00
2,200.00
5,900.00
22,700.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
2.00
6,558.97
Parcial
S/.
1,450,459.98
50,560.15
3,802.42
1,222.80
2,579.62
33,639.79
5,222.19
11,832.60
9,412.00
287.00
2,882.00
826.00
3,178.00
13,117.94
13,117.94
0.25
21.32
37.94
89.21
42.82
40.88
56.38
74.79
18.95
27.12
34.92
12.92
19.41
23.71
9.28
13.02
16.67
6.92
9.32
11.96
15.22
5.11
5.68
7.35
1,399,899.83
996,929.55
2,396.81
154,265.34
78,435.26
92,213.70
41,052.82
80,875.36
51,035.18
13,698.54
51,219.20
24,321.76
1,615.75
15,454.52
32,256.70
12,949.93
5,721.12
6,855.55
541.78
14,194.37
14,214.96
13,691.33
1,090.67
15,641.10
10,326.86
1,493.67
25,973.95
mes
m
m2
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
37,105.64
0.70
25,973.95
759,702.16
525,258.63
6,891.88
3,399.10
7.76
6.12
53,480.99
20,802.49
1,496.10
149.00
14.92
23.94
22,321.81
3,567.06
107.00
372.00
557.00
11.21
11.49
20.94
1,199.47
4,274.28
11,663.58
16,347.00
3,644.00
3.67
4.32
59,993.49
15,742.08
6,853.00
1,865.50
894.00
1,780.10
3,294.40
924.20
52.00
4.32
5.18
6.56
5.18
7.25
9.51
7.51
29,604.96
9,663.29
5,864.64
9,220.92
23,884.40
8,789.14
390.52
9,587.25
7,235.71
2,067.35
1,033.67
958.73
1,978.36
905.20
183.16
2,702.86
896.82
46.27
1,196.17
1,661.86
546.18
616.50
526.54
32.50
2,051.21
1,525.21
1,144.76
71.66
3,060.88
1,818.11
203.22
Item
Partida
Und
267.00
PIP Viable
Precio
S/.
13.66
Parcial
S/.
3,647.22
42.00
5,254.85
3,291.41
3,790.91
11.82
4.33
159,218.22
62,112.33
14,251.81
37,106.20
0.15
5,565.93
70,375.14
168.48
56.16
7.76
6.12
1,307.40
343.70
658.88
2,806.62
77.60
669.12
19.44
3.62
333.28
11.96
12,808.63
10,159.96
25,862.53
8,002.68
Metrado
05.02.01.25
05.02.01.26
05.02.01.27
05.02.01.28
05.02.02
05.02.02.01
05.02.02.02
05.02.02.03
05.02.02.04
05.02.02.05
05.02.02.06
05.02.02.07
05.02.02.08
05.02.02.09
05.02.02.10
05.02.02.11
05.02.02.12
05.02.03
05.02.03.01
05.02.03.02
05.02.03.03
05.02.03.04
05.02.03.05
05.02.03.06
05.02.03.07
05.02.03.08
05.02.03.09
05.02.03.10
05.02.03.11
05.02.03.12
05.02.03.13
05.02.03.14
05.02.04
05.02.04.01
05.02.04.02
05.02.04.03
05.02.04.04
05.02.04.05
05.02.04.06
05.02.04.07
05.02.04.08
05.02.04.09
m
Glb
Glb
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
m2
und
und
und
und
und
und
m2
m3
m3
m3
m2
m2
kg
m3
m3
m2
m2
jgo
jgo
jgo
jgo
jgo
und
und
m2
m3
m3
m3
m2
m2
m3
m2
und
und
und
24.00
7.00
1.00
348.17
413.04
642.88
7.76
6.12
424.32
111.57
222.75
934.09
19.44
3.62
4,330.26
3,381.41
25.65
333.28
8,548.63
224.10
11.96
2,680.24
16.63
5.95
528.97
261.70
28,139.80
28,139.80
3,637.07
28.96
105,329.55
5,602.69
21,167.46
20.75
0.55
67.85
42.34
12.59
6.30
141.36
322.08
1,526.67
21.33
0.25
21.32
37.94
89.21
6.54
49.73
4.84
464.22
116,255.82
11,642.10
127,924.76
16.96
902.69
477.66
562.02
924.49
16,017.04
7,389.08
9,901.81
3,030.80
3.00
5.00
8.00
21.34
1,365.87
1,739.21
1,782.76
64,677.27
4,097.61
8,696.05
14,262.08
97.85
59.85
17.65
8.83
203.25
433.90
2,124.11
34.67
0.25
21.32
37.94
89.21
6.54
49.73
4.84
501.70
107,976.77
24.46
1,276.00
669.64
787.72
1,329.26
21,577.85
10,280.69
17,393.94
411.10
21.34
8,772.87
1.00
2.00
9.00
4.00
9.00
1,031.56
1,418.08
1,471.50
1,865.41
2,365.72
1,031.56
2,836.16
13,243.50
7,461.64
21,291.48
24.39
13.41
3.83
1.92
125.67
88.32
0.25
21.32
37.94
89.21
6.54
49.73
49,397.47
6.10
285.90
145.31
171.28
821.88
4,392.15
11.95
120.44
7.00
464.22
19.27
358.11
5,547.43
2,320.88
2,506.77
7,405.58
261.70
20,554.15
7.76
6.12
129.05
36.41
70.40
19.44
1,368.58
5.10
333.28
1,699.73
29.00
15.00
226.77
716.27
6,576.33
10,744.05
Parcial
S/.
1.00
8,356.08
2,891.28
642.88
27,143.71
54.68
18.23
14.00
1.00
Metrado
PIP a Verificar
Precio
S/.
226.4%
-100.0%
-100.0%
Item
Partida
Und
Metrado
05.02.04.10
05.02.04.11
05.02.04.12
05.02.04.13
05.02.05
05.02.05.01
05.02.05.02
05.02.05.03
05.02.05.04
05.02.05.05
05.02.05.06
05.02.05.07
05.02.06
05.02.06.01
05.02.06.02
PIP Viable
Precio
S/.
Parcial
S/.
und
und
und
und
3.00
4.00
14.00
15.00
PIP a Verificar
Precio
S/.
411.89
744.29
897.71
1,094.60
60.14
24.06
0.25
21.32
Parcial
S/.
1,235.67
2,977.16
12,567.94
16,419.00
111,516.67
15.04
512.96
213.84
302.94
22.65
6.54
49.73
464.22
1,398.51
15,065.21
10,514.58
344.52
297.00
19.27
260.51
6,638.90
77,371.47
Metrado
99,574.40
m2
m3
m3
m2
m2
m3
m3
m2
und
und
m3
m3
m2
kg
m3
68.52
7.59
7.76
6.12
531.72
46.45
1,219.20
64.77
38.10
19.44
333.28
219.47
23,701.25
21,586.55
8,361.81
381.00
119.02
27.63
11.86
197.37
207.21
39.48
7.76
6.12
19.44
3.62
301.98
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
45,346.62
16,796.13
214.41
72.58
3,836.87
750.10
11,922.17
785,676.11
78,567.61
39,283.81
903,527.53
171,670.23
1,075,197.76
26,879.94
25,264.14
43,007.91
1,170,349.75
6,154.61
81.88
49.73
4,071.89
5.71
364.75
2,082.72
12.32%
1,450,459.98
178,744.03
1,629,204.01
1,629,204.01
1,629,204.01
84.6%
127.5%
-100.0%
80.3%
-100.0%
51.5%
-100.0%
-100.0%
-100.0%
39.2%
Partida
Und
Metrado
06
06.01
06.01.01
06.01.01.01
06.01.01.02
06.01.02
06.01.02.01
06.01.02.02
06.01.02.03
06.01.02.04
06.01.02.05
06.01.02.06
06.01.02.07
06.01.03
06.01.03.01
06.02
06.02.01
06.02.01.01
06.02.01.02
06.02.01.03
06.02.01.04
06.02.01.05
06.02.01.06
06.02.01.07
06.02.01.08
06.02.01.09
06.02.01.10
06.02.01.11
06.02.01.12
06.02.01.13
06.02.01.14
06.02.01.15
06.02.01.16
06.02.01.17
06.02.01.18
06.02.01.19
06.02.01.20
06.02.01.21
06.02.01.22
06.02.01.23
06.02.01.24
06.02.01.25
06.02.01.26
PIP Viable
Precio
S/.
Parcial
S/.
726,224.37
24,555.61
Metrado
PIP a Verificar
Precio
S/.
m2
und
60.00
1.00
20.38
2,579.62
und
m3
m3
kg
bls
p2
m
1.00
420.00
420.00
11,100.00
3,600.00
14,000.00
53,000.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
5.00
6,558.97
Parcial
S/.
3,151,898.24
91,010.66
3,802.42
1,222.80
2,579.62
54,413.39
5,222.19
19,114.20
15,204.00
777.00
4,716.00
1,960.00
7,420.00
32,794.85
32,794.85
21,690.39
16,454.21
4,701.20
2,350.60
2,169.04
0.25
21.32
37.94
89.21
42.82
3,060,887.58
2,274,534.89
5,422.60
350,803.76
178,363.53
209,697.03
92,878.29
3,507.13
1,965.12
509.36
140.47
4,468.86
2,410.00
896.86
4,504.69
1,904.37
1,047.95
488.81
1,380.69
1,256.66
440.02
4,130.63
2,586.02
2,264.36
353.04
8,738.80
6,280.62
1,477.06
40.88
56.38
74.79
95.38
18.95
27.12
34.92
12.92
19.41
23.71
30.22
9.28
13.02
16.67
6.92
9.32
11.96
15.22
5.11
5.68
7.35
143,371.47
110,793.47
38,095.03
13,398.03
84,684.90
65,359.20
31,318.35
58,200.59
36,963.82
24,846.89
14,771.84
12,812.80
16,361.71
7,335.13
28,583.96
24,101.71
27,081.75
5,373.27
44,655.27
35,673.92
10,856.39
24,555.61
mes
m
35,079.44
0.70
m2
m3
m3
m3
6,672.66
2,436.84
7.76
6.12
m3
1,340.18
14.92
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
24,555.61
701,668.76
469,405.85
51,779.84
14,913.46
19,995.49
15,890.00
3.67
58,316.30
6,579.00
2,236.50
585.00
2,606.00
4.32
5.18
6.56
4.32
28,421.28
11,585.07
3,837.60
11,257.92
-23.4%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
2,288.10
4,006.80
887.40
PIP Viable
Precio
S/.
5.18
7.25
9.51
Parcial
S/.
11,852.36
29,049.30
8,439.17
37.80
4,909.74
3,086.98
3,790.91
11.82
4.33
143,296.40
58,033.13
13,366.62
35,079.40
0.15
5,261.91
68,032.78
163.22
54.41
7.76
6.12
1,266.59
332.99
m2
638.29
19.44
kg
m3
m2
m2
und
und
und
und
und
und
2,718.92
75.17
648.21
3.62
333.28
11.96
9,842.49
25,052.66
7,752.59
22.00
9.00
348.17
413.04
7,659.74
3,717.36
Metrado
06.02.01.27
06.02.01.28
06.02.01.29
06.02.01.30
06.02.02
06.02.02.01
06.02.02.02
06.02.02.03
06.02.02.04
06.02.02.05
06.02.02.06
06.02.02.07
06.02.02.08
06.02.02.09
06.02.02.10
06.02.02.11
06.02.02.12
06.02.02.13
06.02.03
06.02.03.01
06.02.03.02
06.02.03.03
06.02.03.04
06.02.03.05
06.02.03.06
06.02.03.07
06.02.03.08
06.02.03.09
06.02.03.10
06.02.03.11
06.02.03.12
06.02.03.13
06.02.03.14
06.02.04
06.02.04.01
06.02.04.02
06.02.04.03
06.02.04.04
06.02.04.05
06.02.04.06
06.02.04.07
m
m
m
Glb
Glb
m3
m3
m3
m
m2
m3
m3
m3
m2
12,408.36
Metrado
PIP a Verificar
Precio
S/.
1.00
72,750.74
72,750.74
8,034.79
28.96
232,687.52
12,982.10
50,751.52
20.75
0.55
126.72
78.47
23.16
11.58
262.79
602.19
0.25
21.32
37.94
89.21
6.54
49.73
269,378.58
27,913.34
130,470.89
31.68
1,672.98
878.69
1,033.05
1,718.65
29,946.91
2,868.29
40.49
4.84
464.22
13,882.52
18,796.27
565.98
21.34
12,078.01
65.61
21.87
7.76
6.12
m2
267.30
19.44
kg
m3
m3
m2
m2
und
jgo
jgo
jgo
jgo
jgo
1,120.91
30.78
3.62
333.28
4,057.69
10,258.36
268.92
11.96
3,216.28
18.00
528.97
509.13
133.84
5,196.31
856.24
1,365.87
1,739.21
1,782.76
314.06
191.31
56.08
28.04
649.83
1,387.98
0.25
21.32
37.94
89.21
6.54
49.73
1,712.48
8,195.22
19,131.31
21,393.12
343,422.83
78.52
4,078.73
2,127.68
2,501.45
4,249.89
69,024.25
7,092.08
4.84
34,325.67
110.23
501.70
55,302.39
1,313.35
21.34
28,026.89
10.00
4.00
27.00
18.00
23.00
1,031.56
1,418.08
1,471.50
1,865.41
2,365.72
36.36
20.18
5.76
2.88
190.72
134.00
0.25
21.32
37.94
89.21
6.54
49.73
10,315.60
5,672.32
39,730.50
33,577.38
54,411.56
72,391.11
9.09
430.24
218.53
256.92
1,247.31
6,663.82
30,267.98
-10,258.36
55,302.39
-3,216.28
28,026.89
-9,521.46
10,315.60
5,672.32
39,730.50
33,577.38
54,411.56
50,099.79
9.09
312.91
185.42
256.92
1,247.31
5,419.66
107.86
4.84
522.04
522.04
9,521.46
22,291.32
m2
m3
m3
m3
m2
m2
kg
15.12
5.41
7.76
6.12
64.00
19.44
117.33
33.11
1,244.16
4,040.03
-6,256.39
-7,752.59
12,078.01
-7,659.74
-3,717.36
1,712.48
8,195.22
19,131.31
21,393.12
310,529.76
78.52
3,569.60
1,993.84
2,501.45
4,249.89
63,827.94
2.00
6.00
11.00
12.00
32,893.07
m2
m3
m3
m3
m2
Parcial
S/.
944.1%
701.1%
1489.7%
1228.3%
745.9%
-100.0%
-100.0%
-100.0%
224.8%
266.7%
560.0%
435.6%
Item
Partida
Und
4.64
PIP Viable
Precio
S/.
333.28
Parcial
S/.
1,546.42
19.00
21.00
226.77
716.27
4,308.63
15,041.67
Metrado
06.02.04.08
06.02.04.09
06.02.04.10
06.02.04.11
06.02.04.12
06.02.04.13
06.02.04.14
06.02.04.15
06.02.05
06.02.05.01
06.02.05.02
06.02.05.03
06.02.05.04
06.02.05.05
06.02.05.06
06.02.05.07
06.02.06
06.02.06.01
06.02.06.02
m3
m2
und
und
und
und
und
und
und
und
PIP a Verificar
Metrado
Precio
S/.
18.69
464.22
181.09
19.27
25.00
3.00
7.00
13.00
17.00
3.00
358.11
411.89
744.29
897.71
1,094.60
1,733.47
116.44
46.58
0.25
21.32
8,952.75
1,235.67
5,210.03
11,670.23
18,608.20
5,200.41
215,894.15
29.11
993.09
414.00
586.50
6.54
49.73
2,707.56
29,166.65
43.84
464.22
20,351.40
667.00
19.27
12,853.09
575.00
260.51
149,793.25
24,173.71
93,040.75
m2
m3
m3
m2
64.04
7.09
7.76
6.12
m2
1,139.20
19.44
m3
m3
m2
und
und
60.52
35.60
333.28
219.47
20,170.11
7,813.13
356.00
119.02
42,371.12
m3
m3
26.33
11.29
7.76
6.12
m2
188.08
19.44
kg
m3
197.46
37.62
3.62
301.98
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
496.95
43.39
22,146.05
Parcial
S/.
8,676.27
3,489.60
16,004.99
204.32
69.09
3,656.28
298.92
49.73
14,865.29
181.29
-7,813.13
12,853.09
-42,371.12
149,793.25
8,168.72
-204.32
-69.09
11,209.01
714.81
11,360.49
25.52
364.75
9,308.42
-714.81
-2,052.07
-100.0%
-18.1%
2,425,673.87
315,794.33
-36,311.22
2,705,156.98
-158,680.03
2,546,476.95
-24,845.95
-23,352.41
-39,753.52
2,458,525.07
334.0%
434.8%
-100.0%
323.9%
-100.0%
256.2%
-100.0%
-100.0%
-100.0%
227.3%
726,224.37
72,622.44
36,311.22
835,158.03
158,680.03
993,838.06
24,845.95
23,352.41
39,753.52
1,081,789.94
12.32%
3,151,898.24
388,416.77
3,540,315.01
3,540,315.01
3,540,315.01
0.9%
-100.0%
-100.0%
51.0%
-100.0%
-100.0%
306.6%
Partida
Und
Metrado
07
07.01
07.01.01
07.01.01.01
07.01.01.02
07.01.02
07.01.02.01
07.01.02.02
07.01.02.03
07.01.02.04
07.01.02.05
07.01.02.06
07.01.02.07
07.01.03
07.01.03.01
07.01.04
07.01.04.01
07.02
07.02.01
07.02.01.01
07.02.01.02
07.02.01.03
07.02.01.04
07.02.01.05
07.02.01.06
07.02.01.07
07.02.01.08
07.02.01.09
07.02.01.10
07.02.01.11
07.02.01.12
07.02.01.13
07.02.01.14
07.02.01.15
07.02.01.16
07.02.01.17
07.02.01.18
07.02.01.19
07.02.01.20
07.02.01.21
07.02.01.22
07.02.01.23
07.02.01.24
07.02.01.25
07.02.01.26
PIP Viable
Precio
S/.
Parcial
S/.
1,307,298.28
42,349.35
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
2,174,992.56
74,071.13
3,802.42
1,222.80
2,579.62
32,965.39
5,222.19
10,012.20
7,964.00
357.00
2,620.00
1,036.00
5,754.00
26,235.88
26,235.88
m2
und
60.00
1.00
20.38
2,579.62
und
m3
m3
kg
bls
p2
m
1.00
220.00
220.00
5,100.00
2,000.00
7,400.00
41,100.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
4.00
6,558.97
1.00
11,067.44
16,337.93
12,354.89
3,529.97
1,764.98
1,633.79
0.25
21.32
37.94
89.21
42.82
11,067.44
11,067.44
2,100,921.43
1,655,469.95
4,084.48
263,406.25
133,927.06
157,453.87
69,958.89
1,666.53
1,049.87
189.12
145.89
3,672.19
1,270.01
378.56
3,117.23
1,817.81
1,810.24
1,847.37
1,690.07
982.96
125.94
4,126.21
2,998.45
2,443.67
36.36
4,212.27
3,649.42
1,521.59
40.88
56.38
74.79
95.38
18.95
27.12
34.92
12.92
19.41
23.71
9.28
13.02
16.67
21.23
6.92
9.32
11.96
15.22
5.11
5.68
7.35
68,127.75
59,191.67
14,144.28
13,914.99
69,588.00
34,442.67
13,219.32
40,274.61
35,283.69
42,920.79
17,143.59
22,004.71
16,385.94
2,673.71
28,553.37
27,945.55
29,226.29
553.40
21,524.70
20,728.71
11,183.69
42,349.35
mes
m
60,499.07
0.70
42,349.35
KM
1,264,948.93
789,024.68
m2
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
11,477.86
4,919.02
7.76
6.12
89,068.19
30,104.40
2,434.86
14.92
36,328.11
21,288.90
3,733.40
144.70
15,043.50
8,874.80
3.67
4.32
6.56
2.49
4.32
78,130.26
16,128.29
949.23
37,458.32
38,339.14
-72.5%
28.5%
1078.2%
-100.0%
-100.0%
Item
Partida
Und
3,087.30
865.60
1,472.60
385.50
1,420.00
2,226.00
1,322.10
168.60
493.00
PIP Viable
Precio
S/.
5.18
6.56
7.51
10.71
5.18
7.25
11.21
11.49
9.51
Parcial
S/.
15,992.21
5,678.34
11,059.23
4,128.71
7,355.60
16,138.50
14,820.74
1,937.21
4,688.43
65.00
8,461.26
5,825.33
3,790.91
11.82
4.33
246,409.15
100,012.09
25,223.68
60,499.00
0.15
9,074.85
226,033.60
367.57
122.87
7.76
6.12
2,852.34
751.96
1,441.30
19.44
28,018.87
6,139.50
391.55
1,704.38
3.62
333.28
11.96
22,224.99
130,495.78
20,384.38
15.00
29.00
5.00
7.00
1.00
295.90
348.17
413.04
549.81
855.98
4,438.50
10,096.93
2,065.20
3,848.67
855.98
Metrado
07.02.01.27
07.02.01.28
07.02.01.29
07.02.01.30
07.02.02
07.02.02.01
07.02.02.02
07.02.02.03
07.02.02.04
07.02.02.05
07.02.02.06
07.02.02.07
07.02.02.08
07.02.02.09
07.02.02.10
07.02.02.11
07.02.02.12
07.02.02.13
07.02.03
07.02.03.01
07.02.03.02
07.02.03.03
07.02.03.04
07.02.03.05
07.02.03.06
07.02.03.07
07.02.03.08
07.02.03.09
07.02.03.10
07.02.03.11
07.02.03.12
m
m
m
m
m
m
m
m
m
Glb
Glb
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
m2
und
und
und
und
und
und
und
und
und
Metrado
PIP a Verificar
Precio
S/.
1.00
39,147.05
39,147.05
6,020.28
28.96
174,347.31
9,773.50
38,751.78
20.75
0.55
51.91
31.35
9.02
4.51
105.77
245.68
0.25
21.32
37.94
89.21
6.54
49.73
202,800.13
21,313.48
54,051.86
12.98
668.38
342.22
402.34
691.74
12,217.67
1,196.11
18.01
4.84
464.22
5,789.17
8,360.60
229.80
21.34
4,903.93
2.00
7.00
4.00
1.00
1,181.07
1,365.87
1,739.21
1,782.76
144.41
86.97
25.09
12.55
297.69
644.19
0.25
21.32
37.94
89.21
6.54
49.73
2,362.14
9,561.09
6,956.84
1,782.76
152,532.32
36.10
1,854.20
951.91
1,119.59
1,946.89
32,035.57
3,326.19
49.49
4.84
501.70
16,098.76
24,829.13
599.49
21.34
12,793.12
35,261.91
m2
m3
m3
m3
m2
m2
kg
m3
m3
m2
m2
und
und
und
jgo
jgo
jgo
72.90
24.30
7.76
6.12
565.70
148.72
297.00
19.44
5,773.68
1,245.47
3.62
4,508.60
34.21
333.28
11,401.51
298.80
10.00
3.00
7.00
11.96
528.97
287.58
448.23
Parcial
S/.
3,573.65
5,289.70
862.74
3,137.61
14.00
8.00
6.00
1,031.56
1,418.08
1,471.50
14,441.84
11,344.64
8,829.00
-74.0%
-93.6%
-100.0%
11,590.16
24,829.13
-11,401.51
12,793.12
-3,573.65
-5,289.70
-862.74
-3,137.61
14,441.84
11,344.64
8,829.00
257.1%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
332.6%
227.8%
540.1%
454.9%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
Metrado
07.02.03.13
07.02.03.14
07.02.04
07.02.04.01
07.02.04.02
07.02.04.03
07.02.04.04
07.02.04.05
07.02.04.06
07.02.04.07
07.02.04.08
07.02.04.09
07.02.04.10
07.02.04.11
07.02.04.12
07.02.04.13
07.02.04.14
07.02.04.15
07.02.05
07.02.05.01
07.02.05.02
07.02.05.03
07.02.05.04
07.02.05.05
07.02.05.06
07.02.05.07
07.02.06
07.02.06.01
07.02.06.02
PIP Viable
Precio
S/.
Parcial
S/.
jgo
jgo
PIP a Verificar
Metrado
Precio
S/.
9.00
1,865.41
4.00
2,365.72
34.74
19.10
5.46
2.73
182.34
128.16
0.25
21.32
37.94
89.21
6.54
49.73
Parcial
S/.
16,788.69
9,462.88
67,402.77
8.69
407.21
207.15
243.54
1,192.50
6,373.40
71.90
17.74
173.18
4.84
464.22
19.27
348.00
8,235.26
3,337.18
20.00
8.00
5.00
23.00
8.00
2.00
358.11
411.89
744.29
897.71
1,094.60
1,733.47
87.68
35.07
0.25
21.32
7,162.20
3,295.12
3,721.45
20,647.33
8,756.80
3,466.94
162,580.58
21.92
747.69
311.76
441.66
6.54
49.73
2,038.91
21,963.75
33.02
464.22
15,328.54
502.28
19.27
9,678.94
433.00
260.51
112,800.83
8,883.95
32,550.45
m2
m3
m3
m3
m2
m2
kg
m3
m2
und
und
und
und
und
und
und
32.89
11.76
7.76
6.12
255.23
71.97
139.20
19.44
2,706.05
10.08
333.28
3,359.46
65.00
4.00
4.00
1.00
2.00
11.00
226.77
245.80
308.20
350.12
486.30
716.27
14,740.05
983.20
1,232.80
350.12
972.60
7,878.97
155,775.56
m2
m3
m3
m2
m2
107.21
11.83
7.76
6.12
831.95
72.40
1,907.20
19.44
37,075.97
m3
m3
m2
und
und
101.32
59.65
333.28
219.47
33,767.93
13,091.39
596.00
119.02
70,935.92
m3
m3
m2
43.27
18.54
309.16
7.76
6.12
19.44
26,302.73
335.78
113.46
6,010.07
118.28
49.73
kg
m3
324.59
61.82
3.62
301.98
1,175.02
18,668.40
8.23
364.75
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
1,307,298.28
130,729.83
65,364.91
1,503,393.02
285,644.67
1,789,037.69
44,725.94
42,037.38
71,561.51
1,947,362.52
12.32%
145.1%
-100.0%
628.5%
167.3%
962.9%
2022.9%
11.1%
4.4%
-10.1%
-100.0%
-40.8%
-54.6%
-100.0%
5,882.06
-18,439.39
-13,091.39
9,678.94
-70,935.92
112,800.83
-17,418.78
-335.78
-113.46
-128.01
3,001.89
-1,175.02
-15,666.51
-100.0%
-83.9%
867,694.28
137,300.27
-65,364.91
939,629.64
-285,644.67
653,984.97
-44,725.94
-42,037.38
-71,561.51
495,660.14
66.4%
105.0%
-100.0%
62.5%
-100.0%
36.6%
-100.0%
-100.0%
-100.0%
25.5%
2,174,992.56
268,030.10
2,443,022.66
2,443,022.66
2,443,022.66
-100.0%
-66.2%
-100.0%
-100.0%
-2.1%
Partida
Und
Metrado
08
08.01
08.01.01
08.01.01.01
08.01.01.02
08.01.02
08.01.02.01
08.01.02.02
08.01.02.03
08.01.02.04
08.01.02.05
08.01.02.06
08.01.02.07
08.01.03
08.01.03.01
08.01.04
08.01.04.01
08.02
08.02.01
08.02.01.01
08.02.01.02
08.02.01.03
08.02.01.04
08.02.01.05
08.02.01.06
08.02.01.07
08.02.01.08
08.02.01.09
08.02.01.10
08.02.01.11
08.02.01.12
08.02.01.13
08.02.01.14
08.02.01.15
08.02.01.16
08.02.01.17
08.02.01.18
08.02.01.19
08.02.01.20
08.02.01.21
08.02.01.22
08.02.01.23
08.02.01.24
08.02.01.25
PIP Viable
Precio
S/.
Parcial
S/.
1,597,205.80
52,538.50
Metrado
PIP a Verificar
Precio
S/.
Parcial
S/.
3,227,014.91
105,578.40
3,802.42
1,222.80
2,579.62
57,913.69
5,222.19
20,479.50
16,290.00
868.00
5,240.00
2,114.00
7,700.00
32,794.85
32,794.85
m2
und
60.00
1.00
20.38
2,579.62
und
m3
m3
kg
bls
p2
m
1.00
450.00
450.00
12,400.00
4,000.00
15,100.00
55,000.00
5,222.19
45.51
36.20
0.07
1.31
0.14
0.14
5.00
6,558.97
1.00
11,067.44
21,865.54
16,582.73
5,185.76
1,921.13
2,186.55
0.25
21.32
37.94
89.21
42.82
11,067.44
11,067.44
3,121,436.51
2,252,762.71
5,466.39
353,543.80
196,747.73
171,384.01
93,628.07
3,300.28
1,891.33
834.16
5,119.11
2,933.68
703.04
54.35
4,165.12
1,976.07
508.23
839.02
1,093.45
652.44
3,949.91
3,181.79
2,320.77
95.97
8,438.39
6,907.23
1,990.52
40.88
56.38
74.79
18.95
27.12
34.92
44.50
12.92
19.41
23.71
9.28
13.02
16.67
6.92
9.32
11.96
15.22
5.11
5.68
7.35
134,915.45
106,633.19
62,386.83
97,007.13
79,561.40
24,550.16
2,418.58
53,813.35
38,355.52
12,050.13
7,786.11
14,236.72
10,876.17
27,333.38
29,654.28
27,756.41
1,460.66
43,120.17
39,233.07
14,630.32
52,538.50
mes
m
75,055.00
0.70
52,538.50
KM
1,544,667.30
1,093,932.54
m2
m3
m3
m3
m3
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
14,161.71
6,069.31
7.76
6.12
109,894.87
37,144.18
3,061.41
14.92
45,676.24
745.80
23.94
17,854.45
535.00
1,860.00
2,785.00
11.21
11.49
20.94
5,997.35
21,371.40
58,317.90
31,475.00
9,988.00
3.67
4.32
115,513.25
43,148.16
13,405.00
2,369.50
2,650.00
4.32
5.18
6.56
57,909.60
12,274.01
17,384.00
655.6%
1517.5%
272.3%
-57.9%
-62.7%
-9.1%
-100.0%
-100.0%
-100.0%
Item
Partida
Und
1,780.10
4,006.40
1,860.20
260.00
1,335.00
PIP Viable
Precio
S/.
5.18
7.25
9.51
7.51
13.66
Parcial
S/.
9,220.92
29,046.40
17,690.50
1,952.60
18,236.10
81.00
10,813.49
6,735.13
3,790.91
11.82
4.33
307,063.71
127,815.45
29,163.11
75,055.60
0.15
11,258.34
136,791.68
323.78
108.83
7.76
6.12
2,512.53
666.04
1,276.58
19.44
24,816.72
5,437.86
150.30
1,296.42
3.62
333.28
11.96
19,685.05
50,091.98
15,505.18
50.00
7.00
5.00
348.17
413.04
642.88
17,408.50
2,891.28
3,214.40
Metrado
08.02.01.26
08.02.01.27
08.02.01.28
08.02.01.29
08.02.02
08.02.02.01
08.02.02.02
08.02.02.03
08.02.02.04
08.02.02.05
08.02.02.06
08.02.02.07
08.02.02.08
08.02.02.09
08.02.02.10
08.02.02.11
08.02.02.12
08.02.02.13
08.02.03
08.02.03.01
08.02.03.02
08.02.03.03
08.02.03.04
08.02.03.05
08.02.03.06
08.02.03.07
08.02.03.08
08.02.03.09
08.02.03.10
08.02.03.11
08.02.03.12
08.02.03.13
08.02.03.14
08.02.03.15
08.02.04
08.02.04.01
08.02.04.02
m
m
m
m
m
Glb
Glb
m3
m3
m3
m
m2
m3
m3
m3
m2
m2
kg
m3
m2
m2
und
und
und
und
und
und
und
Metrado
PIP a Verificar
Precio
S/.
1.00
70,158.65
70,158.65
8,096.95
28.96
234,487.67
13,086.37
50,954.87
20.75
0.55
114.81
70.25
20.50
10.25
237.05
550.86
0.25
21.32
37.94
89.21
6.54
49.73
271,542.18
28,025.18
116,689.66
28.70
1,497.73
777.77
914.40
1,550.31
27,394.27
2,624.23
38.14
4.84
464.22
12,701.27
17,705.35
512.77
21.34
10,942.51
8.00
6.00
9.00
7.00
856.24
1,365.87
1,739.21
1,782.76
369.24
230.86
67.13
33.57
788.87
1,679.42
0.25
21.32
37.94
89.21
6.54
49.73
6,849.92
8,195.22
15,652.89
12,479.32
425,641.22
92.31
4,921.94
2,546.91
2,994.78
5,159.21
83,517.56
8,268.78
131.00
4.84
501.70
40,020.90
65,722.70
1,598.08
21.34
34,103.03
33,765.65
m2
m3
m3
m3
m2
m2
kg
m3
m3
m2
m2
und
und
und
jgo
jgo
jgo
jgo
jgo
jgo
69.28
23.11
7.76
6.12
537.61
141.43
282.15
19.44
5,485.00
1,183.18
3.62
4,283.11
32.49
333.28
10,828.27
283.86
14.00
4.00
1.00
11.96
528.97
261.70
642.88
3,394.97
7,405.58
1,046.80
642.88
17.00
7.00
11.00
30.00
19.00
12.00
1,031.56
1,418.08
1,471.50
1,865.41
2,365.72
3,500.11
39.87
23.17
0.25
21.32
41,446.07
m2
m3
35.50
7.76
Parcial
S/.
275.48
17,536.52
9,926.56
16,186.50
55,962.30
44,948.68
42,001.32
81,790.10
9.97
493.98
-35.5%
-64.7%
-100.0%
-100.0%
-100.0%
-100.0%
1160.6%
815.5%
1700.8%
1422.7%
834.4%
-100.0%
-100.0%
-100.0%
-100.0%
-100.0%
97.3%
79.3%
Item
Partida
Und
12.72
PIP Viable
Precio
S/.
6.12
Parcial
S/.
77.85
150.40
19.44
2,923.78
10.91
333.28
3,636.08
67.00
226.77
15,193.59
27.00
716.27
19,339.29
Metrado
08.02.04.03
08.02.04.04
08.02.04.05
08.02.04.06
08.02.04.07
08.02.04.08
08.02.04.09
08.02.04.10
08.02.04.11
08.02.04.12
08.02.04.13
08.02.04.14
08.02.04.15
08.02.05
08.02.05.01
08.02.05.02
08.02.05.03
08.02.05.04
08.02.05.05
08.02.05.06
08.02.05.07
08.02.06
08.02.06.01
08.02.06.02
m3
m3
m2
m2
kg
m3
m2
und
und
und
und
und
und
6.62
3.31
212.95
149.36
PIP a Verificar
Precio
S/.
37.94
89.21
6.54
49.73
395.47
22.15
199.85
31.00
11.00
1.00
13.00
8.00
11.00
4.84
464.22
19.27
358.11
411.89
744.29
897.71
1,094.60
1,733.47
120.08
48.03
0.25
21.32
1,914.07
10,282.47
3,851.11
11,101.41
4,530.79
744.29
11,670.23
8,756.80
19,068.17
222,655.94
30.02
1,024.00
426.96
604.86
6.54
49.73
2,792.32
30,079.69
45.22
464.22
20,992.03
687.88
19.27
13,255.45
593.00
260.51
154,482.43
21,896.88
Metrado
205,159.01
m2
m3
m3
m2
m2
141.10
15.60
7.76
6.12
1,094.94
95.47
2,512.00
19.44
48,833.28
m3
m3
m2
und
und
133.45
78.50
333.28
219.47
44,476.22
17,228.40
785.00
119.02
93,430.70
m3
m3
m2
55.22
23.65
394.47
7.76
6.12
19.44
33,572.35
428.51
144.74
7,668.50
274.92
49.73
kg
m3
414.74
78.91
3.62
301.98
1,501.36
23,829.24
22.55
364.75
10.00%
5.00%
19.00%
(anual)
2.50%
1.80%
4.00%
1,597,205.80
159,720.58
79,860.29
1,836,786.67
348,989.47
2,185,776.14
54,644.40
51,359.62
87,431.05
2,379,211.21
12.32%
Parcial
S/.
251.16
295.29
1,392.69
7,427.67
182.8%
-26.9%
-54.7%
8.5%
-6.5%
-100.0%
-38.4%
-52.8%
-100.0%
13,671.77
-23,484.19
-17,228.40
13,255.45
-93,430.70
154,482.43
-11,675.47
-428.51
-144.74
6,003.27
8,225.11
-1,501.36
-15,604.13
-100.0%
-65.5%
1,629,809.11
237,953.02
-79,860.29
1,787,901.84
-348,989.47
1,438,912.37
-54,644.40
-51,359.62
-87,431.05
1,245,477.30
102.0%
149.0%
-100.0%
97.3%
-100.0%
65.8%
-100.0%
-100.0%
-100.0%
52.3%
3,227,014.91
397,673.60
3,624,688.51
3,624,688.51
3,624,688.51
-100.0%
-34.8%
-100.0%
-100.0%
78.3%