You are on page 1of 34

7.

0 Mine Operating Cost Estimation


For feasibility studies, mine operating costs are typically developed by mining
function (drilling, blasting, loading, hauling, roads and dumps, general mine,
general maintenance, and mine administration) with each function defined in terms
of operating labor, maintenance labor, and repair parts and consumables. Costs
are developed by mining period from equipment levels derived as a function of total
material mining rates. The mine production schedule and equipment requirements
for use in this exercise are summarized in Table 7-1.
Salaried manpower levels and cost by mining period are developed in Table 7-2.
The annual salaries shown are typical western-US rates and include a 45 percent
burden. Supervisory and technical manpower levels may vary significantly from
property to property, reflecting both corporate philosophy and complexity of
operations.
Hourly labor requirements and costs are calculated in Table 7-3. Labor rates
shown are again typical western-US. Manpower levels for major equipment are
calculated from the average number of units operating during each period, which
are included in Table 7-1, multiplied by the number of crews required and an
allowance for vacation, sick leave, and absenteeism (VSA) plus the degree of
cross-training. VSA coverage usually requires a 7-8 percent increase in manpower
and the adjustment has been brought up to 10 percent to consider a significant
degree of cross-training (a lesser degree of cross-training would require a higher
factor).
The number of mechanics required for each mining period is a function of the
hourly maintenance labor cost for each piece of equipment and is calculated in
Table 7-6 and brought back to this table. Historically, each type of equipment had
its own distribution of mechanics, welders, and electricians. With the maintenance
function increasingly becoming one of component exchange, rather than
specialization, a generic mechanic is used to simplify calculations.
Manning levels for non-equipment areas (Trainees, laborers, pumpmen, lubemen,
tiremen, utilitymen, etc.) are a function of local conditions and operating practice.
The costs calculated in Table 7-3 are used to develop operating labor costs by
mining function in Table 7-4.
Table 7-5 contains prices and hourly operating costs for the various types of
equipment, which are, or can be, adjusted as a function of labor rates, cost of
consumables, equipment age (M&R factor), remote location (delivered price factor),
and operating efficiency.

Maintenance labor costs are calculated by mining function in Table 7-6. Summing
all the equipment-generated labor costs and dividing that total by the period cost for
one mechanic calculates the number of mechanics required for each period. This
calculated number of mechanics is adjusted by the VSA and cross training factor
developed in Table 7-3 to arrive at the total mechanics required. The cost of the
total number of mechanics is greater that that required by the itemized equipment,
due to rounding up to whole numbers, and the difference is allocated General
Maintenance to cover small vehicle maintenance.
Costs for explosives are developed in Table 7-7.
In Table 7-8, functional costs for repair parts and other consumables are derived on
a functional basis. An allowance of $0.03 per ton has been added to the General
Mine costs to cover miscellaneous supplies. To account for gasoline and small
vehicle maintenance/supplies, an allowance of $0.04 per ton is added to General
Maintenance. An additional $0.05 per ton has been included in Mine Administration
to cover a dispatch system, surveying and mine computer hardware/software, and
other similar items.
Table 7-9 summarizes mine operating costs both by mining function and by major
cost center.
Table 7-10 summarizes diesel fuel and prill consumption by mining period and the
results are used to size storage facilities (tank farm and prill silos).
Table 7-11 summarizes mine capital costs by mining period in terms of
preproduction stripping, mine equipment, and mine facilities.
Table 7-12 summarizes mine production, equipment, manpower, operating costs,
equipment capital, facilities capital, and the preproduction stripping cost by mining
period.

Table 7-1
Summary of Mine Production and Equipment Requirements

Period
-3
-2
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Total
ktons
Mined
8,213
20,788
30,303
68,010
89,997
90,001
90,000
90,004
90,000
89,999
90,000
90,000
89,997
90,000
90,003
89,898
89,997
89,998
90,003
89,998
89,999
82,745
87,022
55,262
49,385
42,667
39,596
33,360
33,360
33,360
33,360
3,657
2,150,982

Reqd.
Shifts
112
314
476
970
1,546
1,539
1,506
1,568
1,560
1,483
1,541
1,586
1,629
1,640
1,627
1,653
1,642
1,636
1,617
1,620
1,639
1,522
1,636
1,047
935
806
385
0
0
0
0
0

Blasthole Drills (P&H 320XPC)


Units
Eff. Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
0.31
0.43
0.65
1.33
2.12
2.11
2.06
2.15
2.14
2.03
2.11
2.17
2.23
2.25
2.23
2.26
2.25
2.24
2.21
2.22
2.25
2.08
2.24
1.43
1.28
1.10
0.53
0.00
0.00
0.00
0.00
0.00

31%
43%
33%
44%
53%
53%
52%
54%
53%
51%
53%
54%
56%
56%
56%
57%
56%
56%
55%
55%
56%
52%
56%
48%
64%
55%
53%
0%
0%
0%
0%
0%

1
1
2
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
2
2
1
0
0
0
0
0

1
1
2
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
0
0
0
0
0

1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
8

Reqd.
Shifts
0
521
756
1,684
2,215
2,218
2,221
2,212
2,214
2,218
2,215
2,212
2,209
2,210
2,211
2,207
2,210
2,211
2,212
2,212
2,211
2,031
2,134
1,350
1,205
1,039
969
818
818
818
818
90

Shovels (P&H 2800XPC)


Units
Eff. Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
0.00
0.71
1.03
2.31
3.03
3.04
3.04
3.03
3.03
3.04
3.03
3.03
3.03
3.03
3.03
3.02
3.03
3.03
3.03
3.03
3.03
2.78
2.92
1.85
1.65
1.42
1.33
1.12
1.12
1.12
1.12
1.12

0%
71%
52%
77%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
76%
70%
73%
62%
83%
71%
66%
56%
56%
56%
56%
56%

0
1
2
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
2
2
2
2
2
2
2
2

0
1
2
3
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4

0
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
8

Reqd.
Shifts

Haul Trucks (Cat 793D)


Units
Eff. Reqd. Actual
Oprtg. Util. Fleet Fleet Buy

2,099
4,225
6,569
11,257
16,191
17,573
20,487
18,841
17,435
19,248
21,036
17,280
16,622
17,815
18,972
19,420
18,896
18,707
20,041
20,708
20,253
18,955
17,453
12,442
12,675
12,181
9,285
4,215
4,009
3,802
3,492
418

5.75
5.79
9.00
15.42
22.18
24.07
28.06
25.81
23.88
26.37
28.82
23.67
22.77
24.40
25.99
26.60
25.88
25.63
27.45
28.37
27.74
25.97
23.91
17.04
17.36
16.69
12.72
5.77
5.49
5.21
4.78
5.23

72%
72%
75%
73%
76%
75%
76%
76%
75%
75%
76%
76%
76%
76%
76%
76%
76%
75%
76%
77%
75%
76%
75%
74%
75%
76%
75%
72%
69%
74%
68%
75%

8
8
12
21
29
32
37
34
32
35
38
31
30
32
34
35
34
34
36
37
37
34
32
23
23
22
17
8
8
7
7
7

8
8
12
21
29
32
37
37
37
37
38
38
30
32
34
35
35
34
36
37
37
37
36
36
36
34
34
17
10
8
7
7

8
0
4
9
8
3
5
0
0
0
1
0
0
2
6
10
8
2
7
1
0
0
0
0
0
0
0
0
0
0
0
0
74

Reqd.
Shifts
311
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
11

Wheel Loader (Cat994F)


Units
Eff. Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
0.85
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14
0.14

85%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%
14%

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1

Table 7-1 (Continued)


Summary of Mine Production and Equipment Requirements

Period
-3
-2
-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Total
ktons
Mined
8,213
20,788
30,303
68,010
89,997
90,001
90,000
90,004
90,000
89,999
90,000
90,000
89,997
90,000
90,003
89,898
89,997
89,998
90,003
89,998
89,999
82,745
87,022
55,262
49,385
42,667
39,596
33,360
33,360
33,360
33,360
3,657
2,150,982

Reqd.
Shifts
730
1,460
1,460
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
2,190
1,460
1,460
730
730
80

Track Dozers (Cat D10T)


Units
% Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
2.00
2.00
2.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
2.00
2.00
1.00
1.00
1.00

50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%

4
4
4
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
4
4
2
2
2

4
4
4
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
4
4
2
2
2

4
0
0
2
0
0
0
0
0
4
0
0
2
0
0
0
0
0
0
4
0
2
0
0
0
0
0
2
0
0
0
0
20

Reqd.
Shifts
365
730
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
1,460
730
730
730
365
40

Wheel Dozers (Cat 834H)


Units
%
Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
0.50
0.50

50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%

2
2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
2
2
1
1

2
2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
4
2
2
2

2
0
2
0
0
0
0
0
0
2
0
2
0
0
0
0
0
0
2
0
0
2
0
0
0
0
0
0
0
0
0
0
12

Reqd.
Shifts
365
730
730
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
730
730
730
730
365
40

Graders (Cat16M)
Units
%
Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.00
1.00
1.00
1.00
0.50
0.50

50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%

2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
2
2
1
1

2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
4
2
1
1

2
0
0
1
0
0
0
0
0
2
0
0
1
0
0
0
0
2
0
0
0
1
0
0
0
0
0
0
0
0
0
0
9

Reqd.
Shifts
365
730
730
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
1,095
730
730
730
365
365
365
365
40

Water Trucks (Cat 777F WW)


Units
%
Reqd. Actual
Oprtg. Util. Fleet Fleet Buy
1.00
1.00
1.00
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.00
1.00
1.00
0.50
0.50
0.50
0.50
0.50

50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%

2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
2
1
1
1
1
1

2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
2
2
2
1
4
1
1
1

2
0
0
1
0
0
0
0
0
0
0
0
2
0
0
1
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
7

Table 7-2
Salaried Manpower Requirements and Cost ($x1000)
Annual Rates Include 45% Burden
Annual
Year -3
Salary
($x1000) No.
Cost
ktonnes Mined
Mine Manager
Secretary
Mine Superindendent
Secretary
General Foreman
D&B Foreman
Shift Foreman
Relief Foreman
Mine Maintenance Supt.
Secretary
Clerk
Maintenance Planner
General Foreman
Shift Foreman
Shop Foreman
Chief Mine Engineer
Mine Engineer
Geologist
Ore Control Tech.
Surveyor
Technician
Total Cost: $x1000
$/tonne Mined

Year -2
No.
Cost

8,213
157.6
46.8
140.8
46.8
117.3
95.0
95.0
95.0
140.8
46.8
46 8
46.8
95.0
117.3
95.0
95.0
122.7
95.5
87.6
67.2
67.2
67.2

1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

79
23
70
23
59
48
190
48
70
23
23
48
59
190
285
61
143
131
101
101
101
1,876
0.2285

Year -1
No.
Cost

20,788
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.1805

Year 1
No.
Cost

30,303
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.1238

Year 2
No.
Cost

68,010
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0552

Year 3
No.
Cost

89,997
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 4
No.
Cost

90,001
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 5
No.
Cost

90,000
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 6
No.
Cost

90,004
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 7
No.
Cost

90,000
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 8
No.
Cost

89,999
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

90,000
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Table 7-2 (Continued)


Salaried Manpower Requirements and Cost ($x1000)
Annual Rates Include 45% Burden
Annual
Year 9
Salary
($x1000) No.
Cost
ktonnes Mined
Mine Manager
Secretary
Mine Superindendent
Secretary
General Foreman
D&B Foreman
Shift Foreman
Relief Foreman
Mine Maintenance Supt.
Secretary
Clerk
Maintenance Planner
General Foreman
Shift Foreman
Shop Foreman
Chief Mine Engineer
Mine Engineer
Geologist
Ore Control Tech.
Surveyor
Technician
Total Cost: $x1000
$/tonne Mined

Year 10
No.
Cost

90,000
157.6
46.8
140.8
46.8
117.3
95.0
95.0
95.0
140.8
46.8
46 8
46.8
95.0
117.3
95.0
95.0
122.7
95.5
87.6
67.2
67.2
67.2

1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 11
No.
Cost

89,997
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 12
No.
Cost

90,000
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 13
No.
Cost

90,003
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 14
No.
Cost

89,898
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 15
No.
Cost

89,997
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 16
No.
Cost

89,998
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 17
No.
Cost

90,003
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 18
No.
Cost

89,998
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

Year 19
No.
Cost

89,999
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0417

82,745
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0454

Table 7-2 (Continued)


Salaried Manpower Requirements and Cost ($x1000)
Annual Rates Include 45% Burden
Annual
Salary
Year 20
($x1000) No.
Cost
ktonnes Mined
Mine Manager
Secretary
Mine Superindendent
Secretary
General Foreman
D&B Foreman
Shift Foreman
Relief Foreman
Mine Maintenance Supt.
Secretary
Clerk
Maintenance Planner
General Foreman
Shift Foreman
Shop Foreman
Chief Mine Engineer
Mine Engineer
Geologist
Ore Control Tech.
Surveyor
Technician
Total Cost: $x1000
$/tonne Mined

Year 21
No.
Cost

87,022
157.6
46.8
140.8
46.8
117.3
95.0
95.0
95.0
140.8
46.8
46 8
46.8
95.0
117.3
95.0
95.0
122.7
95.5
87.6
67.2
67.2
67.2

1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0431

Year 22
No.
Cost

55,262
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0679

Year 23
No.
Cost

49,385
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0760

Year 24
No.
Cost

42,667
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0880

Year 25
No.
Cost

39,596
1
1
1
1
1
1
4
1
1
1
1
1
1
4
6
1
3
3
3
3
3
42

158
47
141
47
117
95
380
95
141
47
47
95
117
380
570
123
287
263
202
202
202
3,753
0.0948

Year 26
No.
Cost

33,360
1
1
1
1
0
0
4
1
1
1
1
1
0
4
1
1
1
1
2
2
2
27

158
47
141
47
0
0
380
95
141
47
47
95
0
380
95
123
96
88
134
134
134
2,380
0.0714

Year 27
No.
Cost

33,360
1
1
1
1
0
0
4
1
1
1
1
1
0
4
1
1
1
1
2
2
2
27

158
47
141
47
0
0
380
95
141
47
47
95
0
380
95
123
96
88
134
134
134
2,380
0.0714

Year 28
No.
Cost

33,360
1
1
1
1
0
0
4
1
1
1
1
1
0
4
1
1
1
1
2
2
2
27

158
47
141
47
0
0
380
95
141
47
47
95
0
380
95
123
96
88
134
134
134
2,380
0.0714

Year 29
No.
Cost

33,360
1
1
1
1
0
0
4
1
1
1
1
1
0
4
1
1
1
1
2
2
2
27

158
47
141
47
0
0
380
95
141
47
47
95
0
380
95
123
96
88
134
134
134
2,380
0.0714

1
1
1
1
0
0
4
1
1
1
1
1
0
4
1
1
1
1
2
2
2
27

Life of
Mine
Cost

3,657

2,150,982

17
5
15
5
0
0
42
10
15
5
5
10
0
42
10
13
10
10
15
15
15
261
0.0714

4,824
1,433
4,310
1,433
3,108
2,518
11,632
2,908
4,310
1,433
1 433
1,433
2,908
3,108
11,632
15,495
3,756
7,985
7,324
5,895
5,895
5,895
109,232
0.0508

Table 7-3
Hourly Labor Requirements and Cost ($x1000)
Hrs/man/year:
40 hours/week x
52 weeks/year =
Less
80
hours/year vacation =
Less
40
hours/year sick leave =
Unscheduled overtime @
10% =
196
hours @ time-and-a-half =
Total paid =

Base
Rate
MINE OPERATIONS
Driller
Blasting Tech
Powderman
Shovel Operator
Truck Driver
Aux.Equip.Op.
Trainee/Laborer
MINE MAINTENANCE
Mechanic
Lube Tech
Tireman
Utilityman/helper

HOURLY TOTAL

Brdnd
Rate

Cost/
Year
($x1000)

2,080
2,000
1,960
196
294
2,254

hours/year
hours/year
hours/year
hours/year
hours/year (straight time)
hours/man/year

VSA / cross-training factor =


Number of crews required =
Burden =

1.1
4
45%

Year -3
No.
Cost

Year -2
No.
Cost

Year -1
No.
Cost

Year 1
No.
Cost

Year 2
No.
Cost

Year 3
No.
Cost

Year 4
No.
Cost

Year 5
No.
Cost

Year 6
No.
Cost

Year 7
No.
Cost

Year 8
No.
Cost

22.00
31.90
16.00
23.20
15.00
21.75
25.00
36.25
20 00
20.00
29 00
29.00
20.00
29.00
15.00
21.75
Operations Subtotal

71.9
52.3
49.0
81.7
65 4
65.4
65.4
49.0

2
1
1
0
26
26
8
64

72
26
25
0
850
850
196
2,018

2
1
1
4
26
23
8
65

144
52
49
327
1 700
1,700
1,503
392
4,167

3
2
2
5
40
27
8
87

216
105
98
409
2 615
2,615
1,765
392
5,599

6
2
2
11
68
36
8
133

431
105
98
899
4 445
4,445
2,353
392
8,723

10
2
2
14
98
36
8
170

719
105
98
1,144
6 406
6,406
2,353
392
11,217

10
2
2
14
106
36
8
178

719
105
98
1,144
6 929
6,929
2,353
392
11,740

9
2
2
14
124
36
8
195

647
105
98
1,144
8 105
8,105
2,353
392
12,844

10
2
2
14
114
36
8
186

719
105
98
1,144
7 452
7,452
2,353
392
12,263

10
2
2
14
105
36
8
177

719
105
98
1,144
6 863
6,863
2,353
392
11,674

9
2
2
14
116
36
8
187

647
105
98
1,144
7 582
7,582
2,353
392
12,321

10
2
2
14
127
36
8
199

719
105
98
1,144
8 301
8,301
2,353
392
13,112

23.00
33.35
18.40
26.68
18.40
26.68
17.25
25.01
Maintenance Subtotal

75.2
60.1
60.1
56.4

40
4
4
4
52

1,503
120
120
113
1,857

46
4
4
4
58

3,458
241
241
226
4,164

65
8
8
8
89

4,886
481
481
451
6,299

113
8
8
8
137

8,494
481
481
451
9,908

152
8
8
8
176

11,426
481
481
451
12,839

159
8
8
8
183

11,952
481
481
451
13,365

173
8
8
8
197

13,005
481
481
451
14,418

166
8
8
8
190

12,478
481
481
451
13,892

159
8
8
8
183

11,952
481
481
451
13,365

167
8
8
8
191

12,554
481
481
451
13,967

176
8
8
8
200

13,230
481
481
451
14,643

116

3,875

123

8,332

176

11,898

270

18,631

346

24,056

361

25,105

392

27,262

376

26,154

360

25,040

378

26,288

399

27,756

Table 7-3 (Continued)


Hourly Labor Requirements and Cost ($x1000)
Base
Rate
MINE OPERATIONS
Driller
Blasting Tech
Powderman
Shovel Operator
Truck Driver
Aux.Equip.Op.
Trainee/Laborer
MINE MAINTENANCE
Mechanic
Lube Tech
Tireman
Utilityman/helper

HOURLY TOTAL

Brdnd
Rate

Cost/
Year
($x1000)

Year 9
No.
Cost

Year 10
No.
Cost

Year 11
No.
Cost

Year 12
No.
Cost

Year 13
No.
Cost

Year 14
No.
Cost

Year 15
No.
Cost

Year 16
No.
Cost

Year 17
No.
Cost

Year 18
No.
Cost

Year 19
No.
Cost

22.00
31.90
16.00
23.20
15.00
21.75
25.00
36.25
20.00
29.00
20.00
29.00
15.00
21.75
Operations Subtotal

71.9
52.3
49.0
81.7
65.4
65.4
49.0

10
2
2
14
105
36
8
177

719
105
98
1,144
6,863
2,353
392
11,674

10
2
2
14
101
36
8
173

719
105
98
1,144
6,602
2,353
392
11,413

10
2
2
14
108
36
8
180

719
105
98
1,144
7,060
2,353
392
11,870

10
2
2
14
115
36
8
187

719
105
98
1,144
7,517
2,353
392
12,328

10
2
2
14
117
36
8
189

719
105
98
1,144
7,648
2,353
392
12,459

10
2
2
14
114
36
8
186

719
105
98
1,144
7,452
2,353
392
12,263

10
2
2
14
113
36
8
185

719
105
98
1,144
7,386
2,353
392
12,197

10
2
2
14
121
36
8
193

719
105
98
1,144
7,909
2,353
392
12,720

10
2
2
14
125
36
8
197

719
105
98
1,144
8,171
2,353
392
12,982

10
2
2
14
122
36
8
194

719
105
98
1,144
7,975
2,353
392
12,786

10
2
2
13
115
36
8
186

719
105
98
1,062
7,517
2,353
392
12,246

23.00
33.35
18.40
26.68
18.40
26.68
17.25
25.01
Maintenance Subtotal

75.2
60.1
60.1
56.4

158
8
8
8
182

11,877
481
481
451
13,290

155
8
8
8
179

11,651
481
481
451
13,065

161
8
8
8
185

12,103
481
481
451
13,516

167
8
8
8
191

12,554
481
481
451
13,967

169
8
8
8
193

12,704
481
481
451
14,117

167
8
8
8
191

12,554
481
481
451
13,967

166
8
8
8
190

12,478
481
481
451
13,892

172
8
8
8
196

12,929
481
481
451
14,343

175
8
8
8
199

13,155
481
481
451
14,568

173
8
8
8
197

13,005
481
481
451
14,418

163
8
8
8
187

12,253
481
481
451
13,666

359

24,965

352

24,478

365

25,386

378

26,295

382

26,576

377

26,229

375

26,089

389

27,063

396

27,550

391

27,203

373

25,912

Table 7-3 (Continued)


Hourly Labor Requirements and Cost ($x1000)
Base
Rate
MINE OPERATIONS
Driller
Blasting Tech
Powderman
Shovel Operator
Truck Driver
Aux.Equip.Op.
Trainee/Laborer
MINE MAINTENANCE
Mechanic
Lube Tech
Tireman
Utilityman/helper

HOURLY TOTAL

Brdnd
Rate

Cost/
Year
($x1000)

Year 20
No.
Cost

Year 21
No.
Cost

Year 22
No.
Cost

Year 23
No.
Cost

Year 24
No.
Cost

Year 25
No.
Cost

Year 26
No.
Cost

Year 27
No.
Cost

Year 28
No.
Cost

Year 29
No.
Cost

Life of
Mine
Cost

22.00
31.90
16.00
23.20
15.00
21.75
25.00
36.25
20.00
29.00
20.00
29.00
15.00
21.75
Operations Subtotal

71.9
52.3
49.0
81.7
65.4
65.4
49.0

10
1
1
13
106
36
8
175

719
52
49
1,062
6,929
2,353
392
11,557

7
1
1
9
75
36
8
137

503
52
49
735
4,902
2,353
392
8,988

6
1
1
8
77
34
8
135

431
52
49
654
5,033
2,222
392
8,834

5
1
1
7
74
34
8
130

360
52
49
572
4,837
2,222
392
8,485

3
1
1
6
56
32
4
103

216
52
49
490
3,660
2,092
196
6,756

0
0
0
5
26
21
4
56

0
0
0
409
1,700
1,373
196
3,677

0
0
0
5
25
21
4
55

0
0
0
409
1,634
1,373
196
3,611

0
0
0
5
23
16
4
48

0
0
0
409
1,503
1,046
196
3,154

0
0
0
5
21
12
4
42

0
0
0
409
1,373
784
196
2,762

0
0
0
5
23
12
4
44

0
0
0
45
165
86
21
317

15,890
2,432
2,280
27,335
175,084
64,733
11,003
298,757

23.00
33.35
18.40
26.68
18.40
26.68
17.25
25.01
Maintenance Subtotal

75.2
60.1
60.1
56.4

158
8
8
8
182

11,877
481
481
451
13,290

115
8
8
8
139

8,645
481
481
451
10,058

110
8
8
8
134

8,269
481
481
451
9,682

103
8
8
8
127

7,743
481
481
451
9,156

82
8
8
8
106

6,164
481
481
451
7,577

44
8
8
8
68

3,308
481
481
451
4,721

43
8
8
8
67

3,232
481
481
451
4,646

40
8
8
8
64

3,007
481
481
451
4,420

36
8
8
8
60

2,706
481
481
451
4,119

5
8
8
8
29

41
481
481
451
1,454

297,192
14,794
14,794
13,869
340,648

357

24,847

276

19,046

269

18,516

257

17,640

209

14,333

124

8,398

122

8,257

112

7,574

102

6,881

73

1,771

639,405

Table 7-4
Operating Labor Costs
Year -3

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

ktonnes Mined
8,213
DRILLING
$x1000
72
$/tonne mined
0.0088
BLASTING
$x1000
51
$/tonne mined
0.0062
LOADING
$x1000
0
$/tonne mined
0.0000
HAULING
$x1000
850
$/tonne mined
0.1035
ROADS & DUMPS
$x1000
850
$/tonne mined
0.1035
GENERAL MINE
$x1000
196
$/tonne mined
0.0239
GENERAL MAINTENANCE
$x1000
0
$/tonne mined
0.0000
TOTAL
$x1000
2,018
$/tonne mined
0.2457

20,788

30,303

68,010

89,997

90,001

90,000

90,004

90,000

89,999

90,000

144
0.0069

216
0.0071

431
0.0063

719
0.0080

719
0.0080

647
0.0072

719
0.0080

719
0.0080

647
0.0072

719
0.0080

101
0.0049

203
0.0067

203
0.0030

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

327
0.0157

409
0.0135

899
0.0132

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,700
0.0818

2,615
0.0863

4,445
0.0654

6,406
0.0712

6,929
0.0770

8,105
0.0901

7,452
0.0828

6,863
0.0763

7,582
0.0843

8,301
0.0922

1,503
0.0723

1,765
0.0582

2,353
0.0346

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

392
0.0189

392
0.0129

392
0.0058

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

4,167
0.2005

5,599
0.1848

8,723
0.1283

11,217
0.1246

11,740
0.1304

12,844
0.1427

12,263
0.1362

11,674
0.1297

12,321
0.1369

13,112
0.1457

Table 7-4 (Continued)


Operating Labor Costs
Year 9
ktonnes Mined
90,000
DRILLING
$x1000
719
$/tonne mined
0.0080
BLASTING
$x1000
203
$/tonne mined
0.0023
LOADING
$x1000
1,144
$/tonne mined
0.0127
HAULING
$x1000
6,863
$
$/tonne mined
0.0763
ROADS & DUMPS
$x1000
2,353
$/tonne mined
0.0261
GENERAL MINE
$x1000
392
$/tonne mined
0.0044
GENERAL MAINTENANCE
$x1000
0
$/tonne mined
0.0000
TOTAL
$x1000
11,674
$/tonne mined
0.1297

Year 10 Year 11 Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

89,997

90,000

90,003

89,898

89,997

89,998

90,003

89,998

89,999

82,745

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0080

719
0.0087

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0023

203
0.0024

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,144
0.0127

1,062
0.0128

6,602
0.0734

7,060
0.0784

7,517
0.0835

7,648
0.0851

7,452
0.0828

7,386
0.0821

7,909
0.0879

8,171
0.0908

7,975
0.0886

7,517
0.0908

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0262

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0261

2,353
0.0284

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0044

392
0.0047

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

11,413
0.1268

11,870
0.1319

12,328
0.1370

12,459
0.1386

12,263
0.1363

12,197
0.1355

12,720
0.1413

12,982
0.1442

12,786
0.1421

12,246
0.1480

Table 7-4 (Continued)


Operating Labor Costs
Year 20 Year 21 Year 22 Year 23
ktonnes Mined
DRILLING
87,022
$x1000
$/tonne mined
719
BLASTING
0.0083
$x1000
$/tonne mined
101
LOADING
0.0012
$x1000
$/tonne mined
1,062
HAULING
0.0122
$x1000
$/tonne mined
6 929
6,929
ROADS & DUMPS
0.0796
$x1000
$/tonne mined
2,353
GENERAL MINE
0.0270
$x1000
$/tonne mined
392
GENERAL MAINTENANC0.0045
$x1000
$/tonne mined
0
TOTAL
0.0000
$x1000
$/tonne mined
11,557
0.1328

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

Life of
Mine

55,262

49,385

42,667

39,596

33,360

33,360

33,360

33,360

3,657

2,150,982

503
0.0091

431
0.0087

360
0.0084

216
0.0054

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

15,890
0.0074

101
0.0018

101
0.0021

101
0.0024

101
0.0026

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

4,711
0.0022

735
0.0133

654
0.0132

572
0.0134

490
0.0124

409
0.0122

409
0.0122

409
0.0122

409
0.0122

45
0.0122

27,335
0.0127

4 902
4,902
0.0887

5 033
5,033
0.1019

4 837
4,837
0.1134

3 660
3,660
0.0924

1 700
1,700
0.0509

1 634
1,634
0.0490

1 503
1,503
0.0451

1 373
1,373
0.0411

165
0.0451

175 084
175,084
0.0814

2,353
0.0426

2,222
0.0450

2,222
0.0521

2,092
0.0528

1,373
0.0411

1,373
0.0411

1,046
0.0314

784
0.0235

86
0.0235

64,733
0.0301

392
0.0071

392
0.0079

392
0.0092

196
0.0050

196
0.0059

196
0.0059

196
0.0059

196
0.0059

21
0.0059

11,003
0.0051

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0
0.0000

0.0000

8,988
0.1626

8,834
0.1789

8,485
0.1989

6,756
0.1706

3,677
0.1102

3,611
0.1083

3,154
0.0945

2,762
0.0828

317
0.0867

298,757
0.1389

Table 7-5
Equipment Purchase Prices and Hourly Operating Costs (excluding operating labor)

Unit
Blasthole Drill
P&H 320XPC
Cable Shovel
P&H 2800XPC
Haul Trucks
Cat 793D
Wheel Loader
Cat 994F
Track Dozer
Cat D10T
Rubber-Tired Dozer
Cat 834H
Grader
Cat 16M
Water Truck
Cat 777F WW

Diesel fuel =

2.50
0.660

$/gallon
$/liter

Power cost =
M&R factor =
Delivered price factor =

0.080
1.00
1.00

$/kwh

US

Size
Metric

12.25 in

Delivered
Price
($x1000)

Shift length =
Less shift change =
Less meal break =
Balance @
Effective time =
Operating efficiency =
or

Maintenance Labor
Base = 23.00 $/hr
Burden =
0.45
%
Total = 33.35 $/hr

M&R
Labor
Mtc/Op
Cost

Repair
Parts

lit/hr

Fuel
Cost

Power
kwh/hr

Cost

Lube

Tires
Life

$/tire

12
30
30
55
605
84.0%
50.4

Cost

hours
min
min
min/hr
min/shift
min/hr

GEC

Bits &
Steel

Total
$/hr

311 mm

3,903

2.54

71.18

61.65

0.00

300

20.17

34.95

0.00

0.00

70.00

257.94

51.2
51 2 yd

39.1
39 1 m

18,975
18 975

2.94
2 94

82.39
82 39

138.71
138 71

0.00
0 00

970

65.21
65 21

29.22
29 22

0.00
0 00

14.49
14 49

0.00
0 00

330.03
330 03

250 st

226.8 mt

3,352

1.00

28.02

27.61

181

100.41

0.00

25.23

25,500

5,000

25.71

0.00

0.00

206.99

310 hp

231 kw

3,064

0.96

26.90

29.43

133

73.73

0.00

19.57

50,750

3,000

85.29

1.25

0.00

236.18

580 hp

433 kw

1,195

0.51

14.29

12.92

74

40.96

0.00

7.71

0.00

13.07

0.00

88.95

500 hp

373 kw

824

0.50

14.01

12.56

62

34.45

0.00

5.64

7,000

3,000

7.84

0.00

0.00

74.51

16 ft.

4.9 m

726

0.51

14.29

25.11

35

19.33

0.00

4.45

2,350

5,000

2.37

1.02

0.00

66.56

50,000 lit

1,623

1.57

44.00

30.49

175

97.05

0.00

11.50

9,375

5,000

6.30

0.00

0.00

189.34

13,209 gal

Table 7-6
Maintenance Labor Costs
Year -3

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

ktonnes Mined
8,213
DRILLING
Oprtg. Shifts
112
$/shift
854.15
$x1000
95.8
$/tonne mined
0.0117
BLASTING
$x1000
0.0
$/tonne mined
0.0000
LOADING
Oprtg. Shifts
0
$/shift
988.66
$x1000
0.0
$/tonne mined
0.0000
HAULING
Oprtg. Shifts
2,099
$/shift
336.28
$x1000
705.8
$/tonne mined
0.0859
ROADS & DUMPS
994F Wheel loader
Oprtg. Shifts
311
$/shift
322.83
$x1000
100.6
D10T Track dozers
Oprtg. Shifts
730
$/shift
171.50
$x1000
125.2
834H Wheel dozer
Oprtg. Shifts
365
168.14
$/shift
$x1000
61.4
16M Grader
Oprtg. Shifts
365
$/shift
171.50
$x1000
62.6
777F WW Water truck
Oprtg. Shifts
365
$/shift
527.96
$x1000
192.7
Total $x1000
542.4
$/tonne mined
0.0660
GENERAL MINE
$x1000
0.0
$/tonne mined
0.0000
GENERAL MAINTENANCE
$x1000
512.6
$/tonne mined
0.0624
MINE ADMINISTRATION
$x1000
0.0
$/tonne mined
0.0000
TOTAL
$x1000
1,856.7
$/tonne mined
0.2261
Mechanics required
EqpMtc($x1000)
1,344.1
Years in period
0.50
Mechanic $/period
75.2
$/man/year
$/man/period
37.6
Mechanics reqd.
calculated
39.34
rounded up
40

20,788

30,303

68,010

89,997

90,001

90,000

90,004

90,000

89,999

90,000

314
854.15
268.4
0.0129

476
854.15
406.4
0.0134

970
854.15
828.3
0.0122

1,546
854.15
1,320.6
0.0147

1,539
854.15
1,314.7
0.0146

1,506
854.15
1,286.4
0.0143

1,568
854.15
1,339.1
0.0149

1,560
854.15
1,332.5
0.0148

1,483
854.15
1,266.8
0.0141

1,541
854.15
1,316.1
0.0146

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

521
988.66
515.1
0.0248

756
988.66
747.0
0.0246

1,684
988.66
1,665.4
0.0245

2,215
988.66
2,189.6
0.0243

2,218
988.66
2,192.9
0.0244

2,221
988.66
2,195.8
0.0244

2,212
988.66
2,187.2
0.0243

2,214
988.66
2,188.5
0.0243

2,218
988.66
2,192.4
0.0244

2,215
988.66
2,189.7
0.0243

4,225
336.28
1,420.7
0.0683

6,569
336.28
2,208.9
0.0729

11,257
336.28
3,785.4
0.0557

16,191
336.28
5,444.6
0.0605

17,573
336.28
5,909.6
0.0657

20,487
336.28
6,889.3
0.0765

18,841
336.28
6,335.8
0.0704

17,435
336.28
5,863.1
0.0651

19,248
336.28
6,472.7
0.0719

21,036
336.28
7,074.1
0.0786

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

1,460
171.50
250.4

1,460
171.50
250.4

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

730
168.14
122.7

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

730
171.50
125.2

730
171.50
125.2

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

730
527.96
385.4
916.0
0.0441

730
527.96
385.4
1,038.8
0.0343

1,095
527.96
578.1
1,419.3
0.0209

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

1,044.3
0.0502

1,898.2
0.0626

2,209.1
0.0325

2,465.1
0.0274

2,528.9
0.0281

2,627.1
0.0292

2,610.2
0.0290

2,562.0
0.0285

2,615.5
0.0291

2,644.1
0.0294

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

4,164.5
0.2003

6,299.3
0.2079

9,907.5
0.1457

12,839.2
0.1427

13,365.4
0.1485

14,417.8
0.1602

13,891.6
0.1543

13,365.4
0.1485

13,966.8
0.1552

14,643.3
0.1627

3,120.2
1.00

4,401.1
1.00

7,698.4
1.00

10,374.1
1.00

10,836.5
1.00

11,790.7
1.00

11,281.4
1.00

10,803.3
1.00

11,351.2
1.00

11,999.2
1.00

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

45.66
46

64.40
65

112.65
113

151.81
152

158.57
159

172.54
173

165.08
166

158.09
159

166.11
167

175.59
176

Table 7-6 (Continued)


Maintenance Labor Costs
Year 9
ktonnes Mined
90,000
DRILLING
Oprtg. Shifts
1,586
$/shift
854.15
$x1000
1,354.5
$/tonne mined
0.0150
BLASTING
$x1000
0.0
$/tonne mined
0.0000
LOADING
Oprtg. Shifts
2,212
$/shift
988.66
$x1000
2,186.5
$/tonne mined
0.0243
HAULING
Oprtg. Shifts
17,280
$/shift
336.28
$x1000
5,811.0
$/tonne mined
0.0646
ROADS & DUMPS
994F Wheel loader
Oprtg. Shifts
100
$/shift
322.83
$x1000
32.3
D10T Track dozers
Oprtg. Shifts
2,190
$/shift
171.50
$x1000
375.6
834H Wheel dozer
Oprtg. Shifts
1,460
$/shift
168.14
$x1000
245.5
16M Grader
Oprtg. Shifts
1,095
$/shift
171.50
$x1000
187.8
777F WW Water truck
Oprtg. Shifts
1,095
$/shift
527.96
$x1000
578.1
Total $x1000
1,419.3
$/tonne mined
0.0158
GENERAL MINE
$x1000
0.0
$/tonne mined
0.0000
GENERAL MAINTENANCE
$x1000
2,519.0
$/tonne mined
0.0280
MINE ADMINISTRATION
$x1000
0.0
$/tonne mined
0.0000
TOTAL
$x1000
13,290.2
$/tonne mined
0.1477
Mechanics required
EqpMtc($x1000)
10,771.2
Years in period
1.00
Mechanic $/period
75.2
$/man/year
$/man/period
75.2
Mechanics reqd.
calculated
157.62
rounded up
158

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

89,997

90,000

90,003

89,898

89,997

89,998

90,003

89,998

89,999

82,745

1,629
854.15
1,391.4
0.0155

1,640
854.15
1,400.9
0.0156

1,627
854.15
1,389.6
0.0154

1,653
854.15
1,412.3
0.0157

1,642
854.15
1,402.9
0.0156

1,636
854.15
1,397.6
0.0155

1,617
854.15
1,380.8
0.0153

1,620
854.15
1,383.9
0.0154

1,639
854.15
1,400.1
0.0156

1,522
854.15
1,299.8
0.0157

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

2,209
988.66
2,184.2
0.0243

2,210
988.66
2,185.2
0.0243

2,211
988.66
2,185.8
0.0243

2,207
988.66
2,181.8
0.0243

2,210
988.66
2,185.3
0.0243

2,211
988.66
2,185.9
0.0243

2,212
988.66
2,186.9
0.0243

2,212
988.66
2,186.7
0.0243

2,211
988.66
2,185.9
0.0243

2,031
988.66
2,007.6
0.0243

16,622
336.28
5,589.5
0.0621

17,815
336.28
5,990.9
0.0666

18,972
336.28
6,379.8
0.0709

19,420
336.28
6,530.6
0.0726

18,896
336.28
6,354.3
0.0706

18,707
336.28
6,290.9
0.0699

20,041
336.28
6,739.3
0.0749

20,708
336.28
6,963.8
0.0774

20,253
336.28
6,810.5
0.0757

18,955
336.28
6,374.2
0.0770

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0158

1,095
527.96
578.1
1,419.3
0.0172

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

2,480.4
0.0276

2,519.4
0.0280

2,592.3
0.0288

2,573.1
0.0286

2,605.0
0.0289

2,597.9
0.0289

2,616.4
0.0291

2,614.4
0.0291

2,602.0
0.0289

2,565.1
0.0310

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

13,064.7
0.1452

13,515.7
0.1502

13,966.8
0.1552

14,117.1
0.1570

13,966.8
0.1552

13,891.6
0.1544

14,342.6
0.1594

14,568.1
0.1619

14,417.8
0.1602

13,666.1
0.1652

10,584.3
1.00

10,996.3
1.00

11,374.4
1.00

11,544.0
1.00

11,361.8
1.00

11,293.7
1.00

11,726.3
1.00

11,953.7
1.00

11,815.8
1.00

11,100.9
1.00

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

154.88
155

160.91
161

166.45
167

168.93
169

166.26
167

165.26
166

171.59
172

174.92
175

172.90
173

162.44
163

Table 7-6 (Continued)


Maintenance Labor Costs
Year 20
ktonnes Mined
87,022
DRILLING
Oprtg. Shifts
1,636
$/shift
854.15
$x1000
1,397.0
$/tonne mined
0.0161
BLASTING
$x1000
0.0
$/tonne mined
0.0000
LOADING
Oprtg. Shifts
2,134
$/shift
988.66
$x1000
2,109.7
$/tonne mined
0.0242
HAULING
Oprtg. Shifts
17,453
$/shift
336.28
$x1000
5,869.1
$/tonne mined
0.0674
ROADS & DUMPS
994F Wheel loader
Oprtg. Shifts
100
$/shift
322.83
$x1000
32.3
D10T Track dozers
Oprtg. Shifts
2,190
$/shift
171.50
$x1000
375.6
834H Wheel dozer
Oprtg. Shifts
1,460
$/shift
168.14
$x1000
245.5
16M Grader
Oprtg. Shifts
1,095
$/shift
171.50
$x1000
187.8
777F WW Water truck
Oprtg. Shifts
1,095
$/shift
527.96
$x1000
578.1
Total $x1000
1,419.3
$/tonne mined
0.0163
GENERAL MINE
$x1000
0.0
$/tonne mined
0.0000
GENERAL MAINTENANCE
$x1000
2,495.2
$/tonne mined
0.0287
MINE ADMINISTRATION
$x1000
0.0
$/tonne mined
0.0000
TOTAL
$x1000
13,290.2
$/tonne mined
0.1527
Mechanics required
EqpMtc($x1000)
10,795.1
Years in period
1.00
Mechanic $/period
75.2
$/man/year
$/man/period
75.2
Mechanics reqd.
calculated
157.97
rounded up
158

Year 21

Year 22

Year 23

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

Life of
Mine

55,262

49,385

42,667

39,596

33,360

33,360

33,360

33,360

3,657

2,150,982

1,047
854.15
894.3
0.0162

935
854.15
798.6
0.0162

806
854.15
688.7
0.0161

385
854.15
328.8
0.0083

0
854.15
0.0
0.0000

0
854.15
0.0
0.0000

0
854.15
0.0
0.0000

0
854.15
0.0
0.0000

0
854.15
0.0
0.0000

35,235
854.15
30,096
0.0140

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0
0.0000

1,350
988.66
1,334.8
0.0242

1,205
988.66
1,191.5
0.0241

1,039
988.66
1,027.7
0.0241

969
988.66
957.8
0.0242

818
988.66
809.2
0.0243

818
988.66
809.2
0.0243

818
988.66
809.2
0.0243

818
988.66
809.2
0.0243

90
988.66
88.7
0.0243

52,669
988.66
52,072
0.0242

12,442
336.28
4,184.0
0.0757

12,675
336.28
4,262.4
0.0863

12,181
336.28
4,096.1
0.0960

9,285
336.28
3,122.4
0.0789

4,215
336.28
1,417.5
0.0425

4,009
336.28
1,348.1
0.0404

3,802
336.28
1,278.6
0.0383

3,492
336.28
1,174.4
0.0352

418
336.28
140.6
0.0385

442,603
336.28
148,838
0.0692

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

100
322.83
32.3

11
322.83
3.5

3,322
322.83
1,073

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

2,190
171.50
375.6

1,460
171.50
250.4

1,460
171.50
250.4

730
171.50
125.2

730
171.50
125.2

80
171.50
13.7

60,670
171.50
10,405

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

1,460
168.14
245.5

730
168.14
122.7

730
168.14
122.7

730
168.14
122.7

365
168.14
61.4

40
168.14
6.7

40,190
168.14
6,758

1,095
171.50
187.8

1,095
171.50
187.8

1,095
171.50
187.8

730
171.50
125.2

730
171.50
125.2

730
171.50
125.2

730
171.50
125.2

365
171.50
62.6

40
171.50
6.9

30,335
171.50
5,203

1,095
527.96
578.1
1,419.3
0.0257

730
527.96
385.4
1,226.6
0.0248

730
527.96
385.4
1,226.6
0.0287

730
527.96
385.4
1,164.0
0.0294

365
527.96
192.7
723.3
0.0217

365
527.96
192.7
723.3
0.0217

365
527.96
192.7
598.1
0.0179

365
527.96
192.7
474.2
0.0142

40
527.96
21.1
52.0
0.0142

28,510
527.96
15,052
38,490
0.0179

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0
0.0000

2,225.5
0.0403

2,203.0
0.0446

2,116.7
0.0496

2,004.3
0.0506

1,770.7
0.0531

1,765.0
0.0529

1,734.2
0.0520

1,661.7
0.0498

1,173.1
0.3208

71,152
0.0331

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0.0
0.0000

0
0.0000

10,057.9
0.1820

9,682.0
0.1961

9,155.8
0.2146

7,577.2
0.1914

4,720.7
0.1415

4,645.6
0.1393

4,420.0
0.1325

4,119.4
0.1235

1,454.4
0.3977

340,648
0.1584

7,832.4
1.00

7,479.0
1.00

7,039.1
1.00

5,572.9
1.00

2,950.0
1.00

2,880.5
1.00

2,685.9
1.00

2,457.7
1.00

281.3
1.00

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

75.2
75.2

114.61
115

109.44
110

103.01
103

81.55
82

43.17
44

42.15
43

39.30
40

35.96
36

4.12
5

Table 7-7
Explosives Cost
Prill cost =

550 $/tonne
0.550 $/kg

Diesel =

0.660 $/liter /

ANFO:

0.84 kg/liter = 0.786 $/kg

94% prills @ 0.550 $/kg


6% diesel @ 0.786 $/kg
100%
0.564 $/kg plus

40% for supplies

Table 7-8
Parts and Consumables Costs
Year -3

Year -2

Year -1

8,213

20,788

30,303

68,010

89,997

90,001

90,000

90,004

90,000

89,999

90,000

112

314

476

970

1,546

1,539

1,506

1,568

1,560

1,483

1,541

Total

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

Total

0.0101
0.0033
0.0057
0.0115
0.0306

0.0112
0.0037
0.0063
0.0127
0.0339

0.0116
0.0038
0.0066
0.0132
0.0352

0.0105
0.0035
0.0060
0.0120
0.0320

0.0127
0.0042
0.0072
0.0144
0.0385

0.0127
0.0041
0.0072
0.0144
0.0383

0.0124
0.0040
0.0070
0.0141
0.0375

0.0129
0.0042
0.0073
0.0146
0.0390

0.0128
0.0042
0.0073
0.0146
0.0388

0.0122
0.0040
0.0069
0.0138
0.0369

0.0127
0.0041
0.0072
0.0144
0.0384

Total

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

521

756

1,684

2,215

2,218

2,221

2,212

2,214

2,218

2,215

Total

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

Total

0.0000
0.0000
0.0000
0.0000
0.0000

0.0417
0.0196
0.0105
0.0044
0.0762

0.0415
0.0195
0.0105
0.0043
0.0758

0.0412
0.0194
0.0104
0.0043
0.0753

0.0410
0.0193
0.0103
0.0043
0.0748

0.0410
0.0193
0.0103
0.0043
0.0749

0.0411
0.0193
0.0103
0.0043
0.0750

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0748

0.0410
0.0193
0.0103
0.0043
0.0749

0.0410
0.0193
0.0103
0.0043
0.0748

2,099

4,225

6,569

11,257

16,191

17,573

20,487

18,841

17,435

19,248

21,036

Total

331.34
1,204.96
302
302.70
70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

Total

0.0847
0.3079
0.0774
0.0789
0.5488

0.0673
0.2449
0.0615
0.0627
0.4365

0.0718
0.2612
0.0656
0.0669
0.4655

0.0548
0.1994
0.0501
0.0511
0.3555

0.0596
0.2168
0.0545
0.0555
0.3864

0.0647
0.2353
0.0591
0.0602
0.4193

0.0754
0.2743
0.0689
0.0702
0.4888

0.0694
0.2522
0.0634
0.0646
0.4496

0.0642
0.2334
0.0586
0.0598
0.4160

0.0709
0.2577
0.0647
0.0660
0.4593

0.0774
0.2816
0.0708
0.0721
0.5020

311

100

100

100

100

100

100

100

100

100

100

Total

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

Total

0.0134
0.0336
0.0089
0.0388
0.0006
0.0952

0.0017
0.0043
0.0011
0.0049
0.0001
0.0121

0.0012
0.0029
0.0008
0.0034
0.0000
0.0083

0.0005
0.0013
0.0003
0.0015
0.0000
0.0037

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

730

1,460

1,460

2,190

2,190

2,190

2,190

2,190

2,190

2,190

2,190

Total

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

Total

0.0138
0.0437
0.0082
0.0139
0.0796

0.0109
0.0345
0.0065
0.0110
0.0629

0.0075
0.0237
0.0045
0.0076
0.0432

0.0050
0.0158
0.0030
0.0051
0.0288

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

ktonnes Mined
DRILLING
Operating Shifts
$/shift
Repair Parts
Power
Lube
Bits & Steel
$/tonne Mined
Repair Parts
Power
Lube
Bits & Steel
BLASTING
$/tonne Mined
Explosives
Supplies
LOADING
Operating Shifts
$/shift
Repair Parts
Power
Lube
GEC
$/tonne Mined
Repair Parts
Power
Lube
GEC
HAULING
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
L
Lube
b
Tires
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
994F Wheel loader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
D10T Track Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
GEC

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

Table 7-8 (Continued)


Parts and Consumables Costs
Year -3
834H Wheel Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

365

730

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

Total

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

Total

0.0067
0.0184
0.0030
0.0042
0.0000
0.0323

0.0053
0.0145
0.0024
0.0033
0.0000
0.0255

0.0073
0.0199
0.0033
0.0045
0.0000
0.0350

0.0032
0.0089
0.0015
0.0020
0.0000
0.0156

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

365

730

730

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

0.0134
0.0103
0.0024
0.0013
0.0005
0.0279

0.0106
0.0081
0.0019
0.0010
0.0004
0.0220

0.0073
0.0056
0.0013
0.0007
0.0003
0.0151

0.0049
0.0037
0.0009
0.0005
0.0002
0.0101

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

365

730

730

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

0.0163
0.0518
0.0061
0.0034
0.0775

0.0128
0.0409
0.0048
0.0027
0.0612

0.0088
0.0281
0.0033
0.0018
0.0420

0.0059
0.0188
0.0022
0.0012
0.0281

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0635
0.1577
0.0286
0.0476
0.0151
0.3125

0.0413
0.1023
0.0167
0.0119
0.0115
0.1838

0.0320
0.0802
0.0131
0.0104
0.0079
0.1436

0.0195
0.0485
0.0079
0.0052
0.0053
0.0863

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

1.1699

1.0083

0.9980

0.8270

0.8429

0.8758

0.9446

0.9065

0.8728

0.9143

0.9583

0.1583
0.4656
0.0033
0.1117
0.1265
0.0151
0.0115
0.1128
0.0451
0.1200
1.1699

0.1615
0.3472
0.0233
0.0951
0.0746
0.0159
0.0127
0.1128
0.0451
0.1200
1.0083

0.1569
0.3414
0.0233
0.0958
0.0773
0.0122
0.0132
0.1128
0.0451
0.1200
0.9980

0.1261
0.2479
0.0228
0.0743
0.0563
0.0096
0.0120
0.1128
0.0451
0.1200
0.8270

0.1280
0.2534
0.0234
0.0779
0.0594
0.0083
0.0144
0.1128
0.0451
0.1200
0.8429

0.1331
0.2719
0.0234
0.0825
0.0642
0.0083
0.0144
0.1128
0.0451
0.1200
0.8758

0.1436
0.3109
0.0234
0.0922
0.0742
0.0083
0.0141
0.1128
0.0451
0.1200
0.9446

0.1379
0.2889
0.0234
0.0869
0.0685
0.0083
0.0146
0.1128
0.0451
0.1200
0.9065

0.1327
0.2701
0.0234
0.0822
0.0637
0.0083
0.0146
0.1128
0.0451
0.1200
0.8728

0.1388
0.2943
0.0233
0.0879
0.0699
0.0083
0.0138
0.1128
0.0451
0.1200
0.9143

0.1458
0.3183
0.0234
0.0942
0.0760
0.0083
0.0144
0.1128
0.0451
0.1200
0.9583

$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
16M Grader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
777F WW Water Truck
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
T t l
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
Total
Roads $ Dumps Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
GENERAL MINE
$/tonne mined
Miscelaneous
GENERAL MAINTENANCE
$/tonne mined
Miscelaneous
MINE ADMINISTRATION
$/tonne mined
Miscelaneous
TOTAL COST
$/tonne mined
SUMMARY ($/tonne mined)
Repair Parts
Diesel Fuel
Power
Lube
Tires
GEC
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Total

Table 7-8 (Continued)


Parts and Consumables Costs
Year 9

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

90,000

89,997

90,000

90,003

89,898

89,997

89,998

90,003

89,998

89,999

82,745

1,586

1,629

1,640

1,627

1,653

1,642

1,636

1,617

1,620

1,639

1,522

Total

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

Total

0.0130
0.0043
0.0074
0.0148
0.0395

0.0134
0.0044
0.0076
0.0152
0.0406

0.0135
0.0044
0.0076
0.0153
0.0408

0.0134
0.0044
0.0076
0.0152
0.0405

0.0136
0.0045
0.0077
0.0154
0.0412

0.0135
0.0044
0.0077
0.0153
0.0409

0.0135
0.0044
0.0076
0.0153
0.0407

0.0133
0.0043
0.0075
0.0151
0.0403

0.0133
0.0044
0.0075
0.0151
0.0403

0.0135
0.0044
0.0076
0.0153
0.0408

0.0136
0.0045
0.0077
0.0154
0.0412

Total

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

2,212

2,209

2,210

2,211

2,207

2,210

2,211

2,212

2,212

2,211

2,031

Total

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

Total

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0746

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0746

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0747

0.0409
0.0192
0.0103
0.0043
0.0747

0.0408
0.0192
0.0103
0.0043
0.0746

17,280

16,622

17,815

18,972

19,420

18,896

18,707

20,041

20,708

20,253

18,955

Total

331.34
1,204.96
302
302.70
70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

Total

0.0636
0.2314
0.0581
0.0592
0.4123

0.0612
0.2225
0.0559
0.0570
0.3966

0.0656
0.2385
0.0599
0.0611
0.4251

0.0698
0.2540
0.0638
0.0650
0.4527

0.0716
0.2603
0.0654
0.0667
0.4639

0.0696
0.2530
0.0636
0.0648
0.4509

0.0689
0.2505
0.0629
0.0641
0.4464

0.0738
0.2683
0.0674
0.0687
0.4782

0.0762
0.2773
0.0697
0.0710
0.4941

0.0746
0.2712
0.0681
0.0694
0.4833

0.0759
0.2760
0.0693
0.0707
0.4920

100

100

100

100

100

100

100

100

100

100

100

Total

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

Total

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0010
0.0003
0.0011
0.0000
0.0028

0.0004
0.0011
0.0003
0.0012
0.0000
0.0030

2,190

2,190

2,190

2,190

2,190

2,190

2,190

2,190

2,190

2,190

2,190

Total

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

Total

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0038
0.0120
0.0023
0.0038
0.0218

0.0038
0.0120
0.0022
0.0038
0.0218

0.0041
0.0130
0.0024
0.0042
0.0237

ktonnes Mined
DRILLING
Operating Shifts
$/shift
Repair Parts
Power
Lube
Bits & Steel
$/tonne Mined
Repair Parts
Power
Lube
Bits & Steel
BLASTING
$/tonne Mined
Explosives
Supplies
LOADING
Operating Shifts
$/shift
Repair Parts
Power
Lube
GEC
$/tonne Mined
Repair Parts
Power
Lube
GEC
HAULING
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
L
Lube
b
Tires
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
994F Wheel loader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
D10T Track Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
GEC

Table 7-8 (Continued)


Parts and Consumables Costs
Year 9
834H Wheel Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

1,460

Total

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

Total

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0024
0.0067
0.0011
0.0015
0.0000
0.0118

0.0027
0.0073
0.0012
0.0017
0.0000
0.0128

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0037
0.0028
0.0006
0.0003
0.0001
0.0076

0.0040
0.0031
0.0007
0.0004
0.0002
0.0083

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

1,095

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0045
0.0142
0.0017
0.0009
0.0212

0.0048
0.0154
0.0018
0.0010
0.0231

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0367
0.0059
0.0039
0.0040
0.0653

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0147
0.0366
0.0059
0.0039
0.0040
0.0652

0.0160
0.0399
0.0065
0.0043
0.0043
0.0709

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.8697

0.8550

0.8838

0.9111

0.9230

0.9097

0.9050

0.9363

0.9524

0.9420

0.9567

0.1323
0.2680
0.0235
0.0818
0.0632
0.0083
0.0148
0.1128
0.0451
0.1200
0.8697

0.1302
0.2592
0.0236
0.0797
0.0609
0.0083
0.0152
0.1128
0.0451
0.1200
0.8550

0.1347
0.2752
0.0236
0.0838
0.0650
0.0083
0.0153
0.1128
0.0451
0.1200
0.8838

0.1388
0.2906
0.0236
0.0876
0.0690
0.0083
0.0152
0.1128
0.0451
0.1200
0.9111

0.1408
0.2970
0.0237
0.0893
0.0706
0.0083
0.0154
0.1128
0.0451
0.1200
0.9230

0.1387
0.2896
0.0236
0.0874
0.0687
0.0083
0.0153
0.1128
0.0451
0.1200
0.9097

0.1379
0.2871
0.0236
0.0868
0.0681
0.0083
0.0153
0.1128
0.0451
0.1200
0.9050

0.1427
0.3049
0.0236
0.0912
0.0726
0.0083
0.0151
0.1128
0.0451
0.1200
0.9363

0.1452
0.3139
0.0236
0.0934
0.0749
0.0083
0.0151
0.1128
0.0451
0.1200
0.9524

0.1437
0.3078
0.0236
0.0920
0.0734
0.0083
0.0153
0.1128
0.0451
0.1200
0.9420

0.1464
0.3159
0.0237
0.0938
0.0750
0.0086
0.0154
0.1128
0.0451
0.1200
0.9567

$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
16M Grader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
777F WW Water Truck
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
T t l
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
Total
Roads $ Dumps Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
GENERAL MINE
$/tonne mined
Miscelaneous
GENERAL MAINTENANCE
$/tonne mined
Miscelaneous
MINE ADMINISTRATION
$/tonne mined
Miscelaneous
TOTAL COST
$/tonne mined
SUMMARY ($/tonne mined)
Repair Parts
Diesel Fuel
Power
Lube
Tires
GEC
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Total

Table 7-8 (Continued)


Parts and Consumables Costs
Life of
Mine

Year 20

Year 21

Year 22

Year 23

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

87,022

55,262

49,385

42,667

39,596

33,360

33,360

33,360

33,360

3,657

2,150,982

1,636

1,047

935

806

385

35,235

Total

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

739.81
242.00
419.37
840.00
2,241.18

Total

0.0139
0.0045
0.0079
0.0158
0.0421

0.0140
0.0046
0.0079
0.0159
0.0425

0.0140
0.0046
0.0079
0.0159
0.0424

0.0140
0.0046
0.0079
0.0159
0.0424

0.0072
0.0024
0.0041
0.0082
0.0218

0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000

0.0121
0.0040
0.0069
0.0138
0.0367

Total

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.1128
0.0451
0.1580

0.0000
0.0000
0.0000

0.0000
0.0000
0.0000

0.0000
0.0000
0.0000

0.0000
0.0000
0.0000

0.0000
0.0000
0.0000

0.1056
0.0423
0.1479

2,134

1,350

1,205

1,039

969

818

818

818

818

90

52,669

Total

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

1,664.56
782.47
419.37
173.94
3,040.33

Total

0.0408
0.0192
0.0103
0.0043
0.0746

0.0407
0.0191
0.0102
0.0042
0.0743

0.0406
0.0191
0.0102
0.0042
0.0742

0.0406
0.0191
0.0102
0.0042
0.0741

0.0407
0.0191
0.0103
0.0043
0.0744

0.0408
0.0192
0.0103
0.0043
0.0746

0.0408
0.0192
0.0103
0.0043
0.0746

0.0408
0.0192
0.0103
0.0043
0.0746

0.0408
0.0192
0.0103
0.0043
0.0746

0.0408
0.0192
0.0103
0.0043
0.0746

0.0408
0.0192
0.0103
0.0043
0.0744

17,453

12,442

12,675

12,181

9,285

4,215

4,009

3,802

3,492

418

442,603

Total

331.34
1,204.96
302
302.70
70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

331.34
1,204.96
302.70
302 70
308.55
2,147.55

Total

0.0665
0.2417
0.0607
0.0619
0.4307

0.0746
0.2713
0.0682
0.0695
0.4835

0.0850
0.3093
0.0777
0.0792
0.5512

0.0946
0.3440
0.0864
0.0881
0.6131

0.0777
0.2826
0.0710
0.0724
0.5036

0.0419
0.1523
0.0382
0.0390
0.2714

0.0398
0.1448
0.0364
0.0371
0.2581

0.0378
0.1373
0.0345
0.0352
0.2448

0.0347
0.1261
0.0317
0.0323
0.2248

0.0379
0.1378
0.0346
0.0353
0.2456

0.0682
0.2479
0.0623
0.0635
0.4419

100

100

100

100

100

100

100

100

100

11

3,322

Total

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

353.22
884.81
234.84
1,023.46
15.02
2,511.36

Total

0.0004
0.0010
0.0003
0.0012
0.0000
0.0029

0.0006
0.0016
0.0004
0.0019
0.0000
0.0045

0.0007
0.0018
0.0005
0.0021
0.0000
0.0051

0.0008
0.0021
0.0006
0.0024
0.0000
0.0059

0.0009
0.0022
0.0006
0.0026
0.0000
0.0063

0.0011
0.0027
0.0007
0.0031
0.0000
0.0075

0.0011
0.0027
0.0007
0.0031
0.0000
0.0075

0.0011
0.0027
0.0007
0.0031
0.0000
0.0075

0.0011
0.0027
0.0007
0.0031
0.0000
0.0075

0.0011
0.0027
0.0007
0.0031
0.0000
0.0075

0.0005
0.0014
0.0004
0.0016
0.0000
0.0039

2,190

2,190

2,190

2,190

2,190

1,460

1,460

730

730

80

60,670

Total

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

154.98
491.56
92.46
156.90
895.90

Total

0.0039
0.0124
0.0023
0.0039
0.0225

0.0061
0.0195
0.0037
0.0062
0.0355

0.0069
0.0218
0.0041
0.0070
0.0397

0.0080
0.0252
0.0047
0.0081
0.0460

0.0086
0.0272
0.0051
0.0087
0.0496

0.0068
0.0215
0.0040
0.0069
0.0392

0.0068
0.0215
0.0040
0.0069
0.0392

0.0034
0.0108
0.0020
0.0034
0.0196

0.0034
0.0108
0.0020
0.0034
0.0196

0.0034
0.0108
0.0020
0.0034
0.0196

0.0044
0.0139
0.0026
0.0044
0.0253

ktonnes Mined
DRILLING
Operating Shifts
$/shift
Repair Parts
Power
Lube
Bits & Steel
$/tonne Mined
Repair Parts
Power
Lube
Bits & Steel
BLASTING
$/tonne Mined
Explosives
Supplies
LOADING
Operating Shifts
$/shift
Repair Parts
Power
Lube
GEC
$/tonne Mined
Repair Parts
Power
Lube
GEC
HAULING
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
L
Lube
b
Tires
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
994F Wheel loader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
D10T Track Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
GEC
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
GEC

Table 7-8 (Continued)


Parts and Consumables Costs
Year 20
834H Wheel Dozer
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC

Year 21

Year 22

Year 23

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

Life of
Mine

1,460

1,460

1,460

1,460

1,460

730

730

730

365

40

37,595

Total

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

150.75
413.42
67.66
94.11
0.00
725.93

Total

0.0025
0.0069
0.0011
0.0016
0.0000
0.0122

0.0040
0.0109
0.0018
0.0025
0.0000
0.0192

0.0045
0.0122
0.0020
0.0028
0.0000
0.0215

0.0052
0.0141
0.0023
0.0032
0.0000
0.0248

0.0056
0.0152
0.0025
0.0035
0.0000
0.0268

0.0033
0.0090
0.0015
0.0021
0.0000
0.0159

0.0033
0.0090
0.0015
0.0021
0.0000
0.0159

0.0033
0.0090
0.0015
0.0021
0.0000
0.0159

0.0016
0.0045
0.0007
0.0010
0.0000
0.0079

0.0016
0.0045
0.0007
0.0010
0.0000
0.0079

0.0026
0.0072
0.0012
0.0016
0.0000
0.0127

1,095

1,095

1,095

1,095

730

730

730

730

365

40

30,335

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

301.29
231.92
53.34
28.44
12.20
627.18

0.0038
0.0029
0.0007
0.0004
0.0002
0.0079

0.0060
0.0046
0.0011
0.0006
0.0002
0.0124

0.0067
0.0051
0.0012
0.0006
0.0003
0.0139

0.0077
0.0060
0.0014
0.0007
0.0003
0.0161

0.0056
0.0043
0.0010
0.0005
0.0002
0.0116

0.0066
0.0051
0.0012
0.0006
0.0003
0.0137

0.0066
0.0051
0.0012
0.0006
0.0003
0.0137

0.0066
0.0051
0.0012
0.0006
0.0003
0.0137

0.0033
0.0025
0.0006
0.0003
0.0001
0.0069

0.0033
0.0025
0.0006
0.0003
0.0001
0.0069

0.0042
0.0033
0.0008
0.0004
0.0002
0.0088

1,095

1,095

730

730

730

365

365

365

365

40

28,510

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

365.82
1,164.63
138.04
75.63
1,744.11
1 744 11

0.0046
0.0147
0.0017
0.0010
0.0219

0.0072
0.0231
0.0027
0.0015
0.0346

0.0054
0.0172
0.0020
0.0011
0.0258

0.0063
0.0199
0.0024
0.0013
0.0298

0.0067
0.0215
0.0025
0.0014
0.0322

0.0040
0.0127
0.0015
0.0008
0.0191

0.0040
0.0127
0.0015
0.0008
0.0191

0.0040
0.0127
0.0015
0.0008
0.0191

0.0040
0.0127
0.0015
0.0008
0.0191

0.0040
0.0127
0.0015
0.0008
0.0191

0.0048
0.0154
0.0018
0.0010
0.0231

0.0152
0.0379
0.0061
0.0041
0.0041
0.0674

0.0240
0.0597
0.0097
0.0064
0.0065
0.1062

0.0241
0.0582
0.0098
0.0066
0.0073
0.1060

0.0279
0.0673
0.0113
0.0076
0.0084
0.1226

0.0273
0.0704
0.0117
0.0080
0.0089
0.1264

0.0217
0.0510
0.0089
0.0066
0.0072
0.0954

0.0217
0.0510
0.0089
0.0066
0.0072
0.0954

0.0183
0.0403
0.0069
0.0066
0.0037
0.0758

0.0134
0.0332
0.0056
0.0052
0.0036
0.0610

0.0134
0.0332
0.0056
0.0052
0.0036
0.0610

0.0166
0.0412
0.0067
0.0046
0.0046
0.0738

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0300

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0400

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.0500

0.8928

0.9844

1.0517

1.1301

1.0041

0.5614

0.5481

0.5152

0.4804

0.5012

0.8948

0.1364
0.2796
0.0237
0.0850
0.0659
0.0084
0.0158
0.1128
0.0451
0.1200
0.8928

0.1533
0.3310
0.0237
0.0960
0.0759
0.0107
0.0159
0.1128
0.0451
0.1200
0.9844

0.1638
0.3674
0.0237
0.1057
0.0858
0.0115
0.0159
0.1128
0.0451
0.1200
1.0517

0.1771
0.4113
0.0236
0.1159
0.0957
0.0126
0.0159
0.1128
0.0451
0.1200
1.1301

0.1529
0.3530
0.0215
0.0970
0.0803
0.0132
0.0082
0.1128
0.0451
0.1200
1.0041

0.1044
0.2033
0.0192
0.0574
0.0456
0.0114
0.0000
0.0000
0.0000
0.1200
0.5614

0.1024
0.1958
0.0192
0.0556
0.0437
0.0114
0.0000
0.0000
0.0000
0.1200
0.5481

0.0969
0.1776
0.0192
0.0517
0.0417
0.0080
0.0000
0.0000
0.0000
0.1200
0.5152

0.0889
0.1594
0.0192
0.0475
0.0375
0.0079
0.0000
0.0000
0.0000
0.1200
0.4804

0.0921
0.1710
0.0192
0.0505
0.0405
0.0079
0.0000
0.0000
0.0000
0.1200
0.5012

0.1377
0.2891
0.0231
0.0862
0.0681
0.0089
0.0138
0.1056
0.0423
0.1200
0.8948

$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
16M Grader
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
777F WW Water Truck
Operating Shifts
$/shift
Repair Parts
Diesel Fuel
Lube
Tires
T t l
Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
Total
Roads $ Dumps Total
$/tonne Mined
Repair Parts
Diesel Fuel
Lube
Tires
GEC
Total
GENERAL MINE
$/tonne mined
Miscelaneous
GENERAL MAINTENANCE
$/tonne mined
Miscelaneous
MINE ADMINISTRATION
$/tonne mined
Miscelaneous
TOTAL COST
$/tonne mined
SUMMARY ($/tonne mined)
Repair Parts
Diesel Fuel
Power
Lube
Tires
GEC
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Total

Table 7-9
Mine Operating Cost Summary
($/tonne of Material Mined)
ktonnes Mined
DRILLING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Bits & Steel
BLASTING
Operating Labor
Explosives
Blasting Supplies
LOADING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Ground Engaging Components
HAULING
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
Operating Labor
Maintenance Labor
R
Repair
i P
Parts
t
Diesel Fuel
Lube
Tires
Ground Engaging Components
GENERAL MINE
Operating Labor
Miscelaneous
GENERAL MAINTENANCE
Maintenance Labor
Miscelaneous
MINE ADMINISTRATION
Salaried Labor
Miscelaneous

TOTAL
SUMMARY:
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Power
Lube
Tires
Ground Engaging Components
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Salaried Labor
TOTAL

Year -3

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

8,213

20,788

30,303

68,010

89,997

90,001

90,000

90,004

90,000

89,999

90,000

0.0088
0.0117
0.0101
0.0033
0.0057
0.0115
0.0510

0.0069
0.0129
0.0112
0.0037
0.0063
0.0127
0.0537

0.0071
0.0134
0.0116
0.0038
0.0066
0.0132
0.0557

0.0063
0.0122
0.0105
0.0035
0.0060
0.0120
0.0505

0.0080
0.0147
0.0127
0.0042
0.0072
0.0144
0.0612

0.0080
0.0146
0.0127
0.0041
0.0072
0.0144
0.0609

0.0072
0.0143
0.0124
0.0040
0.0070
0.0141
0.0590

0.0080
0.0149
0.0129
0.0042
0.0073
0.0146
0.0619

0.0080
0.0148
0.0128
0.0042
0.0073
0.0146
0.0616

0.0072
0.0141
0.0122
0.0040
0.0069
0.0138
0.0582

0.0080
0.0146
0.0127
0.0041
0.0072
0.0144
0.0610

0.0062
0.1128
0.0451
0.1641

0.0049
0.1128
0.0451
0.1628

0.0067
0.1128
0.0451
0.1647

0.0030
0.1128
0.0451
0.1609

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0157
0.0248
0.0417
0.0196
0.0105
0.0044
0.1167

0.0135
0.0246
0.0415
0.0195
0.0105
0.0043
0.1139

0.0132
0.0245
0.0412
0.0194
0.0104
0.0043
0.1130

0.0127
0.0243
0.0410
0.0193
0.0103
0.0043
0.1119

0.0127
0.0244
0.0410
0.0193
0.0103
0.0043
0.1120

0.0127
0.0244
0.0411
0.0193
0.0103
0.0043
0.1121

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1118

0.0127
0.0244
0.0410
0.0193
0.0103
0.0043
0.1120

0.0127
0.0243
0.0410
0.0193
0.0103
0.0043
0.1119

0.1035
0.0859
0.0847
0.3079
0.0774
0.0789
0.7382

0.0818
0.0683
0.0673
0.2449
0.0615
0.0627
0.5866

0.0863
0.0729
0.0718
0.2612
0.0656
0.0669
0.6247

0.0654
0.0557
0.0548
0.1994
0.0501
0.0511
0.4765

0.0712
0.0605
0.0596
0.2168
0.0545
0.0555
0.5180

0.0770
0.0657
0.0647
0.2353
0.0591
0.0602
0.5620

0.0901
0.0765
0.0754
0.2743
0.0689
0.0702
0.6555

0.0828
0.0704
0.0694
0.2522
0.0634
0.0646
0.6027

0.0763
0.0651
0.0642
0.2334
0.0586
0.0598
0.5574

0.0843
0.0719
0.0709
0.2577
0.0647
0.0660
0.6155

0.0922
0.0786
0.0774
0.2816
0.0708
0.0721
0.6728

0.1035
0.0660
0
0.0635
0635
0.1577
0.0286
0.0476
0.0151
0.4820

0.0723
0.0441
0
0.0413
0413
0.1023
0.0167
0.0119
0.0115
0.3002

0.0582
0.0343
0
0.0320
0320
0.0802
0.0131
0.0104
0.0079
0.2361

0.0346
0.0209
0
0.0195
0195
0.0485
0.0079
0.0052
0.0053
0.1418

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0239
0.0300
0.0539

0.0189
0.0300
0.0489

0.0129
0.0300
0.0429

0.0058
0.0300
0.0358

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0624
0.0400
0.1024

0.0502
0.0400
0.0902

0.0626
0.0400
0.1026

0.0325
0.0400
0.0725

0.0274
0.0400
0.0674

0.0281
0.0400
0.0681

0.0292
0.0400
0.0692

0.0290
0.0400
0.0690

0.0285
0.0400
0.0685

0.0291
0.0400
0.0691

0.0294
0.0400
0.0694

0.2285
0.0500
0.2785

0.1805
0.0500
0.2305

0.1238
0.0500
0.1738

0.0552
0.0500
0.1052

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

1.8702

1.5896

1.5145

1.1561

1.1519

1.1964

1.2892

1.2388

1.1928

1.2481

1.3084

0.2457
0.2261
0.1583
0.4656
0.0033
0.1117
0.1265
0.0151
0.0115
0.1128
0.0451
0.1200
0.2285
1.8702

0.2005
0.2003
0.1615
0.3472
0.0233
0.0951
0.0746
0.0159
0.0127
0.1128
0.0451
0.1200
0.1805
1.5896

0.1848
0.2079
0.1569
0.3414
0.0233
0.0958
0.0773
0.0122
0.0132
0.1128
0.0451
0.1200
0.1238
1.5145

0.1283
0.1457
0.1261
0.2479
0.0228
0.0743
0.0563
0.0096
0.0120
0.1128
0.0451
0.1200
0.0552
1.1561

0.1246
0.1427
0.1280
0.2534
0.0234
0.0779
0.0594
0.0083
0.0144
0.1128
0.0451
0.1200
0.0417
1.1519

0.1304
0.1485
0.1331
0.2719
0.0234
0.0825
0.0642
0.0083
0.0144
0.1128
0.0451
0.1200
0.0417
1.1964

0.1427
0.1602
0.1436
0.3109
0.0234
0.0922
0.0742
0.0083
0.0141
0.1128
0.0451
0.1200
0.0417
1.2892

0.1362
0.1543
0.1379
0.2889
0.0234
0.0869
0.0685
0.0083
0.0146
0.1128
0.0451
0.1200
0.0417
1.2388

0.1297
0.1485
0.1327
0.2701
0.0234
0.0822
0.0637
0.0083
0.0146
0.1128
0.0451
0.1200
0.0417
1.1928

0.1369
0.1552
0.1388
0.2943
0.0233
0.0879
0.0699
0.0083
0.0138
0.1128
0.0451
0.1200
0.0417
1.2481

0.1457
0.1627
0.1458
0.3183
0.0234
0.0942
0.0760
0.0083
0.0144
0.1128
0.0451
0.1200
0.0417
1.3084

Table 7-9 (Continued)


Mine Operating Cost Summary
($/tonne of Material Mined)
ktonnes Mined
DRILLING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Bits & Steel
BLASTING
Operating Labor
Explosives
Blasting Supplies
LOADING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Ground Engaging Components
HAULING
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
Operating Labor
Maintenance Labor
R
Repair
i P
Parts
t
Diesel Fuel
Lube
Tires
Ground Engaging Components
GENERAL MINE
Operating Labor
Miscelaneous
GENERAL MAINTENANCE
Maintenance Labor
Miscelaneous
MINE ADMINISTRATION
Salaried Labor
Miscelaneous

TOTAL
SUMMARY:
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Power
Lube
Tires
Ground Engaging Components
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Salaried Labor
TOTAL

Year 9

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

90,000

89,997

90,000

90,003

89,898

89,997

89,998

90,003

89,998

89,999

82,745

0.0080
0.0150
0.0130
0.0043
0.0074
0.0148
0.0625

0.0080
0.0155
0.0134
0.0044
0.0076
0.0152
0.0640

0.0080
0.0156
0.0135
0.0044
0.0076
0.0153
0.0644

0.0080
0.0154
0.0134
0.0044
0.0076
0.0152
0.0639

0.0080
0.0157
0.0136
0.0045
0.0077
0.0154
0.0649

0.0080
0.0156
0.0135
0.0044
0.0077
0.0153
0.0645

0.0080
0.0155
0.0135
0.0044
0.0076
0.0153
0.0643

0.0080
0.0153
0.0133
0.0043
0.0075
0.0151
0.0636

0.0080
0.0154
0.0133
0.0044
0.0075
0.0151
0.0637

0.0080
0.0156
0.0135
0.0044
0.0076
0.0153
0.0644

0.0087
0.0157
0.0136
0.0045
0.0077
0.0154
0.0656

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0023
0.1128
0.0451
0.1602

0.0024
0.1128
0.0451
0.1604

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1116

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1116

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0127
0.0243
0.0409
0.0192
0.0103
0.0043
0.1117

0.0128
0.0243
0.0408
0.0192
0.0103
0.0043
0.1117

0.0763
0.0646
0.0636
0.2314
0.0581
0.0592
0.5532

0.0734
0.0621
0.0612
0.2225
0.0559
0.0570
0.5321

0.0784
0.0666
0.0656
0.2385
0.0599
0.0611
0.5701

0.0835
0.0709
0.0698
0.2540
0.0638
0.0650
0.6071

0.0851
0.0726
0.0716
0.2603
0.0654
0.0667
0.6216

0.0828
0.0706
0.0696
0.2530
0.0636
0.0648
0.6043

0.0821
0.0699
0.0689
0.2505
0.0629
0.0641
0.5984

0.0879
0.0749
0.0738
0.2683
0.0674
0.0687
0.6409

0.0908
0.0774
0.0762
0.2773
0.0697
0.0710
0.6623

0.0886
0.0757
0.0746
0.2712
0.0681
0.0694
0.6475

0.0908
0.0770
0.0759
0.2760
0.0693
0.0707
0.6598

0.0261
0.0158
0
0.0147
0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0
0.0147
0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0
0.0147
0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0
0.0147
0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0262
0.0158
0.0147
0 0147
0.0367
0.0059
0.0039
0.0040
0.1073

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0261
0.0158
0.0147
0 0147
0.0366
0.0059
0.0039
0.0040
0.1071

0.0284
0.0172
0.0160
0 0160
0.0399
0.0065
0.0043
0.0043
0.1165

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0044
0.0300
0.0344

0.0047
0.0300
0.0347

0.0280
0.0400
0.0680

0.0276
0.0400
0.0676

0.0280
0.0400
0.0680

0.0288
0.0400
0.0688

0.0286
0.0400
0.0686

0.0289
0.0400
0.0689

0.0289
0.0400
0.0689

0.0291
0.0400
0.0691

0.0291
0.0400
0.0691

0.0289
0.0400
0.0689

0.0310
0.0400
0.0710

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0417
0.0500
0.0917

0.0454
0.0500
0.0954

1.1888

1.1687

1.2076

1.2449

1.2604

1.2428

1.2366

1.2787

1.3002

1.2859

1.3152

0.1297
0.1477
0.1323
0.2680
0.0235
0.0818
0.0632
0.0083
0.0148
0.1128
0.0451
0.1200
0.0417
1.1888

0.1268
0.1452
0.1302
0.2592
0.0236
0.0797
0.0609
0.0083
0.0152
0.1128
0.0451
0.1200
0.0417
1.1687

0.1319
0.1502
0.1347
0.2752
0.0236
0.0838
0.0650
0.0083
0.0153
0.1128
0.0451
0.1200
0.0417
1.2076

0.1370
0.1552
0.1388
0.2906
0.0236
0.0876
0.0690
0.0083
0.0152
0.1128
0.0451
0.1200
0.0417
1.2449

0.1386
0.1570
0.1408
0.2970
0.0237
0.0893
0.0706
0.0083
0.0154
0.1128
0.0451
0.1200
0.0417
1.2604

0.1363
0.1552
0.1387
0.2896
0.0236
0.0874
0.0687
0.0083
0.0153
0.1128
0.0451
0.1200
0.0417
1.2428

0.1355
0.1544
0.1379
0.2871
0.0236
0.0868
0.0681
0.0083
0.0153
0.1128
0.0451
0.1200
0.0417
1.2366

0.1413
0.1594
0.1427
0.3049
0.0236
0.0912
0.0726
0.0083
0.0151
0.1128
0.0451
0.1200
0.0417
1.2787

0.1442
0.1619
0.1452
0.3139
0.0236
0.0934
0.0749
0.0083
0.0151
0.1128
0.0451
0.1200
0.0417
1.3002

0.1421
0.1602
0.1437
0.3078
0.0236
0.0920
0.0734
0.0083
0.0153
0.1128
0.0451
0.1200
0.0417
1.2859

0.1480
0.1652
0.1464
0.3159
0.0237
0.0938
0.0750
0.0086
0.0154
0.1128
0.0451
0.1200
0.0454
1.3152

Table 7-9 (Continued)


Mine Operating Cost Summary
($/tonne of Material Mined)
ktonnes Mined
DRILLING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Bits & Steel
BLASTING
Operating Labor
Explosives
Blasting Supplies
LOADING
Operating Labor
Maintenance Labor
Repair Parts
Power
Lube
Ground Engaging Components
HAULING
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Lube
Tires
ROADS & DUMPS
Operating Labor
Maintenance Labor
R
Repair
i P
Parts
t
Diesel Fuel
Lube
Tires
Ground Engaging Components
GENERAL MINE
Operating Labor
Miscelaneous
GENERAL MAINTENANCE
Maintenance Labor
Miscelaneous
MINE ADMINISTRATION
Salaried Labor
Miscelaneous

TOTAL
SUMMARY:
Operating Labor
Maintenance Labor
Repair Parts
Diesel Fuel
Power
Lube
Tires
Ground Engaging Components
Bits & Steel
Explosives
Blasting Supplies
Miscelaneous
Salaried Labor
TOTAL

Life of
Mine

Year20

Year 21

Year 22

Year 23

Year 24

Year25

Year 26

Year 27

Year 28

Year 29

87,022

55,262

49,385

42,667

39,596

33,360

33,360

33,360

33,360

3,657

2,150,982

0.0083
0.0161
0.0139
0.0045
0.0079
0.0158
0.0664

0.0091
0.0162
0.0140
0.0046
0.0079
0.0159
0.0678

0.0087
0.0162
0.0140
0.0046
0.0079
0.0159
0.0673

0.0084
0.0161
0.0140
0.0046
0.0079
0.0159
0.0669

0.0054
0.0083
0.0072
0.0024
0.0041
0.0082
0.0355

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0074
0.0140
0.0121
0.0040
0.0069
0.0138
0.0581

0.0012
0.1128
0.0451
0.1591

0.0018
0.1128
0.0451
0.1598

0.0021
0.1128
0.0451
0.1600

0.0024
0.1128
0.0451
0.1603

0.0026
0.1128
0.0451
0.1605

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000

0.0022
0.1056
0.0423
0.1501

0.0122
0.0242
0.0408
0.0192
0.0103
0.0043
0.1110

0.0133
0.0242
0.0407
0.0191
0.0102
0.0042
0.1117

0.0132
0.0241
0.0406
0.0191
0.0102
0.0042
0.1116

0.0134
0.0241
0.0406
0.0191
0.0102
0.0042
0.1116

0.0124
0.0242
0.0407
0.0191
0.0103
0.0043
0.1110

0.0122
0.0243
0.0408
0.0192
0.0103
0.0043
0.1111

0.0122
0.0243
0.0408
0.0192
0.0103
0.0043
0.1111

0.0122
0.0243
0.0408
0.0192
0.0103
0.0043
0.1111

0.0122
0.0243
0.0408
0.0192
0.0103
0.0043
0.1111

0.0122
0.0243
0.0408
0.0192
0.0103
0.0043
0.1111

0.0127
0.0242
0.0408
0.0192
0.0103
0.0043
0.1114

0.0796
0.0674
0.0665
0.2417
0.0607
0.0619
0.5778

0.0887
0.0757
0.0746
0.2713
0.0682
0.0695
0.6479

0.1019
0.0863
0.0850
0.3093
0.0777
0.0792
0.7394

0.1134
0.0960
0.0946
0.3440
0.0864
0.0881
0.8225

0.0924
0.0789
0.0777
0.2826
0.0710
0.0724
0.6749

0.0509
0.0425
0.0419
0.1523
0.0382
0.0390
0.3648

0.0490
0.0404
0.0398
0.1448
0.0364
0.0371
0.3475

0.0451
0.0383
0.0378
0.1373
0.0345
0.0352
0.3282

0.0411
0.0352
0.0347
0.1261
0.0317
0.0323
0.3012

0.0451
0.0385
0.0379
0.1378
0.0346
0.0353
0.3291

0.0814
0.0692
0.0682
0.2479
0.0623
0.0635
0.5925

0.0270
0.0163
0
0.0152
0152
0.0379
0.0061
0.0041
0.0041
0.1108

0.0426
0.0257
0
0.0240
0240
0.0597
0.0097
0.0064
0.0065
0.1745

0.0450
0.0248
0
0.0241
0241
0.0582
0.0098
0.0066
0.0073
0.1758

0.0521
0.0287
0
0.0279
0279
0.0673
0.0113
0.0076
0.0084
0.2035

0.0528
0.0294
0.0273
0 0273
0.0704
0.0117
0.0080
0.0089
0.2086

0.0411
0.0217
0.0217
0 0217
0.0510
0.0089
0.0066
0.0072
0.1583

0.0411
0.0217
0.0217
0 0217
0.0510
0.0089
0.0066
0.0072
0.1583

0.0314
0.0179
0.0183
0 0183
0.0403
0.0069
0.0066
0.0037
0.1251

0.0235
0.0142
0.0134
0 0134
0.0332
0.0056
0.0052
0.0036
0.0987

0.0235
0.0142
0.0134
0 0134
0.0332
0.0056
0.0052
0.0036
0.0987

0.0301
0.0179
0.0168
0 0168
0.0417
0.0068
0.0047
0.0046
0.1227

0.0045
0.0300
0.0345

0.0071
0.0300
0.0371

0.0079
0.0300
0.0379

0.0092
0.0300
0.0392

0.0050
0.0300
0.0350

0.0059
0.0300
0.0359

0.0059
0.0300
0.0359

0.0059
0.0300
0.0359

0.0059
0.0300
0.0359

0.0059
0.0300
0.0359

0.0051
0.0300
0.0351

0.0287
0.0400
0.0687

0.0403
0.0400
0.0803

0.0446
0.0400
0.0846

0.0496
0.0400
0.0896

0.0506
0.0400
0.0906

0.0531
0.0400
0.0931

0.0529
0.0400
0.0929

0.0520
0.0400
0.0920

0.0498
0.0400
0.0898

0.3208
0.0400
0.3608

0.0331
0.0400
0.0731

0.0431
0.0500
0.0931

0.0679
0.0500
0.1179

0.0760
0.0500
0.1260

0.0880
0.0500
0.1380

0.0948
0.0500
0.1448

0.0000
0.0500
0.0500

0.0714
0.0500
0.1214

0.0000
0.0500
0.0500

0.0714
0.0500
0.1214

0.0000
0.0500
0.0500

0.0484
0.0500
0.0984

1.2215

1.3970

1.5027

1.6315

1.4609

0.8131

0.8670

0.7422

0.7581

0.9856

1.2413

0.1328
0.1527
0.1364
0.2796
0.0237
0.0850
0.0659
0.0084
0.0158
0.1128
0.0451
0.1200
0.0431
1.2215

0.1626
0.1820
0.1533
0.3310
0.0237
0.0960
0.0759
0.0107
0.0159
0.1128
0.0451
0.1200
0.0679
1.3970

0.1789
0.1961
0.1638
0.3674
0.0237
0.1057
0.0858
0.0115
0.0159
0.1128
0.0451
0.1200
0.0760
1.5027

0.1989
0.2146
0.1771
0.4113
0.0236
0.1159
0.0957
0.0126
0.0159
0.1128
0.0451
0.1200
0.0880
1.6315

0.1706
0.1914
0.1529
0.3530
0.0215
0.0970
0.0803
0.0132
0.0082
0.1128
0.0451
0.1200
0.0948
1.4609

0.1102
0.1415
0.1044
0.2033
0.0192
0.0574
0.0456
0.0114
0.0000
0.0000
0.0000
0.1200
0.0000
0.8131

0.1083
0.1393
0.1024
0.1958
0.0192
0.0556
0.0437
0.0114
0.0000
0.0000
0.0000
0.1200
0.0714
0.8670

0.0945
0.1325
0.0969
0.1776
0.0192
0.0517
0.0417
0.0080
0.0000
0.0000
0.0000
0.1200
0.0000
0.7422

0.0828
0.1235
0.0889
0.1594
0.0192
0.0475
0.0375
0.0079
0.0000
0.0000
0.0000
0.1200
0.0714
0.7581

0.0867
0.3977
0.0921
0.1710
0.0192
0.0505
0.0405
0.0079
0.0000
0.0000
0.0000
0.1200
0.0000
0.9856

0.1389
0.1584
0.1379
0.2896
0.0231
0.0862
0.0682
0.0089
0.0138
0.1056
0.0423
0.1200
0.0484
1.2413

Table 7-10
Mine Diesel Fuel and Prill Consumption

years in period
ktonnes
diesel cost ($/tonne)
diesel $x1000
$/liter
kliters/period
kliters/day
Powder factor
kg/tonne
ANFO
tonnes/period
tonnes/day
prills @ 94%
tonnes/day

years in period
ktonnes
diesel cost ($/tonne)
diesel $x1000
$/liter
kliters/period
kliters/day
Powder factor
kg/tonne
ANFO
tonnes/period
tonnes/day
prills @ 94%
tonnes/day

years in period
ktonnes
diesel cost ($/tonne)
diesel $x1000
$/liter
kliters/period
kliters/day
Powder factor
kg/tonne
ANFO
tonnes/period
tonnes/day
prills @ 94%
tonnes/day

Year -3

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

0.50
8,213
0.4656
3,824
0.66
5,790
32

1.00
20,788
0.3472
7,218
0.66
10,929
30

1.00
30,303
0.3414
10,344
0.66
15,663
43

1.00
68,010
0.2479
16,862
0.66
25,532
70

1.00
89,997
0.2534
22,807
0.66
34,534
95

1.00
90,001
0.2719
24,473
0.66
37,056
102

1.00
90,000
0.3109
27,983
0.66
42,371
116

1.00
90,004
0.2889
26,000
0.66
39,369
108

1.00
90,000
0.2701
24,307
0.66
36,804
101

1.00
89,999
0.2943
26,491
0.66
40,111
110

1.00
90,000
0.3183
28,646
0.66
43,374
119

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

1,643
9.00

4,158
11.39

6,061
16.60

13,602
37.27

17,999
49.31

18,000
49.32

18,000
49.32

18,001
49.32

18,000
49.32

18,000
49.31

18,000
49.32

8.46

10.71

15.61

35.03

46.35

46.36

46.36

46.36

46.36

46.36

46.36

Year 9

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

1.00
90,000
0.2680
24,120
0.66
36,521
100

1.00
89,997
0.2592
23,326
0.66
35,319
97

1.00
90,000
0.2752
24,764
0.66
37,497
103

1.00
90,003
0.2906
26,158
0.66
39,607
109

1.00
89,898
0.2970
26,698
0.66
40,426
111

1.00
89,997
0.2896
26,067
0.66
39,469
108

1.00
89,998
0.2871
25,839
0.66
39,125
107

1.00
90,003
0.3049
27,446
0.66
41,558
114

1.00
89,998
0.3139
28,251
0.66
42,776
117

1.00
89,999
0.3078
27,701
0.66
41,944
115

1.00
82,745
0.3159
26,138
0.66
39,577
108

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

0.200

18,000
49.32

17,999
49.31

18,000
49.32

18,001
49.32

17,980
49.26

17,999
49.31

18,000
49.31

18,001
49.32

18,000
49.31

18,000
49.31

16,549
45.34

46.36

46.35

46.36

46.36

46.30

46.35

46.36

46.36

46.36

46.36

42.62

Year 20

Year 21

Year 22

Year 23

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

Life of
Mine

1.00
87,022
0.2796
24,328
0.66
36,836
101

1.00
55,262
0.3310
18,290
0.66
27,694
76

1.00
49,385
0.3674
18,146
0.66
27,476
75

1.00
42,667
0.4113
17,550
0.66
26,574
73

1.00
39,596
0.3530
13,976
0.66
21,162
58

1.00
33,360
0.2033
6,782
0.66
10,268
28

1.00
33,360
0.1958
6,533
0.66
9,892
27

1.00
33,360
0.1776
5,925
0.66
8,971
25

1.00
33,360
0.1594
5,316
0.66
8,049
22

0.11
3,657
0.1710
625
0.66
947
24

30.61
2,150,982
0.2896
622,935
0.66
943,223
84

0.200

0.200

0.200

0.200

0.200

0.000

0.000

0.000

0.000

0.000

17,404
47.68

11,052
30.28

9,877
27.06

8,533
23.38

7,919
21.70

0
0.00

0
0.00

0
0.00

0
0.00

0
0.00

402,777
36.05

44.82

28.46

25.44

21.98

20.39

0.00

0.00

0.00

0.00

0.00

33.89

Table 7-11
Mine Capital Costs
Item
Ktonnes mined
Preproduction stripping
ktonnes
$/tonne
$x1000
Mine Equipment
P&H 3200XPC blasthole drill
P&H 2800XPC cable shovel
Caterpillar 793D haul truck
Caterpillar 994F wheel loader
Caterpillar D10T track dozer
Caterpillar 834H wheel dozer
Caterpillar 16M grader
Caterpillar 777F WW water truck

Delivered
Unit
Price
Year -3
($x1000) No. $x1000

Year -2
No. $x1000

Year -1
No. $x1000

Year 1
No. $x1000

Year 2
No. $x1000

Year 3
No. $x1000

Year 4
No. $x1000

Year 5
No. $x1000

Year 6
No. $x1000

Year 7
No. $x1000

Year 8
No. $x1000

8,213

20,788

30,303

68,010

89,997

90,001

90,000

90,004

90,000

89,999

90,000

30,303
1.87
56,673

68,010
1.59
108,107

89,997
1.51
136,301

3,903
1
18,975
0
3,352
8
3,064
1
1,195
4
824
2
726
2
1,623
2
Subtotal

Initial spare parts @ 5%


Small equipment @ 10%
Mine equipment total
Mine Facilities
Mine shop/warehouse
Facility
Initial tools and equipment @ 25%
Fuel storage
Diesel average liters/day (x1000)
Store 15 days @ $4/liter of capacity
Gasoline @ 10% of diesel
Explosives storage
Magazine
Prills (average tonnes/day)
Store 10 days @ $5,000/tonne

3,903
0
26,816
3,064
4,780
1,648
1,452
3,246
44,909
2,245
4,491
51,645

8,000
2,000

1
1
0
0
0
0
0
0

3,903
18,975
0
0
0
0
0
0
22,878
1,144
2,288
26,310

1
1
4
0
0
2
0
0

3,903
18,975
13,408
0
0
1,648
0
0
37,934
1,897
3,793
43,624

1
1
9
0
2
0
1
1

3,903
18,975
30,168
0
2,390
0
726
1,623
57,785
2,889
5,779
66,453

0
1
8
0
0
0
0
0

0
18,975
26,816
0
0
0
0
0
45,791
2,290
4,579
52,660

0
0
3
0
0
0
0
0

0
0
10,056
0
0
0
0
0
10,056
0
1,006
11,062

0
0
5
0
0
0
0
0

0
0
16,760
0
0
0
0
0
16,760
0
1,676
18,436

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
4
2
2
0

0
0
0
0
4,780
1,648
1,452
0
7,880
0
788
8,668

0
0
1
0
0
0
0
0

0
0
3,352
0
0
0
0
0
3,352
0
335
3,687

84
5,065
507

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Mine facilities total

50
33.9
169
15,741

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Total mine capital

67,387
6,739
74,125

26,310
2,631
28,941

43,624
4,362
47,987

66,453
6,645
73,098

52,660
5,266
57,926

11,062
1,106
12,168

18,436
1,844
20,280

0
0
0

0
0
0

8,668
867
9,535

3,687
369
4,056

Mine equipment and facilities ($x1000)


Contingency @ 10%

Table 7-11 (Continued)


Mine Capital Costs
Item
Ktonnes mined
Preproduction stripping
ktonnes
$/tonne
$x1000
Mine Equipment
P&H 3200XPC blasthole drill
P&H 2800XPC cable shovel
Caterpillar 793D haul truck
Caterpillar 994F wheel loader
Caterpillar D10T track dozer
Caterpillar 834H wheel dozer
Caterpillar 16M grader
Caterpillar 777F WW water truck

Delivered
Unit
Price
Year 9
($x1000) No. $x1000

Year 10
No. $x1000

Year 11
No. $x1000

Year 12
No. $x1000

Year 13
No. $x1000

Year 14
No. $x1000

Year 15
No. $x1000

Year 16
No. $x1000

Year 17
No. $x1000

Year 18
No. $x1000

Year 19
No. $x1000

89,997

90,000

90,003

89,898

89,997

89,998

90,003

89,998

89,999

82,745

90,000

3,903
0
18,975
0
3,352
0
3,064
0
1,195
0
824
2
726
0
1,623
0
Subtotal

Initial spare parts @ 5%


Small equipment @ 10%
Mine equipment total
Mine Facilities
Mine shop/warehouse
Facility
Initial tools and equipment @ 25%
Fuel storage
Diesel average liters/day (x1000)
Store 15 days @ $4/liter of capacity
Gasoline @ 10% of diesel
Explosives storage
Magazine
Prills (average tonnes/day)
Store 10 days @ $5,000/tonne

0
0
0
0
0
1,648
0
0
1,648
0
165
1,813

0
0
0
0
2
0
1
2

0
0
0
0
2,390
0
726
3,246
6,362
0
636
6,998

0
0
2
0
0
0
0
0

0
0
6,704
0
0
0
0
0
6,704
0
670
7,374

0
0
6
0
0
0
0
0

0
0
20,112
0
0
0
0
0
20,112
0
2,011
22,123

0
0
10
0
0
0
0
1

0
0
33,520
0
0
0
0
1,623
35,143
0
3,514
38,657

1
1
8
0
0
0
0
0

3,903
18,975
26,816
0
0
0
0
0
49,694
0
4,969
54,663

1
1
2
0
0
0
2
0

3,903
18,975
6,704
0
0
0
1,452
0
31,034
0
3,103
34,137

1
1
7
0
0
2
0
0

3,903
18,975
23,464
0
0
1,648
0
0
47,990
0
4,799
52,789

1
1
1
0
4
0
0
0

3,903
18,975
3,352
0
4,780
0
0
0
31,010
0
3,101
34,111

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
2
2
1
0

0
0
0
0
2,390
1,648
726
0
4,764
0
476
5,240

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Mine facilities total

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

Total mine capital

1,813
181
1,994

6,998
700
7,698

7,374
737
8,112

22,123
2,212
24,336

38,657
3,866
42,523

54,663
5,466
60,130

34,137
3,414
37,551

52,789
5,279
58,068

34,111
3,411
37,522

0
0
0

5,240
524
5,764

Mine equipment and facilities ($x1000)


Contingency @ 10%

Table 7-11 (Continued)


Mine Capital Costs
Item
Ktonnes mined
Preproduction stripping
ktonnes
$/tonne
$x1000
Mine Equipment
P&H 3200XPC blasthole drill
P&H 2800XPC cable shovel
Caterpillar 793D haul truck
Caterpillar 994F wheel loader
Caterpillar D10T track dozer
Caterpillar 834H wheel dozer
Caterpillar 16M grader
Caterpillar 777F WW water truck

Delivered
Unit
Price
Year 20
($x1000) No. $x1000

Year 21
No. $x1000

Year 22
No. $x1000

Year 23
No. $x1000

Year 24
No. $x1000

Year 25
No. $x1000

Year 26
No. $x1000

Year 27
No. $x1000

Year 28
No. $x1000

Year 29
No. $x1000

Life of Mine
No.
$x1000

55,262

49,385

42,667

39,596

33,360

33,360

33,360

33,360

3,657

2,150,982

87,022

188,310
1.60
301,081
3,903
0
18,975
0
3,352
0
3,064
0
1,195
0
824
0
726
0
1,623
0
Subtotal

Initial spare parts @ 5%


Small equipment @ 10%
Mine equipment total
Mine Facilities
Mine shop/warehouse
Facility
Initial tools and equipment @ 25%
Fuel storage
Diesel average liters/day (x1000)
Store 15 days @ $4/liter of capacity
Gasoline @ 10% of diesel
Explosives storage
Magazine
Prills (average tonnes/day)
Store 10 days @ $5,000/tonne

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
1

0
0
0
0
0
0
0
1,623
1,623
0
162
1,785

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
2
0
0
0

0
0
0
0
2,390
0
0
0
2,390
0
239
2,629

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0

8
8
74
1
18
12
9
7

31,224
151,800
248,048
3,064
23,900
9,888
6,534
11,361
485,819
10,465
48,582
544,866

8,000
2,000

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

5,065
507

Mine facilities total

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

169
15,741

Total mine capital

0
0
0

0
0
0

1,785
179
1,964

0
0
0

0
0
0

2,629
263
2,892

0
0
0

0
0
0

0
0
0

0
0
0

560,607
56,061
616,668

Mine equipment and facilities ($x1000)


Contingency @ 10%

Table 7-12
Mining Summary

Years in period
Total mateial mined (ktonnes)
ktonnes per day
Haul distance (EqKm)
Equipment required
Blasthole drills
Cable shovels
Haul trucks
Wheel loaders (shvl bkup)
Track dozers
Wheel dozers
Graders
Water trucks
Manpower
Salaried
Operations hourly
Maintenance hourly
Total
Functional operating cost ($/ton)
Drilling
Blasting
Loading
Hauling
Roads & dumps
General mine
General maintenance
Mine administration
Total
Operating cost ($/ton)
Salaried labor
Operating labor
Maintenance labor
Parts and consumables
Total
Mine capital cost ($x1000)
Equipment
Facilities
Contingency @ 10%
Subtotal
Preproduction stripping
Total

Year -3

Year -2

Year -1

Year 1

Year 2

Year 3

Year 4

Year 5

Year 6

Year 7

Year 8

0.50
8,213
45
9.38

1.00
20,788
57
8.34

1.00
30,303
83
9.00

1.00
68,010
186
6.50

1.00
89,997
247
7.20

1.00
90,001
247
7.95

1.00
90,000
247
9.53

1.00
90,004
247
8.64

1.00
90,000
247
7.88

1.00
89,999
247
8.86

1.00
90,000
247
9.83

1
0
8
1
4
2
2
2

1
1
8
1
4
2
2
2

2
2
12
1
4
4
2
2

3
3
21
1
6
4
3
3

4
4
29
1
6
4
3
3

4
4
32
1
6
4
3
3

4
4
37
1
6
4
3
3

4
4
34
1
6
4
3
3

4
4
32
1
6
4
3
3

4
4
35
1
6
4
3
3

4
4
38
1
6
4
3
3

42
64
52
158

42
65
58
165

42
87
89
218

42
133
137
312

42
170
176
388

42
178
183
403

42
195
197
434

42
186
190
418

42
177
183
402

42
187
191
420

42
199
200
441

0.05
0.16
0.00
0.74
0.48
0.05
0.10
0.28
1.87

0.05
0.16
0.12
0.59
0.30
0.05
0.09
0.23
1.59

0.06
0.16
0.11
0.62
0.24
0.04
0.10
0.17
1.51

0.05
0.16
0.11
0.48
0.14
0.04
0.07
0.11
1.16

0.06
0.16
0.11
0.52
0.11
0.03
0.07
0.09
1.15

0.06
0.16
0.11
0.56
0.11
0.03
0.07
0.09
1.20

0.06
0.16
0.11
0.66
0.11
0.03
0.07
0.09
1.29

0.06
0.16
0.11
0.60
0.11
0.03
0.07
0.09
1.24

0.06
0.16
0.11
0.56
0.11
0.03
0.07
0.09
1.19

0.06
0.16
0.11
0.62
0.11
0.03
0.07
0.09
1.25

0.06
0.16
0.11
0.67
0.11
0.03
0.07
0.09
1.31

0.23
0.25
0.23
1.17
1.87

0.18
0.20
0.20
1.01
1.59

0.12
0.18
0.21
1.00
1.51

0.06
0.13
0.15
0.83
1.16

0.04
0.12
0.14
0.84
1.15

0.04
0.13
0.15
0.88
1.20

0.04
0.14
0.16
0.94
1.29

0.04
0.14
0.15
0.91
1.24

0.04
0.13
0.15
0.87
1.19

0.04
0.14
0.16
0.91
1.25

0.04
0.15
0.16
0.96
1.31

51,645
15,741
6,739
74,125
56,673
130,798

26,310
0
2,631
28,941
108,107
137,047

43,624
0
4,362
47,987
136,301
184,288

66,453
0
6,645
73,098

52,660
0
5,266
57,926

11,062
0
1,106
12,168

18,436
0
1,844
20,280

0
0
0
0

0
0
0
0

8,668
0
867
9,535

3,687
0
369
4,056

73,098

57,926

12,168

20,280

9,535

4,056

Table 7-12 (Continued)


Mining Summary
Year 9
Years in period
1.00
Total mateial mined (ktonnes)
90,000
ktonnes per day
247
Haul distance (EqKm)
7.79
Equipment required
Blasthole drills
4
Cable shovels
4
Haul trucks
31
Wheel loaders (shvl bkup)
1
Track dozers
6
Wheel dozers
4
Graders
3
Water trucks
3
Manpower
Salaried
42
Operations hourly
177
Maintenance hourly
182
Total
401
Functional operating cost ($/ton)
Drilling
0.06
Blasting
0.16
Loading
0.11
Hauling
0.55
Roads & dumps
0.11
General mine
0.03
General maintenance
0.07
Mine administration
0.09
Total
1.19
Operating cost ($/ton)
Salaried labor
0.04
Operating labor
0.13
Maintenance labor
0.15
Parts and consumables
0.87
Total
1.19
Mine capital cost ($x1000)
Equipment
1,813
Facilities
0
Contingency @ 10%
181
Subtotal
1,994
Preproduction stripping
Total
1,994

Year 10

Year 11

Year 12

Year 13

Year 14

Year 15

Year 16

Year 17

Year 18

Year 19

1.00
89,997
247
7.43

1.00
90,000
247
8.08

1.00
90,003
247
8.71

1.00
89,898
246
8.95

1.00
89,997
247
8.67

1.00
89,998
247
8.57

1.00
90,003
247
9.29

1.00
89,998
247
9.65

1.00
89,999
247
9.41

1.00
82,745
227
9.60

4
4
30
1
6
4
3
3

4
4
32
1
6
4
3
3

4
4
34
1
6
4
3
3

4
4
35
1
6
4
3
3

4
4
34
1
6
4
3
3

4
4
34
1
6
4
3
3

4
4
36
1
6
4
3
3

4
4
37
1
6
4
3
3

4
4
37
1
6
4
3
3

4
4
34
1
6
4
3
3

42
173
179
394

42
180
185
407

42
187
191
420

42
189
193
424

42
186
191
419

42
185
190
417

42
193
196
431

42
197
199
438

42
194
197
433

42
186
187
415

0.06
0.16
0.11
0.53
0.11
0.03
0.07
0.09
1.17

0.06
0.16
0.11
0.57
0.11
0.03
0.07
0.09
1.21

0.06
0.16
0.11
0.61
0.11
0.03
0.07
0.09
1.24

0.06
0.16
0.11
0.62
0.11
0.03
0.07
0.09
1.26

0.06
0.16
0.11
0.60
0.11
0.03
0.07
0.09
1.24

0.06
0.16
0.11
0.60
0.11
0.03
0.07
0.09
1.24

0.06
0.16
0.11
0.64
0.11
0.03
0.07
0.09
1.28

0.06
0.16
0.11
0.66
0.11
0.03
0.07
0.09
1.30

0.06
0.16
0.11
0.65
0.11
0.03
0.07
0.09
1.29

0.07
0.16
0.11
0.66
0.12
0.03
0.07
0.10
1.32

0.04
0.13
0.15
0.86
1.17

0.04
0.13
0.15
0.88
1.21

0.04
0.14
0.16
0.91
1.24

0.04
0.14
0.16
0.92
1.26

0.04
0.14
0.16
0.91
1.24

0.04
0.14
0.15
0.91
1.24

0.04
0.14
0.16
0.94
1.28

0.04
0.14
0.16
0.95
1.30

0.04
0.14
0.16
0.94
1.29

0.05
0.15
0.17
0.96
1.32

6,998
0
700
7,698

7,374
0
737
8,112

22,123
0
2,212
24,336

38,657
0
3,866
42,523

54,663
0
5,466
60,130

34,137
0
3,414
37,551

52,789
0
5,279
58,068

34,111
0
3,411
37,522

0
0
0
0

5,240
0
524
5,764

7,698

8,112

24,336

42,523

60,130

37,551

58,068

37,522

5,764

Table 7-12 (Continued)


Mining Summary
Year 20
Years in period
1.00
Total mateial mined (ktonnes)
87,022
ktonnes per day
238
Haul distance (EqKm)
8.21
Equipment required
Blasthole drills
4
Cable shovels
4
Haul trucks
32
Wheel loaders (shvl bkup)
1
Track dozers
6
Wheel dozers
4
Graders
3
Water trucks
3
Manpower
Salaried
42
Operations hourly
175
Maintenance hourly
182
Total
399
Functional operating cost ($/ton)
Drilling
0.07
Blasting
0.16
Loading
0.11
Hauling
0.58
Roads & dumps
0.11
General mine
0.03
General maintenance
0.07
Mine administration
0.09
Total
1.22
Operating cost ($/ton)
Salaried labor
0.04
Operating labor
0.13
Maintenance labor
0.15
Parts and consumables
0.89
Total
1.22
Mine capital cost ($x1000)
Equipment
0
Facilities
0
Contingency @ 10%
0
Subtotal
0
Preproduction stripping
Total
0

Year 21

Year 22

Year 23

Year 24

Year 25

Year 26

Year 27

Year 28

Year 29

Life of
Mine

1.00
55,262
151
9.41

1.00
49,385
135
10.95

1.00
42,667
117
12.36

1.00
39,596
108
9.87

1.00
33,360
91
9.87

1.00
33,360
91
9.87

1.00
33,360
91
9.87

1.00
33,360
91
9.87

0.11
3,657
91
9.87

30.61
2,150,982
193
8.83

3
3
23
1
6
4
3
3

2
2
23
1
6
4
3
2

2
2
22
1
6
4
3
2

1
2
17
1
6
4
2
2

0
2
8
1
4
2
2
1

0
2
8
1
4
2
2
1

0
2
7
1
2
2
2
1

0
2
7
1
2
1
1
1

0
2
7
1
2
1
1
1

3
4
30
1
6
4
3
3

42
137
139
318

42
135
134
311

42
130
127
299

42
103
106
251

27
56
68
151

27
55
67
149

27
48
64
139

27
42
60
129

27
44
29
100

41
167
171
379

0.07
0.16
0.11
0.65
0.17
0.04
0.08
0.12
1.40

0.07
0.16
0.11
0.74
0.18
0.04
0.08
0.13
1.50

0.07
0.16
0.11
0.82
0.20
0.04
0.09
0.14
1.63

0.04
0.16
0.11
0.67
0.21
0.03
0.09
0.14
1.46

0.00
0.00
0.11
0.36
0.16
0.04
0.09
0.05
0.81

0.00
0.00
0.11
0.35
0.16
0.04
0.09
0.12
0.87

0.00
0.00
0.11
0.33
0.13
0.04
0.09
0.05
0.74

0.00
0.00
0.11
0.30
0.10
0.04
0.09
0.12
0.76

0.00
0.00
0.11
0.33
0.10
0.04
0.36
0.05
0.99

0.06
0.15
0.11
0.59
0.12
0.04
0.07
0.10
1.24

0.07
0.16
0.18
0.98
1.40

0.08
0.18
0.20
1.05
1.50

0.09
0.20
0.21
1.13
1.63

0.09
0.17
0.19
1.00
1.46

0.00
0.11
0.14
0.56
0.81

0.07
0.11
0.14
0.55
0.87

0.00
0.09
0.13
0.52
0.74

0.07
0.08
0.12
0.48
0.76

0.00
0.09
0.40
0.50
0.99

0.05
0.14
0.16
0.90
1.24

0
0
0
0

1,785
0
179
1,964

0
0
0
0

0
0
0
0

0
0
0
0

2,629
0
263
2,892

0
0
0
0

0
0
0
0

0
0
0
0

1,964

2,892

544,866
15,741
56,061
616,668
301,081
917,749