LARJI HYDROPOWER PROJECT (3*42MW)

SUBMITTED BY

GAURAV& NISHANT VERMA

DEPARTMENT OF MECHANICALENGINEERING
JUNE, 2013

LARJI HYDROPOWER PROJECT (3*42MW)

A Industrial seminar report submitted in partial fulfillment of the requirements for the award of the degree of

BACHELOUR OF TECHNOLOGY
in

(MECHANICAL ENGINEERING)
by

(Roll No.46015& 46033)

DEPARTMENT OF MECHANICALENGINEERING

JUNE, 2013

CONTENT

Sr. No. 1

Particulars

Pg. No.

Certificate

Acknowledgement

Detail of contents

6-8

Chapter 1: Introduction about Hydro Plant

9-17

Chapter 2: Plant Location

18-29

Chapter 3: Specification of Equipment of hydro Plant

30-44

Chapter 4: Operation and Maintenance

44-52

Chapter 5: Conclusion

53

Certificate

ACKNOWLEDGEMENT

I do express my deepest sense of gratitude and indebtedness towards my training supervisor J.E. AshishDepartment of HPSEBLarji, thalot, distt. Mandi (H.P.), for their invaluable guidance, constant encouragement, suggestions, great patience, and continuous technical support which helped me, survive through crests and troughs of my dissertation work which got completed successfully. It is a great privilege to work under them, who motivated me in every course of my work and made me believe in myself. I also thank Mr. Sunil kumar HOD ME and co-ordinator who have equally given me valuable guidance and advise to improve quality of my work. I express my sincere thanks for their suggestions, constant and continuous support throughout this work. I would like to extend my sincere thanks to my colleagues for their valuable assistance and co-operation. I would like to express my heartfelt appreciation for my parents and family members for their constant encouragement and blessings. I save the best for my God who destined me to go beyond deliverance into eternal land of true joyfulness to experience the fullness of his purpose and plan in my life. I thank you God for all things happened and will be happening to my life; Youre gracious, Your ultimate sacrifice made my life possible. I will never be tried of thanking You!

NISHANT VERMA Date: Place: ROLL NO 46033

CONTENTS
CHAPTER 1 1.1 1.2
Introduction Historical background of the project Civil work Electro mechanical work Transmission line Commissioning of the project Hydro power plan Hydro electricity Hydro power is produced Cost of hydro electricity Generating methods Conventional dam Pumped storage Run of the river Tide Type of plant Water turbines Type of turbine with typical range of heads Advantages and disadvantages Advantages Disadvantages

1.3

1.4

1.5 1.6

1.7

CHAPTER 2
2.1 Hydro generator Stator Rotor Bearing Description of turbine equipment Spiral casing Draft tube cone Draft tube kneeling Stay ring Lower ring Runner Turbine shaft Set of guide vanes
6

Turbine top cover. Regulating ring Guide earthing Oil pumping unit Pressure accumulator Oil leakage unit Cooling water system Dewatering and drainage system. Main inlet valve Governor Power transformer Power equation

CHAPTER 3
3.1 Hydro generator Specification 3.2 Turbine. Specification 3.3 Main inlet valve. Specification. 3.4 Generator transformer Specification Function. 3.5 Unit auxiliary transformer Specification Function. 3.6 Unit excitation transformer Specification. Function 3.7 Station transformer Specification. Function.
7

3.8 Battery bank Specification. Type of cell 3.9 Battery charger 48V DC PLCC Battery charger 1,2 220V DC Distribution board 1,2 3.10 Gas insulated substation type F35 Performance Characteristics Customer benefits Technical data Main components Function of GIS

CHAPTER 4
Operation and Maintenance 4.1 Best practice in operation & maintenance of hydro plant

4.2 Maintenance practice Turbine & its auxiliary Turbine Governor Governor & its auxiliary Transformer & switchyard. Emergency D.G. set Other P.H. equipment

CHAPTER 5
Conclusion

LIST OF FIGURES: Figure 1.1- Inside Larji Power House

Figure 2.1- internal view of generator Figure 2.2- internal view of turbine Figure 4.1- water conduction system

CHAPTER 1
1.1 INTRODUCTION:INDIA is endowed with economically exploitable and viable hydro potential assessed to be about 84,000 MW at 60% load factor (1,48,701 MW installed capacity). In addition, 6780 MW in terms of installed capacity from Small, Mini, and Micro Hydel schemes have been assessed. In addition, 56 sites for pumped storage schemes with an aggregate installed capacity of 94,000 MW have been identified. However, only 19.9% of the potential has been harnessed so far.

Figure 1.1: Inside Larji Power House

1.2 BACKGROUND:1.2.1 The Himachal Pradesh State Electricity Board Limited (hereinafter referred to as HPSEB Ltd) is a deemed licensee under the first proviso to section 14 of the Act for distribution and supply of electricity in the State of Himachal Pradesh as well as a generation company falling within the definition of section 2 (28) of the Electricity Act, 2003 (hereinafter referred to as the Act). 1.2.2 The HPSEB Ltd has filed Petition No. 171 of 2010 on August 23, 2010 before the Himachal Pradesh Electricity Regulatory Commission (hereinafter referred to as the Commission) for determination of Capital Cost of Larji Hydro Electric Project (the Project) and determination of generation tariff from FY 2007-08 to FY 2010-11 under sections 62 and 64 of the Electricity Act, 2003, read with the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2007, framed by the Commission, which now stands repealed by the HPERC(Terms and Conditions for Determination of Hydro Generation Tariff) Regulation, 2011 with the stipulation that the provisions concerning the tariff for the Control Period ending on the 31st March, 2011 and the provision for conduct of proceedings for its revocations, variation or alternation, as stood before such repeal, shall continue to be in-force. 1.2.3 This Order relates to the above mentioned Petition under the Multi Year Tariff regime. Further, this Order also relates to truing up of ARRs for the period from FY 2007-08 to FY 2010-11 against the ARRs and tariff provisionally approved by the Commission for electricity generated from Larji HEP (126 MW) in its Multi Year Tariff Order for FY 2008-09 to FY 2010-11, dated May 30, 2008.

1.3 FUNCTION OF THE COMMISION:1.3.1 The Himachal Pradesh Electricity Regulatory Commission was established and incorporated by the Government of Himachal Pradesh through a notification dated December 30, 2000, under section 17 of the repealed Electricity Regulatory Commissions Act, 1998 (14 of 1998), and now covered under the first proviso to section 82 of the Electricity Act, 2003, with its headquarters located at Shimla. 1.2.4 The Act guides the Commissions approach to regulation. The Act mandates the Commission to take measures conducive to the development and management of the electricity industry in an efficient, economic and competitive manner. 1.2.5 The Commission derives its powers under section 86 of the Act, which came into force with effect from June 10, 2003. The Act repealed the Indian Electricity Act, 1910, the Electricity (Supply) Act, 1948 and the Electricity Regulatory Commissions Act, 1998. 1.2.6 As part of the tariff related provisions of the Act, the State Electricity Regulatory Commission (SERC) has to be guided by the Act, the National Electricity Policy (NEP) and the National Tariff Policy (NTP).
10

1.2.7 The functions assigned to the Commission under the Act are as follows: The State Commission shall discharge the following functions, namely: determine the tariff for generation, supply, transmission and wheeling of electricity, wholesale, bulk or retail, as the case may be, within the State: Provided that where open access has been permitted to a category of consumers under section 42 of the Act, the State Commission shall determine only the wheeling charges and surcharge thereon, if any, for the said category of consumers; regulate electricity purchase and procurement process of distribution licensees including the price at which electricity shall be procured from the generating companies or licensees or from other sources through agreements for purchase of power for distribution and supply within the State; facilitate intra-State transmission and wheeling of electricity; issue licences to persons seeking to act as transmission licensees, distribution licensees and electricity traders with respect to their operations within the State; promote cogeneration and generation of electricity from renewable sources of energy by providing suitable measures for connectivity with the grid and sale of electricity to any person, and also specify, for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee; adjudicate upon the disputes between the licensees and generating companies and to refer any dispute for arbitration; levy fee for the purposes of this Act; specify State Grid Code consistent with the Grid Code specified under clause (h) of sub-section (1) of section 79; specify or enforce standards with respect to quality, continuity and reliability of service by licensees; fix the trading margin in the intra-State trading of electricity, if considered, necessary; discharge such other functions as may be assigned to it under this Act.

The State Commission shall advise the State Government on all or any of the following matters, namely: promotion of competition, efficiency and economy in activities of the electricity industry; promotion of investment in electricity industry;
11

reorganisation and restructuring of electricity industry in the State; matters concerning generation, transmission, distribution and trading of electricity or any other matter referred to the State Commission by that Government.

1.4

HISTORICAL BACKGROUND OF THE PROJECT:-

1.4.1 Larji HEP with an installed capacity of 126 MW (3 Units each of 42 MW), a run- of-river scheme on river Beas with pondage, with underground power station and static excitation, situated in District Kullu, was initially taken up for construction in 1987 after its techno-economic approval was received from Government of India (GOI) on August 04, 1986 and the approval from Planning Commission was received on March 30, 1987 at a total cost of Rs.168.85 crore. The total cost of Rs.168.85 crore included civil works consisting of Rs.99.95 crore Electrical works of Rs.54.40 crore and cost of transmission line of Rs.18.50 crore. In the DPR prepared in 1987, following structures were envisaged for the project: Diversion Tunnel on left bank 30.30 m high concrete Gravity Dam Desanding arrangements with 4 chambers. 4850 m long, 8.50 m dia circular Power Tunnel. Two open ended Surge Shafts each of 44m height 28m dia. Surface Power House with 3 Units each of 42 MW Rectangular, 29 m long Tail Race channel.

1.4.2 However, despite techno-economic clearance by the Central Electricity Authority (CEA) on August 4, 1986 and approved by Planning Commission G.O.I. on March 30, 1987 for an estimated cost of Rs.168.85 crore, the construction of the Larji HEP did not proceed as planned, primarily due to paucity of funds. From 1987 to March, 1999 only limited infrastructure was developed and detailed investigations were carried out. Initially, the State Government decided to take up the project for execution in 1991. Consequent to findings of Sub-surface geological explorations which were concurrently in progress, some inherent changes in Project components were found necessary by the erstwhile HPSEB (the Board) in consultation with the Panel of Experts (P.O.E), which was constituted by the Board in 1995 for suggesting and firming up the necessary changes in the DPR. As practically no work had been carried out in respect of main structures envisaged in 1987 proposal, the Board decided to incorporate following changes in main project structures: Concrete Dam was replaced by a gated diversion barrage. 6 Nos. radial gates in spillway were replaced with 5 Nos. radial gates in the diversion barrage but of bigger size. Desanding arrangements of 4 chambers was retained with bigger sizes. HRT length was reduced to 4119.86 m retaining old dia and type of Power Tunnel.
12

Adit locations were changed which changed their length type of Power Tunnel. Two numbers Surge Shafts were replaced by one open Surge Shaft after making changes in height and size. Surface Power House was replaced by underground Power House 29 m long Tail Race channel was replaced by 258mx10m dia Tail Race Tunnel. A new provision of TRT chamber was made.

1.4.3 The State Government decided to take up the Project for active construction in 1998. Accordingly, a revised DPR (March 1999) with the above mentioned changes in scope of the Project was submitted to the Central Electricity Authority (CEA) for according Techno Economic Clearance (TEC) and Planning Commissions Approval. The Central Electricity Authority (CEA) accorded Techno Economic Clearance on January 14, 2000 at revised cost estimate ofRs.796.98 crore including transmission line and IDC. This included civil works costing Rs.419.03 crore. Electro mechanical works of Rs.221.05 crore, cost of transmission lines as Rs.25.75 crore and estimated IDC at Rs.131.16 crore with an overall per MW cost of Rs.6.32 crore. 1.4.4 Civil works: Except for HRT works (Package II) for which letter of intent had been issued in April, 1999, all other Civil/ Mechanical Works for the project were awarded during April, 2000 to January, 2002. 1.4.5 Electro Mechanical works: the HPSEB Ltd entered into two main contracts for Electro Mechanical works for the Project. The first contract was for Ex-manufacturing works/place for main equipment with Alstom make SF6 GIS and mandatory spares and the second contract was for main Equipment and mandatory spares, unloading and handling at site, storage, installation, testing and commissioning including performance testing and insurance covering all activities, which was awarded to M/S BHEL on February 15, 2001. 1.4.6 Transmission line: The construction of transmission lines was decided to be taken up internally by the Board. There were two 132 kV D/C lines, one from Larji to Gaggal which was completed in May, 1993 and commissioned in December, 1998. However, the line was charged on 33 kV for supplying additional power to Kullu Valley. The second line from Larji to Kangoo was completed in June, 2006. 1.4.7 Commissioning of the Project: The First Unit (Unit-III) of Larji HEP was commissioned in September, 2006, Second Unit (Unit-II) was commissioned in October, 2006 and Third Unit (Unit-I) was commissioned in February, 2007.

1.5 HYDRO POWER PLANT:1.5.1 Hydroelectricity is the term referring to electricity generated by hydropower; the production of electrical power through the use of the gravitational force of falling or
13

flowing water. It is the most widely used form of renewable energy, accounting for 16 percent of global electricity consumption, and 3,427 terawatt-hours of electricity production in 2010, which continues the rapid rate of increase experienced between 2003 and 2009. 1.5.2 Hydropower is produced in 150 countries, with the Asia-Pacific region generating 32 percent of global hydropower in 2010. China is the largest hydroelectricity producer, with 721 terawatt-hours of production in 2010, representing around 17 percent of domestic electricity use. There are now three hydroelectricity plants larger than 10 GW: the Three Gorges Dam in China, Itaipu Dam in Brazil, and Guri Dam in Venezuela. 1.5.3 The cost of hydroelectricity is relatively low, making it a competitive source of renewable electricity. The average cost of electricity from a hydro plant larger than 10 megawatts is 3 to 5 U.S. cents per kilowatt-hour.[1] Hydro is also a flexible source of electricity since plants can be ramped up and down very quickly to adapt to changing energy demands. However, damming interrupts the flow of rivers and can harm local ecosystems, and building large dams and reservoirs often involves displacing people and wildlife. Once a hydroelectric complex is constructed, the project produces no direct waste, and has a considerably lower output level of the greenhouse gas carbon dioxide (CO2) than fossil fuel powered energy plants.

1.6 GENERATING METHODS:1.6.1 CONVENTIONAL DAM:Most hydroelectric power comes from the potential energy of dammed water driving a water turbine and generator. The power extracted from the water depends on the volume and on the difference in height between the source and the water's outflow. This height difference is called the head. The amount of potential energy in water is proportional to the head. A large pipe (the "penstock") delivers water to the turbine.

1.6.2 PUMPED STORAGE:This method produces electricity to supply high peak demands by moving water between reservoirs at different elevations. At times of low electrical demand, excess generation capacity is used to pump water into the higher reservoir. When there is higher demand, water is released back into the lower reservoir through a turbine. Pumped-storage schemes currently provide the most commercially important means of large-scale grid energy storage and improve the daily capacity factor of the generation system.

1.6.3 RUN-OF-THE-RIVER:Run-of-the-river hydroelectric stations are those with small or no reservoir capacity, so that the water coming from upstream must be used for generation at that moment, or must be allowed to bypass the dam.

1.6.4 TIDE:A tidal power plant makes use of the daily rise and fall of ocean water due to tides; such sources are highly predictable, and if conditions permit construction of reservoirs, can also
14

be dispatchable to generate power during high demand periods. Less common types of hydro schemes use water's kinetic energy or undammed sources such as undershot waterwheels.

1.7 TYPES OF PLANT:1.7.1 SMALL TYPE: Small hydro is the development of hydroelectric power on a scale serving a small community or industrial plant. The definition of a small hydro project varies but a generating capacity of up to 10 megawatts (MW) is generally accepted as the upper limit of what can be termed small hydro. This may be stretched to 25 MW and 30 MW in Canada and the United States. Small-scale hydroelectricity production grew by 28% during 2008 from 2005, raising the total world small-hydro capacity to 85 GW. Over 70% of this was in China (65 GW), followed by Japan (3.5 GW), the United States (3 GW), and India (2 GW). Small hydro plants may be connected to conventional electrical distribution networks as a source of low-cost renewable energy. Alternatively, small hydro projects may be built in isolated areas that would be uneconomic to serve from a network, or in areas where there is no national electrical distribution network. Since small hydro projects usually have minimal reservoirs and civil construction work, they are seen as having a relatively low environmental impact compared to large hydro. This decreased environmental impact depends strongly on the balance between stream flow and power production.

1.7.2 MICRO:Micro hydro is a term used for hydroelectric power installations that typically produce up to 100 KW of power. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without purchase of fuel.[12] Micro hydro systems complement photovoltaic solar energy systems because in many areas, water flow, and thus available hydro power, is highest in the winter when solar energy is at a minimum.

1.7.3 PICO:Pico hydro is a term used for hydroelectric power generation of under 5 KW. It is useful in small, remote communities that require only a small amount of electricity. For example, to power one or two fluorescent light bulbs and a TV or radio for a few homes. [13] Even smaller turbines of 200-300W may power a single home in a developing country with a drop of only 1 m (3 ft). Pico-hydro setups typically are run-of-the-river, meaning that dams are not used, but rather pipes divert some of the flow, drop this down a gradient, and through the turbine before returning it to the stream.

15

1.8 WATER TURBINES:Water turbines were developed in the 19th century and were widely used for industrial power prior to electrical grids. Now they are mostly used for electric power generation. They harness a clean and renewable energy source, but can cause indirect environmental damage associated with water storage and construction.

1.8.1 TYPES OF TURBINES WITH TYPICAL RANGE OF HEADS: Hydraulic wheel turbine0.2 < H < 4 Archimedes' screw turbine Kaplan2 < H < 40 Francis Pelton Turgo Where (H = head in m) 10 < H < 350 50 < H < 1300 50 < H < 250 1 < H < 10

1.9 ADVANTAGES AND DISADVANTAGES:1.9.1 ADVANTAGES: A renewable source of energy - saves scarce fuel reserves.

Non polluting and hence environment friendly. Long life (The first hydro project completed in 1897 is still in operation at Darjeeling is still in operation) Cost of generation, operation and maintenance is lower than the other sources of energy. Ability to start and stop quickly and instantaneous load acceptance/rejection makes it suitable to meet peak demand and for enhancing system reliability and stability. Has higher efficiency (over 90%) compared to thermal (35%) and gas (around 50%). Cost of generation is free from inflationary effects after the initial installation. Storage based hydro schemes often provide attendant benefits of irrigation, flood control, drinking water supply, navigation, recreation, tourism, pisciculture etc.
16

Being located in remote regions leads to development of interior backward areas (education, medical, road communication, telecommunication etc.)

1.9.2 DISADVANTAGES: Away from Load Centers, Evacuation of power is Big Problem. Environmental /Ecological & rehabilitation/ Resettlement Problem due to submergence/ Construction activities Difficulty in Investigation / Implementation due to Remoteness of the area Long gestation period Lack of availability of long term finance Geological surprises resulting in the time and Cost Over-runs. Hydro Projects suffer from production Risks since the project is planned based on the Historical data, which may not occur in future.

17

CHAPTER 2
2.1 HYDRO GENERATOR
The hydro generator at larji HEP is a vertically placed generator. The major mechanical parts of the generator are stator, rotor, shaft and turbine. Since the rotor and stator are enclosed, these are not visible. Main content are explained as follow.

2.1.1 STATOR : STATOR FRAME:It is made of wieldable steel plates and has adequate depth to prevent distortion during any operation. Joints between the segments are heavily flanged internally and coupled by number of studs. Water cooled air cooler are fixed on the opening , provided on outer casing of the stator frame.

STATOR CORE:It is build up of stampings of high ratings, hot rolled silicon alloy steel with varnish insulation on both sides. Stator core is pressed between steel plate ends through non magnetic radial fingers welded on them. The core is securely clamped by number of long studs along the outer periphery of the core, extending over its full height.

STATOR WINDING:It is a double layer, bar type wave wound. brazing joins the bar ends and each joints is tested by ultrasonic wave for perfection. the stator winding is star connected. three main and three neutral terminals have been brought out side the stator frame. in order to prevent condensation of winding during period of shut down, low temperatures heaters are mounted below the lower air baffles.

2.1.2 ROTOR: ROTOR:The rotor has been design to safety with stand all mechanical stresses imposed by the maximum run way speed. The dynamic balancing of the rotor shall be carried out to keep values of rotor vibration within allowable limits.

18

FIGURE 2.1 Internal view of generator

ROTOR RIMS:the rotor rim is built up from sheet steel laminations each covering two pole pitches and successive layers of laminations overlapped to give adequate strength to the rim. T shaped slots in the outer periphery of the ring receive similar shape projection on the pole. The rim is secured tangentially to the rectangular bars of the spider with sets of five parts keys having a master key in the middle and a set of taper keys on the each side so as to allow the rim to float freely during operation.
19

SHAFT AND THRUST CUM GUIDE BEARING COLLAR:It is made from high quality alloy steel. It has been accurately mechanism and has a hole bored through the centre for inspection and other purpose. The bottom surface of collar is polished in fine limits to act as runner surface.

POLES WITH FIELD WINDING:poles are of laminated construction consisting of sheet steel poles punching, clamped between heavy steel and plates by means of studs. The poles core has a number of T shaped tails to engage with corresponding T shaped tails in the rotor rim. The damper windings bar are of circular copper section and are embedded in poles face. The ends of damper bar are short circuit together by copper segments. The field windings are made of special profile copper strip wound on edge. The coils are electrically heated and pressurized to heal the turn insulation and thus strengthen the coil.

SLIP RINGS AND BRUSH GEAR:slip rings are of mills steel and shall be mounted on extension shaft. The brush gear collector shall be mounted on insulated studs supported on the upper brackets and is conveniently accessible for maintenance and inspection. The insulation for slip rings and their connection is non hygroscopic and oil resistant. Slip rings shall have condition for reversing their polarity without removing the field poles or its collector rings by interchanging connection of the field leads at brush gear.

2.1.3 BEARINGS: THRUST BEARING:It is of pivoted segmented type, in which stationary parts consists of sets of pivoted segmented pads supported on circular pad supports. Bearing shall be self lubricated type with plug in type oil coolers located in oil reservoir. Each pad rests on pad supports which work like spring plates and provided cushioning effect to whole assembly. Radial movements are prevented by the mean of stoppers.Thrust bearing collar is accurately perpendicular to the axis of the shaft. Thrust bearing pads are completely immersed in the oil and would be cooled by mean of oil cooler units. Oil used in the trust bearing is of 46 no. of the prime oil. The edge pads are tapered to allow the oil to enter in the gaps between pads and runner. Pads are designed so that tilting is possible, thus enabling the automatic adjustment of required lubrication gap for actual speed and load.

GUIDE BEARINGS:the guide bearing is of pivoted pad type consisting of a raw of white metal pads arranged in a support ring. A pivoted bar is bolted to the back of each guide pad to enable the pad to move up and down slightly to take up stable position and facilitates formation of the
20

oil film while running. Guide bearing pads are immersed in oil of 68 prime oil. Resistance and dial thermometer are provided in pads, and oil bath for temperature measurement and protection against over heating.

UPPER BRACKET:The upper bracket supports the weight of the stationary parts of brush gear. Upper gear generator cover and mechanical over speed devices etc. It is to be placed on the stator frame.

LOWER BRACKET:The lower bracket houses is the lower guide bearing. The bracket is designed to carry the weight of the rotating parts of the generator and turbine as well as hydraulic thrust. It is designed in such a way that it is possible to lift it through the stator core.

BREAKING AND JACKETING SYSTEM:To apply the brakes, air at 4.0-5.0 atmospheric pressure shall be fed in to the cylinder from the station compressed air system. Brakes shall be automatically applied, when the speed of the rotor reduced to a present value and shall remain applied continuously, so that the unit stop completely. However, it shall be possible to apply the brakes manually. The brakes shall automatically reset after complete stopping of the generator. Limit switches have been provided for each brake to prevent the machine from starting, if any brake be in the raised position and provide ON and OFF indication on the unit control room.

CARBON DUST COLLECTION EQUIPMENT:Carbon dust is produced due to continuous rubbing of carbon brushes on slip rings. To prevent deposition of this dust on slip ring, a chamber has been provided to enclosed the slip rings area and the air from this chamber is extracted by an exhaust fan through a sheet metal duet.

BRAKE DUST COLLECTION EQUIPMENT:The brake dust collection equipment consists of an extraction unit, hoppers around brake assembly for trapping the brake dust and flexible hoses for connecting hoppers to extraction unit. Provision has been made in the control schematic to the unit for its ON/OFF operating in auto mode.

VENTILATION:The generator has closed circuit type ventilation. Twelve air cooler units have been installed in the outer periphery of the stator frame and the cooled air is discharged into
21

the space surrounding the stator. Part of this air is then returned to fan below rotor through ducts in the foundation and remainder cooled air returns to the fan above rotor.

FANS:fans of suitable design are fixed at each end of the rotor rim at top and bottom. Suitable air guides have been provided to ensure proper distribution of air in the machine.

AIR COOLERS:A number of the air cooler are fixed on the stator frame for dissipating the heat in the form of losses in the generator. Each air cooler consists of a rectangular nest of tube between two water chambers, arranged for the air to flow over water through the tubes. The tubes are of cuprous nickel alloy and have coiled coil tinned copper wire around its periphery to increase cooling surface.

2.1.4 DESCRIPTION OF TURBINE EQUIPMENTS:-

FIGURE 2.2 Internalview of turbine


22

SPIRAL CASING:It is logarithmic form and substantially circular in the cross-section, designed to withstand maximum water hammer pressure. The diameter at the inlet is 4200 mm. It is made from boiler steel plates in minimum number of section of different thickness and shall be welded to straying at site.

DRAFT TUBE CONE:It is fabricated from plates and made in three parts to facilitate runner removal from bottom at valve floor. The upper draft tube cone is fabricated from stainless steel plates. On the upper side it is connected to bottom flange of the lower ring of the guide apparatus and on the lower side it is bolted to the intermediate draft tube cone. The intermediate draft cone is fabricated from structural steel and on the upper side it is connected to the upper cone and end is kept in position with the help of the lower draft tube cone. The lower draft cone is also fabricated from carbon steel plates and fixed to the top ring of draft tube knee lining. To prevent leakage of water, all the joints have been provided with rubber sealing cords.

DRAFT TUBE KNEE LINING:It is fabricated from steel plates and is ribbed on its outer surface to give rigidity. It is also manufactured in number of parts. A drainage box has been provided at the side of the liner for dewatering turbine water path into dewatering gallery through a pipe and gate valve.

STAY RING:It is designed to withstand the hydraulic forces and is of cast fabricated construction. It consists of cast upper and lower belts connected together by steam lined cast steel stay vanes for drainage the top cover leakage water by gravity. This is designed to give hydraulic losses, to conform to the flow formed by spiral casting, to guide the water to vanes and meeting the strength requirements.

LOWER RING:The lower ring of guide apparatus (bottom ring) is fabricated from steel plates. The cups, which house the lower brushes of guide vanes are rigidly to the lower ring so that they can be taken out and replaced without dismantling either lower ring or turbine top cover. The lower ring is fixed to stay ring.

RUNNER:The runner shall be Francis type having inlet diameter of 3450 mm. It is made from stainless steel. The runner cone is also of stainless steel. The design is such that the velocity of the water at the skirt is relatively low to minimize silt erosion. All the surface of the runner is ground smooth and is free from hollow, cracks or projections.
23

TURBINE SHAFT:The turbine shaft of external diameter 750 mm and internal diameter 400 mm is forged from high quality manganese steel. The shaft has flanges at both its ends. The upper flanged of the turbine shaft is connected to the flanged of the generator shaft and its lower flange, the turbine shaft is connected with the runner. The connection at both the ends is made with the help of fitted bolts. The axial load as well as the torque is transmitted through these bolts. The shaft is provided with a bearing skirt for guide bearing and stainless steel rotating sleeve for turbine sealing.

SET OF GUIDE VANES:The guide vanes, 24 in number are made of cast stainless steel and have a smooth hydraulic profile. The guide vanes are housed between the turbine top cover and lower ring. The turning of the guide of the guide vane is carried by two servomotors. Safety share pins set shared off, in the event of a foreign body getting wedged between the vanes, thus protecting the guide vanes and turning mechanism against any damage. Contacts have been provided for signalling in case of shear pin failure. The limit switches are provided to give the alarm signal when any of the shear pin gets broken due to jamming of guide vanes. The limit switches are oil/water tight and special glands are used to prevent entry of water in the limit switches through the cables. Stoppers are provided to prevent movement of guide vanes beyond the fully opened and closed position.

TURBINE TOP COVER:The turbine top cover is fabricated from steel plates and is made in two parts. It is rigidly connected to the upper belt of stay ring. provision for gravity drainage of top cover has been made. In its internal vertical cylinder, windows have been provided to have access to turbine sealing for repairs. Renewable stainless steel upper stationary labyrinth sealing has been fixed with top cover.

REGULATING RING:The regulating ring is made of welded construction. It is supported and guided on the support for regulating ring. Which is also fabricated on the turbine top cover. The regulating ring is provided with bronze pads on the surfaces, rubbing against the support and these pads are immerged in an oil bath to minimize friction. Oil is poured in the bath through a special funnel provided for the purpose. The regulating ring is connected with servomotors.

GUIDE BEARING:Oil lubricating turbine guide bearing of segment type has been adopted in the design. It consists of eight Babbitt line segment arranged along the outer circumference of bearing belt of the shaft. The bearing body is made of mild steel plates and is fixed to the top turbine top cover with the help of studs. The guide bearing oil cooler are located inside
24

guide bearing. under stationary condition, the Babbitt line segments are kept immerged in the oil bath. Radial holes have been provided in the skirt of the shaft to act as a centrifugal pumps, when the shaft rotates, thus forcing the oil under pressure to pass through the gap between the segment and shaft and take a wedge form and a oil film is formed ensuring lubrication of guide bearing. The oil flow over the cylinder to guide bearing oil cooler.The oil, after passing through the cooler, flow to the inner tank. Thus the complete circulation of oil is achieved. Cooling water is fed to the oil cooler at a pressure of 3 to 4 kg/cm2. Level relay and flow relay with the alarm are providing for indicating low oil level and less flow of cooling water respectively. For temperature control thermo signalizes and resistance thermometers are provided in the bearing segments as well as in oil bath.

OIL PUMPING UNIT:Each unit is provided with its own pressure system. The pumping unit is equipment with two screw pumps driven by electric motors through flexible coupling and of sufficient capacity, to meet all the oil requirement of turbine. The pump with the turbine is mounted on the top of oil sump tank. Pumping of the oil is mainly carried out by the main pump under the control of idler cum safety valve to maintain the pressure in the pressure accumulator. When the oil pressure drops to a present value in the pressure accumulator, the pressure switch aculates the standby pump to start. When the pressure build up again, the pressure switch operates to stop the pump.

PRESSURE ACCUMULATOR:It is a fabricated pressure vessel. It is an oil accumulator filled with oil and compressed air, and serves as the source of energy for driving the power organs of the system by means of oil under pressure.

OIL LEAKAGE UNIT:the oil leakage unit is intended for the collection of oil leakage from the servomotor of guide apparatus and periodic pumping from the tank of leakage unit into the sump tank of oil pressure unit. The O.L.U. consists of tank and mounted on its pump motor set.

COOLING WATER SYSTEM:water shall be taken from the individual penstock of each unit through self cleaning strainer and cyclonic and will be supplied to serve the following requirement of respective unit: Cooling water for generating air cooler. Cooling water for heat exchanger of generator guide and thrust bearing. Cooling water for turbine sealing, turbine guide bearing etc. Cooling water for transformer,
25

Cooling water for supply to compressor. The water after passing through the self cleaning strainer and cyclonic strainer will be feed to the various equipments. Water from the various equipments will be directly discharged into the tailrace.

DEWATERING AND DRAINAGE SYSTEM:this is common for all units the water of draft tube is collected in sump. The bottom of sump is at an elevation of 880m. Two vertical turbine pumps each of capacity 750m3/hr are installed to give maximum dynamic head of 50m, when the working in parallel. The discharge of both is combined through suitable slide and non-return valves and goes to tailrace. One pressure gauge is also provided in common discharge line.

AIR AND WATER PIPE LINES:air and water pipe line inside the turbine pits are provided serve for: Supply of air to the repair seal (inflatable type) provided under turbine sealing. Cooling water to turbine sealing. Drainage of leakage water by pump motor set from turbine top cover. Cooling water to labyrinth sealing during synchronous condenser operation. Air supply during synchronous condenser operation. Air supply during part load operation. Water pressure relieving from upper portion of crown. Cooling water inlet and outlet for guide bearing.

2.1.5 MAIN INLET VALVE:A) The butterfly valve is located on the pen stock before the turbine and serves the following purposes: It stops the water entry to the turbine when the latter leakage is stopped for a longer period, to decrease the water leakage and to protect the guide apparatus against silt cavitations. It stops the water supply to the turbine in case of emergency. B) Normal closing of valve takes place in still water, but during emergency it is closed against flow of water.
26

C) Butterfly valve is installed in the power house building itself. During operation the valve should be either completely closed or completely opened. Intermediate position of disc to allow partial flow is not allowed. D) Opening of the valve is carried out after equalization is done by supplying water to the spiral casing through bypass valve, keeping the guide apparatus in closed position. E) The valve is operated by means of two oil operated pistons receiving oil from oil pressure unit. F) The butterfly valve has got horizontal axis of rotation. G) A set of limit switches have been mounted on butterfly valve with corresponding set of levers to operate of B.F. valve.

2.1.6 GOVERNOR
The accuracy and sensitivity of the order of 0.02% is desired so that as to assure that several regulators behave in the same way for the system disturbances, thus avoiding mutual hunting and over regulation. To meet above requirements it is, therefore, provided withmicro processor based on electric hydraulic governor which should be able to perform speed control, load control, intelligent sequencing a rapid system monitoring of hydro turbine with reliability and precision. To ensure flexibility in the system there will be provision to change the reference values like speed setting. Gate limit or position and parameter values of PID controller by software means in addition to conventional hardware means.

27

2.1.7 POWER TRANSFORMER


For each 42MW unit there are three power transformer of 52MVA, rating. Transformer has two side HV and LV side, whatever side will be used as input or output. When an hydro generator is in generating stage output voltage of generator is 11 kv, which is input to power transformer and output of that transformer will be 132 kv which is feed to power grid system at that time this transformer is used as step up transformer, but in case of power grid failure power plants will be totally shut down then to start a unit of plant same transformer is used to step down voltage from 132 kv to 11 kv. This 11 kv supply is given to UAT, UET of plant to start machine of plant.

28

2.1.8 POWER EQUATION:-

Every Power house has different power generating capacity. This is governed by factor like water head level, discharge rate of water and the efficiency of the system. Power, P = 9.81*q*h* Where, P= is power generated in KW q= is Discharge of water (m3/sec) = is overall efficiency of TG units h= is net head acting on turbine in meters (Net Head=Gross Head-Losses in WCS) Power calculation for each unit of LARJI power house:Given data:Rated head = 56 m Discharged of water = 83.33m3/sec Efficiency = 0.9% to 0.95% Power produced by each unit = 0.92*83.33*9.81*56 kw = 42115.92 kw = 42 MW

29

CHAPTER 3 3.1 HYDROGENERATOR


3.1.1 SPECIFICATIONS: Types of generator Capacity (KVA) Capacity (KW) Maximum continuous output (KVA) Maximum continuous output (KW) Terminal voltage Stator current2450 A Power factor Excitation current Excitation voltage Speed/no. of rotor poles Frequency Direction of rotation Types of winding No. of slots Height of stator frame Height of generator shaft Overall diameter of rotor Stator core inside diameter Pressure for cooling water SV 806/083-36 46667 42000 51334 46200 11000 V 0.9 lag/lead 1165 A 140V 166.7 RPM/36 50 Hz Clock wise Wave wound 270 2150 mm 2384 mm 7264 mm 7300 mm 3-4kg/cm

30

3.2 TURBINE
3.2.1 SPECIFICATIONS:1. Type of turbine 2. Net head Maximum Rated Minimum 3. Rated output at rated head 4. Maximum output at Rated net head Maximum net head Minimum net head 5. Discharge at rated output & rated net head 6. Speed Rated speed Run away speed 7. Direction of rotation when Viewed from top 8. Maximum speed raise 9. Maximum pressure raise 10. Runner inlet diameter 11. Guide apparatus Elv. Of centre line P.C.D. of guide vane Height\of guide vane No. of guide vane 12. No. of blades 13. Type of spiral casing 14. Elevation of lowest point in the draft tube francis(vertical) 68.25m 56.84m 53.80m 43500 kw 47850 kw 47850 kw 43500 kw 81.86 m3/sec

166.7 rpm 330 rpm clockwise 45% 45% of max. static head 3450 mm 894.7 m 4140 m 1092 m 24 13 metallic 883.7 m

31

3.3 MAIN INLET VALVE (MIV)


3.3.1 SPECIFICATIONS: Type Diameter Design pressure Opening / closing time Number and diameter of servo motor Diameter of bypass valve Diameter of air valve double seal lattice valve 4200 mm 11 kg/cm2 60 sec 2/450 300 mm 200 mm

32

3.4 GENERATORTRANSFORMER(132/11kv)
3.4.1 SPECIFICATIONS: Type of transformer Rating HV(MVA) Rating LV(MVA) No load voltage HV (KV) No load voltage LV (KV) Line current HV (amp) Line current LV (amp) Type of cooling Core/ winding (kg) Weight of oil (kg) Total weight (kg) core type 52 52 132 11 227.71 2732.53 OFWF 35000 12500 62000

3.4.2 GENERATOR TRANSFORMERS


Generator transformers of 52 MVA, 11/132 kv, 3 Phases, 50Hz rating is provided and is place in different niches on has been providing. The transformer on 11KV side has been connected to the generator through bus duct and on 132 KV side to SF6 GIS. The transformer shall be equipped with protection equipments.

33

3.5 UAT:- UNIT AUXILARY TRANSFORMER


3.5.1 SPECIFICATIONS: Type of transformer Capacity (KVA) Rating HV (KV) Rating LV (KV) Rated current HV (amp) Rated current LV (amp) No. of phases Frequency (Hz) Ambient temperature Temp. rise over ambient Insulation class Weight (Kg) dry type 500 11 0.415 26.24 695.6 3 50 50 90 F 3400

3.5.2 FUNCTION OF UAT:These transformers are not oil type transformer, they are of dry type. Dry type transformer is a step down and has rating of 5 KVA. All the auxiliary of machine such as carbon dust collector, breaking system, MIV system, water cooling and oil pumping system have supply from UAT. The input for UAT is from hydro generator, diesel generator and from power grid system.

34

3.6 UET:- UNIT EXCITATION TRANSFORMER


3.6.1 SPECIFICATIONS: Type of transformer Capacity (KVA) Rating HV (KV) Rating LV (KV) Rated current HV (amp) Rated current LV (amp) No. of phases Frequency (Hz) Ambient temperature Temp. rise over ambient Insulation class Weight (Kg) dry type 610 11 0.240 32.02 1.467 3 50 50 90 F 3000

3.6.2 FUNCTION OF UET:These transformers are not oil type transformer, they are of dry type. Dry type transformer is a step down and has rating of 610 KVA.UET supply the power to the excitation unit of generator. UET transformers are take input from generating unit.

35

3.7 STATION TRANSFORMER


3.7.1 SPECIFICATIONS: Type of transformer Rating HV (MVA) Rating LV (MVA) Line current HV (amp) Line current LV (amp) No. of phases Frequency (Hz) No load voltage HV (KV) No load voltage LV (KV) Type of cooling Core/ winding (Kg) Weight of oil (Kg) Total Weight (Kg) core type 6.3 6.3 27.56 330.66 3 50 132 11 OFWF 14010 8680 3480

3.7.2 FUNCTION:At starting time of generating unit when there is no power generated by generator in power house. To start generating unit, we need power. At first power is taken from grid system through station transformer, then synchronized the generating unit with grid. Station transformer supply the power to all auxiliary machines of generating unit, within 3-5 sec. generating unit start running and generate 11 kv the supply from the grid will cut off and this transformer taken power from generating unit then all auxiliary machine get power from station transformer.

36

3.8 BATTERY BANK


Battery bank is the main heart of the power house. Battery bank supply the D.C. power to controlling and protection system of the power house, Liquid type of battery is used and are connecting in series.

3.8.1 SPECIFICATIONS:A) Lead acid cell plante: Type Capacity Temperature Total no. of cell Each cell voltage Total voltage YHP-21 1070 AH 60C 110 2 V D.C. 220V D.C.

YHP-21 is a lead acid cell plante, which supply DC voltage to all DC panels (metering panel) and protection relay of generator and transformer, circuit breaker open and closed, lighting. B) Lead acid cell tublar: Type Capacity Temperature Total no. of cell Each cell voltage Total voltage

B-150S 150AH-10HR 210-270C 24 10V D.C. 240V D.C.

B-150S is a lead acid cell tublar, which supply DC voltage to remote optical fiber wires, used in DC panel. C) Dry cell: type Type Capacity System voltage Total no. of cell Each cell voltage Floating voltage Boast voltage Maximum charging current

B-150S 760AH 26V 13 2V D.C. 28.99V 29.09V 152A

This cell supply DC voltage to microprocessor and data chip.


37

D) Lead acid cell tublar: Type Capacity Temperature Total no. of cell Each cell voltage Total voltage

T600H HDP 600AH-10HR 210-270C 24 2V D.C. 48V D.C.

T600H HDP is a lead acid cell tublar, which supply DC voltage to PLCC ( Power Line Carrier Communication) E) Dry cell: Type Capacity Total no. of cell Each cell voltage Total voltage It is dry cell, supply DC voltage to computer.

T600H HDP 100AH 120 2V D.C. 240V D.C.

38

3.9 BATTERY CHARGER


3.9.1 48V DC PLCC Battery charger 1,2:A) Serial no. B) Direct voltage Float voltage Boost voltage C) Direct current Float current Boost current D) Type of load E) Insulation class F) Input voltage G) Phase H) Frequency IS-3136 43-53V 43-64V 60A 100A continuous F 41510% 3 50 Hz

3.9.2 220 DC Distribution Board 1,2:A) Serial no. B) AC input C) Output voltage Float voltage Boost voltage D) Output current Float current Boost current at starting rate Boost current at finishing rate E) Phase F) Frequency G) Max. operating temperature H) Battery bank DB/18811 41510 236.5V DC 2.75V DC 286A max. 128A 64A 3 50 Hz 50C 110 nos. lead acid cell of 1070 AH

39

3.10 GAS INSULATED SUBSTATION TYPE F35


3.10.1 PERFORMANCE: Up to 145 kv Up to 40 kv short circuits Up to 3150A continuous

3.10.2 CHARACTERSTICS: Three phase in one enclosure Cast aluminium enclosure Spring mechanism

3.10.3 CUSTOMER BENEFITS: flexibility space spacing, having compactness increased safety & reliability modularity and adaptability easier operation accessibility of components

3.10.4 TECHNICAL DATA: Type Location Rated voltage (KV) Rated frequency (Hz) Rated normal current (Amp) Rated short ckt current (KA) Rated lighting impulse withstand Voltage (peak) (KV) Number of phases No. of bus bars Material of bus bar Insulation medium 3 phase, common metal enclosed underground/indoor 72.5-145 50/60 2500-3150 31.55-40 325-650 3 2 aluminium alloy SF6

40

3.10.5 MAIN COMPONENTS:Main components are made of thermal effect circuit breaker with 3 single phases interrupting elements contains in the same enclosure are: Ckt breaker/disconnector combining the functionality and performance of a ckt breaker and a disconnector. High-speed earthing switch: moving contact driven by a spring charged during opening and closing operation. Current and voltage transformers. Surge arresters. High-voltage interfaces: HV plug in cable connection and direct connection to power transformer, over head line connection. Local control cubicle.

3.10.6 FUNCTION OF GIS:The GIS type F35 is designed to withstand 40 KA, and the ckt breakers to interrupt the full 40KA short ckt from 72.5 KV to 145 KV. They protect substation equipment, transmission lines and power transformer, it acts as isolator between the line connected to the power transformer. The single phase interrupting elements of thermal type are contained in the same enclosure. The ckt breaker combined the functionally and performance of a ckt breaker, a ckt breaker interrupting capability and a disconnectorsdielectrical insulation with insulation co-ordination across terminal and to earth.

41

3.11 COMPONENTS

1) Dam / barrage Spillway, radial / vertical gates, sluice gates Power dam Intake 2) Silt flushing arrangement 3) Head race tunnel / Head race channel (Open or Cut & cover) 4) Penstock direct from DAM 5) Surge shaft (Upstream of penstock) 6) Power House Turbine Generator Transformer 7) Tail race tunnel / channel / tail pool 8) Switchyard

42

3.12 MAJOR COMPONENTS OF POWER HOUSE

1) Water path Inlet valve Spiral casing and turbine Draft tube 2) Governor 3) Generator 4) Excitation system 5) Unit auxiliary transformer 6) Bus duct 7) Generator transformer 8) Unit control board 9) Control & protection 10) A.C. Supply System 11) D.C. Supply System 12) Cooling water system 13) Compressed air system 14) EOT crane 15) Ventilation system and air conditioning 16) Drainage and dewatering system 17) Fire protection system

43

3.13 SWITCHYARD COMPONENTS

1) Circuit Breaker 2) Isolator 3) Earthing switch 4) Current transformer 5) Potential transformer 6) Lightning Arrestor 7) Bus Bar 8) Control & relay panel

44

CHAPTER 4
OPERATION AND MAINTENACE
Operation and Maintenance of hydro power stations must aim at reducing failure rate by ensuring smooth operational levels of the power utility. This can be done by adopting timely preventive maintenance schedule regarding all vital areas of the power project. Engineers are well-advised here to follow the well-known dictum Prevention is better than cure.

4.1Hydro Power Plant Engineering : Major component of hydro electric power projects:
A typical Hydro electric power project is spread in a vast geographical area. Depending on the designs of the project, it may be spread over 30 to 50 Km of area. In the vast geographical area, there are large number of critical component which make a hydro electric project works. In this blog post I am going to briefly describe each and every part of those component.

Figure 4.1 Water conductor system.


45

4.1 DAMS:-The most important aspect of hydro power generation is to ensure that the plant
continue to function continuously. The main component of hydro power project is dam, which may be concrete gravity, rock filled, earthen or combination of some of above types. Earthen dams differ from masonry and concrete dams due to relatively greater deformability and higher permeability of earth masses (excluding plastic clay hearting). As these dams are big in general, The safety of the dams is most vital for the unhindered performance of the power plant.

4.2 BARRAGE:-The diversion structure like barrage and weir are generally designed on the
principle governing the percolating of water below the foundation of the structure. The floor of the structure is suitably designed either as a raft of gravity section to be safe against the uplift pressures created.

4.3 WATER INTAKE STRUCTURE:-A structure to divert the water to waterway,


which includes trash racks, a gate and an entrance to a canal, penstock directly to turbine depending on the structure of the project.

4.4 HEAD RACE TUNNEL/POWER CHANNEL:-A canal, tunnel and/or penstock


carries the water to the power house. Sometimes a desilting chamber precedes the head race tunnel, which remove the larger size sediments from entering into the tunnel.

4.5 SURGE SHAFT:-Surge tank is provided into water conducting system primarily to
reduce the surge pressure to be considered in the designed penstock/ pressure shaft. This economizes the design of penstock/ pressure shaft justifying the extra cost for the provision of the surge tank. The provision of the surge tank has following advantages:

The length of the column of water gets reduce by placing a free water surface close to the turbine. It act as a pressure relief opening to absorb surplus kinetic energy. It acts as a balancing reservoir to supply/ store additional water during starting/ closure of the gates/ valves.A surge tank absorbs the water hammer effects due to rapid start or closure of the turbine.

4.6 PENSTOCK/PROTECTION VALVE:-The penstock valves are provided after the


surge shaft to facilitate maintenance of the penstock. These valves are butterfly valves. The are butterfly valves are operated hydraulically with provision of pressure accumulated in case of power failure.

4.7 PENSTOCK/ PRESSURE SHAFT:-The penstock convey the water to the power
house and can take many configurations, depending upon the project layout. Where the power house is an integrated part of the dam, the penstock is simply a passage through the upstream portion of the dam. In case of project having long head race tunnel terminating in the surge tank, the penstock from the surge tank, where most of drop in elevation occurs, would be a pressurerized tunnel or pipe. For multi unit installation, it is often desirable to surve several units with a single penstock, and manifolds or bifurcation structures are provided to direct the flow to individual units.

46

4.8 MAIN INLET VALVE (MIV):-These are spherical valves just provided before the
water enter into the spiral casing of the turbine. This is provided to stop the water for small maintenance purpose In turbine hall.

4.9 POWER HOUSE:-Power house contains the electro mechanical equipment i.e. hydro
power turbine, Generator, excitation system, main inlet valves, transformers, Switchyard, DC systems, governor, bus duct, step up transformers, step down transformers, high voltages switch gears, control metering the protection systems.

4.10 TAILE RACE (Tunnel/ channel):-The tail race tunnel or channel are provided to
direct the used water coming out of draft tube back to the river. The important criteria of designing the tail race tunnel/ channel is kind of draft tube, the gross head and geographical situation of the area. Tail race is designed in such a way that water hammer is minimizes when water leaves the draft tube.

4.2 BEST PRACTICES IN OPERATION & MAINTENANCE OF HYDRO POWER STATIONS:4.1 Best Practices in Operation & Maintenance of Hydro Power stations shall be such that by following such procedures, the downtime of individual generating Unit & Plant should be minimum. The operational reliability of the generating units of the hydro power stations shall be such that whenever the grid demands, it should be available for generation. Some of the aspects, which can be taken into consideration, in Operation & Maintenance of Hydro Power Stations, are given as under : 1) Each failure/tripping occurrence must be questioned with basicminimum three questions :a) Why this occurred? b) How this occurred? c) What is to be done to avoid its reoccurrence? This will definitely reduce failure rate to the greater extent. 2) Since It is important to adopt timely preventive MaintenanceSchedules covering all vital areas and plants, the detailed Daily,Weekly, Monthly, Quarterly, Annually and Capital MaintenanceSheets should be maintained properly. 3) During replacement of any part or equipment after its full utilization or breakdown, it should be ensured that the replaced part orequipment should be of improved version & of latest technologyhaving longer durability to meet all desired requirements so as to213increase plant efficiency and reliability.
47

4) Operating conditions should continuously be monitored and recorded.Records are very important to diagnose the causes of fault / failure/replacement & to determine residual life. Early action can be takenbefore any type of failure. 5) Eventhough Original Equipment Manufacturers recommend max./min. permissible parameters for their equipment, the records/experience/past history play important role to set limiting values ofparameters of these equipment, as characteristics of identicalequipment vary from unit to unit and required to monitor its set values. 6) On the basis of past history/records & recommendations of OEMsmaintenance schedules can be framed. Breakdowns/forced outagescanbe minimized by proper follow-up of the maintenance schedulesbased on recommendations of OEMs.etc. Life of the equipment thuscanbe enhanced.

7) Starting/stopping of the units shall be planned to be minimum toincrease the life. 8) Procurement of the equipment spares should be planned as per therate of the consumption, based on minimum requirement to optimize the inventory. 9) Optimum utilisation of the men & material to be planned. 10) It would be beneficial to arrange training to O&M staff to refresh theirknowledge and to give advanced technical information to improvework quality & quantity.

11) Interaction amongst working staff at various power stations in thecountry needs to be organised to improve performance of plant andequipment in totality so as to implement good Operation &Maintenance Practices. 12) Provision of On Line Condition Monitoring System on genenrator,214turbine and main transformers could be considered for installationon all existing power stations.

13) Afforestation in catchment areaCatchment Area Treatment studies for the Stations in operation could begot carried out and as per recommendations of the studies, the PowerStation should carry out afforestation work in the catchment area. Thiswould help in reduction of silt content in the inflow water.

48

4.2 MAINTENANCE PRACTICE:Some of the practices to be adopted at hydro power stations for maintenance of certain main plant are broadly given below. 4.2.1 Water Intake, Water Conduit System and Associated Equipment Water storage (Reservoir) & water conductor system comprising of intake, head race tunnel, surge shaft, emergency valves & pressure shafts, penstock, main inlet valves are very vital organ of a hydro power plant. .Due to negative and positive water hammer during sudden changes in water flow, it is essential to attend to these plant & equipment very carefully. It is very important to regularly test operation of conduit isolation system/equipment i.e. intake gates, butterfly valves, excess flow device, surge equipment etc. Periodic physical inspection of water conductor system from inside as well as outside to know its condition, silt deposition, rusting/erosion of conduit system is very much essential to find out various changes due to aging factor, stresses developed due to water hammer etc. The records of such physical inspection should be maintained by noting all the details:i.e. normal as well as abnormal. These records can be compared withthe installation data. Any abnormality is to be further investigated bycarrying out hydraulic testing, measurement of thickness by Ultrasonictesting& tests for measuring and computing stresses at strategic locationssuch as intake point, bends, besides observing sudden changes inelevations& sizes of pressure shafts, penstock etc. Leakages, if any,should be scrupulously noted and records maintained. It should be215ensured whether inside / outside (wherever possible) painting is carriedout to protect the conduit system. The valve seals, if deteriorated shouldbe replaced by using new seals with latest materials for enhancing thelife of this equipment. Purification and frequent testing of hydraulic systemoil should be carried out as per recommendations of the manufacturers.For oil purification on-line electrostatic liquid cleaners may give bestresults. Some of the additional points as mentioned below also need tobe considered: Cavitation & erosion at top portion due to rushing of air during fill up. The inspection schedule for the durability of anticorrosive paints used. Replacement schedule for various vulnerable parts such as bends,open conduits etc. Due to humidity open conduit deteriorates from outside. As suchinspection& cleaning to be carried out from time to time at regularintervals. Anticorrosive-painting schedules followed. Timely Operation & Maintenance of the cranes & hoists. Healthiness of control & protection for isolating gates/valves &forcranes/hoists. Maintenance of trash-rack/intake gate filter.
49

Maintenance of communication systems, availability of power supply,equipment for emergency operations, approach roads etc.

4.2.2 TURBINE& ITS AUXILIARIES:Regular inspection of runners of turbines should be carried out and recordto that effect should be invariably maintained. Many a times it is notpossible for Francis Turbine being always immersed in water and needsisolation on either side. For this it is done as recommended bymanufacturer without any compromise. Due to cavitation there maybehuge damages to turbine wheel causing adverse effect on performanceand consequently efficiency. Sometimes, it would be necessary toundertake in-situ repairs of turbine buckets to recoupe/fillup erosions/white pitting by using various cold compounds viz. Belzonacompound,Loctite, SS Metalset, Throtex compound etc. This may give satisfactory216results. Low heat input welding can also be tried at some of the locationsto some extent. An effective system for monitoring of silt content (quantity and size inPPM) may be installed & commissioned by each power station and siltcontent may be monitored continuously on the basis of which action tomitigate the damaging effect to under water parts may be initiatedreducing the down time of units / station.Best efficiency microprocessor based digital PID speed governorsprovide fast response. Periodical maintenance of speed governorsalongwith all associated mechanical, electrical, electronicscomponentshould be carried out. The control circuit should be neatly dressed withidentification marks. The electronic components and cards should becarefully maintained at appropriate temperature level to achieve desiredperformance. Periodical calibration and testing of transducers, metersNew Turbine Runner of Unit No. 3 of Burla Power House of HirakudPowerSystem being replaced for RIM & U Works.217etc. needs to be done. Desired purity level of hydraulic oil is to bemaintained to give trouble free operations. History of each important partshouldbe maintained. Following maintenance works also need to betaken up:-

TURBINE: Periodic NDT viz. Ultrasonic, etc. Polishing of the various under water parts of the turbines once in a year to minimize the white pitting. Inspection & testing of the runners from experts to decide residual life so as to initiate action for procurement of runners for replacement. Inspection of labyrinth seals in case of reaction turbines. Painting of runner housing with anticorrosive I tar based paints. Applying anti-erosion coating to the runner. Checking of brake jet operation in power stations having Pelton turbines once in three months.
50

GOVERNOR: Purification of hydraulic oils by centrifugal as well as electrostatic liquid cleaner. Periodic maintenance of the servo valves and motors after carrying out inspection of the pistons & housings of the servo valves and motors for their worn-out parts. Replacement of the leaking seals. Survey of the component failure & procurement of the same and maintain minimum inventory.

4.2.3 GENERATOR & ITS AUXILIARIES:Stator & rotor winding, bearings & excitation system are the main partsof a generator. As regards stator and rotor windings, regular recording ofIR Values of these winding should be maintained at regular intervals.Tan Delta and DLA tests of stator winding indicates the status I conditionof stator winding insulation. Likewise impedance test (voltage drop testacross each pole) indicates condition of the rotor winding. Proper coolingsystem is to be maintained to limit rise in stator winding temperaturesand consequently increase the life of stator winding. Inspection of the218stator winding is also required to be carried out to verify its firmness instator core slots and healthiness of overhang portion with firm end windingcaps& end spacers, slot wedges checked for healthiness. Windings arerevarnished to enhance their life. Looseness of stator core or interlamination, core insulation are direct factors affecting winding heatingdue to eddy current loss. Thus recommended maintenance as perschedule should be carried out its records maintained and correctiveactionsbe taken if necessary.Another precision and very critical components of generator are its guideand thrust bearings. The thrust bearing is main bearing holding completethrustof rotating mass of turbine and generator unit. The generator andturbine guide bearings act as guides for controlling the vibrations of theunit . If T -G shaft alignment with accurate shaft level is achieved then thepad clearances are adjusted precisely and the rotating machine willoperate smoothly without rise in bearing temperature and increase lifeMachine Hall of Bhabba Power House 3x40 MW219of bearings. Following works also need to be taken up: Periodic checking of the foundations, tightening the bolts. Filling thefoundations with epoxy. Checking the vibrations periodically & history of the recordedreadings gives guidelines for realignment, looseness if any,unbalanced electrical components, increase in bearing gaps,coupling misalignment, uneven stator -rotor air gap etc. Periodic cleaning or replacement of the generator air coolers andbearing oil coolers to improve performance of the generator. Primary and secondary testing of the protection system for itshealthiness and correct operation. Inspection of the CTs, PTs and bus bars for overheating, temperaturerise etc.
51

Inspection of circuits for protection & control circuits & mock trials of the fire fighting system along with evacuation system. Checking weightloss of the CO2 cylinders and replenish as per recommendations ofOEM.

4.2.4 TRANSFORMER & SWITCHYARD: Continuous monitoring of oil & winding temperature. Periodic oil filtration. Oil testing for various tests and Dissolved Gas Analysis. Tandelta& insulation resistance etc. as per schedule. Cleaning and replacement of oil cooler Testing protection system for healthiness. Mock trials of Checking, maintenance and inspection for Fire fighting system, CO2 &mulsifire. Tests for operation time of the breaker. Operation & testing of isolator opening & closing. Checking of control circuit & healthiness of operating system of thebreaker.220 Periodic cleaning of transformer bushings & insulator strings. Switchyards are to be kept neat & tidy. Minimum area surrounding theyard to be free from growth of scrubs and bushes to avoid any bushfire damaging the equipment.

4.2.5 EMERGENCY D.G. SET: Regular maintenance of the emergency set. Checking control & Protection system. Running of DG set at regular intervals.

4.2.6 OTHER P.H. EQUIPMENT: Periodic maintenance of unit auxiliary, station auxiliary &stationService transformer. Checking healthiness of station batteries & battery chargers.TheTwo charges should be rotated once in a week. Regular inspection of cable ducts to ensure proper ventilation / heatDissipation. Checking the healthiness of pressure relief valve, if provided.

52

CHAPTER 5
CONCLUSION

HPSEBL is committed to provide adequate, reliable power to all its consumers and in this direction all out efforts are afoot. HPSEBL is also committed to ensure Grid discipline & operate with in a frequency band of 49.5Hz to 50.2 Hz. To achieve the above aims we seek the support & cooperation of our Industrial brethren.