You are on page 1of 22

`SATKAR HOTEL'

B-65

Tuesday, July 02, 2013

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

TABLE OF CONTENT:

Concise Report
A. - Project Design Parameters and Load Combinations
A.1 - Project Design Parameters
A.2 - Load Combinations
B. - Design Strip Report B-65
B.1 - Geometry
B.2 - Applied Loads
B.3 - Design Moments
Envelope
B.4 - Tendon Profile
B.5 - Stress check / Code check
Envelope
B.6 - Rebar Report
B.7 - Punching Shear
B.8 - Deflection
B.9 - Quantities
Tabular Reports - Compact
1 - User Specified General Analysis and Design Parameters
2 - Input Geometry
2.1 - Principal Span Data of Uniform Spans
2.3 - Effective Width Data of Uniform Spans
2.7 - Support Width and Column Data
3 - Input Applied Loading
3.1 - Loading As Appears in User's Input Screen
3.2 - Compiled Loads
4 - Calculated Section Properties
4.1 - Section Properties of Uniform Spans and Cantilevers
5 - Moments, Shears and Reactions
5.1 - Span Moments and Shears (Excluding Live Load)
5.2 - Reactions and Column Moments (Excluding Live Load)
5.3 - Span Moments and Shears (Live Load)
5.4 - Reactions and Column Moments (Live Load)
6 - Moments Reduced to Face of Support
6.1 - Reduced Moments at Face of Support (Excluding Live Load)
6.2 - Reduced Moments at Face of Support (Live Load)
7 - Selected Post-Tensioning Forces and Tendon Profiles
7.1 - Tendon Profile
7.2 - Selected Post-Tensioning Forces and Tendon Drape
7.4 - Required Minimum Post-Tensioning Forces
7.5 - Service Stresses
email: Support@Adaptsoft.com website: http://www.Adaptsoft.com
1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
2

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

7.6 - Post-Tensioning Balance Moments, Shears and Reactions


8 - Factored Moments and Reactions Envelope
8.1 - Factored Design Moments (Not Redistributed)
8.2 - Reactions and Column Moments
8.3 - Secondary Moments
10 - Mild Steel (No Redistribution)
10.1 - Required Rebar
10.2 - Provided Rebar
12 - Shear Reinforcement
12.1 - Shear Calculation Envelope
14 - Deflections
14.1 - Maximum Span Deflections
Tabular Reports - Detailed
21 - Tendon Heights
22 - Post-Tensioning Balanced Loading
23 - Detailed Moments
24 - Detailed Shears
25 - Factored Moments and Reactions
27 - Detailed Stresses
28 - Required Post-Tensioning
29 - Detailed Rebar
34 - Demand Moment and Moment Capacity
34.2 - Based on Designed Values

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
3

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

A. Design Parameters and Load Combinations


A.1 Project Design Parameters
Parameter
Concrete
F'c for BEAMS/SLABS
For COLUMNS/WALLS
Ec for BEAMS/SLABS
For COLUMNS/WALLS
CREEP factor
CONCRETE WEIGHT
UNIT WEIGHT
Tension stress limits / (f'c)1/2
At Top
At Bottom
Compression stress limits / f'c
At all locations
Reinforcement
Fy (Main bars)
Fy (Shear reinforcement)
Minimum Cover at TOP
Minimum Cover at BOTTOM

Value

Parameter

Post-tensioning
28.00 N/mm 2
SYSTEM
28.00 N/mm 2
Fpu
26587.00 N/mm 2
Fse
24870.00 N/mm 2
Strand area
2.00
Min CGS from TOP
NORMAL
Min CGS from BOT for interior spans
2500.00 Kg/m 3 Min CGS from BOT for exterior spans
Min average precompression
0.550
Max spacing / slab depth
0.550
Analysis and design options
Structural system
0.450
Moment of Inertia over support is
Moments reduced to face of support
500.00 N/mm 2
Moment Redistribution
500.00 N/mm 2
Effective flange width consideration
25.00 mm
Effective flange width implementation
method
25.00 mm
DESIGN CODE SELECTED

Value
BONDED
1860.00 N/mm 2
1200.00 N/mm 2
99.000 mm 2
150.00 mm
100.00 mm
100.00 mm
0.85 N/mm 2
8.00
BEAM
NOT INCREASED
YES
NO
YES
ACI-318
American-ACI318
(2008)/IBC 2009

A.2 Load Combinations


Strength load combinations
1. 1.5 SW + 1.5 LL + 1.5 SDL + 1.5 X + 1 HYP
Service load combinations
Sustained Load
1. 1 SW + 1 LL + 1 SDL + 1 X + 1 PT

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
4

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

B. Design Strip Report: B-65


B.1 Geometry
- Plan

- Elevation

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
5

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
6

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

B.2 Applied loads


- Superimposed Dead Load

- Live Load

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
7

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
8

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

B.3 Design Moment


LOAD COMBINATION: Envelope
Moment Diagrams
Project: "`SATKAR HOTEL'" / Load Case: Envelope
Moment Drawn on Tension Side
Bending Max Strength

Bending Min Strength

Bending Max Service

Bending Min Service

Bending Pos Moment

Bending Neg Moment

-5000
-2500

Moment [kNm]

0
2500
5000
7500
10000

Span 1

DESIGN MOMENT
(Moment is drawn on tension side)

B.4 Tendon Profile


Tendon Height Diagram
File: B65
1200
1100
1000

Tendon Height [mm]

900
800
700
600
500
400
300
200
100
0
Span 1

POST-TENSIONING
PROFILE

B.5 Stress check results / Code check


LOAD COMBINATION: Envelope

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
9

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013
Stress Diagrams

Stress Diagrams

Project: "`SATKAR HOTEL'" / Load Case: Envelope

Project: "`SATKAR HOTEL'" / Load Case: Envelope

Tensile Stress Positive


0

Top Max

Top Min

Tensile Stress Positive


Allowable Stresses

Bottom Max

Bottom Min

Allowable Stresses

-1
2
-2
Stress [N/mm]

Stress [N/mm]

1
-3
-4
-5
-6

0
-1
-2

-7
-3
-8
Span 1

Span 1

SERVICE COMBINATION STRESSES


(Tension stress positive)

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
10

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

B.6 Rebar Report

B.8 Deflection
Deflection Diagrams
File: B65
Service Envelope Max

Service Envelope Min

0.00

Deflection [mm]

0.25

0.50

0.75

1.00

1.25

Span 1

DEFLECTION

B.9 Quantities
CONCRETE
Total volume of concrete = 31.49 m3
Area covered = 30.28 m2
MILD STEEL

Total weight of rebar = .00 kg


Average rebar usage = 0.00 kg/m2, 0.00 kg/m3
PRESTRESSING MATERIAL
Total weight of tendon = 607.6 kg
Average tendon usage = 20.07 kg/m2, 19.30 kg/m3

1 - USER SPECIFIED GENERAL ANALYSIS AND DESIGN PARAMETERS


Parameter
Concrete
F'c for BEAMS/SLABS
For COLUMNS/WALLS
Ec for BEAMS/SLABS
For COLUMNS/WALLS
CREEP factor
CONCRETE WEIGHT
UNIT WEIGHT
Tension stress limits / (f'c)1/2
At Top
At Bottom
Compression stress limits / f'c

Value

Parameter
Value
Post-tensioning
28.00 N/mm 2
SYSTEM
BONDED
28.00 N/mm 2
Fpu
1860.00 N/mm 2
26587.00 N/mm 2
Fse
1200.00 N/mm 2
24870.00 N/mm 2
Strand area
99.000 mm 2
2.00
Min CGS from TOP
150.00 mm
NORMAL
Min CGS from BOT for interior spans
100.00 mm
2500.00 Kg/m 3 Min CGS from BOT for exterior spans
100.00 mm
Min average precompression
0.85 N/mm 2
0.550
Max spacing / slab depth
8.00
0.550
Analysis and design options
Structural system
BEAM

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
11

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

At all locations
Reinforcement
Fy (Main bars)
Fy (Shear reinforcement)
Minimum Cover at TOP

0.450
500.00 N/mm 2
500.00 N/mm 2
25.00 mm

Minimum Cover at BOTTOM

25.00 mm

Moment of Inertia over support is


NOT INCREASED
Moments reduced to face of support
YES
Moment Redistribution
NO
Effective flange width consideration
YES
Effective flange width implementation
ACI-318
method
DESIGN CODE SELECTED
American-ACI318
(2008)/IBC 2009

2 - INPUT GEOMETRY
2.1 Principal Span Data of Uniform Spans
Span Form Length Width
Depth TF Width

m
8.65

mm
700

mm
1200

mm
3500

TF
Thick.
mm
1000

BF/MF
Width
mm

BF/MF
Thick.
mm

Rh
mm
1200

Right
Mult.

Left Mult.

0.50

0.50

2.3 Effective Width Data of Uniform Spans


Span
Effective Width
mm
1
2163

2.7 Support Width and Column Data


Joint Support Length B(DIA.) D LC
Width
LC
LC
mm
m
mm
mm
1
900.0
4.0
700.0
900.0
2
900.0
4.0
700.0
900.0

% LC

100
100

CBC LC Length
UC
m
(1)
4.0
(1)
4.0

B(DIA.)
UC
mm
700.0
700.0

D UC

% UC

CBC UC

mm
900.0
900.0

100
100

(1)
(1)

3 - INPUT APPLIED LOADING


3.1 Loading As Appears in User's Input Screen
Span Class Type
W
P1
P2
kN/m2
kN/m
kN/m
1
LL
L
60.200
1
SDL
C
1
SDL
C
1
SDL
C
1
SDL
L
37.000

A
m
0.000
2.450
3.350
4.900
0.000

B
m
8.650

C
m

F
kN

M
kN-m

275.000
2190.000
200.000
8.650

NOTE: SELFWEIGHT INCLUSION REQUIRED (SW= SELF WEIGHT Computed from geometry
input and treated as dead loading. Unit selfweight W = 2500.0 Kg/m^3
NOTE: LIVE LOADING is SKIPPED with a skip factor of
1.00
3.2 Compiled loads
Span Class Type

1
1
1
1
1

LL
SDL
SDL
SDL
SDL

P
C
C
C
P

P1

P2

kN/m
60.200

kN/m

kN

kN-m

m
0.000
2.450
3.350
4.900
0.000

m
8.650

275.000
2190.000
200.000
37.000

Reduction
Factor
%
0.000

8.650

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
12

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

SW

89.271

4 - CALCULATED SECTION PROPERTIES


4.1 Section Properties of Uniform Spans and Cantilevers
Span
Area
Yb
Yt
b_eff
mm2
mm
mm
mm
1
3640000.00
676.92
523.08
2162.50

I
mm4
0.2280E+12

Yb
mm
663.52

Yt
mm
536.48

5 - MOMENTS, SHEARS AND REACTIONS


5.1 Span Moments and Shears (Excluding Live Load)
Span Load Case
Moment
Moment
Moment
Left
Midspan
Right
kN-m
kN-m
kN-m
1
SW
-343.41
491.53
-343.40
1
SDL
-2012.48
2917.23
-1605.41
1
XL
0.00
0.00
0.00

Shear
Left
kN
-386.10
-1832.75
0.00

Shear
Right
kN
386.10
1152.30
0.00

5.2 Reactions and Column Moments (Excluding Live Load)


Joint Load Case
Reaction
Moment
Moment
Lower Column Upper Column
kN
kN-m
kN-m
1
SW
386.10
-171.71
-171.71
2
SW
386.10
171.71
171.71
1
SDL
1832.75
-1006.28
-1006.28
2
SDL
1152.30
802.73
802.73
1
XL
0.00
0.00
0.00
2
XL
0.00
0.00
0.00
5.3 Span Moments and Shears (Live Load)
Span
Moment
Moment
Moment
Left Max
Left Min
Midspan
Max
kN-m
kN-m
kN-m
1
-231.58
0.00
331.46

Moment
Moment
Midspan Min Right Max
kN-m
0.00

kN-m
-231.58

Moment
Right Min
kN-m
0.00

Shear
Left

Shear
Right

kN
-260.37

kN
260.36

5.4 Reactions and Column Moments (Live Load)


Joint
Reaction
Reaction
Moment
Moment
Moment
Moment
Max
Min
Lower
Lower
Upper
Upper
Column Max Column Min Column Max Column Min
kN
kN
kN-m
kN-m
kN-m
kN-m
1
260.37
0.00
0.00
-115.79
0.00
-115.79
2
260.36
0.00
115.79
0.00
115.79
0.00

6 - MOMENTS REDUCED TO FACE OF SUPPORT


6.1 Reduced Moments at Face of Support (Excluding Live Load)
Span Load
Moment
Moment
Moment
Case
Left
Midspan
Right
kN-m
kN-m
kN-m
1
SW
-178.70
491.50
-178.70
1
SDL
-1191.00
2917.00
-1091.00
1
XL
0.00
0.00
0.00

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
13

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

6.2 Reduced Moments at Face of Support (Live Load)


Span Moment Left Moment Left Moment
Moment
Moment
Max
Min
Midspan Midspan Min Right Max
Max
kN-m
kN-m
kN-m
kN-m
kN-m
1
-120.50
0.00
331.50
0.00
-120.50

Moment
Right Min
kN-m
0.00

7 - SELECTED POST-TENSIONING FORCES AND TENDON PROFILES


7.1 Tendon Profile
Tendon A
Span Type
X1/L
1
1
0.100

X2/L
0.500

X3/L
0.100

A/L
---

7.2 Selected Post-Tensioning Forces and Tendon Drape


Tendon A
Span
Force
CGS Left CGS C1
CGS C2 CGS Right
kN
mm
mm
mm
mm
1
********
676.92
--300.00
676.92
All Tendons
Span
Force

kN
0

Total P/A

P/A
MPa
2.95

Wbal
kN/432.676

WBal (%DL)
100

Total WBal
(%DL)

MPa
0

Approximate weight of strand:

607.6 Kg

7.4 Required Minimum Post-Tensioning Forces


Based on Stress Conditions
Type
Left
Center
Right
Left
kN
kN
kN
kN
1
1073.40
8260.42
649.63
3094.00

Based on Minimum P/A


Center
Right
kN
kN
3094.00
3094.00

7.5 Service Stresses (tension shown positive)


Envelope of Service 1
Span
Left
Left
Left
Left
Center
Top
Top
Bot
Bot
Top
Max-T Max-C Max-T Max-C Max-T
MPa
MPa
MPa
MPa
MPa
1
-----2.74
-----3.56
-----

Center
Top
Max-C
MPa
-5.76

Cetner
Bot
Max-T
MPa
0.52

Cetner
Bot
Max-C
MPa
-0.44

Right
Top
Max-T
MPa
-----

Right
Top
Max-C
MPa
-2.97

Right
Bot
Max-T
MPa
-----

Right
Bot
Max-C
MPa
-3.27

Envelope of Service 2
Span
Left
Left
Top
Top
Max-T Max-C
MPa
MPa
1
0.00
-----

Center
Top
Max-C
MPa
-----

Cetner
Bot
Max-T
MPa
0.00

Cetner
Bot
Max-C
MPa
-----

Right
Top
Max-T
MPa
0.00

Right
Top
Max-C
MPa
-----

Right
Bot
Max-T
MPa
0.00

Right
Bot
Max-C
MPa
-----

Left
Bot
Max-T
MPa
0.00

Left
Bot
Max-C
MPa
-----

Center
Top
Max-T
MPa
0.00

7.6 Post-Tensioning Balance Moments, Shears and Reactions


Span Moments and Shears
Span
Moment Left Moment Center Moment Right
Shear Left
kN-m
kN-m
kN-m
kN
1
1280.00
-2548.00
1280.00
0.00
Reactions and Column Moments
Joint
Reaction
Moment

Shear Right
kN
0.00

Moment

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
14

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

1
2
Note:

kN
-0.005
0.004

Lower
Column
kN-m
749.500
-749.500

Upper
Column
kN-m
749.500
-749.500

Moments are reported at face of support

8 - FACTORED MOMENTS AND REACTIONS ENVELOPE


8.1 Factored Design Moments (Not Redistributed)
Span
Left
Left
Middle
Middle
Max
Min
Max
Min
kN-m
kN-m
kN-m
kN-m
1
-736.30
-555.55
7109.00
6611.75

Right
Max
kN-m
-586.30

Right
Min
kN-m
-405.55

8.2 Reactions and Column Moments


Joint
Reaction
Reaction
Moment
Moment
Moment
Moment
Max
Min
Lower
Lower
Upper
Upper
Column Max Column Min Column Max Column Min
kN
kN
kN-m
kN-m
kN-m
kN-m
1
3719.25
3328.65
-1017.05
-1190.75
-1017.05
-1190.75
2
2697.75
2307.15
885.80
712.10
885.80
712.10
8.3 Secondary Moments
Span
Left
Midspan
kN-m
kN-m
1
1499.00
1499.00

Right
kN-m
1499.00

Note: Moments are reported at face of support

10 - MILD STEEL - NO REDISTRIBUTION


10.1 Required Rebar

10.2 Provided Rebar

12 - SHEAR REINFORCEMENT
12.1 Shear Calculation Envelope
SPAN 1
X/L
X
d
m
mm
0.05
0.45
960.00
0.10
0.86
960.00
0.15
1.30
960.00
0.20
1.73
960.00
0.25
2.16
960.00
0.30
2.60
960.00
0.35
3.03
960.00
0.40
3.46
960.00
0.45
3.89
960.00
0.50
4.33
960.00
0.55
4.76
960.00
0.60
5.19
960.00

Vu
kN
-3593.00
-3477.00
-3356.00
-3235.00
-3114.00
-2580.00
-2459.00
1025.00
1106.00
1188.00
1309.00
1730.00

Mu
kNm
-561.10
781.00
2230.00
3669.00
5055.00
6329.00
7430.00
8113.00
7672.00
7180.00
6635.00
5948.00

Ratio
3.25
3.14
3.03
2.92
2.81
2.71
2.99
2.31
2.48
2.40
2.33
2.29

Req.
mm2/m
****
****
****
****
****
4527.00
4545.00
1616.00
1832.00
1926.00
2074.00
2706.00

Spacing
mm
****
****
****
****
****
49.96
49.77
139.90
123.40
117.50
109.00
83.59

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
15

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

0.65
0.70
0.75
0.80
0.85
0.90
0.95

5.62
6.05
6.49
6.92
7.35
7.79
8.20

960.00
960.00
960.00
960.00
960.00
960.00
960.00

1851.00
1972.00
2093.00
2214.00
2335.00
2456.00
2573.00

5167.00
4331.00
3443.00
2502.00
1509.00
506.00
-409.60

2.10
1.89
1.89
2.00
2.11
2.22
2.33

2698.00
2572.00
2740.00
3076.00
3412.00
3748.00
4072.00

83.85
87.93
82.54
73.52
66.28
60.34
55.54

Note: "Vu" is related to the load combination which produces the maximum "Ratio"
Note: Sections with **** have exceeded the maximum allowable shear stress.
14 - DEFLECTIONS
14.1 Maximum Span Deflections
Span
SW
SW+PT SW+PT+ SW+PT+SDL
LL
SDL
+Creep
mm
mm
mm
mm
mm
1
0.5
-2.1
1.0
3.1(2747)
0.4(23689)

Total

mm
0.0(*****)

mm
3.5(2475)

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
16

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

21 - TENDON HEIGHTS
X/L
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

X
m
SPAN 1
0.000
0.433
0.865
1.298
1.730
2.162
2.595
3.027
3.460
3.892
4.325
4.758
5.190
5.622
6.055
6.488
6.920
7.353
7.785
8.217
8.650

CGS A
mm

CGS B
mm

CGS C
mm

676.92
658.07
601.54
530.86
469.61
417.79
375.38
342.40
318.85
304.71
300.00
304.71
318.85
342.40
375.38
417.79
469.61
530.86
601.54
658.07
676.92

676.92
658.07
601.54
530.86
469.61
417.79
375.38
342.40
318.85
304.71
300.00
304.71
318.85
342.40
375.38
417.79
469.61
530.86
601.54
658.07
676.92

676.92
658.07
601.54
530.86
469.61
417.79
375.38
342.40
318.85
304.71
300.00
304.71
318.85
342.40
375.38
417.79
469.61
530.86
601.54
658.07
676.92

22 - POST-TENSIONING BALANCED LOADING


Span

Type

1
1
1
1

3
3
3
3

W
kN/m
2163.380
2163.380
-540.845
-540.845

F
kN

M
kN-m

a
m
0.00
7.79
0.87
4.33

b
m
0.87
8.65
4.33
7.79

23 - DETAILED MOMENTS
SPAN 1
X/L
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60

X
m
0.00
0.43
0.86
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19

SW
kN-m
-343.41
-184.77
-42.84
82.40
190.95
282.79
357.93
416.38
458.13
483.18
491.53
483.18
458.13

SDL
kN-m
-2012.50
-1223.30
-441.00
334.36
1102.80
1864.30
2579.00
3207.80
3588.70
3256.40
2917.20
2571.10
2160.10

XL
kN-m
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LL Min
kN-m
-231.58
-124.60
-28.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LL Max
kN-m
0.00
0.00
0.00
55.57
128.77
190.70
241.37
280.79
308.94
325.83
331.46
325.83
308.94

PT
kN-m
1498.90
1296.60
689.58
-69.18
-726.78
-1283.20
-1738.50
-2092.60
-2345.50
-2497.20
-2547.80
-2497.20
-2345.50

Secondary
kN-m
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
17

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

5.62
6.06
6.49
6.92
7.35
7.79
8.22
8.65

416.38
357.94
282.79
190.95
82.41
-42.83
-184.77
-343.40

1713.60
1260.20
799.92
332.70
-141.45
-622.52
-1110.50
-1605.40

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
-28.88
-124.60
-231.58

280.79
241.38
190.70
128.77
55.57
0.00
0.00
0.00

-2092.60
-1738.50
-1283.20
-726.80
-69.21
689.55
1296.60
1498.90

1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00
1499.00

SDL
kN
-1832.70
-1816.70
-1800.70
-1784.70
-1768.70
-1752.70
-1461.70
-1445.70
760.27
776.27
792.28
808.28
1024.30
1040.30
1056.30
1072.30
1088.30
1104.30
1120.30
1136.30
1152.30

XL
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LL Min
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
26.04
52.07
78.11
104.15
130.18
156.22
182.25
208.29
234.33
260.36

LL Max
kN
-260.37
-234.33
-208.29
-182.26
-156.22
-130.18
-104.15
-78.11
-52.07
-26.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PT
kN
0.00
935.67
1871.30
1637.40
1403.50
1169.60
935.67
701.75
467.84
233.92
0.00
-233.91
-467.83
-701.74
-935.66
-1169.60
-1403.50
-1637.40
-1871.30
-935.66
0.00

Secondary
kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

24 - DETAILED SHEARS
SPAN 1
X/L
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

X
m
0.00
0.43
0.87
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.06
6.49
6.92
7.35
7.79
8.22
8.65

SW
kN
-386.10
-347.49
-308.88
-270.27
-231.66
-193.05
-154.44
-115.83
-77.22
-38.61
0.00
38.61
77.22
115.83
154.44
193.05
231.66
270.27
308.88
347.49
386.10

25 - FACTORED MOMENTS AND REACTIONS


Load Combination: 1.50SW + 1.50LL + 1.50SDL + 1.50XL + 1.00SEC
Factored Design Moments (Not Redistributed)
Span
Left
Left
Middle
Middle
Max
Min
Max
Min
kN-m
kN-m
kN-m
kN-m
1
-736.30
-555.55
7109.29
6612.10

Right
Max
kN-m
-586.30

Right
Min
kN-m
-405.55

Reactions and Column Moments


Joint
Reaction
Reaction
Moment
Moment
Moment
Moment
Max
Min
Lower
Lower
Upper
Upper
Column Max Column Min Column Max Column Min
kN
kN
kN-m
kN-m
kN-m
kN-m
1
3719.25
3328.65
-1017.05
-1190.75
-1017.05
-1190.75
2
2697.75
2307.15
885.80
712.10
885.80
712.10
Note: Moments are reported at face of support

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
18

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

27 - DETAILED STRESSES
SPAN 1
X/L

0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

m
0.00
0.43
0.86
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.06
6.49
6.92
7.35
7.79
8.22
8.65

X/L

0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

m
0.00
0.43
0.86
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.06
6.49
6.92
7.35
7.79
8.22
8.65

SW
Top
MPa

SW
Bot
MPa

SDL
Top
MPa

SDL
Bot
MPa

XL
Top
MPa

XL
Bot
MPa

0.10
-0.19
-0.45
-0.67
-0.84
-0.98
-1.08
-1.14
-1.16
-1.14
-1.08
-0.98
-0.84
-0.67
-0.45
-0.19
0.10

-0.12
0.24
0.56
0.82
1.04
1.21
1.33
1.41
1.43
1.41
1.33
1.21
1.04
0.82
0.56
0.24
-0.12

1.04
-0.79
-2.59
-4.39
-6.07
-7.55
-8.44
-7.66
-6.86
-6.05
-5.08
-4.03
-2.97
-1.88
-0.78
0.33
1.46

-1.28
0.97
3.21
5.43
7.51
9.33
10.44
9.48
8.49
7.48
6.29
4.99
3.67
2.33
0.97
-0.41
-1.81

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LL Top LL Top LL Bot LL Bot


Max-T Max-C Max-T Max-C
MPa
MPa
MPa
MPa

0.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.07

0.00
-0.13
-0.30
-0.45
-0.57
-0.66
-0.73
-0.77
-0.78
-0.77
-0.73
-0.66
-0.57
-0.45
-0.30
-0.13
0.00

0.00
0.16
0.37
0.55
0.70
0.82
0.90
0.95
0.96
0.95
0.90
0.82
0.70
0.55
0.37
0.16
0.00

-0.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.08

PT
Top
MPa

PT
Bot
MPa

-4.57
-2.79
-1.24
0.07
1.14
1.97
2.57
2.93
3.05
2.93
2.57
1.97
1.14
0.07
-1.24
-2.79
-4.57

-0.94
-3.15
-5.06
-6.68
-8.01
-9.04
-9.77
-10.22
-10.36
-10.22
-9.77
-9.04
-8.01
-6.68
-5.06
-3.15
-0.94

Env-1 Env-1 Env-1 Env-1 Env-2 Env-2 Env-2 Env-2


Top
Top
Bot
Bot
Top
Top
Bot
Bot
Max-T Max-C Max-T Max-C Max-T Max-C Max-T Max-C
MPa
MPa
MPa
MPa
MPa
MPa
MPa
MPa

---------------------------------------------------------------------

-3.43
-3.90
-4.59
-5.43
-6.34
-7.21
-7.68
-6.64
-5.75
-5.03
-4.32
-3.70
-3.23
-2.93
-2.77
-2.78
-3.01

------------0.12
1.24
2.32
2.90
1.61
0.52
---------------------------------

-2.43
-1.94
-1.30
-0.44
-----------------0.44
-1.33
-2.16
-2.84
-3.30
-3.53
-3.54
-3.32
-2.96

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

---------------------------------------------------------------------

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

---------------------------------------------------------------------

28 - REQUIRED POST-TENSIONING

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
19

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

Note: Required post-tensioning force based on stress conditions


X/L
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

X
m
SPAN 1
0.00
0.43
0.87
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.06
6.49
6.92
7.35
7.79
8.22
8.65

PT
kN
----0.00
0.00
2605.83
6253.10
8497.65
10040.77
10725.61
9373.93
8260.42
7278.22
6159.46
4876.07
3352.71
1277.55
0.00
0.00
0.00
-----

29 - DETAILED REBAR
SPAN 1
X/L

0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00

X
m
0.00
0.43
0.86
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.05
6.49
6.92
7.35
7.79
8.22
8.65

Analysis
Top
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Analysis
Bot
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Minimum
Top
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Minimum
Bot
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Selected
Top
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Selected
Bot
mm2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
20

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

34 DEMAND MOMENT AND MOMENT CAPACITY


34.2 - Based on Designed Values
SPAN 1
X/L

0.00
0.05
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
0.95
1.00

X
m
0.00
0.43
0.45
0.87
1.30
1.73
2.16
2.60
3.03
3.46
3.89
4.33
4.76
5.19
5.62
6.06
6.49
6.92
7.35
7.79
8.20
8.22
8.65

Demand
Demand
Moment
Moment
Demand/Cap Demand/Cap
Moment Pos Moment Neg Capacity Pos Capacity Neg acity Pos
acity Neg
kN-m
kN-m
kN-m
kN-m
0.00
-736.30
5056.75
-4879.74
0.00
0.15
0.00
-736.30
5365.72
-4673.38
0.00
0.16
0.00
-736.30
5401.54
-4648.33
0.00
0.16
773.24
0.00
6281.92
-4054.31
0.12
0.00
2207.56
0.00
7499.74
-3285.32
0.29
0.00
3633.05
0.00
8573.21
-2556.54
0.42
0.00
5005.25
0.00
9436.53
-1980.51
0.53
0.00
6266.45
0.00
10071.61
-1540.02
0.62
0.00
7356.80
0.00
10565.56
-1217.22
0.70
0.00
8033.00
0.00
10918.38
-1001.53
0.74
0.00
7596.50
0.00
11130.08
-873.53
0.68
0.00
7109.00
0.00
11200.64
-826.25
0.63
0.00
6569.00
0.00
11130.08
-873.53
0.59
0.00
5889.50
0.00
10918.38
-1001.53
0.54
0.00
5115.80
0.00
10565.56
-1217.22
0.48
0.00
4287.95
0.00
10071.61
-1540.02
0.43
0.00
3409.10
0.00
9436.53
-1980.51
0.36
0.00
2477.60
0.00
8573.21
-2556.54
0.29
0.00
1493.87
0.00
7499.74
-3285.32
0.20
0.00
501.00
0.00
6281.92
-4054.31
0.08
0.00
0.00
-586.30
5401.54
-4648.33
0.00
0.13
0.00
-586.30
5365.72
-4673.38
0.00
0.13
0.00
-586.30
5056.75
-4879.74
0.00
0.12

Note: Capacity is calculated with the rebar and PT required for the design, including user defined base reinforcement

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
21

Project Name: `SATKAR HOTEL' Specific Title: B-65


File Name: B65 Date of Generation: Tuesday, July 02, 2013

email: Support@Adaptsoft.com website: http://www.Adaptsoft.com


1733 Woodside Road, Suite 220, Redwood City, California, 94061, USA, Tel: (650) 306-2400 Fax (650) 364-2401
22