You are on page 1of 28

2009 Bentley Systems, Incorporated

OPTRAM Looking into the Future

Universal Truisms of Rail


Too much of: Not Enough of:

Infrastructure Problems

Maintenance Budget

2 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Highest Priority Issues


How Do You: 1) 2) 3) 4) 5) 6) 7) Know where to work Know what work to do Prioritize work Monitor work progress, costing and material Extend asset life whilst avoiding run to fail Demonstrate competence to operate Improve safety, reliability and Return on Investment
2009 Bentley Systems, Incorporated

3 | WWW.BENTLEY.COM

Integration
Collect
Condition

Interpret

Analyze

Disseminate
Workstation

Work

Web (Java)

Inspection Equipment Location & Video Usage Finance

Optram
Handheld/ Tablet Reporting
2009 Bentley Systems, Incorporated

3rd party software: EAM, Google, GIS, Etc.

4 | WWW.BENTLEY.COM

Vizualization
Enterprise or departmental solution Present decision support information Unified view of infrastructure data such as:
Track layout Asset information Corridor assets Work items Condition data

5 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Sample Optram Screen


Mile/KM Post

Track Layout Designed & Measured Curve Work History

Defect History Geometry History Roughness History


6 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated

7 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated

Rail Geometry

Track Geometry with Roughness and OLE


8 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

9 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated

Image Plot

Video Synchronisation
10 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Links to Documents and Drawings


11 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Looking into the Future Analysis and Forecasting


An analytic engine built to automatically turn large amounts of railway data into prioritized actions like: Prioritize and plan work Identify areas of rapid deterioration or instable condition Evaluate work effectiveness Calculate quantitative measures of condition Do preventive maintenance by predicting failures
2009 Bentley Systems, Incorporated

Plan quarterly/monthly instead of annually Forecast when conditions will go out of tolerance

12 | WWW.BENTLEY.COM

Optram Analysis and Forecasting


Organized & Correlated Data
Condition Work Inspection Assets Usage Finance

Insight Visualization and Reporting

Unified Database

Optram

13 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Optram Scripts

Measurement Alignment
Automatic

14 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Measurement Thresholds
Create event list based on threshold values in measurement data Output event data

T h re s h o ld E ve n t
58 57.8 57.6 57.4 57.2
2009 Bentley Systems, Incorporated

57 56.8 56.6 56.4 56.2 56 0 2 4 6 8 10 12 14 16

15 | WWW.BENTLEY.COM

Track Tolerance
Use look up tables for defect thresholds for different track types Tables held in database Works on event sets

If track type = Class 1 then Gauge Threshold >57.6 If track type = Class 2 then Gauge Threshold >57.2
2009 Bentley Systems, Incorporated

If track type = Class 3 then Gauge Threshold >56.8

16 | WWW.BENTLEY.COM

17 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated

Script Commands

Example: Forecast Tamping


Forecasts where and when tamping required Optram automates 4 steps:
Aligns track measurements Calculates historic quality indexes every 100m Extrapolates when tamping is required Presents results graphically

Makes prediction over large railways practical


2009 Bentley Systems, Incorporated

18 | WWW.BENTLEY.COM

Aligns Track Measurements

19 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

20 | WWW.BENTLEY.COM
2009 Bentley Systems, Incorporated

Tamping Tamping History History

Last Last Measuremen Measuremen t t Recommend Recommend Tamping Tamping

Trend Visualization

Forecast Visualization

Forecast

Red = Fix Green = OK Recommend Tamping Last Measuremen t Tamping History

Historic

21 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Example: Work Analysis


Analyzes where tamping work was effective Optram automates 4 steps:
Aligns track measurements Calculate a Track Quality Index for each survey Determine where Track Quality improved Compare improved Quality locations with recorded work

Summarizes amount of
2009 Bentley Systems, Incorporated

Productive and unproductive work Unreported work

22 | WWW.BENTLEY.COM

Optram Aligns Track Measurements

23 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Optram Forecast Visualization

24 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

Recorded work

Improved Improved TQI TQI

No change in TQI

Optram Work Analysis Visualization

Change in Track Quality Recorded Work Productive work Unproductiv e work


2009 Bentley Systems, Incorporated

25 | WWW.BENTLEY.COM

Other Example Scripts Available


Data Correlation Segmentation Creation Segmentation Analysis Quality Calculation Rate of Change Prediction Alert Limits Channel Derivation Channel Filtering
2009 Bentley Systems, Incorporated

Plus whatever the user wants to write


26 | WWW.BENTLEY.COM

Look into Future Development Roadmap


Field Data System Linking to GIS Data upload from Bentley Rail design products Display and edit survey routes Integration with Bentley Platform

27 | WWW.BENTLEY.COM

2009 Bentley Systems, Incorporated

2009 Bentley Systems, Incorporated

OPTRAM Looking into the Future