AHU

T&C Forms Air Conditioning System

JKR/CKM/T & C :______________________ CAWANGAN KEJURUTERAAN MEKANIKAL JABATAN KERJA RAYA

AHU TESTING AND COMMISSIONING PROCEDURE

AHU
BLOWER UNIT (a) Model No. (b) Manufacturer (c) Type (d) Serial No. (e) Belt No. / Type (f) Primary filter type (g) Secondary filter type (h)Pulley type MOTOR UNIT Manufacturer Rated RPM / kW Volt / Phase / Hz Full Load Amp Class COMMISSIONING TEST Item 1 2 3 4 5 6 7 8 9 10 Description AHU start up ( Manual ) Check for housing air leakage Check for usual noise & vibration Check for unwanted duct vibration Check thermometer functionality Check pressure gauge functionality AHU shut down Auto mode (BMS) start up & shut down AHU for external housing condensation Drain pipe & pan overflowing check Result ( Pass / Fail ) Remark

Page 1 of 4

AHU

T&C Forms Air Conditioning System

Water temperature measurement (a) Chilled water temperature (b) Reheat water temperature Electrical measurement (a) Starting Amp (b) Running Amp AHU Control Panel Commissioning Test (A) Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 With all electrical supplies isolated Description Panel, switchgear, components and all contacts cleaned Circuit diagram attached to panel All connections and terminals shrouded All connections on bus bars tightened Local isolation of motor and control circuits No mechanical damage to panels, switchgear etc. Physical checks on all control wiring Internal connections on starter correct Wiring completed to circuit diagrams Check all hand operated switches to ensure proper operation Fuse ratings correct Earth leakage setting correct Running Amp measured Overload protection correctly set on starters Overload tripping time correctly set on starters Check Yes No Remark

C C A A

A mA A A s

(B) 1 2 3 4

With electrical supplies energied Correct phase rotation Correct voltage on all supply phase Check for correct operation of starters, controls, relays etc. Check function of all signal lamps and instrument

Page 2 of 4

AHU

T&C Forms Air Conditioning System

AHU Temperature and Humidity Performance Test AHU No: Physical (Reheat / Non reheat ) Condensation With Reheat Coil Dry Bulb Check Wet Bulb Temp (0F ) R. H. ( % ) (OK / Not OK ) Temp (0F ) Result Pass Fail

Room No.

Room No.

Comment

Page 3 of 4

AHU

T&C Forms Air Conditioning System

Checked By Contractor:

Witness By JKR Representative:

Sign:.. Name: Date:

Sign : Name: Date:..