Professional Documents
Culture Documents
Boiler Manual
Munchkin heater
backflow preventer
air separator
vacuum breaker
21
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (zoning with valves) Space heating mode
Drawing 2A
zone valves
make-up water
P2
closely spaced tees differential pressure bypass valve
purging valves
V1
OFF
P1
T/P
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler is 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
22
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (zoning with valves) Domestic water heating mode
Drawing 2B
zone valves
OFF OFF OFF OFF
make-up water
P2
closely spaced tees differential pressure bypass valve
purging valves
V1
anti-scald mixing valve cold water
P1
T/P
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler is 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
23
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (zoning with circulators) Space heating mode
space heating zone circuit
Drawing 2C
P2
cold water
P1
T/P
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
24
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (zoning with circulators) Domestic water heating mode
space heating zone circuit
Drawing 2D
P2
cold water
P1
T/P
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
25
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (multiple boilers / zoning with circulators) Space heating mode
space heating zone circuit
Drawing 2E
P2 PB1 PB2
T/P
T/P
Munchkin boiler
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
26
GAS-FIRED BOILER
Boiler Manual
Standard Munchkin boiler Preferred piping (multiple boilers / zoning with circulators) Domestic water heating mode
space heating zone circuit
Drawing 2F
P2 PB1 PB2
T/P
T/P
Munchkin boiler
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges. The alternative is standard flanges with full port ball valves. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
NOTE: For Vision piping applications, refer to the Vision Installation Piping Diagrams.
27
GAS-FIRED BOILER
Boiler Manual
Drawing 3A
zone valves
purge
P1
DHW temperature sensor outdoor temperature sensor
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself.
29
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system (zoning with valves) Domestic water heating mode
Drawing 3B
zone valves
purge
P1
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself.
30
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system (zoning with valves) Space heating mode (w/ submixing)
3-way (manually-set) mixing valve vent air handler
Drawing 3C
purge
balancing valve
cold water
P1
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust differential pressure bypass valve to eliminate any flow velocity noise when zone with highest pressure drop operates by itself. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
31
GAS-FIRED BOILER
Boiler Manual
Drawing 4A
make-up water zone circulators high limit safety make-up water purge closely spaced tees
purge
P1
outdoor temperature sensor
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
32
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system (zoning with circulators) Domestic water heating mode
Drawing 4B
OFF
OFF
OFF
zone circulators
purge
P1
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown.
33
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system (zoning with circulators) Space heating mode (w/ submixing)
3-way (manually-set) mixing valve vent air handler
Drawing 4C
purge
P1
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
34
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system Drawing 4E (zoning with circulators) Space heating mode (3 fully reset supply temperatures)
vent medium temperature manifold station
purge
P1
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Do not use valve actuators on manifolds supplied by manually-set 3-way mixing valves. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
35
GAS-FIRED BOILER
Boiler Manual
Munchkin VISION 1 system Drawing 4F (zoning with circulators) Space heating mode (3 different supply temperatures)
vent 3-way manually-set mixing valve
air handler (higher temp.) vent low temperature manifold station high limit safety variable speed injection mixing
purge
balancing valves
cold water
P1
OFF
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin boiler
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Follow all instructions for installation of injection mixing system. A purging valve may be used in lieu of the ball valve / hose bib combination shown. Adjust 3-way manually-set mixing valve to yield proper supply temperature to lower temperature load.
36
GAS-FIRED BOILER
Boiler Manual
Drawing 4G
air handler
OFF OFF OFF
make-up water
zone circulators
air handler
purge
OFF
P1
T/P
P2
differential pressure bypass valve Super Stor indirect DHW tank thermal trap (w/ drain plug) purge
Munchkin heater
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. High temperature loads cannot operate simultaneously with low temperature loads. Supply water temperature to high temperature loads is not reset based on outdoor temperature. Domestic water heating is highest priority load, and controlled through priority zone of multi-zone relay center
37
GAS-FIRED BOILER
Boiler Manual
Drawing 4H Munchkin VISION 1 system Multiple high temperature priority loads controlled with zone circulators Multiple low temperature load controls with zone circulators
air handler
OFF
OFF
make-up water
OFF
zone circulators
air handler
purge
purge
OFF
P1
T/P
P2
purge Super Stor indirect DHW tank thermal trap (w/ drain plug)
Munchkin heater
NOTES:
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. This drawing is meant to show system piping concept only. Installer is responsible for all equipment & detailing required by local codes. All closely spaced tees shall be within 4 pipe diameter center to center spacing. A minimum of 6 pipe diameters of straight pipe shall be installed upstream and downstream of all closely spaced tees. The minimum pipe size for connecting a Super Stor water heater is 1 inch. The minimum pipe size for connecting a Munchkin boiler shall be 1.25 inches and 2 inches for the 399M. All pumps are shown with isolation flanges and integral flow check valves. The alternative is standard flanges with full port ball valves and a separate flow check valve. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119F. Install a minimum of 12 diameters of straight pipe upstream of all circulators. A purging valve may be used in lieu of the ball valve / hose bib combination shown. High temperature loads cannot operate simultaneously with low temperature loads. Supply water temperature to high temperature loads is not reset based on outdoor temperature. Domestic water heating is highest priority load, and controlled through priority zone of multi-zone relay center
38