Target area Drafted by Product

Huawei Technologies Co., Ltd. Product Name China/Overseas Regional Division Document Version Optical Network Engineering Department Issued Date All Microwave

Microwave Quality Inspection/Self Inspection Report V2.0


Subcontractor Installed by Checked by Checked Date Confirmed by Site quantity INTRODUCTION

11/18/2013

124

189406597.xls.ms_office

Microwave V2.0 2007-7-28

pection Report V2.0

11/18/2013

224

189406597.xls.ms_office

Security Level

Site information and Score HT/NC/FC/047 Site Name ABJ0008 Site ID Chike Village Site Address HT/NC/FC/845(ABJ0018) Opposite Site Self-check Score Recheck Score

HT/NC/FC/801(ABJ0019)

Problem Distribution Self-check Recheck System Setting Antenna Fastness ODU Fastness IF Distribution IDU Fastness Cable Distribution

Key Check Item RX-TX Power Check:The transmit setting and actual receive signal level should be consistent with the value designed.The difference between the tested receive value and the theoretical value ranges from 3 dBm to +3 System Setting dBm. Frequency setting:The transmit and receive frequency should be consistent with the value designed. The matter that is paint break off and distorted can not appear on antenna.The antenna must be installed in the right height and position and polarization according to the design document or customer's instruction. Antenna Fastness The fixation of antenna and pole are reliable.For the more than 1.2m antenna, the side strut must be installed and fixed position is correct. Antenna identifier:The identifier of each antenna should be labeled with opposite site name or ID. The ODU's and hybrid coupler's appearance are properly.The latches of the ODU and hybrid coupler should tightly engage on the antenna. The screws should be fastened tight. ODU waterproof:The IF connector of ODU should be waterproofed and face ODU Fastness downward. ODU grounding:The ODU grounding cable should be shortest length as possible and attached to the tower body by the cable clamp. Before attached grounding cable, must scrape-off the paint. Type

Selfcheck

Rechec Attached k photo

OK OK

OK OK

Photo 1 Photo 2

OK OK OK

OK Photo 3 OK OK

Remark Must attached photo,print screen the graphical interfaces of LCT Must attached photo,print screen the Must attached photo, the antenna rear photo,including the side strut and antenna identifier,etc.

OK OK

OK OK

Photo 4

Must attached photo, If the ODU is directly mounted onto the antenna, it can refer to antenna rear photo, Must attached photo, Grounding point photo.

OK

OK

Photo 5

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page3of24

189406597.xls.ms_office
In general,the IF cable should be grounded to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 50 meters.The place about 1 m away from the ODU and 1 m away from the cable entry are propositional grounding point.All of outdoor connector should be waterproofed. Porthole:IF cable must be uptilted or have Waterproof curve in the entrance IF Distribution of porthole IF redundant:Leave enough slack when connecting cables to the ODU to facilitate future maintenance. The IF cable route and position for the cabling should be designed beforehand and arranged neatly.IF cable turns should be smooth, and the bending radius should be larger than 30 cm. The installation position of IDU accords to the engineering design document.The matter that is paint break off and scratch and smear can not appear on IDU. Otherwise the equipment must be repaint and cleaned. IDU Fastness There must be a space of 1 unit at the top and bottom of the IDU chassis for heat dissipation.If there are multiple IDU,label opposite site name or ID for each one. The cable route of the power cable, ground cable, IF cable and E1 calbe should accord with that defined in the designed document, easy to capacity expansion and maintenance. The power cable, ground cable should be distributed with signal cable separately.The spacing outside the cabinet should be more than 3 cm. Check all the cable should be connected in a correct and reliable way.The connector of cable is clear without any breakage. The connector of making on site should be accorded with the specification, and be connected correct and reliable.No breakage and rupture and intermediate connector is found on the cable. The connection between the jumper and the IF cable should be connected in Cable Distribution a correct and reliable way.If theconnection is at outdoor, waterproof the connection. Indoor cables should be tiled with uniform spacing and moderate tightness. Cable ties should be tied in a tidy way. Their redundant parts should be cut from their bottom after they are tied without any spine. The Power cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector.

Security Level

OK OK OK

OK OK OK

Photo 6 Photo 7 Photo 8

Must attached photo, Grounding point waterproof photo. Must attached photo, photo of porthole

OK

OK

Photo 9

OK

OK

Photo 10

OK

OK

Photo 11

OK

OK

Photo 12

OK

OK

Photo 13

OK

OK

Photo 14

OK OK

OK OK

Photo 15 Photo 16

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page4of24

189406597.xls.ms_office
The Grounding cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector. OK The E1 cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector. OK Self-inspection specifications: When the inspection score by the company or regional office is lower than or higher than 5 scores by self-inspection, the quality score must be deducted another.

Security Level

OK OK

Photo 17 Photo 18 Needn't fill in, system calculate automatic.

Other

Return

Photo 1::Actual TX/RX Power

Return

Return

Photo2:Frequency setting

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page5of24

189406597.xls.ms_office

Security Level

j Return Photo 3:Antenna Fixing Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page6of24

189406597.xls.ms_office

Security Level

Return

Photo4:ODU Fixing and waterproof

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page7of24

189406597.xls.ms_office

Security Level

Return

Photo5:ODU Grounding and Cable Fixing

Return

Return

Photo6:IF Cable waterproof

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page8of24

189406597.xls.ms_office

Security Level

Return

Photo7:Porthole and IF Cable waterproof

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page9of24

189406597.xls.ms_office

Security Level

Return

Photo8:IF Cable Redundant

Return

Return

Photo9:IF cable distribution

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page10of24

189406597.xls.ms_office

Security Level

Return

Photo10:IDU Fixing

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page11of24

189406597.xls.ms_office

Security Level

Return

Photo11:IDU label

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page12of24

189406597.xls.ms_office

Security Level

Return

Photo12:Cable Distribution 1

Return

Return

Photo13:Make Connector

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page13of24

189406597.xls.ms_office

Security Level

Return

Photo14:IF connector waterproof

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page14of24

189406597.xls.ms_office

Security Level

Return

Photo15:Cable Distribution 2

Return

Return

Photo16:Power cable label

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page15of24

189406597.xls.ms_office

Security Level

Return

Photo17:Grounding cable label

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page16of24

189406597.xls.ms_office

Security Level

Return

Photo18:E1 cable label

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page17of24

189406597.xls.ms_office

Security Level

Return

Photo19:

Return

Return

Photo20:

Return

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page18of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page19of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page20of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page21of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page22of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page23of24

189406597.xls.ms_office

Security Level

11/18/2013

Confidential Information of Huawei. No Spreading without Permission

Page24of24