Huawei Technologies Co., Ltd. Product Name China/Overseas Regional Division Document Version Optical Network Engineering Department Issued Date All Microwave
11/18/2013
124
189406597.xls.ms_office
11/18/2013
224
189406597.xls.ms_office
Security Level
Site information and Score HT/NC/FC/047 Site Name ABJ0008 Site ID Chike Village Site Address HT/NC/FC/845(ABJ0018) Opposite Site Self-check Score Recheck Score
HT/NC/FC/801(ABJ0019)
Problem Distribution Self-check Recheck System Setting Antenna Fastness ODU Fastness IF Distribution IDU Fastness Cable Distribution
Key Check Item RX-TX Power Check:The transmit setting and actual receive signal level should be consistent with the value designed.The difference between the tested receive value and the theoretical value ranges from 3 dBm to +3 System Setting dBm. Frequency setting:The transmit and receive frequency should be consistent with the value designed. The matter that is paint break off and distorted can not appear on antenna.The antenna must be installed in the right height and position and polarization according to the design document or customer's instruction. Antenna Fastness The fixation of antenna and pole are reliable.For the more than 1.2m antenna, the side strut must be installed and fixed position is correct. Antenna identifier:The identifier of each antenna should be labeled with opposite site name or ID. The ODU's and hybrid coupler's appearance are properly.The latches of the ODU and hybrid coupler should tightly engage on the antenna. The screws should be fastened tight. ODU waterproof:The IF connector of ODU should be waterproofed and face ODU Fastness downward. ODU grounding:The ODU grounding cable should be shortest length as possible and attached to the tower body by the cable clamp. Before attached grounding cable, must scrape-off the paint. Type
Selfcheck
OK OK
OK OK
Photo 1 Photo 2
OK OK OK
OK Photo 3 OK OK
Remark Must attached photo,print screen the graphical interfaces of LCT Must attached photo,print screen the Must attached photo, the antenna rear photo,including the side strut and antenna identifier,etc.
OK OK
OK OK
Photo 4
Must attached photo, If the ODU is directly mounted onto the antenna, it can refer to antenna rear photo, Must attached photo, Grounding point photo.
OK
OK
Photo 5
11/18/2013
Page3of24
189406597.xls.ms_office
In general,the IF cable should be grounded to a minimum of three points. When the IF cable is longer than 60 meters, add a grounding point for every extra 50 meters.The place about 1 m away from the ODU and 1 m away from the cable entry are propositional grounding point.All of outdoor connector should be waterproofed. Porthole:IF cable must be uptilted or have Waterproof curve in the entrance IF Distribution of porthole IF redundant:Leave enough slack when connecting cables to the ODU to facilitate future maintenance. The IF cable route and position for the cabling should be designed beforehand and arranged neatly.IF cable turns should be smooth, and the bending radius should be larger than 30 cm. The installation position of IDU accords to the engineering design document.The matter that is paint break off and scratch and smear can not appear on IDU. Otherwise the equipment must be repaint and cleaned. IDU Fastness There must be a space of 1 unit at the top and bottom of the IDU chassis for heat dissipation.If there are multiple IDU,label opposite site name or ID for each one. The cable route of the power cable, ground cable, IF cable and E1 calbe should accord with that defined in the designed document, easy to capacity expansion and maintenance. The power cable, ground cable should be distributed with signal cable separately.The spacing outside the cabinet should be more than 3 cm. Check all the cable should be connected in a correct and reliable way.The connector of cable is clear without any breakage. The connector of making on site should be accorded with the specification, and be connected correct and reliable.No breakage and rupture and intermediate connector is found on the cable. The connection between the jumper and the IF cable should be connected in Cable Distribution a correct and reliable way.If theconnection is at outdoor, waterproof the connection. Indoor cables should be tiled with uniform spacing and moderate tightness. Cable ties should be tied in a tidy way. Their redundant parts should be cut from their bottom after they are tied without any spine. The Power cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector.
Security Level
OK OK OK
OK OK OK
Must attached photo, Grounding point waterproof photo. Must attached photo, photo of porthole
OK
OK
Photo 9
OK
OK
Photo 10
OK
OK
Photo 11
OK
OK
Photo 12
OK
OK
Photo 13
OK
OK
Photo 14
OK OK
OK OK
Photo 15 Photo 16
11/18/2013
Page4of24
189406597.xls.ms_office
The Grounding cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector. OK The E1 cable should be labeled in DDF,the labels should be stuck at the place 2cm away from their connector. OK Self-inspection specifications: When the inspection score by the company or regional office is lower than or higher than 5 scores by self-inspection, the quality score must be deducted another.
Security Level
OK OK
Other
Return
Return
Return
Photo2:Frequency setting
Return
11/18/2013
Page5of24
189406597.xls.ms_office
Security Level
11/18/2013
Page6of24
189406597.xls.ms_office
Security Level
Return
Return
11/18/2013
Page7of24
189406597.xls.ms_office
Security Level
Return
Return
Return
Return
11/18/2013
Page8of24
189406597.xls.ms_office
Security Level
Return
Return
11/18/2013
Page9of24
189406597.xls.ms_office
Security Level
Return
Return
Return
Return
11/18/2013
Page10of24
189406597.xls.ms_office
Security Level
Return
Photo10:IDU Fixing
Return
11/18/2013
Page11of24
189406597.xls.ms_office
Security Level
Return
Photo11:IDU label
Return
11/18/2013
Page12of24
189406597.xls.ms_office
Security Level
Return
Photo12:Cable Distribution 1
Return
Return
Photo13:Make Connector
Return
11/18/2013
Page13of24
189406597.xls.ms_office
Security Level
Return
Return
11/18/2013
Page14of24
189406597.xls.ms_office
Security Level
Return
Photo15:Cable Distribution 2
Return
Return
Return
11/18/2013
Page15of24
189406597.xls.ms_office
Security Level
Return
Return
11/18/2013
Page16of24
189406597.xls.ms_office
Security Level
Return
Return
11/18/2013
Page17of24
189406597.xls.ms_office
Security Level
Return
Photo19:
Return
Return
Photo20:
Return
11/18/2013
Page18of24
189406597.xls.ms_office
Security Level
11/18/2013
Page19of24
189406597.xls.ms_office
Security Level
11/18/2013
Page20of24
189406597.xls.ms_office
Security Level
11/18/2013
Page21of24
189406597.xls.ms_office
Security Level
11/18/2013
Page22of24
189406597.xls.ms_office
Security Level
11/18/2013
Page23of24
189406597.xls.ms_office
Security Level
11/18/2013
Page24of24