TOWER CRANE
2410P164
Fushun Yongmao Construetion
[l,4ae
STT2Oi)
Table of contents
TO\IIR
CF.T.\..E
ERECTION ]\IA\IJA,
l. Characteristic parameter
62 onr
l0r
!. r r.t I f-l
;1q
R
=E
Fall
IV
1
55
50
II ry
IT
5.00
l0 00
5.00
3t.66
)7.67 32.35
IV
II
4S
I0.00
5.00
,t)
T;
5.00 6.45
5.00
5 0U
1q!9L!!
IV
l t? 33.91
{
35.08 _r .9l
,0.u0
5.00
10.00
5.uU
lqli
l!l!
r!.oo
I r0
5. uo
40
J.oo I
II
35 30
ff.-
-I{
J5.00
l0l!
5.00
10.00 5.00
lq
io
5o
30 00
ro.oo
I lo. J.o0 i5
,i",
,ilsa
r11""
rogelafs
3n1
,Fg -t9
O -"*a* "*
t"
service
':;r'l
(withortr counterweight
Motor
4I
(s5hP)
45L[v258
5.0
1090m
55
55t.Fv25
4.0
1.5
>1090m*
0
0 o
57 m/min
95N.r
57 m^nin
2x120N
5Rl-cv
lpt
2)ti20 N
4:x2'615
12.5
25 rn/min
2. Safety rules
usel
l) It
is forbidden to use the tower crane which has not passed the performance test;
2) Acco.ding to the technical regulation and method of use, the crane must be used in
its good condition. Pay more attention to the safety to prevent the
dangerous!
Eliminate all kinds ofmallunctions in time which may cause the safety accident;
3) Operate the tower crane in specified scope oltemperahre: (_20.C_+40.C);
4) Qremte
d1e
tower crane in specified limit of wind speed (the max. rvind speed for
5) Obserue the regulation in operation manual and regulation related to serr,.ice and
maintenance.
2.2 Safety measures
1) The
operator should read the operation rules before operating the to\\,er crane:
2) The operator should always remember every safety measure and recognize the
hazard, meanwhile the operation rules should be visible;
3)
It\
forbidden lor the operator to be rvith Iong hair, wearing robe or wearing
jeweiry;
4) Often read the rvaming board about safety and prevcnting from hazard; 5)
lf
6)
5
It is forbidden
1o change
crane
manulacturer permitted;
.{.m
7) Service, lubricate and debug the tower crane according to the cyole specihed in
operation ll,]anual;
8) The crane operalor should know the position the method
0N
r0
a1]d grasp
t.6t5:l
of using it.
ications
l-r"r*nn*'"ctingandtheirqualif
person; operated by qualihed be musts crane the 1) The tower regulation about specific a be musl must be trained There operator crane 2) The and sewice person; maintenance erectol' ability of driver' thal they and make them know responsibility' shoutd clari their 3) Crane operatols safety; which act against the orders the all shor'cl refuse ls
rvhen the tolver crane jobsite on personnel must supelise 4) The experience<1
or learners oPerated bY trainees
I I
1
I
I
he ooetatd b'v professional be oper must '-"'t mechanism each for 6) 'the debug and mair.ltenance
operated by r--^ 'rl^ devices ^' '.o'ices must be hydraulic of and maintenance 7) '1he installing' debug
exPerienced Person'
2.zt
competent
electfician
person;
r'elease
irxing
13nT/s):
on the tracl(; d). Check that tirele iq on obstacles e). Cancel the
2) In service
a). The driver should operate the crane in the cabin;
b). Test the motion ofeach mechanism with no load and low speed;
c).
It is ibrbidden to
pass the load over the person when the crane is in service;
0. It requires someone to guide when the load is out ofthe sight ofthe driver; g). It is forbidden to sling overload out ofthe specified radius;
h). It is forbidden to sling heavy load when the load has not been hang
tirmly;
j). It is lorbidden to sling the load which has fixed to the ground; k). It is lorbidden to stop normal motion by emergency stop bulton; it only can be used in exceptional case which may threaten the safety;
l), lt is lorbidden to use limiter and brake as an normal stop device; rn). It is forbidden to shoft-circuit, change and adjust the safety device, or obstruct its normal operation;
n) when the max. wind speed is less than 20,r/s, the road should be iower than rm2/t. Stop working ifthe wind speed reaches to 20mls;
o) Make sure that there is no obstacle enters into jib slewing area after the
crane traveling;
tower.
p) lfthe crane operation is in bad condition, stop immediately and send somebody to
repair;
q) Make sure that there is enough distance between the tower crane and ai.eleclric
wire;
F
AND Sf,RVICE MANUAL TOWERCRANE OPEI{ATTON
2.6 ln
3)
to leave any load on is forbidden it meanwhile limit point' a). Lift the hook below the
the hook;
l) wl
be
a). On
to the mast; b). Drive the trolley close effect; c). Starting up the wealher-vane
on the trackl d. Grip the clamp rail devices and locked' e). Cut off the power supply
to
b). Dr
c). No
during the tower crane operation clearance fault and 2.5 Maintenance to the method each pa ofthe crane according check-up and 1) Debug, maintenance devices and replace some pafis and manual; operation in and cycle specified
according to the regulation;
adopt tower crane with powel'off' the maintenance and 2l If it needs to service lock the power starting of the crane' First' false prevent to necessary measures
d). Cu
e). Do
cu
2) Me
ele
thc
panel; hang warning plate on the Second' key' the off take and supply panel after during service and mintenance' devices safety some 3) If it needs to dismantle
a) The
m
th
Iin
b),
r
dis col
c).
i1
ma
.I'O\YER
I
CRTINE OI'T]R,{TION AND SERYTCtr r\IANI]A,
l)
When operating tower crane near the air line, there should be enough distance between the tower crane and air line.
a). Once the tower cmne connected with the air line, the driver should stay in the cab,
Noti
d). Cut oflthe power supply which comected with the air line;
e).
Don't leave the tower crane unless you can confi.that the erectric wire has been
cut
off
line (afler this, do please clismantle the eaflhing ancl short circuit line):
b)
checked periodically.
If
discover some hidden clanger, such as connection loosen, elcctr.ical wire earlhing,
component
c)
li'e-\yire work,
TOWER CRANEOPERATION
2.?
IlYtlraulic
sYstem
"r. every kind of conduct check b). Periodicallv so' eliminate t if mlfunction' oil leak and extemal check up the
damage and frre); leak maY oause
O.,r,n" *'*sional
tt'i.t"tl'-,lj-
::::ffi:;
regulations before relevant the to according component pressure the Release c).
pressure the high and low conect not Do pipe line correctly d). tnstall the hydraulic of the flexible pipe qual and length joint Meanrvhile' the interfaces in reverse
rePairing'
oil box' and quality in the quantity oil the Hold e).
Sf,
RYICE I\IANUAL
3. Operation
Important
notice:
be made debug must
;;ra
it is service when into put be only tower rane can The the tower crane' the issuance of license' authorities with
of and erection
i::::"#:iver
the exam' units and passed specified or board of labor It is important the crane correctly' maintenance and opelate' service time and The driver must loss of working avoiding availability, improving device failure, for reducing
drums'
is more' construcdon What steel iniegral ropes' even the brakes and wire
personnel loss' and result in accident cause serious mechanical 3.2 OPeration highlights
it
may
lt is finishing equipment panel control 1) The or stopping' slowly when starting operated be must 2) The control lever to eet over shlft forbidden is it one' by 3) Change shift one ,-when stoppi"g to*" operation sequential 4) It is forbidden to disobey devl '^"' when actuating gradua tum to zero position 5) The control lever should stopped' mechanism completely the until Operate making reverse movement has a failure' unsoundn device safety the crane which 6) lt is forbidden to operate the safety,devices to pick off or sealed forbidden is it or inaccurate' fuilhenore
it'
uttbt
^t'^ **edtal"''.
9) The driver must master the moment curve, the max. load, the min. load (at the jib
end) and the load under hook in random radius. 3.3 Operation instruction 3.3.1 Starting
a) Check the tower crane before everyday stading according to the instruction
regulation. Ifthere is any problem, repo it and it is not allowed to start anv more.
b) Switch on the main power supply and press down the start button.
c) Test the working condition of all mechanisms with no load and low speed, check
the
limit devices of
al1
mechanisms.
Confirm the lifting load radius according to the moment curve (or table).
b) Estimate the
speed.
* -
)$
c) Use the
It
d)
@
n l**rir"trtt lifting' is allowable in normal
of rnotor instead use the rated speed
of
load selecte low speed Heavy load of weight selected as per the g) The speed u'as (GV)' selecte high speed load light and (PV) limiter' operating the stroke
h) Stop moving before
on ground' i) Don't Put the hook
medium sPeed'
load' winding when placing rope avoid to j) Loosen the wire rope slowly
slewing mechanism 3.3.3 Operating the to the shift to be reached' speed according slewing the a) Select allowed' as long as the angle speed max' the b) Every time use
c)
If
;;;;"
its speed' suddenlv changes mechanism the slewing operation mu$ be deceleradon and t-ing So acceleration
t rn"l "":::l:-
,,.done
and It should decelerate firs brake' slewing jib by the d) It is forbidden to siop slewing speed' can brake in minor brake the that so release the control lever' jib in which can keep condition' windy in only be used e) The slewing brake can
graduallY.
then
its
position.
iib, it
is recommended to operate
the
lifting or
lo1{ering
the
it
ofthe trolley.
b) It must accelerate or decelerate gradually to avoid swing when suddenly changing the shift oftrolley operation. c) Stop the trolley movement before operating the trolley limiter
3.3.5 Operating the traveling mechanism
a) The traveling speed is selected by the distance
oftraveling.
b) In order to ensure the tower crane safety, when it travels in the track, the trolley
must be at the
speed. Meanwhile
traveling to the end ofthe track, the tower crane operation must be stopped.
*
ng is
It is forbidden
wh"n tow.,
".ane
nn'
"'*uttu
ttnnu*
l
the is: _20C-+40C, -2( -- crane ^-^-tower temperature of environmental The \Yorking rvorking gratte is A4'
operation vr--
irtl
and
rnut.
t*'ting ''nrl
of tt
adju
l, ,*. **
^-- i-.erfect in pelfec condition' and switches are cables tn"t tne power supply' the condition' restrict normal in are pin split each pin' f'oft and that sure b) Make
effect)' (release the weather-vane fieely sleu'ing are fixed hrmly' and base ballasts blocks the counter-weight c) Make sure that wire ropes and trolleying hoisting the Check ' d) , slerving 1^...i-artng' and reducer condition ofhoisting lubricating the e1 Check
the Power 0 Switch on
operation
jib
3.4.:
a)L
b)r
t
(
(
if brake and limiter' mechanism' each no load and check with g) Test all mechanisms
necessary, readusted
suPPlY'
No
anemoscoPe must an 50m, beyond of towel crane is height rvorking h) If rhe alarm' c) audible and visual sent can it 20m/s' speed exceeds installed ll the wind d) must stop $'orking' then the tower crane 3.4.2 During operation
a) Never
it'
be
Iifl
instruction whether the extinguisher' that check cabin' c) When entering into the
and warning Plate are in Place
condition' haiiet' is in perfect d) Chcck that \\'hether the .-t. .,.,hich fixed on the ground'
IA
I,
J:-i
Special notice:
If
if the wind
of the driver, there must be someone as a guide; never cancel any safety device or
adjust at random witout authorization. 3.4.3 Each time after operation
a)
the
jib
If
power
off
,.
I
crane driver must start the weather-vane effect after he is off duty.
Tum off the main power supply switch and take the measures against rain.
ss
down the emergency stop button, and cut offthe power supply.
li
ii:
3.,
3.4.4.l Electricity
lnspection item
I r
After each efection
\
I
sr.""r tt ut *h"thffi
:ffi i[T
.*l.--'------'-.'--**.*"*-:""11'::lrt::X:'":,::'*'*o
tower crane resistance of earth the Check of electric equipment resismnce Check the insulation
otor
coffi
in of switch contact
I illiltJfi
3.-1.1..:. achinery
Inspection item Mast vefticality and levelness
:1
ViV
pil;;?ffii:
Detect the crack ofsection steel and check the weld joint
Mechanical parls
of
of
Hoisting winch Slewing mechanism Trolleying winch Traveling mechanism Hoistins winch Slewing mechanism Trolleying winch Traveling mechanism Hoisting winch Slewing mechanism Trolleying winch fraveling mechanisrr
Cable drun.r Ilydraulic push rod
+l
-
joint
condition
chcck that whether the prcr enr ru isl hook at frxing point othoo[ p.ri..i JYrii,t',
"rIr'i,
'lccr( lhe autornalic locking der ice in 2,4 lall or doublc lrolley loc[ing device
iv
],,
I
I
tAfter each
erection
Inspection item
Hoisting limiter
Slewing limiter TrolleYing limiter Traveling limiter
devices Prevent roPe broken devices Prevent shaft broken
.I'OWI]R
Inspeclion item
After each
erection
One month
Hoisting winch
twist
_-!qri""
lTroJleying
I
I
l
winch
wlre rope
The tensioner or tension spring ofthe wire rope
nrotor
fsc--l---.devi.,
Cable drum
bearing ofdrum
pin. spring. inion. prevenr rope broken device cabin cloor, tumed-door
Track
_i
J
IOWER
CRANE' OPERATION
3'5 OPeration
;a;';*-'
There are
also catled
*"el
'igl't "ont'ot
(See Figure
fthe ioystick. in the cente u' "'- -' lever t here is a control
catrin
ioYstick)
oflever operating)
side for hoisting Co-nirol console tor siewing sioe Controt consote
Riqht
_:i..
I
ILD
Let
DAv
_-^,
RG-,
r l,i , _o
i
ot
I
'.- il.
iLH
ivgr)
lo)
tsHl
XRFS
,o*"*,,
RG :
DAR LH
Slewing
leltrvards
RD
TAV
Slewing right\ards
DAV : TAR :
,.
TrolleY in
Tra{elling fo(wards
( Traveling tYPe )
.x
I
I,D
: Lo$e
ng
\1r^'iinP Dosition
l
i
-..
lr
',
ryith functions as
follorvs:
The button is used in the special case such as telescoping, changing iall, and so on. when move the trolley to the jib foot or raise the hook to limited position, the limited switch cut
ofl
jib root
of the crane tower or making the hoist hook to a highest position until finishing the
aforementioned job.
2)
functions as follows:
In the windy working circumstance and the speed of the wind is under 20mls, it,s
necessary to hoist a load bake, which made
Th"
control lever can switch
respectively
for moving forwards and backwads the jib slew to the left RG as push
left RD. In reverse. The lever can be pushed at random towards left
or dght without
limit of shift. The bigger the turning angle of the lever. is, the faster
e speed of slewing
contolled
diection Thee
will
be
in the form of x) which drive both the trolleying and slewing operate in 2
at the same
tire.
__
.. -' roctrn* ^.-, tnechanisrn and zero protective devices lor preventing the lever
-* "r*rls"t*
rn"*-l"""
(zero) be started if the lever is not in neutral cannot supply power accidents. The pin up with shown in figure and press locking as lever the of hold position. Take was strictly forbidden to pin' it Iocking pressing Before lever' push the
hnger, then
parts was destroyed' push the lever lest have the function panel and the right control panel control left the both on The levers
IS EQUIPPED WITH: THE RIGHT CONTROL PANEL VOI button') symbol ; warning light horn (also button supply Power
and
to
button O' To begin with' tum the emergency break button (emergency button)
automatically.Ifrequired,turnittotherightuntilitspringsupbyitself'PIeSSthe is out of service or to meet the emergent button to cut off current when the crane or other attaching mechanism is out of control
requirement such as the contactor
eurergency requiring current break'
* '"
instead 0l
*X",
Push the lever forward that is the lever can not be pushed in oblique direction'
to lower the hook. travelling cond lwhen the lever is nushed to the left or to the right (TAV TAR)' the
rin
ero)
olthe crane is effected. But for the anchorage or climbing crane, there
ofcontrol lever installed. And no control circuit is set on the panel.
(2) . Precautions during the operation
is no such kind
,'/ith
nto
l)
Obserue the safety operation regulations strictly during the operation. The
operation which might influence the safety of the crane is absolutely forbidden.
ltlon
For example, raise a load buried in the ground; slings (rope clamps) are not in line
time (not exceed 10 seconds according to the regulation), the shifts should be inueased or reduced gradually, the time between two shifts should not less than
)ower mel A
break
will
be destroyed.
rrP
back)
good operating habit. When move the trolley, do your best to switch from
to shift 2 then shift 3 and in the slewing operation the contlol of the lever is
required to be handled harmoniously.
lss
I
In any case:
It
return) suddenly or to press brake button forcibly during the running of the jib.
3) Set the tower crane in the state
finished. 4) Duing
rcad
rhe operation, provicled that the crane falls into the trouble, please call on
service
man
-'"::::':,*,.::::":
;:::":::J;J;''"'-*
hoist speed limiter SLCIIPY
their initial anl truly during well which is adjusted a'Iiustments' their moalify
overroad
calibration' installation and with relevant regulaiions accordance in operation your crane during Lubricate 5) CRANE)' Pav special
(SEE CIIAPTER
RULES OF TIIE
brake)
up'
,,
;:,;'l,: l::;-;;;
last' cut off the main At state)' unlocked (in released slewing brake is
suPPlY of the crane'
,*", 'v
o ^
4.1 Power
supply.. supply
........._...............48-z
4.1.1 Power
........................48_z
,l
I
F
l.:,4. 6
Pott"t tupPlY
series to\\'er orane meet requitement ST the use on iobsite and supply power of management regulation manufacture. the four-wire system or TT three-phase five-wire three-phase requiretrents of TN-S construction must meet the national supply porver jobsite The s.vstem power supply "third class distribution supply use requirement po\\'er the requirements'
department
your reference: system diagram is for iblloiDg The and two class protection"
Jib site
1\-S
or TT or TT
Branch sitcl't
TN.S
k^\
3U0V
50t{Z
main electdcal
ho\
pael
Note:
wi switch box are equipped branch and panel control 1) Both the branch electrical
box: {3OmA protector in branch switch leakage of 2) The operaLing parameter to the of TN-S or TT according method installation 3) The user can select the
regulations' supply network acltninistralive by user' cable) should be prepared (i[cluding box A beiore 4) All the devices
local
Ll
L2 L3 PEN
Ll
L2 L3
PE
TN-S
TT
]Q;-gn'ni'eP'otectionandearthins
the crane
or surge suppressor
:t":,1:-1*
with lightning rotl condition he above special or take aiming at protection' recommended to the actual conilition'
according
.rr,
""t,n"t
A. The earth
substance
is made of normal
eat1h stake'
or
L70x70
r'1
11i ili ,:.]1
,i
is made-of,ree"i'ilr":.1T;,lt:::t: B. The earrh ptare an area ol Im ' metat Plate \\ith the ground surlace' l.5m depth from
c.
rhe coPPer conductor conductors " rurrnr or iron casmg' buried in the wire
mm2 is
il:lX'::::H
l:,:"i;.;r;"d
:::::
l[:';
ro
be
deprh is
In
,""0o,
chloride (salt) in the soil and pour some water. For traveling type oftower crale, each section of rails must be electrical cormected, and the two rails must be electrical connected. The earth esistance is less than 4.
"o-rr[--il
TOWERCRANE
standard: and china National : operatins the tower crane. during A voltage of Panel
'
tl
^-::;"
If the real
t:^",:i;:
::::" :; :::':H:
sTT200(100
:i::::til;
the e'lectrical needs to look up often it and sen'ice' In the process of installing to -- ' "" comPlete tn" purPur" ine n"*ot" *ttn wlth diagram schematic ;chematic r-.^+ lttr svmbols and graphic
flow to
see
electrical schematic
diagrams
theiM::::#lS
o,'n., ",o
i"",,,u,"lv.
,': .":i"1';:;:::;.
"JHt ,,o
o-,-,
symbols in coordinate
diagram' sc schematic elecfical ^,-:, every "lectrical are under coordinate numbers Horizontal 4-1-2. symbols' which (relay) coil BraPhic line t"ld"t "*O""**tor there is a ve(ical t:: at uuLrr ar numbers on th marked narked coordinate rpositions used *u tn" ""-:t:t:::on contactor (relav) the which of auxiliarJ auxiliary switch
t"""Y:t"l:H:::"I
switch (contact)'wttn
t'u"tu"t""
:-1;::"l". :::
;)::l::J:".:'J #;
.*t"":;;;
'l'-t"
"*"
t-,-,o".' t*lt"'t line shows the position oi J;;;;';t"n working condition, look ror t'"
;;;;;-er
quarler
'1ef'i
*uo
,1.5
"**"
o"a*tloNAND
'ERVICE
ilrANUaL
rth
ge
Smbol r vol
ymbol
:al
rce
Dcscriptior
Emergency stop
. -...-.....-
rly
HCX0L lero
Sh
H,I
I Poe 6.uo].
Su.irch
button
ttir,
_Uo;.,,
CXORD
Hon
SD
I,
xl
Red,
cal
Redx
P
Di
Mains Srvitch
;
i I SFI'P
._----__
XP
RedFU
Contacto ( a)oor
;;;-i
Lraini
] Transformer (A panel)
**+.""--c"*"r
I
fOrmer
Contactor (Door)
I rr&r,Lrqteake(CaxtDlrrNf_*r
Circuit-beake
XBa
Cicuit-breake
lransformer) Lanlem
(C*,..
LMO
SLD
;r*---;---r-
xl, >a
f
I
!91!ion)
Position)
xi
,Flefre"
_--.----
L S\df.. M*
---_:-limite)
i""d f"-doad
..-
C(ltunfo.lloifokrhke
dmorff ,ssor
LPV
l
Relay (up)
'=-
StpplyCrllccforhvE
LPVl
r*
-=--
--''a.Y
llnd shifr
shir
*.d _rrr
LRaGV
l,Ra2
Lontactor(for
sralo-I)
high
speerl motor,s
Relay (Jrd
Resistrncc
Rebv
r.
r4.)
rrake)
con
tor (eri",s,
.",-rr.r
I
LRa
SYbol
Description
Relay (4th shift)
Symbol
LRaPV
DecriPtion
stalor Co rtactor for Iow sPeed motor's
xL41
xL5
LD LH
SH
lRelay
(5th shift)
I,GV
El""t
i"
"ontu"to.
for high
sPeed
LGVl
T,1
I*t*o,
stator
t,2
L3
esistance Contactol
for
second
CXL3
LFs Rf1, Rf)
TSL
Control tansformer
lHoistine brake
Resistance
LMGV
I,MPV
R1-R23
F
ln"]l|,"n T1*".*
low sp"ed motor
\Hoisting
--
lTiming
esistance for brake motor
TSl
TS3
1--F6
JTiming TS2
Autotansfomer
AnemoscoPe looP
JControl transforme
FADi
Protectio switch
Switch Reductio Trolley backward
\_I
SDAV
RXDAI
SDAr
SM
RDMO
SDMO
DMV
radius
DMVl
DFa
for low
sPeed
Y'
XDAr
I*
ro. r,o,,"r
oud*'o
DAV
Suf'ply contaclor
for
Itolle)
XDp\
niddle Ered
rol{
Sl mbol
Description
SLrpply
Description trolley
Panel switch fo high speed
DAr
contactor for
back*ard
rolley
DpV
DGV
DRa
Trolley brake
DM
DDi
JrolleJ moror
DveM
vane
RFa
Contactor for
slerg
brake
RD
Tcminal stip
Supply contactor for left slewing Temperature controi Brake lor slerving bow wave
Signal light of rveather vane Button for sleq, baking Switch for ieft slcwing Switch for right slewing
RM
NNDSERVTCE
NTNNAL
Table 4.6-1
DescriPtion
Figure
I
l
DescriPtion
(HF Panel) Termrnal striP
(L Panel) Terminal striP (R Box) Terminal striP (HF Panel) Terminal striP (D Box) Terminal striP
V1 \
i
ElectricHorn
switch Ovedoad Auto-break
ring
bulion
swit"]!------
Push-button s\\itch
,r*ri-"**""u,ornosuitchL
cage Thlee Phase squinel motor asynchronous
Push-button switch
Linkage switch
Resistaoce
Anemoscope
Thermo-sensitive resistance
Potentiometer
Crossing junction
Pressure-sensitive resistance
4,7
diagram' to this electrical schematic according cable the can install The consumer
\ \\
:!
Fig' 4'7-1
of tower crane Wiring diagram of cable for stationary type
-l
,i
,1
,. "
L o^
Rruo
1D
!rl
l2i
i'L
qiilii
ltltk
lrr
fig.4.7-2
/1
Notice:
ani"d
rr,3rrtailu gutt
is 5mm' keep diameter the cable, can protect the wire rope whi<)h
the usage as follow' the same heieht' the cable net to with "'' ;;,:::' ""t" '"ith it " hang 4 7-2' rope as figure \1';e ofthe on one end fi gure every 10m as Hoid a clamp for ring a to make use the clamp slewing' on lor'r'er (ftgure by nylon belt the steel book ring the on to ground lio* cables the 't"'ulng making wtre 4.7-3. Fix ail the wire ropes' on distribution of cabie unifornl rveight the from damage 4.7-4). Make cables' the eight of ' "'"'.t^:*::-t.::.*oo undertaking need secunng rope the wire ropes 100m' exceeds When the height
tension because of in
lOOm' to
uniformly
.
"u.tl
"ntore
,a1'
't)el
Frg,. 4.7 -3
F\g.
4.1
-2
-..-
/1
1 \
.I'OWER
ep
conftol element
to
.lr9
50Hz/60H2 3B0V
i lre
'ire
rge
Di
airbeaker
tA
48V-control voltage
I
SAHzt\AHz 4Bv
ing
CXORK,CXOL
I
starting
CXORD-let inrerlock desk zero p..irion CXOL- righr inrerlock desk zcro posirion AU-.en icing butron
l
I
rela,
\P-Joor
P-rioor
conracror
relay
I I
XP-P
iriphasc power
suppty
brcak
clolvn
SIRYICf, MANUAI,
5. Traveling
The composition of bogie traveling system The bogie traveling system is c, of four bogies (with traveling audible uno ur.ru,"rotoosed mo
erectric contror panei. Each educe *,hich
or*r,
"ra"r"ol'e
"qripp"-a
;;
:#rt :*"
ffiililJ,:ini]i,Jl':'
o'T":"*
1"1 external
5.r
u, [aKe more mechanical force, the Iongtime allowaho *uo'" .,,^-,_,_:-_''-'' working temperature of the cable shall not exceed 65 c), ,,w,, type tnt featues such as weather "u0," resistance and oil esistance, which is suitable a. ,nut and the site contacting National Standard oil stain, Chinese ,"",,r".,0oos accodance with the requirements "0j_ Intemationar Erectro;;,;; specified in -urrmission IEC215(t 980). -* wortng
**" ., ,.",",,,*Tffi:l:'r:ilj::;,:::;i:,r750v rL
princ;;
sets
**;;-1";;,'"::':":::'
coaols
the
contactor to control mov ing loruard: TAr i5 a colaelor Dackward; Tp,, ;"
^^
r*,,r'.,, '"'r uaKc: I windin" -- , ^_l]'_' unu ind ing of cable drum. p*::.",,o '"!4utrons:
contror nrst shift rGv,. ; l"'""# " are aveling audible and visual aiarm cievice; RE controls lhe sen ice brake and lneanr.r hile ,,I
-,]-,"j',i
""",,rl
fu,,,":::";::,;[,,,,jr
due to adopting soft stop, when the cranc stop traveling, confinue sliding it witt f( a certain dstance, normally the sliding tlistance is 2.2m _ rrr when the crane direcfly stops af the secord shift, be s.re to a"".1* elerate in advance when the crane comes close to fh^ -^., _
5.2 llogie brake bv hard brake' They take effect one and brake soft both st"" brake includes stop the RE conffols the auxiliary brake When brake' set.rice the .",r,r",' it flrst' then stable deceleration' after that friction soft a provides it O"*",
;;. ;:
"r.'a , *",,*
fully stopped'
of chassis' and parallel with the 'fhe cable dmn.r is installed on the horizontal bracing
rail.
u'orting principle of cable drum slip ring' bracket' drurr 'fhe cable drum is composed of moment motor' reducer'
5.3.1 Features and
and
roller box.
the the po\Yer supply direction" stad up to\\'ards moYing crane Whcn the tower to drum via rotor disc and moment the transfers 'l rotor moment motor. he moment when the tower cable is involved in the disc; the rotate' slou'l.v drum flange, then the the r'ia dra$ing ol the cable to conquer supply' pou'er the against crane moving cable auto exit' u,hich pulling the disc rotate, and the reducer, the in moment friction
'y le
it
The outer porver supply cabie pass through the roller box (see Fig. l), as per the direction of arrorv in Fig. 1A to induct the drum inne ring, via the inner hole of the reducer output sha1 to get into the slip ring, connect with thee real line connecting plates ol the slip ring inner ring and a zero line comecting plate; the service motor cable via the cable elborv into the slip ring, and corutect it to the conductor.clip on curent conducting plate ol the slip ring outer ring. The marked curent conducting plate connect with zero line, the othe three cuffent conducting plates connect with the eal line. (See l A, the p vieu,.)
the
and
the
{it.
Slip rig
Dun
Cabl.
ANT'
SERV::::
. f:
P
Current conducting Plate
view
culfent conducting
Plate
5.3.3 Debug
Before the cabre drum putting into service, screw out the rocking pans on the shelr reducer (See Fig. 1A. for its position in reducer). Check that whether the groove adjusting nut of reducer and the installing hole
of
of
not,
manual rotate the disc until the groove is aligned with the hole, then insert the locking pafis into the hole (see Fig. 2) and rotate the disc. The person stands outside the drum,
if rotate the disk clockwise, the adjusting nut under the limit of locking pafis moves
towards the spring and increase the output torque by force. In reverse, rotate the disk
anticlockwise rvill reduce the output torque. Adjust fhe output epeatedly, until the
cable can extend
sides
wind successfully and avoid overheat of motor. This optimum position can
scre.w the locking parts which
In debug
Sockel
Out ofdebug
l-ocking part
Socket Reducer housing
fuducrhousing
Adjusring
Locking part
nut
Adjusling nut
Fig.
a.SwitchoffthepowersupplybeforeoperunguleuwuDn,".-.-r working the nut groove in into parts locking the {orbidden to insefi b. It is strictly
hole' the center of inspection above be should level of the reducer c. The grease
condition;
month' time' after the hrst first the for pulting into service a. When the reducer
must be replaced' grease in the reducer
the
center ol is lower than the it when month' of reducer every two b. Check the oil level
ring every two month slip in parts condition of electrical c. Check the tightening is reliable' connection of cable ioint the and well contact Make sure that they normal the cable drum fo check time' of a period puning into serr'ice
d. After
..... ^,,, -he screlv ue' grease' the When replacing reducer each year' in grease the e. Replace the screw orrt meanwhile oil' the dirty to the boftom to drain close plug hexagonal oil draining the dify after plug screw up the hexagonal locking parts, and then parts' screw up the locking then and grease' clean add the
r.rinding and
unwinding
clean
g.
ll
.-c^,manc6 pet'"'operatrng the already influenced the part wom a lot and had
replace it in time.
,].OWER
6. Hoisting winch
( r -- RCS r__
Explanation of symbols
Description
Tension the steel rvire rope at minimum raising speed.
To lorver a load at minimum
lorering
speed.
ioad: Raise
NOTICE: I
tho
It is fbrbidden to put the hook on the ground. Loosen the steel rope
f
v
tho
lI,....-...--.-,,*o**'*winch:(see6-1-1)
l. Limit switch
5. Two motors
2. IJrum
Rcductiorr gear
4. Chassis
drum, height limiiator' motot' of chassis' reduceL' I composing winch The hoist control Panel electr'tc and repair device' examines oneself lisriter support' save
and resistance box'
6.2.
equip with _J^. ihe end end the asytlchronous motor' 'lhis lnotot is wound rotor triphase
crect, omasnetic
working
principle
th
brake or power
;;";
;"'""*"
11,
]1,,::,t::li5:
operating by rating rotate D|,lsu alone. speed arone, lr it rorm form two different speed on the drum
LMPV motor tandem connection stailing resistor electuomotion opel.ate, the motor LMGV stator under the early excitation condition, its rotors generate electricity and feedback to self_excitation supply porver and consume power brake of stator
operation. Through transf-er the resisance value of
and resistance value
The electric control rcises and descends five gears respectively. .lhe speed increase by degrees frol the first gears to five gears. Raise fiist three gears the rotor of
electromotion operate condition. the contol rotor tandem connection tlte R numeical value by the contactor L I, L2, L3, rhe contactor LRa2 and LpVl make GV thow into action supply power condition. The contactor LRa2 and LRa
contol consume power br.ake loop. In the fourth gears, LMpV make electromotion operation alone,
connection
LMpV rotor
tandem
buffer
espectively,
sPeed
LM'V
come into the stable elecuornotion operation after 2s. the drum
LPYLPVf,IZ,I-
to the fifth
gears,
tir.st,
I t
lu codition.
t still
cut off the electricity and make motor divorce circuit, then
make motor LMGV enter electromoton opcrate
"* '"ect
particular Need specific indicate in GV speed reach and hook speed the drum speed load; depend on the size ol lifting gears fifth the into \\'hether come
":";.'.r:.,
2'5t(2'5t+2'5x107o) and than more should two scale lactor rvhen Laise the rope forbid than 5t (5t+5xl0o/o) all more should factor four scale when raise the rope due damage the motor LMGV only not otherwise, speed. occur the fifth gears proofread accident' Therefore' must other generate also to over loading but limit the high speed) capaci hoisting that (the switch and verifv the SLchGV link) and debug exactly' (dynamonmeter brake in hoisting capacity uP self-excitation genemte nrake LMPV motor gear the Descendent rst three moreover the motol' condition' 11'6(ig btake pou'er electricity and consume and the electromotion in the second in.rpedance bunch LMGV operating undel'rotor perch heavy by motor speed slowest the gain geal and third gcar. Descend one Molor LMGV
one
electromotion gears the motor LN4GV ltve Descend alone' electromotion operate
opelate alone.
6.3.
Wiring diagram of hoist eler ric control panel L (L panet (see 6-1_3) )
I
l
Ri-3
R
11-
13
2
Fl-F6
R21-
Fig. 6.1-3
Mu st check and fastening al the binding screw and terminal strip wire splice inside the resistance . box when put in service new
,
ffi
"ff""t
t,
1
cycle' and or Ac negative half cycle harf positive AC electric potential whatever a" to "b"' flow ftom always coil brake the circuit in the was cut out' the LFa contactor the If 2).
"b'
AC power supply' brake coil cut out the value to the curent from maximum changes of zero at that time' this
induced cuent all/alt produced self the electric e.m.f. in the brake coil'
potential
rb'
the
induced current
through the diode.
Oo'' u to
r(b"
o:
Out ofsevice
motor conditio
1f,)'
'-' a
.?.
'
o
JC
a':
.J
:t 4 .i'
j t oo
...
-.,]
j
j
.o:l
o.
..,]
i
-:-i(J
-j
. : _i Qd.rx
o J o J
h
,
9l
..
J
U
,9
'F
P
E
:E I
e*
E'E
PE *:
E
--,4
2
.i
iil
E
l
!i 2 6 qp
I
;
z
a
z'e
2-
:
.- q
Q;
t p
!+l
6yp
3 -F t8, ; ;
;.=
Z E ?:
l
I I
'7 Z- i
7
2'
7 =
= --
6E
i,
l.-l i
lL ': jl l
- ll1
.- --tI*
ir ir
/!' -i
i
i*rtl
]
trl-)l
1,
,\',
li,llil ()t
-...1
t-
eL
i. .! =
>
> dj
.:J
> ^j
,o+
T,.><
l
-l .
^
_q
E
'j':*,
3<
,^.
tu Ets
b I
1E
E
.eU.)
hE i{p
E'2F
a2
i,
EE
2l
(,
o
3 o
1
d
+E
4,
1',4
;
?,8
, a
E
"E
=a
:2 =z
.EiiP EBB
9r 2
,.,
7.1 Explanation of
symbols................ princip1e...............
-.-.-.........-......--..78-2
RIC controller
.........................7B-4
7.5
?.1 ExPlanation
of sYmbols
t j1
Explanation:
required Accelerate displacement ^rrdance with the in accoroa""" speed by iorce via slewing choose the slerving ,- "-^tt e iib iib by the stop gradually Don't slewing speed the The slewing or decelerate movement slewing then stop the ti"t' than decelerate "l speed is less brake, it must wind the when t; position;" to it must '"'hoisting brake is only used the same time' at out *,a* are carried n",.,-* and slewing 13m/s. If the
rope from disLoning' pre\ enl the u ire
working principle
The slewing mechanism is composed of torque motor and planetary reduction gear (see Fig.7.2-1). adopts electronic variable voltage control system. Through adjusting the torque motor stator power voltage, the eddy_cunent brake
It
and
driving system is composed of torque motor, which adopts two sets of eddy-current brakes and
weathervane brakes, and planetary reduction gear. Weathervane brake can be brake and released automatically or manually. Electromagnetic brake is released when power on, while brake when power off When power on, the slewing brake is
,
one set of
{ways released. During operation, ifnecessary adopt the slewing brake to protect the irane against action of wind, under the condition of wind speed is ress than l3m/s
At the end of
magnetic brake work automatically or manually so that the tower crane into the state ofweathervane effect.
of the motor
rotates
with
the
shaft. the
of the eddy-current brake produces magnetic field in the air gap 61 the armature when the excited coil was supplied with .lhe
direct current.
: incises the magnetic field so as to form potential field and the current (that
curent and rotate speed of the armature. Through the frequency control
-current
braking, it can
fulfill
i1
and troubleshooting mechanism operating slelving RTC 7.4 oPerating RTC 7.4.1 Notice for controller adopts special slewing mechanism slewing the loop' 7.4.1.i In the control o*o** or down un speed that ensure which (electronic block)' due to stop and reversion suddenly emergency liom crane the and s'hich prevent block)' slewing conffoller (electronic the that inpofiant very is mispla,r'. Thus it block and alr parts of erectronic of supply power conrroi panel, potentiometer, and reliable' connection ale cor-rect in regular' Refore the failure mechanism slerving the and service 7.4.1.2 Maintenance destroy Otherwise' it may serious ii operate continue to is eiiminated, it is forbidden l even result in serious accidents structures' and pafis the transmission RTC maintenance methotl of and diagnosis 7.4.2 Malfunction in normarri irthe srewing doesn't work
s1bl1.:::::'n*'*
ln::i:'l::^
ll"LT]:l:::"ffi;';
condition,
aspects:
it
followingl first and then check the t'pply po'u"t the off cut should
l'',,*' *"'"'
7,4.2.|
t''nnil.'g' uft"' time, another direction can cut offtht stop immediately and ot"u''"d' to"ndnton this by single direction again ll and between control panel conr.recting lines two power supply to check that wl]ethel There isa well is grip earthing and centre tap clectric contl'ol panel, potentiometer
a period o| in single direction, aftef Stop it can only operatt a period time running'
bloch didn't connect well' relay contact ot slerving control or onct direction; other the than fast .7.4.2.2 Theslewing speed in or.re direction is on towards rotate mechanism the slewing closed the slewing air breaker RDi' at]rhetheff imnrediately and c}rgck .,0,,, th" off cut ,'*", Should It direction, *'i,"*rr, ofut tuvh lt addition' I, ci'cuit il open potentiometer open wire ot
Measuletheresistanceofcentletaparrdslidingendbymultimeter|n,|r' position readjusl the zero should it othelwise !) , should be \vithin 0.-50
potentiometer.
:.--
should Pos
oller
'king, te to ock),
,
on and check the motor three phase of voltage whethe loss of phase; thrce phase voltage rvhether balance. In normal condition, the degree ofunbalance for three phase voltage shouldn,t be more than 3%. Namely, the voltage of three phase output line
can't exceed
ts of.
ilure
)stuoy
7.4.2.1 The sleu,ing system staft up fast and stop slowly. Check the exciting voltage of RRa eddy-cunent, it should about 20V direct current in stop state. If the voltage is too low, check that rvhether the altemaring voltage (4gV) ofthyristor module is too iow, if it has no voltage, cut offthe porver supply and check the connecting line ofthis part; check that whether the thyristor modure damaged again, the inspection method is as
follows:
1)
sm
ormal cwing
2) The resistance
iod
of
Ifall above have no problem, please replace the slewing controller. 7.4.2.5 After tIe control handle back to zeo, there is a contactor (RD or RG) still power on. It should power off and check the zero position of potentiometer pull
the insertion
out
piece belween controller and mother boad of thyristor Measure the esistance between potentiometer earthing end and sliding end by multimeter, if the resistance is infinitely great, replace the potentiometer.
4'2.6 The clockwise and anticlockrvise contactor (RD or RG) no athacting. Fit.st, check that whether the cormection wire roosen or broken; next check that whether the
?
re ls
I
Js
r^.. )lltc
*a
of potentiometer Rp has
hel
problem of controller. When all the above check is in condition, check that whether the contacror RD or A1 end of RG have 48V , ]llal volho" ,._ . ,h. operate handle condition and farther check the controller have 4gV ,olr:-' ") lut, rr all the above check is in normal condition, please replace the slerving
''
rne slewing controller and thyristor both bur out and blackening. Check the lar first, then checi( that *h"th", th" por"", supply voltage is too high. lf all the I ch.^r. - "' ls ln normal condirion. please clrech the sleu ing conLrollcr.
M:)1
Eig 7 5-1)
Lift
A. (l ), i.e. movement
;, ;:.;;;,"-." ,,) ""* ":::;";::;:."'.t:" brake rek -' '"t"^"" th" mut'ai pin the clip
"''
-,"st
'sm oan rotate fteely mechant the siewing accomplished and effect d). The weathervane device tt'" weather vane n"t"u'" Z.S.t.Z i'e movement A' (t)' lever brake release a). Lift the manual (4)' spring foroe the under out O' "t"oted Jr. be standstill' ll' o"'"""" *"
,1"* t.',
*"
*"c**
*"'*"]*-*]|".
*"*'n"nould ll)'tn" -
2. brake released
eely.
Note: "E,, is the clearance of brake, which value must be kept between 0.8necessary adj ust it. l.2nim.
7.5,2 Electric staftup
if
ofweather yaxe
is an electromagneric brake, which is engaged as soon as rhe cur.ent own and independent power supply.
2. brake eleased
TOWERCRANE
OPERATTON
Note: it
ctc.)
grease' as cement' sand' (such braf(es in the foreign bodles any have mustn't
7.5.3.1 Unscheduled
maintenance
conditions: the following under out should be caied The maintenance ofbrake pad damage and by worn which is caused moment braking
a). lnsufflcient
is out ofwork' b). fhe indicator light maintenance 7.5.3.2 Scheduled or each month' hou 200 every slerving br ake of te a). Maintenance the conrlition wear as the torque as well brake and b). Check the clearance
pad, teplace them
sand, .^.,^L as o".ement, ce (such the brahes loreign boclies in no are thee that c). Check
brak
ifnecessary
greasl
t IF t
23
25
L
terminal board of slewing center teminal box (R box)
47.48,49,46
r
progressive
grease Iubricating system
I . Intoduction ofprogressive
do differential
mainry depends
Progressive grease lubricating system consists of lubrication pump, progressive oil distributoq pipeline accessories and control unit. When system supplies oir, a series ofpistons ofprogressive oir distribufor would
reciprocating motion
in a
distributor. The scope ofgrease used for system is NLGI 000-2#, working pressure is l -300Mpa, dispiacer
il:: ::"r,:::::::.T:
is
#:':::';:':il'::rT::::.::;
The motion
through the
The system can be equipped with oil indicator rod and blockage alarm so as to monitor the oil supply situation of each outlet. In case that the system is blocked or a certain outlet cannot supply oil, the indicator rod will stop motion, and the alarm will emit the waming signal immediately.
controller.
According to the structure, progressive oil distributor can be divided into two types, integration type and sli By choosing different structure and different ''o" slice composition,"t"
carry out periodica,
Features;
*o,rr-",.,,"i]
can
"j,;:,ffi:,*apprication
1. 2'
Accurate oiling capacity; Regionalization performance: operation and monitoring on individual region;
. 4 5.
inspeotion ; SimPle malfixrction point easily; Testing the malfrmction oil distributor easily' replace and Repa
Lubrication PumP
1. ComPosition:
1.
2. Size-changed
joint
block
4. Oii PiPe
joint
femrle 5. Bipyramid
block
S.Greas e
6 Radial
7. Tee oil-distributing
10.
filter
Motor
system of grease lubricating Schematic 1 Fig'
2.
pump shown in:l:' grease manual joint of First connect the outlet u"' rill the erease lnto the inlet of electric"
Working PrinciPle
2 to
container
,'"""
pump
is 2L;
supplles
,r under
nrlantiFrcationallyandperiodicallytoeprogressiveoildistributo
certin orde and the oil successively escapes at the individual outlets. The oil capacity supplied mainly depends on the piston stroke and section area of progressive
distributor' For working piece of double outlets, be sure not to let any outlet be blocked so as not to affect nomal working, otherwise the distributor will be damaged.
in a
-!t
1.
-,.,
., ,,-1-.., t
)l i
-;-,.
3.
Low
avoiding the device to be damaged when thee is no oil in oil drum (as Fig.4), it is connected to the normal closed point ofoil drum switch (Note: no oil is the closed point, with oil is the open point).
Refer to the drawing, S switch with the function of avoiding the device to be damaged when mallinction occurs on distributor, it is connected to a
hicroswitch
on the distributor (as lig.5), connected to the nomal opon point ofthis switch, viz. on the black and yellow line.
-Oil
level s\!"LrL
le indicator
trltl
ti
i-. tall
'
I
i
'
!ig.5: Disfibutor
Fig
4:
Oil dru'
in the when the oil capacitv :1' oil controlling limit switch
the
-::":'**,i1tl"llT"
"^t:'::,
s'r' :,;;;king -"
I
"j""1 ";
lubricatrng
at e
moment
lr*.*lo *"'
If
:" :t:-:::-"
the cycle switch order' in oil will supply in the system' there are any faults lf cycle supplY of c}cle completing one oil any motion time
such as leakage,
distributor each outlet on normally' rvorks system after the auto lubricating (S) will give ofl signal
",o,
.,
ou,,,o
o,*n,
making
tht
"on"oll"'
*tl"'** "O"r
auto (5 mins)' the time alarm preset and controller' of control the
4.
Ml2x1.s
ij
ll
I
lil
l',
i
Ill
1
SM-AC ControLler
General
sN4-AC
is a multi-purpose
:"":ffi::,:jtt:::["]::J'rl"";
t",
rhis controller
o[ rouph indu'
antlvibration
St'1-AC
'
u R " A0 A1 3 4 rar 12 ^,
'
A2
l.Terminalt.:eo*.,inptltlphaSeline.nostrictrequllellt(1,.'.
etc )' solenoid valve or motor Load input (pump 2. Terminal 3,4: the switch is closed, (The input level signal 3. ltrminal 5,6: Low offalarrn)' corrtroller nill give :^ )
zero line)'
4.
switch (NO) pressure r'vith Terminal 7,8: collnect 3 or NC) at mode (No switch connect with cyclc
at rloo( "'
relay.
There are one 4-digit display and 3 LED lights on t}re panel.,The digital screen can display operation mode and program. 3 LED .lights indicate respectively: power supply (Green), pump running @ed) and low level alarm (Yellow).
C. Key boardi
R t
A. Switch on:
the power is switched on, the controller
will be work
and display
on the data stored before power off, follow the procedure below
data needed to be reset:
.
if
Data Setting
"R"
.,-,,
and
.f
,,
8.
8.
I Explanation of syrnbols
Locked rotor torque Eddy-current speed regulation Variable voltage speeJcontot Trolley winch
TO\!ERCRANE
fig' 7-3-1)
off lt
has
9. Protective cover
rig.8.3-l
switching off, the elecffomagnelic coil exciting the Braking: when
disappears, lhe
atraction
()
disc disc (5)' then the brake lriction the brake spring (2) pushes
at"armature ls the coil, exciting into thc Br.akc rcre.se: whcn curlent enter.ing
statc
,,",cLed
m'L" the b:":.:t (2)' spLing tlle (5)' co*.rptess "nd r rvhich drives the liicrion disc 1"" the fol next brake when rcady is brake fhe c.terirs. inlo rereasing statc.
_.._ (r)*r""" *
disc by screw, until it lean ag;nst the cove ofthe latch. Move the disc again, and locked it in the 3.d. At this time, the cleaace is 0.g to l.2mm
brake moment adjustment: It is already adjusted in the manufactuer. Manual brake release: Tighten the release nut (3). Do not forget to unscrew the nut
when restarting.
.3.2. Maintenance
Every 200 hours or every one month once. check the cleaance and brake momeng as wefl as the wom condition ofthe brake
isc, replace
it if necessary.
't replace the brake until it wom out completely. that whether there is some foreign substance in the brake (such as cement,
grease, etc).
r
I
ro\vER
CRANE oPERAlloN
trolle!
t\
a
,,,
iLo
o o
C
r.
t,='
iO
o ':-'-
?-
RD-, Ri51\!-,...
oo
O t
o
I
xlli
:
.n.\'
:/,
-a u
oo - '
oo ,
\
r
t., I 't
'- -:r --
aa
rl
^'
l
:l
j_
____.ir,
..- =l =J*l
I
I
14_XJ
Phase
sequence
Dotecor
I5.DI
ai
lo-xP
1I.RE
switch
26-Tfu1
Cable
drum
cotactor
" i-3,
-t-
f--
-t_-,\-:_
i-
t ----\-
9-. -6 I
?'?
: a*l = "
3i
:
-6g
'lr'
liil -L-:J
"i; H
I
.-lt
al
- EC
ali
< a
s 9a
--.1=l n
3=
.-A
E gB
ll
r
l= =
E Al9
llr
t--l
-a?-{
E=+\
f=
I
-l
.lJ:
EI
.J :/:_____j1--
lAEs=!
I
__
iFi I
I
l4
I,l
.. l[s
l
-,.3_
i',
rl
l
*t
| s s
:E
.-1?
iL-l>
'-:
-ta_ =r1l
Es
=l:]:
-la
furucalLrsr
TSFUp, psdF
Name Transformer
94
_l
2
Bcaker
XLIJ. XLD, xI_2. xr:. xrq. 'XL.l1. XL5. SH. CXL2. CXL3
CXL
Middle relav
Conn.ol relav
L1. L2,
LFa
onnect CXI l Connect XL2.
L
R"l. I Rap\
L:l
.
Lnir
AC contacto
Xii
CXL3
XL4.
Tirne de la relay
conneer
_!&
sH.
lRar. L:. r l
Connect
in"pv.-ini
LpV
fime
Aelay
rilav cover
CCtLPVI. LD,
LGV]. LH
BSL
iV,EH.
1
Auxiliary
BSL
Tonperutra" alay
Terminal strip
__l
4
,r---
--.-15
6t
)l
-7--l
rlf
,'
=lE=*
-------*q
ji
L--Q:;; i
- --
I'e,
=k_--
-l-
tc
o 6
I u-
==R== it++q
l!
'
.,?
f_--+
...-^-sJ ,\-/\eJ
4l
I.{YOUT oF SLEWING/TRoLLEY
TS1
Transforme
TS2
Transfome
Red
Diode
Red2
Diode
RDM
Control relay
DAr
DMVl
DPV
DMV
DPV I
DCV
Control relay
DDi
Circuit-brea
tvc;
I
Control relay
l****,. Lisht
*o'
XRGjI
XRGi2
Control relay
I
I
Lrl
xnur
XRa2 Control relay
I
I
Rr"
SD
DFa
DRV
Control relay
SDM
Conrrol relay
RDi
Conroi relay
Cont.ol
relay
Circuitbrea
ker
Ar,iliury
Auxiliary
Au\iliary
Auxiliary
Au\ilialy
rsrunjrsrutlooi
MTC
Circuil-brealCircuit-brealCircu;t_rea
ker Ir.,
lr..
RD
AC contactor
XRT)
XRG
RedFU
RedFUl
FaDi
t:!
Conlrol
relay Control relay Circuit-brea Circuitbrea Circui!brea RC
[]
ke
ker
Auxilia4
I'/I,K
IIF,DRK
Socket
Socket
a3
1
rs3
Red. Red2
T;;=:Diode
I I
2 I
_l
RDi
rslin-
Circuit-breaker
-l
2
Dpv.-Mttl
ACconractor
__
xRai
-*Yi------l
gon;ctE"lP
r-----l
Control relav Control relay
l I
2 9
r,:;i- .'-il-
lr lr
ll
uunnect
.-RG
n,n" d.lrnr;lay
"CI/",
-Jgryectoav,
MTC
Ric=-
Da.-
Auxiliary
---r
___
__
4 2 I
;;;*"
Silicon controlled rectifier
-- R;d;t'--
l
I 25
T.
Terminal strip
-Ri
VGi
*1._rlryao ,,,roR[
-_.-.-rJr/D.E,R
ft:.I!l{.
FtF/Mo
@e,erlgr,. Brflnr
_q l
--
< o
-J , o l-, o =
6 I 6
CD OD
z, O
=
= C'
-, C) := -l .-J
{lt
HE
EI
ITE
-J <.) -J <t) CJ
LU
o < o
-t
<n
tl_. E
CE
6 -
o-J
cE
--
<
E, =
ra
o
-
> o
<\.1
<\
u:
3b.3iE
.3
(Y) CD
OD
:
.= .:
o
I
EE
E
rH i;iH:*! *d.3H
tk EfE
E
E*- ! = F. :*l<. i
6
e
,.t
CJ
r.-
g 2 o
o
=
5F5sEsEEelxEpsr
H,.9-.*gr
6r
U-E=
{il|
IiE
:F<9r =,
E--
9. .Hydraulic system
l" n*urrn
system
ol
It
nrainl-v nrakes
vaive'
pressure
1.
Molor
2
3
6
:
9
10
11
5. Oil box for liquid 6. Temperature gauge 7. Oil outlct 8. Lifting Point 9. Hldraulic air cleanel
li
t13
connectroi 10. High Pressure lluid connecrol 11. Low Pressre fluid
:
I
Mofor power
SafetJ
Return speed
Cylitrder trvel
prcsure hoe
Pressure hose ssemblv
West Germany
stadad 4D-13-60
makes the oil after motor starting up The oil pump coupling by pu[rp oil Drive the valve and cylinder via the filter' combination reversal telescoping to box oil from between the oil pump and hose assembly' The setting pressure
high pressure
is
of
the
and the balance lowering overflow valve is 6 5Mpa combination valve is 40Mpa, the
pressure
gaugc l{'
P
'
reliefvalve
10\lP!
\
oilbox
relescoPig cYlinder
rnolor
-es the
oil
lah
power supply
l
valve and
ump
and
SBh
SBz
e of
Le
the
balance
l\, M-a
valve in the middle position H, the opening p and opening T are joined togetheq the hydraulic oil ofthe oil pump outputted went back to the oil box, the hydraulic system is in oft,load condition at this moment.
revesal valve is in the left position of figure (when lifting the lever of colnbination reversal valve), the hydraulic oil ofoil pump outputted come into the big chamber via the combination revers
Combination
open,r.
B and I the telescopins .ylinder start to telescope. The ''''"'"''"" cvl telescoping Gp.od.,'",,. ,,, tc rlow ^"* ol oilpurnp. \-
move downward; the hydraulio oil ofthe small chamber flow back to the oil box via the hydraulic rock, high pressu.e hose assembry and combination reversal valve
speed
0fcylinder
Cornbination
oil of oil pump outputted come hydraulic the valve)' revesal lerer of combination the high pressure reversal valve P and B' combination the via chamber into the small time and hydraulic lock at the saure the Open lock and the hydraulic hose assembl-v small chamber the hydraulic oil of the upward; move of cyrinder make the pisto' and pressure hose assembly high lock' via the hydraulic flow back to the oil box start to lower' The lowet cylinder telescoping the T' revesal valve Fl and
combinatiou
rotate
up the clean and fill and filter air hyclraulic cover of anticlockwise OPen the telescoping system pipelinc hydraulic the Connect appointed hydraulic oil joinl: test run and and screw up the diagram system according to the hydraulic rraybe normal condition The cylinder in is pump h'vdrar'rlic chcck that whether the and bleed hole of cylinder air via screw ailbleed lelt the ioggirg at beginning' tuln tighten up more' jogging any didn'L it times' if spun some oil Operate it several (the overflow valve oftelescoping pressure check the thc ailblced screrv tightwarcl; necessao' it no needs to adrust. If factory, reaving betbre overflorv varve is 40Mpa
namely for lorvering is 6 5Mpa)' valve ovelllow the and it can be ad.iusted Afler completely retract and completely the pressure $'hen the cylindel cxtends rlrc ebor e
rr ot
obselve
t
TO\YER CRANI OPERATION AND SIiRVfCE ]UANUAL
n the
30me
SSUIC
oil box
--...................."........................................-
has
cylinder when it
"r*;;;;;
until it eaches to the
e and rmber
and
lower
upper rimit of level gauge check the creanliness ofhydraulic oil every six month or after 2000 hours,running. According to the specific circumstances, it can be checked in advance. Ifthe oil is milkiness, freezing and dirt, it must be replaced. In orde to protect the seal ring of cylinder, wipe the dirry bodies on piston rod. The hydraulic pump should be covered weil with plastic materiai after work with the pulpose to protect the oil quality and prolong the selice
life.
ifit
rotate
hydraulic system every two or three months with no load, which will protect the pump, valve and cylinder.
9.4.4
,n
and
peline
and
If the oil is milkiness, freezing and dirt, it must be replaced. The cylinder must be cleaned when replacing the oil and checked that some place have
rusted.
It
so.
get
maYbe
9.4.5 Check
periodically.
lr
musr be mainrenance
it
may occur
"".,".tJe
$f
9,5 Th" "ollnoo even heavilv when it lowering' shakes 1) The cvlinder retum circuit is unsuitable' of throttle valve for oil
caut::"::::*:*t"-
**l* ,* 'r*t'"ent
until it to the operation manual' according valve Adjust the thottle Troubleshooting: didn't posidon of throttle valve opening the If condition' reaches to the optimum
thread' it can not be adjusted' screw the with align
2) The
Reason:Themanufacturingprocessofsleevewasn,tensured. connection weld the nut and direct e i weld' joint or the Troubleshooting: Replace of oil pipe)' adjust the direction joint can't the time' completely' (At this falling down 3) The cylinder continually or the gas left; not well sealed; residual have of e cylinder Reason: Two chambers hydraulic oil wasn't clear'
of control
Piston
sealedl
Troubleshooting:Eliminatethegasofthecylinder;ensuretheseal well and ensure the oil box cleanliness oil the often check
and check valve;
thecontrolvalveofhydraulicpumpmustbeaccuratelyadjusted.
telescoping interface of hylraulic pressure low and The high
systerrt
load;itmustbecarefultoa.ljustthehighpressurethrottlevalve.
to ensure the safety ofperson crane are important devices tower of The safe devices
and equiPment'
0. 1
Introduction
for the load limiter set a limit the ard limiter devices' the moment Among the safe breaking off' and the wire rope fiom overtuming to protect it against tower crane so as The purpose of each adjustments their are set' don't modi After the safety devices mechanism' the motion range of each timit to switch timit
O. If the top of tower craneexceeds30m,itisnecessarytofitredobstacleindicator stopped' even the tower crane feed current remain lights, which
O. If
anemoscoPe,
jib foot exceeds 50m' it.is ""::::i"":: exceeds operation when wind speed stop to *u*i'g o,rt which ."rr-d
field ' after divert to the new device safety every @. Readjust the
10.2 Hoisting
limit switch
10.2.1 Purpose
the
I off.
:ach
Hoisting limit switch is a device to avoid any possible error operation. a). To stop the hoisting-up motion as soon as the pulley block re'vr uuu,' qomes c< near the jib trorey (at l-2m
distance).
b). To prevent the wire rope from completely unwinding or winding up onto the drum in the everse diection when the pulley block is lowered.
I
limit switch, which equipped with a reduction gear and located on the chassis of , is driven either directly by e drum shaft or the pinion
engaged a gear ring.
It
several cams to rotate which control the circuit breakers, so as to cut off the onding motion.
it into service, it is essential to unscrew the plug located at the lowest pa of switch in order to drain away the condensing water. This plug must be
before the tower cane transportration.
rr
{
10.2 3 Adjustments
tl
I
lowering load Control the hoisting or no with out carried be Adjustmenis must the manually so as to detennine 4W and lW microswitch motion ard operate or falls (Note: If changing the height molion control the oll hich cuts micros'itch
of
1o\\'e1.
and
lo\\erirg.
f'.r,
i-
17 2Z
1Z
,2
4l
3W 2W
3T
4Z
2Z
2f
1T
"rrO
Adjusing spiudle Ivficroswitch
ng
he
lls
rd
Adjusfing p"o"...,
t_
4z-
| ::a ---:.-
=-
4Z
1W
I l) D i.u.r"rb,-ng the
z) r oo,.n nut r
housing t
]rl;" ;,:":t'*'"r
,.
"ompreterv
irch ror rouerins (Sr D)
Iz
,spihdle
o"ot"r"n.
id ha. At o,
s
. *. o";;; - .. -' ;;;:"*' l.u.t , ,"u., . ,"r;, ,--, at the ";;;" lorvest posiion).
-2m distance. rt is rorbidden to make rhe ",u rre pu{pose to prevent the rope unwinding unwinriio rrom r.^* ., the ;.trte *'trdings should remain on the drum (when the hool<
I
"orr".oororr*l;"
fi"::;"
distance or 4-fa'll' until the 2-fall with up the hook Hoist t:"]-::^:;.
"-
*;*"mit
b":::::::"::::::r:
motion stopped' 4W and the hoisting contact the coresponding until it depresses disorder' make the memory will it otherrvise Scre up nut E' Check that times with no load several rvotk u'inch and Operare the hoisting it as the above process' adjust lfnot' position is right whether the memory housing' nut E' install the up screw right' If the position is conol' so as t' memory of position of l'inch' check the
oa*"p*u* o'
5)
6)
7)
8)
"6**"'
'"*'st
fails erection and changing each after s'itch the hoisting lirnit
10.3 slewing
limit switch
10.3.1 Purpose:
This device is used on the tower crane which hasn,t have slip ring. Its function focus on avoiding cable twist and damage. It,s equipped with slewing limite, and allows the max slewing circle is three.
I
Limiter has reducing device with pinion driving. pinion joggle with slewing ring directly. When slewing, limiter reducing device bring protruding block slewing. And ing block controls breaker (iggle switch). So the slewing can be stopped by
Fig
10.3
-l
10.3'3 Adjustnents
ot' 1ift load. Control thc right slewing no with ou1 carried be Adjustments must to determine the and 4W manually so as 1W mict'oswitch slerving and opetate rr hich e uis olf >ler'r ing rnotion '
mi.r osr'iLcll
fi,
1Z
4Z
2Z 3Z
lL
41
3W 2W
3T
42
2l
1T
and lc, cam ant Comparir tiYe ta blc for atljusling sPind
Cm
l
tL
1,2 37,
t
I
1'l
2T 3T
| ,'l 1,'u-)
[.r:i
--l
Adjusting process:
rift
the
i il:r)r,i
42
/ ,._
,'
-1 r,._,i 17
1)
2)
D isassembling the housing of limiter, check and screw up 2 screws o. Loosen nut E and make it loose completely.
3)Adjusting the right slewing limit switch 1br lou,ering ( SRD ) Slew the jib make the cable not twist, sle.right for. half rotation ,and then adjust spindle 1Z and rotate cam I T until press relevant microsq,itch to lw, stop slewinr . 4)Adjusting the deceleration limit su,itch tbr lifl slerving ( SRG )
Slew
right for half rotation, and adjust spindle 42 and rotate cam
to,lW,stop
slerr,,ing.
4.1_,
inspect
o1.
6) Operate
the slerving winch and rvork several times with no load. Check that
position is right. If.not, adjust it as the above process.
?)
8)
t,
If the position is right, screw up nut lr, install the housing. After the operation of winch, check the position of memory
,, ,n the proper time.
control, so as to
]Ql
Everyday adjust the crane all above before in service, when the ctane diYcrt to other lieltl must [re pultr out plug of limiter lower and drain away oholtg
condensation
rv"t"
agai.
water.
r
TOWT,RCR{NE
T^NUAI' OPf,BATION AND SERVICE
f O,+
10.4.1 PurPose:
jib foot
Trolley liritel
which is joggles wifh the teeth ring it limiter; device in trolley Thete is a teducing slewing' the protruding block brings device b"v a pinion Reducing fixed on the drum relevant switch). so cut off the (iggre breaker contrors And the protrr-rding block movlng.
Principle:
.,i1,.. irll
I0,1.3
Adjustments
foot
ch is
ving.
3vant
t
\
q!u-\,
iji
42.
4W
3W
1Z
2Z 32
.t
, , 2: 4Z
12
4r 3T
2r
1T
2W
Cornparative
Atljusting spindlc
3Z
Adiusting Proces
1Z
22 3Z
T
4W3W 2W
/--..a -- 1'\ l-
3T
4z^.-1:Y--22
2r
-|f
limiter' check and screw up 2 screws F'
arm of buffe adjust spindle 22 and The trolley is apart from 1 5m for the top
oontact 2W' rotate cam 2T so as to depress the corresponding 4) Adjusting the trolley
adjust spindle 12 and of buffer top the for 20cm about from ' The trolley is apart lw, stop trolley and stop contact coresponding the depless as to so rotate cam lT
adjust for cam 2T.
5) Adjusting the trolley
and rotate admit to the trolley for arm root, adjust spindle 32
depress the corresponding contact 3W' 6) Adjusting the trolley
4Z
a t0
trolley
7) Scew up nut E, otherwise it will make the memory disorder8) Operate the trolley winch and work several mes with no load. Check that whether the memory position is right. Ifnot, adjust it as the above process.
9)
Ifthe position
Note
10.5 Monent
limiter
l.
Fig 10.5-1
:::'jff:[,
then the contact (3)' touches it ,ntil (2) rotate the bolt
clos
the
10.5.1 Purpose
cranefr.omovertuming.ruauUi1topleventthetower
1
'Ihe tower crane is calculated and designed according to constant r load moment. It is forbidden to exceed the max. load moment. The -o_"rra ,rr.lll a device to inspect the hoisting and f"ll";i;g motion with rated ,oad.o ur,ottt"'is
0.5-2 Working principle
The moment limiter, rvhich is located on the main member at the counter-jib foot, is of a pair of elastic plate, three micro_inching limit switches as well as :r,"1:.:"d installation suppoft. adjustable screw, housing und ,o on. When hoisting with load, the elastic prate began distorting (the distance between the two p-l-ates became sma,er) due to the action of load moment. If the load exceeds rated value, the adjustable screw on one elastic plate depresses the switch contact which located on the other elastic plate so as to cut offthe control circuit and stop the mechanism motion. 10.5.3 Adjustments
:-:,
Specialsuggestion:
Confirm the rated load moment of tower crane beibre adjusting the moment limiter, then debug the relevant data. l
Lisht load
Overload
SLMO
SDMO
e fbe
RDMO
t)
2.
Limit switch
3. Adjustable screw
Fig. 10.5-J
I0.6
Table 10 5-1
1.
1
0.6.
1).
The s accol
l'uax.
overk
10.6.'.
A)
of Y=X+X l0% wjth 2). Lowcr the load. then lift a load switch the lowest spee<1 in 2 falls The inching
Wher
produ
circuit' otherlvise SLMO will move artl cut olf the it should be readjusted'
2.
ring (
distor
6 and
load, contr(
i 0.6.:
^djusting the valid radius (L) 1). I{easure the dislance and mark 10% on lor max. load (W) and the radius L':L+L
the ground.
2). Lift
air) and drive the the max. load [suspending in thc (Adjust devicc C) hook to the markerl raditls (I-)
Confi
the re
t:.
trolley out with 3). Dd\e e trolle,\' to the jib lbot' then rated speed. Ilefore reaches 1() the markcd
(L)'
the
t
lrigh speed
outff, othe$ise
readjust it'
i
R
LorY
oojuuin=
,n"
Lili the
Load
at the
jib
ou1
witl
as
Note:
(a) The loacl X,
I I
(Se
I I ;l
i{
Notet
and D:
l) Th
2) E,
a
r{
JJ
will flot
,l
The stuctue and hoisting winch of the tower cr.ane are calculated and designed in accordance u,ith maximum load. It is fobidden that the wol*ing load exceeds the max. load. The load limiter MSWL is a safeq, device to prevent the towel. crane fton.r
overload.
I
When passing though the proving ring pulley of hoisting wire rope, the rope produces tension due to the action of load. The tension was transmitted to the proving ring (9) ich coLnects with the pulley. As the load changes, the proving ring begins distoting, as well as the metal plate (10) which equipped with inching switches (2,4, 6 and 7) and adjustable screw (1, 3, 5 and g). According to the requirenent of the load, via proper adjustment, the inching switch (2, +,6 and 7) was depressed so as to control the circuit.
10.6.3 Adjustments
Special suggestion: Confirm the rated load of tower crane before adjusting the load limiter, then debug the relevant data.
itlt
the
.,..,
ich
ius
viih
lleY
las
Fig. 10.6-1
(See
9. proving ring
10. metal plate
inching switch
boltj
It/ rre
to\ver cr.ane should be set 2 sensitive switches ard adjustable bolt.s. ''^(cpt normal inspection arrd rnaintenance lor the lord lilniter, afier.each erecriorr and changing falls, it must be readjusted according to characteristic parameters.
t'
l-
Table 10.6-1
lodiu*,r*,n"
limiter ( sLcHGV )
'oeed
lirr,. l-.
( SLCHPV )
sPeed'
o"tt l'""d t"'"h"t th .,** a-. *u *** [, to the load l: r,o*.rttl. r., * " r0o load can oe
- '-,
-:i''-=--'.ti
1"1
J'I
ltll
10.6-2' Notci For various load V W, X and Y, see fable
itl.
.h
Yl
(l2t):
Table t0. 6 2 Overload m-itel
SLChPV&{V\
w
(10N)
2500 (10N)
2500
x
(10N)
5000
(10N)
s500
5000
5500
10000
11000
l
Adjusting load and radius table for the moment limiter (l2t):
SNI 2 ropes
(m)
ti0
Lf
(10\)
2420
2i3ii0
3
SDM)
(m)
(m)
36.5 75
RDTIO
D m)
48
'I
2
70
1.1
55
3'7.t)7
31.07
41 10
36
50 45 40
35 30
300
4000
70
3500
430u
38r0
4730 5500 5500
31. 60
38.06
39.05
3',1.4
32 28 24
000
5000
3t.0u
Table 10.6-4
4ropes
DM
_
(10N)
10000 10000
'frolleyilg Iimitcr
Lf
(m)
SDMO
L
(m) 17.04
Rr)uo
(10N)
1870
lf
(-)
18.744
19.97 6
L'
(n,
4B
.1,1
I lll
r!
L
60 55 50
,L
2t70
2570
3r 70
3.170
tB. i6
18. 15
18. 69
r0000
34fJ7
40 36
32 23
45
l
40 35 30
,12i7
5
r9.09 r8.90
18. 77
467t) 5570
t37
6127
20.647
2,t
10.7 AnemoscoPe
sPeed
5m/s:
Dial
gawge <+3oA\
tempelature: O.l.Z Op"'u'ing "nvironment -40 - +50'C;0 - 100%RH sensor: t,"ed , ,. *trr' ,4., 'Jor,rl,,r.r.r*, -2s +5oc; o - 7oYoRH
r*r"
The ---^^+-,1 rvirh three core cables' to the wind speed' Thewindspeedsensorandthedialgaugealeconneciedwiththf which ProPortionated t'" is magnified wind speed sensor outputs level Then the current *to
.,
.,
**Ot,
rearr"*"u
*ut'*"
"" to
the signal via exclusive limit value' *ltta tp"ed exceeds the *t
processes light beam gauge tED the sp""a' i}t" winO The alarm sounds 'no* up 201 raster lines'
;;" ;; *"":;"'*
""
"""'"';;;;
';s
cable screw .,,:+r. rhe included inclu the -^ with gauge the sensor and dial Before power on, connect
use
;;;;, ;""
n"*", o',
"'no*"
ffiin:;:X
T:lii',:: *i
au'* out both audible and visual value' it can reset automatically' limit the tO* ,, ,0"*
set the lirnit hoisting it when to 13 limits' it set above the exceeds
il is . , -^^,{., o:"" h.en adiusred. alreadv anemoscope has l;;;; t',,,,'0"* U"'*":*t:r":; ln the event of sufficient 0"" Ot^' l' necessary to readjust it' preset t* "llo" 1";inaccurate or the "ttt conditions, the display can be anemosc( "0"" staff can open the
not
"**
-,.2
set;
W2 - 20mls limit alarm setup; W3 - LED light beam gauge full range adjustment;
W4
w21
.20
- 6
13
u
II
" v|t
-6
IX
fils
o
I
3.,n
oFFEoN 13r0
WS-2 anemoscope
light
1.
should be crane top beyond 30m' tl.re tower crane tower of height the Fo light on crane top and two equipped with red obstruction
by power failure' porver supply should not be influenced
jib
2.
crane should
speed of
limit
3.
for each time' all the safety devices When modifu the crane working condition
should be reviewed and readjusted'
rope.........
Rope strand
broken
..............._... 1lB_g
....................1lB_g
Rope diameter decreased due to the rope core broken.......................... 1lB,g and intemal
wear..
........ 1lB-9
...... 1lB_9
......... l18_10
.I
11.1 ExPlanation
A1thoughitSStructureiScompactanditSappeaIanceiSSffong,thefatigueandwearof rope will dauraged rapidly' wire wear and fatigue The rvire roPe is unavoidable if the users personar and equipment) on (both in serious accidents rvhich mal, result
attentiori to do not pa special
'
The
l'ire
equipment,
hoist inspecdon. For the periodical by found rope condition can be of expendable. It should be kind a as taken be the ire rope should
it'
5)
and strength reduced' replaced once its intensity rope 11.2 FitLing the wire
one lf same as the original the be should of ner'v wire rope The type and sPecification capability of new wire the ancl that the characteristics not. the user must ensure the groove rope is applicable to wire nerv the and originat one are not lower than the twisting together'
rope
I
buck1ingot.adheringsundries.BeloIeputtingthewireropeof1owelcraneint0 work of
rvith the kinds of devices involved all that ensure servicc. the users shoriid in place l(eep the wire rope to order ln 'orting condition ,ire r.ope are in nomal times' rated load several ofthe 100 with crare steaclil'. opetate the to\!er
1
(see any twist avoid and ground rvile rope on the clean 1) cornplctely unu'i.td the large utlwind it in completely' roPe unwind the wire 2-1). ll it is no1 possible to onto tho rope wire the cluling enrvinding danger avoid can it ay loops. Ir tlris
rig'
dl um.
^f.,,i-a r^rle
TOltTh
3) Enwind the wire rope onto the drum via a sling and fasten it with bulldog grips.
of
llv,
ers
The distance between the wire rope and the last bulldog grip should be not less
than 3cm (the tightening moment of the screw is gmdaN).
4) Hoisting up and enwind the wire rope onto the drum 4-10 circles tightly (See Fig.
)
-)\
limit stch
and readjust it
oist
be
if
necessary.
.::
Fig. 2-1
Fig,2-2
SERVICE MANUAL
li: ,H|"J:::"r
the or hoisting machinery' purpose the on wire rope depends wire rope should used lf possible' the rope *i'" tf'" ut as well working environment o'l *O" rope which and curved bended the greased' especially :un be cleaned and be suitable to the grease should oil lubricating of the pultey tle type reeled through is one of the common rnaintenance of Lack wire rope tactory works in which used in the when the machinery life time of wire 'op"'' "tp""iully reasons reasons fot shorl be greased due to some not can rope wire or the corrosive environment of operation' caused by the limitation
1
1.4 InsPections
il::i:ffi:
ll."*"
:: the person m found''inform is if any obvious change which fixed fourth item listed below' the to according wire rope charge to inspect the by person in charge 11.4.2 Periodical inspection the inspection order to detemine in account into e iaken The lollowing items shoutd
:TT
;:::::j:HT:
tower crane";
r"1.'.,",''-
and it working b). Types oflT oisting machinery machinery; c). Working grade of hoisting defects before; d). The test results and the
environment;
-"' '1'1"*"u ?.::Til: ::: ."- :::. :.?:',::::'":;" into sel'vic putting the wire rope
week. After an accident or before thoroughly' dismounting, inspect the wire rope
Pay special attention to the following places although a thorough inspection on the rvhole length of the rvire rope should be made.
a.).
ofwire rope.
,n
in
ils
b), For the rope or rope sections which reeving through the pulley block, pay special attention to all the places reeving through the pulleys during hoisting when the mechanism carrying out repeated operation.
c). The lope sections rvhich located on the balancing pulley.
d). The rope sections rvhich may be wom due to extemal factos.
in
the drum.
Iixed
pulley
caused
by
unqualified enwinding,
n.u. . ,
point
especiafly
rof
V
Fig. 5-l
l.od
''
"l' eheck lor brol<en and corrosion of wir.e r.ope on fixing points, as well as the wir.e
rope sections around the balancing pulleys.
--^'-*
o'r.
.ntto
rope'
:t,,0;
*.
n,.
c ).
Intemal damage rope' Intemal :::;;" and latigue or uire extemal be di"o' tred bY not ;; ,r--. ir the wire roPe is nearlY
of wire rope' Checl' for conosion inspecting oI wire 'oO1 rr.r'a I 1.5.4 lntemal is mainly carrsed
aJ*.t"'
^,,---
;;":;';"""
,i,"oi.,;
u'rotr-* "o*pt"t"tv'
-"*.U "t
;'*t
The person
in
charge
***'
foU"t:l
,,,;]P..j;;;.
screw the suitabte dimensions. roPe core oIwire divorced from the the rope bv in chip und gr"u."
."**ol**
'n"
"i
are d). confirrn if there wire rc the :::: for l';.;:;;li"ab1" i then grease (This method layers )
,,,".r" ,.**'*'1"':111I[::T:Ji:li:
t*l
il: :'ifi":#i,
sall wear' the rnd end fatigue ' rone from rhe lixing o"-' t*t" wire the iF dangerous very rr is a: roPe'ax'"i**"tn "".n", devices' 5qh xing nth"' on 'oF inspecrion should be *,dt t"t drrr check on ttt" if there is crackl crarnp and so on. check
end
*ttt't
':';;"
I 1.6
1 1
ys,
For rvire ropes with 6 or 8 strands, the broken of wire rope mostly occurs on the
appearance. For the wire rope with multilayer strands, it mostly occurs inside the wire
rope.
The visible broken wire ropes which must discard for the hoisting
machinery:
Table 6-1
rli
The wire no. of outer strands
the
Mg
Altemate lay
Wre rope structure
Lang lay
Length range
6d 30d
19
6d, 5
toPe.
30d
pe by
101)) I Note:
1).
120
6x19,7x19,6x(19) 6w(19),34x7
6x37
l0 l9
t0
19
)-
10
I ste,
rultiple
'r' lhe lilling wires is not the load-bearing wires, so it must be take out from the
sare ( cabl'
re
hsPection number.
hould
en roP I u"-,
take out the stuff steel wire froln the check number because can,t make
sluff
dfur"
w,re as l.ud sreel wire. The multilayer wire rope only considered its visible
Iayer For the wire rope with steel core, consider it as the intemal strands.
trr^-, -'"
11.6 .2
gtok""
ti'"
on roPe end
end or around' it rope breaks at rope wire the When orrope end Find out the installation incorrect bv be caused it again if its length is allowable' fix and part broken Cut off the reason for damage
indi"*:tt"l:::
:::l',t:r:
:ffi;;;av
within the length of wire focusing part wire be discard if the broken The rope should number is even if the broken wire sand one in or it concentated rope less than 6d
listed above' less than the table
of broken wire rope 11.6.4 Increase rate wire rope damage' The broken for reason is an important In some events, the fatigue time ln increases in a short number broken period of time and its occurs after using a rate in order to
the broken wire increasing down write and this condition, check
discard date' conltrm the wire rope
broken due to the rope core decreased diameter 11.6.6 Rope obviously due decreased diameter discarded when the rope The rvire rope should be for multilaYer inner wire rope strand (or break core steel to the fiber core damage and
structure).
1l .6.7 Elasticity
decfeased
of
to use any more safe noi it's wire rope shall decrease obviously'
accompany with follow conditions:
a). The roPe dianeter decreased;
Generally '
c). Lack of air gap between the wire rope and wire strand due to extrusion ofeach other. d). Thele is some brown dust at the wire rope sinking places;
became hard
to bent and
the
rls
'fhe internal \year was caused by friction between the wire rope and wire strand, in
pafiicular the wire rope bend frequently.
b). External wear
'rylle
e.
In
t0
drum groove or the wear between ropes on the drums. The lack
incorrect lubrication, dust and sancl
discarded
of lubrication,
:r
will
if
reaches 4 0o%
ol its
diameter.
If
of its nominal
it also
corosion:
due
a).
Extemal corrosion outer corrosion of wire rope can be observed by naked eye. The wire rope should
iilayer
The
be
discarded
ifthe surface
b) lnteural corrosion
ilitY of
nerailY
Thewire
ll
6.l o
Distortion
to mechanical darnage
oi.
if it
appeared
the
APP
be
Ifthe
follo
in order to keep them in The drun.r and pulley should be checked periodically' be suitable for the nominal nomal condition. The radius of pulley groove should
diameter of wire roPe.
Notice in particular
after it damaged' o It is forbidden to use the wire rope on mechanical drives damage the safety and o It is lorbidden to make the wire rope distorling, which may
service life of wire roPe.
r Visually
three months' inspect the whole length ofthe wire rope every
- distort, crushing, folding, knot or other damage' - twist distofiion. - ifthe wire rope drying or oxidation, using the RC oil to lubricate' o Dismantling the old wire roPe - lower down the pulley block on fixing suppott' - loosen the wire rope from its fixing end. - unu,ind the wire rope from the druur. of wire rvile rope ancl loosen the single bulldog
o1'
it.
,-_
APPEIIDIX:
Common wire rope defects
Ifthe wire
ldividual wies bend up and prorrude from the straEds, the wire rope serious
damaged whicb caused by stess changiDg.
Iceased diametet ofa parallel enwinding wire rope tesults in distortion to e metal core due to abrupt change stess. Coosion and wea are often noted on the extemal layer ofthe wire tope.
Example
rope
of
serious bending
of
the \'re
Basket-slacking (birdcage) of multilayer wre rope (non rotadng T,e) &hich caused by forced enwinding of the wire rope llrough narow groove or large deflection
angle.
12. Slewing
ring
Periodical inspection for fastening bolt of slewing ring (type eWA1390.5OZt) Frequency of inspection: After the initial 100 hours,running ofthe slewing ring, the pretension ofthe bolt should be inspected. After this, it should be inspected every 500
hours. Enough pretension should be maintained.
At the
of
the bolt should be inspected each time when the tower crane is to be mounted and dismounted.
Method of inspection: make sure that the bolts to be checked are not influenced bv
the tension force due to load or counter weights,
Using a torque wrench to check the tightening torque of the bolts coresponds to the
values as listed in Table
l2.l
-1.
Occasional replacement:
one or several
bolts show a tightening torque beyond the minimum and maximum torques as stated
will
ofthe bolts.
Systematic replacement: The screws and bolts used for the slewing ring assembly tlust be systematically replaced every seven years or 14000 hours.
.
&'ghtening
or. the
.lewing
ring is e-assembled by using new bolts, the tighr.ening ofthe bolts should be
them
tine to make
sure that all the bolts on the circle have the same pretension.
Table 12.1-
(run)
@20 @22 @24
t3
Max,
580 780 10000
l3
@27
41500
2000
41350
1800
t3.
(D30
If
1.
please
I
1
I 13.4
13. Maintenance
I i
!
I
t
13.1 Every
l
;
L
s mbols
T12032
16
HL-20
20 # gear oil
MIL-L21osB sAE80-voIo3242
MrL-I. 21058 sAE 90-J0103255 i'li" ,ir" ."r"ny with hot or comfo weather
--]
M
N
Oil level
v
R
G
13.2.1 Running-in period
Fill up
Lubricating
Cary out the first draining ofoil in the reducer aler 450 working hours.
13.2.2 Using the grease gun Grease all the connecting pieces without grease nipples (such as door and trap door hinges, joystick, locks and hinges ofthe safety devices). 2) ln order to avoid any impurity getting into the oil when checking the oil level and draining, clean the parts which located around the plugs.
l)
3) The oil quantities shown in this manual are only for the user,s reference; essential that the oil reaches to the lower part ofthe oil level plug.
13.2.3 Checl<s to be
it
is
periodically according to the recommended cycles in the manual. Each time before the tower crane erection and dismantling, all the mechanisms should be inspected properly. 2). For last eection and self-erection tower crane, it required the folded winch to installing and disrnantling thejib. So it is necessary to checr<
3) Check the
each mechanism.
ifnecessary.
condition of brake dirsc' each friction surface ancl the pins Adjust them
4) Make sure that nothing will influence the goocl worting order of tower. crane (perl'ect motor and brake supply circuit , fuses in place and in good working order,
flexible ofthe rod for manual brake release, remove the nut, ifnecessary ) Note: Ihe dr.um must be locked when can.ying out re above checks. carere\sness ofthis warning rnay cause serious resulrs-
Ary
Ir,
*rrnt""un""
draining
schedule
G: lubricating
N: oillcvel
checking
a:
.a:-,
6p :
..
L
r:lt
.: t)
;;. ,rr if
I i:r
:l
i 'i' rl I i- ,
1,,,
,l
r0
;
,e
I !.,
,:,,
,O
.M .: 450 h
900 h
t900h
t>: ia)
,..))
3 .3 . 1
The following rules should be stictly observed to do any kind of maintenance on trolley winch:
The operator must fasten the safety rope.
When carri/ out maintenance the brake, the operator must ride on the motor.
Oil sy mbol
350 h
3 month
.,
Mutn
"nu""e
on rope-twist protector
13.:
M:
-!9)
--li 'ptr
they seem to be dry or tend when or monlhs 6 every The wire ropes must be greased lubrication' lubricate them using 10 # mechanical that recommended We to oxidize. should be grease (Detailed it rope' wire the of using no In case of long time information
please see
Be
hy,
ac(
l
lr
"fixing
en
It(
M: when
starting
N : oil
level
V: draining
R: fill up
o o o
,!:
Maximum
Minimum
tend
Minimum
don.
iled
hydraulic purnp station should be different. The user should add proper hydraulic oil
according to the environment temperature.
-30,-20" C
D
-20--10"c
YC.N32
-10 -0"c
YB.N32
0-20'c 20-38.C
YB-N46
J8-80.C
I yB,N68
lyB-N8o abo\ e
New grade
N46D N32# N32 Low freezirng Low freezing lAbovc N80/ Antiwear Anti$cr Anti\ Anti\vear point poirt hyaulic oil lr-vrlufrc,ril hyJrrurli. oil I h)drauli. oiJ hydraulic oil r hydraulic oil
N4 | i
N8 crr
Original
Srad
30r)#
20#
20H
t,t l;
I,;
'l
rope guiding pulley 13.3.6 Greasing the
fill
I
i_ l'"
based grease) Before greasing clean out the (2 Iithium # hours 50 every grease
fill
In
case
fully greased until time when greasing, the gear ring should be
it
while greasing which can make the grease sealing place. Tum the slewing ring slowly
evenly.
li
base
i
.fhe tooth surface should be cleaned every 10 days and lubricate with calcium
grease.
"-
:ted according to
th.
lollowingiffi
Lubricating grease
the
Woking conditions
50
extreme
pressure
Iithium base
cabon calcium base
BG7324-J q94
lach
r the
'ease
sH0369_1992
1#,2#
GB712l-1991
40.c
labl,rinth seal for metal isoiation block
aceway
140"c High
lemperature and wet
base
sYl511-65
MOS2 complex calcium lubricating
80"c
180"c
raceway
sY151l-65
nomal tempetature.
proofseawater colosion - 50"c
2# complex
aluminium
4#, complex
aluminium
sH0378-1992
hoisting winch 133.8 Gt"aring th" drain plug of reducer and 1) Unscrew the
and volatilizing' the plug after draining
1:
fill
diesel
2)
Fill
18-20
gear lubricant'
standard oil level' Oil level: reaching to about 1/5 of dirty or nipple and around clean' Prevent
working hours Drain the oil after 200 every oil add and level 3) Check the oil refill with oil' 2400 hours, clean it and then
working
on the drum tail' was filled up support bearing the outside 4) The grease nipple which
with2#lithiumbasedgreasebeforeleavingfactory.Checkandfillupwiththis
200 hours' kind of grease after working
Ihten
rvel.
Scope of mainlenance
yor
Paint la,er fte
#f:lm
Insfructions uatty
ori'n".J.
o avoid corosion
up
,:;ffiT::H[
:is
Lubrication
system
ln. normat
'*ffi
;;;","""""
,fl*i*r."ffi**,',,,,:*lm
[ g:".',
Fasteners
t1{&3!
in" ii I r
# :irn'.t
pnerrnaric
Electic equiprent
Effi
Do ,or
,*;;;:":f l;,,;,J,4'"11^::_
,-it
/.",,o\\,ng codiion"
"rrotld.slop usin-g .,r( - (lr.lver.s cah
*11
ofthJ
Strloe
1*;mm
lreglllsll. J
tIr I)raDulaclUrcr
o
ururF;::*mfi_T*:,; ,r.io-.;-.,==-.
; J"?,]:T'
l',";' ,Y;B
Ltt-
Add
fel.
Fax.
3-76
rtt99.
764998b
B6-413-764!999
Wuiisito E, ail
Mat
ww\/.yor'\gmao.com.cn
sun@yongmao.com.c
Licer-i:e
I i
riaciJre
of Special Equipmcnt
tio'
-[S2''l
10592
2012
r
1