You are on page 1of 0

82

DAFTAR PUSTAKA


[1] Asiyanto, Construction Project Cost Management (Jakarta:Pradnya
Paramita,2003)
[2] Afrizal Nursin (1999) Perencanaan, Penjadwalan, dan Pengendalian
Proyek Konstruksi. (Politeknik Negeri Jakarta Depok 1999)
[3] A. Elias (1999), Construction planning and scheduling CCE 5035,class
Notes September 1999.
[4] Beecher, J(1995) Integrated Resource Planning Fundamental. AWWA
Journal v87(6)
[5] Brian J Dreger, Project Management: Effective Schedulling (New
York:Van Wastrand,1992).
[6] Daniel W. Halpin and Ronald W Woodhead, Construction Management
(1998) John Wiley and sons, Inc.
[7] Donald S Barrie, Boy C Paulson Jr, Manajemen Konstruksi Profesional,
(Jakarta: Erlangga, 1990).
[8] Edi Nugroho, Dasar-dasar manajemen proyek konstruksi (Depok, FTUI
2001)
[9] Greenberg V. and Harshbarger S. (1993). Least cost selection of energy
conservation measures for regulated gas utilities. Energy Economic. July
93
[10] Harris, Robert B., Precedence And Arrow Networking Techniques For
Construction (New York :John Wiley & Sons, 1978)
[11] Holsapple, C.W. (Ed), Handbook of Knowledge Management, Springer-
Verlag, Heidelberg, 2002
[12] Humpreys, KK, Jelens Cost and Optimization Engineering (Singapore
:Mc-Graw-Hill).
[13] Imam Soeharto, Manajemen Proyek-dari konseptual sampai operasional,
(Jakarta:Erlangga, 1995)
[14] Kunal Sinha, Ogilvy & Mather India (2004). Knowledge, Entertainment,
Networking. Journal of Knowledge Management Practice, May 2004
Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008
83
[15] Kyunghwan Kim and Jesus M de la Garza (2005), Evaluation of the
Resource-Constrained Critical Path Method Algorithms ASCE Journal
May 2005.
[16] Leroy J Isidore and W. Edward Back (2001). Probabilistic Optimal Cost
Scheduling ASCE Journal Vol 127, No.6 November/Desember 2001.
[17] Makarand Hastak, Daniel W Halpin and Jorge Vanegas (1996). New
Paradigm for Project Cost Control Strategy and Planning.Journal of
Construction Engineering and Management. September 1996
[18] Roberta Russell and Bernard W. Taylor, III (2006). operation
management-5
th
edition. Project management. John Willey and Son inc.
[19] Shtub, A., Globerson, S., Band, J.f., Project Management: Enrg, Tech, and
Imple.(New Jersey: Prentice Hall, 1994)
[20] Simon Fane and Stuart White (2007),Levelised cost, a general formula
for calculation of unit cost in integrated resource planning
[21] Stepehen Grey , Practical Risk Asessment for Project Management
(Chichester: John Willey and Sons Ltd, 1995)
[22] Suhail, S., and Neale, R (1994). CPM/LOB: New methodology to
integrate CPM and line of balance.J. Constr. Eng. Manage., 1994
[23] Terry Sugijanti (1999), Penjadualan Proyek dengan PERT-CPM Jurnal
Teknik Sipil Sipil Soepra1999, Volume 1. No.2
[24] Yin R. K., Case Study Research, Design and Method (Sage Publication,.
1994)
[25] Yusuf Latief, Perencanaan dan Penjadualan Proyek Konstruksi(Depok
FTUI, 2001).









Tinjauan optimalisasi biaya..., Tri Budiarso, FT UI, 2008

You might also like