Chevron Bangladesh Drilling Morning Report

Date: 11/7/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 19.67 Time from Spud: 19.06 Days Since Last DAFW / RI Case :
TVD End (mKB): 2,761.43
Water Depth (m) Target Depth (MD) (mKB)

Rpt No: 21 Hours: 24.00 1,094 / 138

SBU Drilling Well Category : Drlg Well Category 1


Depth End (MD) (mKB): 3,038
Field Name Original Spud Date Country

Original KB to Mud Line (m) Target Depth (TVD) (mKB)

Bibiyana
Actual Start Date

6/13/2013
Actual End Date

Bangladesh 4,410
Total AFE Amount (Cost)

7/19/2013 08:30
AFE/WBS Number

3,865.89 22,183,123

100794 Safety/Inspections
Date Safety Check Tour Des

11/7/2013 00:00 11/7/2013 00:00 11/7/2013 00:00 11/7/2013 06:00 11/7/2013 06:00 11/7/2013 06:00 11/7/2013 06:30 11/7/2013 06:30 11/7/2013 06:30 11/7/2013 08:00 11/7/2013 08:00 11/7/2013 09:00 11/7/2013 10:00 11/7/2013 10:00 11/7/2013 11:00 11/7/2013 11:30 11/7/2013 12:15 11/7/2013 12:15 11/7/2013 14:00 11/7/2013 14:00 11/7/2013 14:30 11/7/2013 17:00 11/7/2013 18:00 11/7/2013 18:30

Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit Safety Procedures Safety Procedures Pre-Tour Safety Meeting Pre-Job Meeting Pre-Job Meeting Pre-Job Meeting PTW Audit PTW Audit Safety Meeting Pre-Job Meeting Pre-Tour Safety Meeting

Night Night Night Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Day Night Night Night Night Night Night Night Night Night

RADAR, Ops, Tnt#07 & GEMS#07 @BYWP Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Gen. Crane Lifting @BYWP Welding, cutting, grinding at Workshop @BYWP(PTW) Diesel transfer @BYWP(PTW) w/Kamal Ent., RADAR Cards, Tnt#07 @BYWP Gen. Housekeeping (K/E) @BYWP Gen. Forklift Ops @BYWP Maintenance and inspection of TDU by NOV @BYWP (PT Pest control @BYWP (PTW) Welding at NOV area @BYWP (PTW) Diesel transfer to rig equipment@BYWP Heavy vehicle inspection@BYWP T-Card Audit RADAR, Ops, Tnt#07 & GEMS#07 @BYWP Gen. Crane Lifting @BYWP Gen. Forklift Ops @BYWP Rig service using man ridding @ BYWP (PTW) General hot work at workshop@BYWP Maintenance and inspection of TDU by NOV @BYWP Ops. Review, Tnt#07 @BYWP Welding, cutting, grinding at Workshop @BYWP (PTW) w/Kamal Ent., RADAR Cards, Tnt#07 @BYWP Gen. Crane Lifting @BYWP Gen. Housekeeping (K/E) @BYWP T-Card Audit Check seat and valve of mud pump-2 @BYWP Preparing 9 5/8 casing by TRS @ BYWP(PTW) Check seat and valve of mud pump-2 @ BYWP(PTW) Work on well head @BYWP (PTW)
Incident Desc

11/7/2013 18:30 Pre-Job Meeting 11/7/2013 18:30 Pre-Job Meeting 11/7/2013 19:30 Safety Procedures 11/7/2013 22:00 PTW Audit 11/7/2013 22:00 Pre-Job Meeting 11/7/2013 22:00 Pre-Job Meeting 11/7/2013 23:00 Pre-Job Meeting Safety / Environmental Incidents
Incident Cat.

No safety or environmental incident

Page 1/5

Report Printed : 11/8/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/7/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 19.67 Time from Spud: 19.06 Days Since Last DAFW / RI Case :

Rpt No: 21 Hours: 24.00 1,094 / 138

SBU Drilling Well Category : Drlg Well Category 1


Daily Operations
Report Start Date

Report End Date

11/7/2013 00:00
Daily Field Est Total (Cost) Cum Field Est To Date (Cost) Daily Mud Field Est (Cost) Cum Mud Cost to Date (Cost)

11/8/2013 00:00
Drilling Hours (hr) Cum Rotating Hrs on Casing

230,670
Operations Summary

4,958,453

16,480

483,421

8.50

Continued drilling 12 hole section from 2966m to 3038m at Section TD. Circulate hole clean.POOH from 3038m to 1951m. Tight spot @ 1951m. Back ream of hole from 1975m to shoe. Rig service. Circulated bottoms up at shoe. Continued POOH.
Comments

00:00 - 01:00: Trouble shoot and repair Draworks. Problem with parking break. 01:00 - 02:30: Rack back last stand of HWT. Rack back LWD. Soft break motor stab. Lay out motor and bit. 02:30 - 03:30: Pull W/B. Pick up wash toll and wash well head and BOP stack. 03:30 - 05:00: Clean off the rig floor. Change out elevators and pick up landing jt and perform test run to establish landing depth. Lay out same. Rig up TRS casing running equipment.
Max Drill Gas Required Matls next day Avg Background Gas Head Count

143.0 Halliburton batch mixer in customs. CCTV: driller has camera for derrick,stabbing board, mud pump. STP recorder non-operational Drillers MD Totco monitor at Rig floor, Not in service. No ETA. Iron Roughneck spinners, not in service because of bad hydraulic leak. No spare seals on location. Having to use standalone spinners. Drillers rig floor communciation hands free microphone not working. No ETA. No back up flow line encoder for SLS. MD Totco flowline indicator not reading. WDI flowline sensor three weeks ETA. No ETA from SLS. Safety Observation Cards
Observation Typ # Rpts Com

CVX-3, WDI-28, Other-42

73 Observed one person was cleaning the mud pump standing on top of the mud pump.Stopped the job and discussed the hazards, He agreed & did the job safely. Tenet #2 MD. ABDUS SALAM-WDI-Roustabout

Daily Contacts
Contact

Shayne Atkins Passagon Heamtanon Randy Roberts Kitichai Leekitchakorn Mahbubur Rahman Ismail Hossain Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event? UE Time (hr) UE Ref No. Com

00:00

08:30

INTCSG2, DRILL

DRLDD

8.50

Continue directional drilling 12-1/4" hole section F/2966 m to 3038m 12-1/4" section T.D. Formation Top: BB60 at 3035m MD. Increased MW f/ 11.ppg to 11.2ppg before BB55 shale. Pump25bbl base oil/13.4ppg hiwt/hivis pill in tandem. Circulate sweep out of hole.Pump Carbide. 0.4% gas peak seen from 3035m, No gas % when static or swab test to surface. Carbide lag check results, Average I.D. 12.57 inches. TOH on elevator F/3038 m to 1951m. Worked tight spots at 2426m and 2187m. No reaming required only work stand back through area. No issues. Note:Worked and reamed area at top of BB55 shale at 2905m MD.

08:30

12:00

INTCSG2, DRILL

CC

3.50

12:00

16:30

INTCSG2, DRILL

TOH

4.50

16:30

18:30

INTCSG2, DRILL

REAMBK

2.00

Ream from 1951m to 1835m.Pull up into the casing shoe at 1799m. Observed 20k overpulls. Slight torque seen while back reaming. Rig Service Circulate Bottoms up @1799 m. Flow check. Pump 40 bbls Slug.

18:30 19:00

19:00 20:00

INTCSG2, DRILL INTCSG2, DRILL

UNITMAIN CC

0.50 1.00

Page 2/5

Report Printed : 11/8/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/7/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 19.67 Time from Spud: 19.06 Days Since Last DAFW / RI Case :

Rpt No: 21 Hours: 24.00 1,094 / 138

SBU Drilling Well Category : Drlg Well Category 1


Time Log
Start Time End Time Phase Activity Dur (hr) Unsched Event?

UE Time (hr)

UE Ref No.

Com

20:00

00:00

INTCSG2, DRILL

TOH

4.00

Continue TOH Dry F/1799m to 67m. Performed flow check at 236m and removed wiper rubber.
SSE

Personnel
Company Total Headcount

Chevron Weatherford Weatherford Weatherford Aker-Kvaerner Weatherford Halliburton Weatherford MI Swaco Gyrodata Inc Weatherford NOV - Fluids Services HAL - Wireline Weatherford Weatherford Chevron Smith International Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Chevron Weatherford Weatherford Mud Checks
Date Depth (MD) (mKB) Depth (TVD) (mKB)

12 14 Rig Expat 44 Rig National 22 1 3 5 2 2 Shamolima Catering Wellhead Eng LWD/MWD Cementing DD Mud Engineers

0 Gyrodata 7 TRS 0 7 5 0 1 4 0 0 0 0 Solids Control Wireline SLS Ayun ent PetroBangla Completion/Liner hands WWT BanglaCat Bangla Industrial Hunting Casing

3 Inspection

11 NOV Tech 0 WWS 0 HES 0 SPM 0 MD Totco Tech


Mud/Brine Type Sample Source Checked By YP Calc (lbf/100ft)

11/7/2013 22:00
Flow Line Temperature (C) Vis 3rpm Fluid Density (lb/gal)

3,038.0
Gel 10 sec (lbf/100ft)

2,761.43 NAF
Gel 10 min (lbf/100ft)

Active Pit
Gel 30 min (lbf/100ft)

11.20
Vis 6rpm Vis 300rpm

15.0
Vis 600rpm

27.0
Funnel Viscosity (s/qt)

30.0
PV Calc (Pas)

20 0
ROC (Wet) (% by wt) (lb/lb) Retort NAF by Volume (%)

10
pH Filtration Sz (m) NAF/Water Ratio Chlorides (mg/L)

11
CaCl2 (mg/L)

49
Electric Stability (V)

78
Water Phase Salinity (mg/L)

64 313,200
Retort Water by Volume (%)

59,000
High Gravity Solids (lb/bbl) Corrected Solids (%)

259,854.00 16.03
API Filtrate (cc/30min) API Filter Cake (1/32")

620.0
Retort Solids (% by Volume) (%)

166.74
NaCl (mg/L)

18.50
HTHP Filtrate (cc/30min)

20.25
HTHP Filter Cake (1/32")

61.25 1
Visibility (km)

75.2/24.8 Weather Conditions


Wave Ht (m) Swell Ht (m) Wave Dir () Wind Spd (knots) Wind Dir P Bar (mmHg) T High (C)

3.4
T Low (C)

Support Vessels
Vessel Name Vessel Type Arrival Date Depart Date Note

Unscheduled Events
Referen ce No. Start Date End Date Event Type Unsch Maj Cat Unsch Detail Description Accountable Party Contractor

Page 3/5

Report Printed : 11/8/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/7/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 19.67 Time from Spud: 19.06 Days Since Last DAFW / RI Case :

Rpt No: 21 Hours: 24.00 1,094 / 138

SBU Drilling Well Category : Drlg Well Category 1


Mud Additive Amounts
Des Date

Rec

Consumed

On Loc

Barite Base Oil Df1 Cacl2 / Nacl HRP Lime M-I Gel Nova Plus Novatec F Safe Surf W Saraline Versatrol M VG Plus VG-69 Job Supply Amounts
Supply Item Des

11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013 11/7/2013
Date Received

704.0 4.0 96.0 60.0 30.0 8.0

9.0 30.0 50.0

78.0 75.0 1,554.0 6.0 505.0 140.0 35.0 7.0 9.0 59.0 270.0 263.0 267.0

2.0 1.0 20.0

150.0 164.0 164.0


Consumed Cum On Loc

Diesel Drill String/BHA BHA #7, Motor Build


Bit Run Drill Bit Length (m)

11/7/2013

22,500.0

17,243.0

153,824.0

IADC Bit Dull

Bit Total Fluid Area (nozzles) (in)

BHA ROP (m/hr)

1b
Nozzles (1/32")

12 1/4in, SK5519, E168478


String Length (m)

0.28 1-1-WT-S-X-I-CT-TD
Max Nominal OD (in)

1.24

8.8

18/18/18/18/18
String Components

236.94

812.000

SK5519, 8" Hyperline Motor w/12"UBHS, 11-3/4" Stabilizer, NM XO Sub, 8 1/4"LWD - MFR, 8 1/4"HEL, NM XO Sub, 8" NMDC Long, XO Sub, HWDP, Drilling Jars - Hydraulic, HWDP
Comment

String/BHA Components
Item Des Len (m) Mass/Len (lb/ft)

HWDP Drilling Jars - Hydraulic HWDP XO Sub 8" NMDC Long NM XO Sub 8 1/4"HEL 8 1/4"LWD - MFR NM XO Sub 11-3/4" Stabilizer 8" Hyperline Motor w/12"UBHS Drilling Parameters
Wellbore Depth Start (MD) (mKB) TVD Start (mKB) Depth End (MD) (mKB) TVD End (mKB) Drill Time (hr)

159.41 9.68 28.05 1.10 9.22 0.91 6.90 9.02 0.91 2.47 8.99
On Bottom Drill Time (hr)

49.30 49.30

Interval ROP (m/hr)

Original Hole
Cum Depth Drilled (mKB)

2,931
Cum Drilling Time (hr)

2,671.63
Flow Rate (gpm)

3,038
Weight on Bit (1000lbf)

2,761.43
RPM (rpm)

8.50
Stand Pipe Pressure (psi)

7.97
Drill Str Wt (1000lbf)

12.6 225 210

963
Pick-Up String Weight (1000lbf)

109.00
Drilling Torque

770 25.0

22
Weight of String in Air (1000lbf)

4,100.0
Slack-Off String Weight (1000lbf)

290 Casing Strings


Casing Description Comment Set Depth (MD) (mKB)

30
Set Depth (TVD) (mKB) Run Date

Casing Components
Top Depth (MD) (mKB) Btm Depth (MD) (mKB) Len (m) Jts Item Des OD (in) ID (in)

Page 4/5

Report Printed : 11/8/2013

Chevron Bangladesh Drilling Morning Report

Date: 11/7/2013

Well Name: Bibiyana -19 Slot: 7 Rig: WDI 801 End Date:

Total Time: 19.67 Time from Spud: 19.06 Days Since Last DAFW / RI Case :

Rpt No: 21 Hours: 24.00 1,094 / 138

SBU Drilling Well Category : Drlg Well Category 1


Tubing Strings
Tubing Description Comment

Set Depth (MD) (mKB)

Run Date

Tubing Components
Top Depth (mKB) Bottom Depth (mKB) Length (m) Joints Item Description OD Nominal (in) ID (in)

BOP Test
Date Com

10/29/2013 Wellbores
Wellbore Name

Shell test BOPs and related equipment to 250/5k psi, ok, Full BOP test was done on 22 October'13.
Parent Wellbore

Original Hole Directional Surveys


Description

Original Hole
Date

Planned survey Survey Data


Date Description MD (mKB) Incl () Azm () TVD (mKB) VS (m) Date NS (m)

5/27/2013
EW (m) DLS (/30m)

Actual Surveys Survey Data


Date MD (mKB) Incl () Azm () TVD (mKB) VS (m) NS (m)

7/22/2013
EW (m) DLS (/30m)

11/7/2013 11/7/2013 11/7/2013 11/7/2013

2,965.71 2,994.79 3,013.28 3,038.00

33.38 32.84 32.28 31.83

137.98 137.18 136.78 136.28

2,700.54 2,724.90 2,740.48 2,761.43

-850.64 -834.77 -824.83 -811.74

-796.90 -808.63 -815.90 -825.42

77.54 88.26 95.05 104.07

0.73 0.72 0.97 0.63

Page 5/5