You are on page 1of 0

SAP MM & PP Course Material

December, 2007
Sample Training Lecture Slides
R/3 Org Structure Overview - MM
Client
Bus. Area
2000
Bus. Area
1000
Company
0003
Company
0002
Company
0001
Bus. Area
3000
Company
Code
Sto.Loc.
0001
Plant
0001
Sto. Loc.
0002
Plant
0002
Sto. Loc.
0003
Plant
0003
Plant
Purchase Org
Storage Location
Materials Management Financial
Valuation Area in SAP MM
Valuation Area is either Company Code or Plant.
When stock is valuated at plant level, you can valuate a material in different
plants at different prices.
When you valuate stock at company code level, the valuation price of a material
is the same in all of a company's plants (that is, in a company code).
SAP recommends that you valuate material at plant level.
Valuation at plant level is mandatory if you want to use either of the Production
Planning or Product Cost Accounting components
Purchase Requisition (PR) Process Flow
Approval
Required?
Purchasing
No
Yes
MRP-
controlled?
Yes
No
Convert to
PO via MRP
List
Purchase
Orders
Released
Requisitions
Release
Requisition
Req. Created
Automatically or
Converted from
a Planned
Order in PP
Enter
Requisition
Requisitions
MRP Run in SAP
Services or Materials
Required (Outside of Those
Handled by MRP)
G/L Account Postings from GR
Material Price -
$10 a piece
Amount $100/
(10 PC * $10)
Order Price -
$12 a piece
Amount $120/
(10 PC * $12)
GR Diff - $2 a
piece
Amount $20
Invoice Price -
$11 a piece
Amount $110/
(10 PC * $11) +
Tax $11
Total Due $121
Invoice Verification Process
Purchase
Order
Goods
Receipt
Purchase Req
Tax
Calculation
Tax
Calculation
Invoice
Receipt
Pay to
Vendor
Purchase Order based Invoice Process
Tax is estimated on
PO Price
Tax is expensed at
Goods Receipt
Tax is paid or
accrued at Invoice
Receipt
CBP Vs. MRP - Key Differences
MRP is based on current and future sales. Useful for the planning of finished products and important
assemblies and components. Requirement elements are sales orders, planned independent
requirements, material reservations.
CBP is based on historical data and uses material forecasts or statistical procedures to determine future
requirements. It is not triggered by independent or dependent requirements. It is either triggered by
the available stock level falling below the reorder point or by forecast requirement calculated from
historical data.
M
R
P
C
B
P
MRP Type: Changed to Reorder Point Plan
Reqd
Date
Reqd
Qty
Material
12/24 200 Golf Iron
Reservation
Purchase Req - creation indicator
Matl Master - MRP 1 View
Matl Master - MRP 2 View
Multiple PRs are created to cover
reqd qty: 237, because order qty
is limited by fixed lot size of 60
per planned order / pur req
MRP Type - Reorder
Point Plan
Super BOM - Maintenance Screen
Class Item as BOM
Component
Will be replaced by a material
based on char value assigned
during BOM config for an order
Variant Items / Alternate
Items as BOM Components
One of the alternatives will be
selected based on char value
assigned during BOM config for
an order
BOM Component is a
Configurable Material.
Contains a Class Item
PC CASE - Configurable Item, contains Class Item
PC ASSY - A Configurable Item, contains another
Configurable Item, PC CASE.
Configurable BOM - Config Simulation
Simulation - Assign / Pick Char Value
Result of Parent BOM (Level 0) - PC Assy
Result of Child BOM (Level 1) - PC Case
Result of Child BOM (Level 2) - Fan & Heat Sink
L
e
v
e
l

1
L
e
v
e
l

2
1
2
3
4
Level 0
Level 1
Level 2
Auto selection via Action
User selection
Capacity Leveling in Planned Order
Planned order capacity situation shows
an over load of 43.2% at Work Center
WC 1 where the operation is carried
out.
Required capacity: 79.58 HR
Available capacity: 55.57 HR
Cap Load: 143.2%
Overload
on 1/9
No overload
during other
periods
Capacity Evaluation - Order Qty 100
Production Order Settlement Example
Order Settlement Doc
GR for Order (Post this Before Settlement)
Accounting Doc - Settlement Result
Controlling Doc - Settlement Result
Settlement - Sender & Receiver
KANBAN Execution - Example - Step 2
Employee responsible for
Supply SA sees the
container status.
A new PO 4500000096 is
automatically created,
because the
Replenishment strategy is
set to External
Procurement with Purchase
Orders
The PO is for qty 2 PC as
kanban qty is set to 2 in
control cycle. The PO will
be sent to the Vendor
3000
Employee sets status to In
Process, yellow color.

You might also like