Name of Project:-

_____________________________________ DESIGN OF THRUST BLOCK

TOTAL FLOW PEAKING FACTOR PEAKING FLOW DIAMETER OF PIPE AREA OF PIPE VELOCITY IN PIPE FLOW IN CUMSECS HMG OF LINE LOWEST LEVEL ON GROUND MAXIMUM STATIC PRESSURE I.E i.e I.e

150 MLD 1.1 165 MLD 1100 MM 0.95 SQMT

(Input Data)

(Input Data)

2.01 MT/SECOND 1.91 CUMECS 82 MT 30 MT 52 MT 5.2 Kg/sqcm 0.52 Mpa 520 Kpa (Input Data) (Input Data)

DEGREE OF BEND Radiants of degree cos of given degree Sin of given degree FORMULA p1xa1 - Fx - p2xa2cos 90 = gQ ( v2cos 90-v1) Units p1,p2 A1,A2 v1,v2 g=

90.00 1.571 0.00 1.00

(Input Data)

pascals sqmt mt/second 1000

Q p1xa1 p2xa2xcos degree gQ(v2cos degree-v1) Fx 493922 3.026E-11 -3839.595 497761.59

cumecs

p1xa1 - Fy - p2xa2sin 90 = gQ ( v2sin 90-v1) p1xa1 p2xa2xsin degree gQ(v2sin degree-v1) Fy 493922 493922 0 0

F=(Fx*Fx +fyxFy)^0,5 F= Force in Kg Density of concrete Volume of concrete required Keeping depth as Area required

497761.59 497761.59 Newton 49776.159 2400 kg/cum 20.74 cum 2 mt 10.37 sqmt

Size required considering square block in plan 3.22 mt


Note: Add some extra length to get net required volume after deduction of pipe

Hence provide size in plan as

3.5

(Input Data)

Check for net volume after pipe diameter Total volume Less pipe volume'3,75*,785*1,1*1,1 Net volume Volume required 24.5 3.324 cum 21.18 cum 20.74 cum