You are on page 1of 0

M

M
A
A
R
R
I
I
N
N
E
E
R
R
S
S

G
G
U
U
I
I
D
D
E
E

T
T
O
O

O
O
R
R
A
A
L
L

E
E
X
X
A
A
M
M
I
I
N
N
A
A
T
T
I
I
O
O
N
N


C
C
C
A
A
A
P
P
P
T
T
.
.
.


S
S
S
.
.
.
P
P
P
A
A
A
N
N
N
D
D
A
A
A





MARINERS GUIDE TO ORAL EXAMINATION

CHAPTER 1: PASSAGE PLANNING 06 10
1. How will you plan a passage? Give all relevant publications/ documents etc., which are to be used in such
planning
2. Which regulation relates to Safety of Navigation and Avoidance of Dangerous Situations?
3. Who checks and approves the passage planning?
4. Describe a typical checklist for passage planning.
5. How is ECDIS used in planning a passage?
6. What care must be taken when we use a combination of paper and electronic charts?
7. What are the salient differences in the planning of a passage in Open Oceans and Coastal or Restricted
waters?
8. How is the monitoring of passage plan conducted?
9. Does the passage planning include pilotage waters? If so describe briefly pre-arrival, pilot on board and the
outward-bound pilotage plan.
10. In a passage planning what are the elements used in the routing scheme?
11. What do you understand by Ship Reporting System and how is it used to plan a passage?
12. What role does a Vessel Traffic Service play in planning a passage?

CHAPTER 2: WATCH KEEPING 11 16
1. What are the duties of an Officer on Watch (OOW) on the bridge?
2. What do understand by maintaining a lookout?
3. What do you understand by a sole lookout?
4. How does the OOW comply with the provisions of the COLREGS?
5. What special precautions are to be taken by the OOW?
6. What records must be maintained on the bridge by the OOW?
7. What kinds of checks are required to be carried out on the navigational equipment on board?
8. How does the OOW hand over watch?
9. When does the OOW call the Master?
10. What constitutes a bridge team and what are the assigned duties of a bridge team?
11. How are new personnel familiarised with the watchkeeping?
12. Which are the danger messages the OOW is obliged under SOLAS to broadcast to ships and near coast
stations?
13. While navigating in pilotage waters with a pilot on board describe the duties of the OOW.
14. What basic principles the ship for communication by radio must follow?
15. What precautions are required while anchoring and at anchor watch?
16. What special precautions must be taken while navigating in coastal waters?

CHAPTER 3: BRIDGE EQUIPMENT 17 18
1. What are the general precautions the OOW should take in the operation and maintenance of bridge
equipment?
2. What do you understand by good Radar Practice?
3. What aspects of the radar need to be checked while using the same for position fixing and monitoring ship's
progress?
4. What is parallel indexing when monitoring the ship's progress in a passage planning?

CHAPTER 4: STEERING GEAR ETC., 19 23
1. How is a steering gear tested?
2. What is the difference between a track-keeping and course-keeping autopilot?
3. How does an off-course alarm work in an autopilot?
4. What precautions are required to be taken while using a transmitting magnetic compass (TMC) or a gyro
compass for navigating a ship?
5. What types of speed measurement instruments are used on the ship?
6. What precautions are required to be taken while using an echo sounder?
7. What are the electronic position-fixing systems used on the ship and what care should be taken while using
the same?
8. What is Integrated Bridge Systems (IBS)?
9. What is ECDIS and how is it used for navigation on ships?
10. What is the difference between the electronic chart format of Vector and Raster charts?

2 of 101



CHAPTER 5: P&I CLUB 24 26
1. What are P and I clubs?
2. What are the covers provided by the P and I club?
3. What is call money and how is decided by the P and I Club?
4. Who are P & I club correspondents and what are their functions?
5. How are claims of P & I clubs paid?
6. How does a ship owner register his claim?
7. What are the P & I covers for pollution?
8. Which liabilities are normally not covered by the P & I clubs?

CHAPTER 6: MARINE INSURANCE 27 31
1. What types of marine insurance covers are required by ship owners and ship managers?
2. What kind of insurance covers are there for Time and Voyage Charterers?
3. What are the basic principles of marine insurance?
4. Differentiate between a) Actual Total Loss and b) Constructive Total Loss.
5. What is particular average loss in marine insurance?
6. What is general average loss under marine insurance?
7. What constitutes common maritime adventure?
8. What are the essential elements of a general average act?
9. What are the sacrifices or expenditures normally allowed in a general average act?
10. What do you understand by sacrifices extraordinarily, intentionally and reasonably made?
11. How is the general average adjustment made?
12. What documents and information are required to make a claim?

CHAPTER 7: ISM CODE 32 38
1. What are the basic principles of the ISM code?
2. Define the following: 1. ISM code, 2. Company, 3. Administration, 4. Safety Management System, 5.
Document of Compliance, 6. Safety Management Certificate, 7. Objective Evidence, 8. Observation, 9. Non-
conformity, 10. Major Non-conformity, 11. Anniversary Date, 12. Convention.
3. What are the objectives of SMS?
4. What are the functional requirements for a SMS?
5. What is the Safety and Environmental Protection Policy?
6. What are the responsibilities and the authorities of the company?
7. Who is a DPA and what are his responsibilities?
8. What are Master's responsibilities and authorities?
9. How does the company ensure proper resources and personnel are provided on the ship?
10. How is the ISM code implemented on the ship?
11. How is the certification and verification done for ISM?
12. Under the ISM Code define a Safety Officer and a Safety representative and their duties.
13. What is a safety committee and what is its function?
14. What are the duties of the Company and Master under the Code of Safe Working Procedures on board?

CHAPTER 8: ISPS CODE 39 47
1. What is ISPS code?
2. What are the objectives of the ISPS code?
3. In order to achieve the objectives what functional requirements are embodied in the code?
4. Define 1. Convention, 2. Ship Security Plan (SSP), 3. Port Facility Security Plan (PFSP), 4. Ship Security
Officer (SSO), 5. Company Security Officer (CSO), 6. Port Facility Security Officer (PFSO), 7. Security
Level 1 (SL1), 8. Security Level 2 (SL2) and 9. Security Level 3 (SL3).
5. Which ships' are covered under ISPS code?
6. What are the responsibilities of the CG under this code?
7. What is DoS and when is it required to be completed?
8. What is the obligation of the company under the ISPS code?
9. What activities are allowed under different Security Levels, SL1, SL2 and SL3 on ships?
10. How is a Ship Security Assessment (SSA) done?
11. How is a Ship Security Plan (SSP) made?
12. What records are required to be kept on board for the SSP?
13. What are the duties and responsibilities of a CSO?
14. What are duties and responsibilities of a SSO?
15. What activities are allowed under different Security Levels, SL1, SL2 and SL3 in a port?
16. How is the Port Facility Security Assessment (PFSA) done?
17. How is the Port Facility Security Plan (PFSP) made?
18. What are the duties and responsibilities of a PFSO
3 of 101



19. What is the certificate issued to a port under the ISPS code?
20. For the purpose of ISPS code which amendments were brought about in the SOLAS 1974?
21. What are the functional requirements of a Ship Security Alert System (SSAS)? In the Indian context, what
happens when the SSAS is alerted on board?
22. What do you understand by protocol of communication under the ISPS code?

CHAPTER 9: PORT STATE CONTROL 48 51
1. What is Port State Control? What are its primary responsibilities?
2. Which are the eight PSC regimes in operation worldwide?
3. What the general criteria are as laid down by the PSC MOUs?
4. Which certificates and documents are to be inspected for the PSC?
5. What is 'Equasis' and what are its main principles?
6. When can a ship be detained under the PSC code?

CHAPTER 10: PORT OF REFUGE 52 54
1. What constitutes a port of refuge?
2. What are the typical procedures followed by a port for a ship calling a port of refuge?

CHAPTER 11: STCW 95 55 61
1. What is STCW 95 and how is different from STCW 78?
2. What is a "White List"?
3. What are the certificates required for a seafarer under the STCW code?
4. What are the mandatory requirements for certification of deck and engineer officers?
5. What are the functions for deck examination as defined by STCW 95 and what are the levels of
responsibilities?
6. What are the general provisions of sea service requirements as per STCW code?
7. What are the training and certification requirements for 1. Tankers, 2. Gas and Chemical Carriers, 3. Ro-Ro
Passenger Ships, and 4. Passenger ships other than Ro-Ro Ships.
8. What are the requirements for revalidation of certificate of competency as per STCW Code?
9. What are the safe manning regulations as per STCW 95 and the Code?

CHAPTER 12: MASTER AND HIS RESPONSIBILITY 62 67
1. How is the command of a ship taken or handed over?
2. How does a successor take over command of a ship in case of an emergency?
3. What are the chief responsibilities of a master?
4. What is a crew agreement and what are the master's responsibilities regarding it?
5. What is a breach of crew agreement and how is it dealt with?
6. What are the guidelines for drug and alcohol abuse on board?
7. Which conditions may constitute a criminal liability for a seafarer?
8. What are master's actions in response to complaints from seamen?
9. What are the actions of a master if the crew goes on strike?
10. What procedures are required to be followed in case of a death on board?

CHAPTER 13: CHARTER PARTY 68 81
1. What is a liner trade and how is it different from a tramp trade?
2. How are ships in the dry bulk and tanker market categorised?
3. Which parties are involved in transportation of goods by sea?
4. Outline the meaning of following International Trade Terms (INCOTERMS):
EXW, FCA, FAS, FOB, CFR, CIF, CPT, CIP, DAF, DES, DEQ, DDU & DDP.
5. Explain the terms FOB and CIF in detail and their advantages.
6. What is a Documentary Credit System (DCS) between a buyer and seller of goods?
7. What are the different charters? Name salient features of a) Time, b) Voyage and c) Bareboat charter parties.
8. What is a sub-charter?
9. What is a contract of affreightment (COA)?
10. What are the duties and responsibilities of a shipbroker?
11. Given below are some of the chartering terms in abbreviations used by shipbrokers:
12. What are the salient clauses of a voyage charter party?
13. What is World Scale and how is it used for reference to fix a tanker on charter?
14. What are the salient features of a time charter party?

4 of 101



CHAPTER 14: BILLS OF LADING 82 88
1. What is a Bill of Lading and describe its functions?
2. How will you describe B/L as a receipt for goods?
3. How will you describe B/L as evidence of contract?
4. How will you describe B/L as a document of title?
5. Describe different types of B/L.
6. Differentiate between a Clean and Dirty B/L. What is a letter of indemnity (LOI) and what precaution must
be used before accepting the same?
7. What is a Mates Receipt?
8. What precautions must be taken while signing a B/L?
9. How does the master give delivery of cargo on presentation of the original B/L?
10. What is a seaway bill?
11. What are the typical problems related to B/L?
12. What are the rules governing carriers obligations and liability?

CHAPTER 15: COGSA 1971-1992 89 94
1. What are the salient features of the Carriage of Goods by Sea Act 1971 (COGSA 71)?
2. What are the salient features of the Carriage of Goods by Sea Act 1992 (COGSA 92)?
3. What are the provisions for carriage of deck cargo
4. How is the rule of General Average (GA) act applicable in case of a deck cargo?
5. What is IMDG Code?
6. What are the classes of Dangerous Goods?
7. How will you accept any bulk cargo other than grain for loading on board?
8. What are the International Grain Code requirements?
9. What are the hazardous bulk cargo documents needed?

CHAPTER 16: INTERNATIONAL MARITIME LAW 95 99
1. What are International law, Customary law and Treaties?
2. What is UNCLOS and what are the provisions incorporated in it?
3. What is the nature and purpose of IMO?
4. What are the main organs of the IMO?
5. Describe the IMO instruments e.g. Conventions, Protocols, Amendments, Recommendations, Codes and
Guidelines and Resolutions
6. Give brief descriptions of various chapters of SOLAS 1974.
7. How is a Convention developed, entered into force and amended in the IMO?

CHAPTER 17: SHIP REGISTRATION 100 - 103
1. What are the provisions for ship registration?
2. What are the purposes and benefits of ship registration?
3. What is the IMO identification number?
4. What is a classification society? Is it mandatory? What are the advantages of having a ship under class?














5 of 101



CHAPTER 1

PASSAGE PLANNING

Q.1. How will you plan a passage? Give all relevant publications/ documents etc., which
are to be used in such planning.

Ans. Passage planning is done from departure Berth to Berth on arrival. We come to
know of the berth at destination port through the owner, the Master or the destination
agent.
Passage planning is through (a) Planning, (b) Execution and (c) Appraisal. It is a
dynamical process and needs constant monitoring and reviewing as per the situation on
hand e.g. in TRS weather conditions courses laid down need to be changed and evasive
actions taken depending on the circumstances of the case.
Following publications are referred for a passage planning:
Chart Catalogue,
Admiralty List of Radio Signal,
Admiralty Tide Tables,
Guide to Port Entry,
Notices to Mariners (latest),
Marine Observer's Hand Book.

Chart Catalogue gives the names and the numbers of charts, which will be required for
the particular passage. If any charts are not available on the ship or any chart not
corrected for the latest Notices to Mariners, the new charts are to be ordered or corrected
as the case may be, before laying down the courses and distances on them. Great care
must be taken to ensure the largest scale charts available are used. While transferring the
courses from one chart to another, ensure that positions, course and distances are
accurate. Recheck all courses and distances as laid down. It is a good idea to have a small
notebook with us to write down the courses and distances from point to point along with
their latitudes and longitudes for our record. These may be useful in future or in case of a
court of enquiry.

Q.2. Which regulation relates to Safety of Navigation and Avoidance of Dangerous
Situations?

Ans. SOLAS regulation V/34 relates to Safety of Navigation and Avoidance of
Dangerous Situations. It is applicable to all ships, which proceed to sea. SOLAS V/34.2
provides that the voyage plan must identify a route which:
takes into account any relevant ship's routing systems;
ensures sufficient sea room for the safe passage of the ship throughout the voyage;
anticipates all known navigational hazards and adverse weather conditions and
expected current, tide, wind, swell and visibility;
takes into account the marine environmental protection measures that apply, and
avoids as far as possible , actions and activities which would cause damage to the
environment.
6 of 101
INDEX



imposes routing constraints by draft or cargo on board;
identifies areas of high traffic density;
anticipates on shore sets due strong currents or tide;
requires additional sea room for tank cleaning or pilot embarkation etc.;
regulates ship routing or ship reporting systems;
alters course at positions indicated on the chart taking the speed and turning circle of
the ship into account;
checks the reliability of propulsion and steering systems.

Q.3. Who checks and approves the passage planning?

Ans. The master should check that the tracks so laid for planning a passage are safe and
the chief engineer should verify that the ship has sufficient fuel, water and lubricants for
the intended voyage.
The responsibility of passage planning is normally entrusted to the 2nd officer on board.

Q.4. Describe a typical checklist for passage planning.

Ans. Every Company has a typical voyage plan checklist, which may be in the following
format:
Charts used :
Large scale for coastal waters
Small scale for ocean passages
Planning chart
Routing, climatic, load line zone charts
Publications used:
Sailing directions/ pilot book
Guide to port entry
List of lights
Radio signals
Tide table tidal stream atlas
All Charts and publications are corrected?
By ordering new charts
Notices to mariners
Local area warning
NAVAREA warning
Points considered?
Drafts on departure and arrival
Ship's cargo imposing any passage restrictions
Ship's special operation requirements
Points checked?
Ship Routing System, Ship Reporting System and Vessel Traffic Services (VTS)
Weather charts of the area
Is the vessel under weather routing for the passage?
For arrival port:
Large scale charts studied?
7 of 101
INDEX



Ship/ Shore, Master/ Pilot exchange form ready?
Pilot card updated?
Port guide studied for arrival/ berthing restrictions?
Other checks:

Q.5. How is ECDIS used in planning a passage?

Ans. Passage planning with electronic navigating systems is no different, except that over
reliance on the systems could take away the basic seamanship aspects of the mariner and
non performance of any of the instruments may lead to confusion. Electronic Display and
Information System (ECDIS) can be of Raster Chart Display Systems (RCDS) displaying
Raster navigational charts (RNC), which can be used in conjunction, with paper charts.
When passage planning uses ECDIS, it is prudent for the navigator to draw a Safety
Contour around the ship. Crossing the safety contour e.g. shallow water, prohibited zone
or a traffic separation scheme will be automatically indicated by the ECDIS.

Q.6. What care must be taken when we use a combination of paper and electronic charts?

Ans. When we use a combination of paper and electronic charts, care should be taken that
all paper or all electronic charts are used at critical points of landfall, port arrival and
pilotage etc. When transferring the details from a paper chart to an electronic chart
display system or vice-versa the navigator should ensure that:
positions are transferred to and are verified on, electronic charts of an equivalent scale
to that of the paper on which the position was originally plotted;
any differences in chart datum is applied to the transferred position;
the plan is rechecked for accuracy before being used.

Q.7. What are the salient differences in the planning of a passage in Open Oceans and
Coastal or Restricted waters?

Ans. Open Oceans use small-scale charts, gnomonic projection ocean charts for plotting
great circle routes. Load line zone charts are used to ensure Load Line rules are complied
with. Ocean current charts are used to take advantage of the favourable currents. Ice
movements are noted to keep clear of them. Frontal depressions and poor visibility can
restrict the northerly or southerly latitudes for navigation. Seasonal Tropical Revolving
Storms (TRS) where encountered are to be avoided and enough searoom provided to
steer clear of the same. Weather routing services are to be followed.
Landfall targets are identified with their likely radar/ visual ranges. In respects of lights,
their rising and dipping ranges and arc/ colours along with their sectors are identified.
Coastal or restricted waters have limited time available in taking corrective measures.
Manoeuvring characteristics of the ship and its limitations, if any, particularly with
reference to the propulsion and the steering systems must be taken into consideration
before planning these passages. Ship squat can reduce underkeel clearance at speed and
must be considered very carefully.
8 of 101
INDEX



Ship routing schemes and reporting systems along with route and vessel traffic services
should be strictly followed. Coastal weather bulletins including gale warnings may
require changes in the passage plan.

Q.8.How is the monitoring of passage plan conducted?

Ans. In the oceans, monitoring of a passage plan is easier as it involves restructuring a
course based on information received on weather, ice, fog, frontal depression or tropical
storms with ample searoom.
In the coastal or restricted waters the monitoring is highly critical especially the time to
place the wheel over at the end of a track and ensuring that the ship is on the new track
after the alteration of course. Distinctive features e.g. transit bearings, bearing line of
conspicuous object etc., can be effectively used. Visual, Radar and Echo sounder
information become an integral part of a passage plan. Radar clearing ranges and
bearings are effectively used. Parallel indexing can be used to check that the ship is
maintaining the course and not drifting to port or starboard.

Q.9. Does the passage planning include pilotage waters? If so describe briefly pre-arrival,
pilot on board and the outward-bound pilotage plan.

Ans. Passage planning includes pilotage waters. Pre-arrival plan should be for anchoring
or aborting port entry. The plan should also include contingency measures such as
equipment failure, poor visibility etc.
The Pilot Card should be updated. The card contains information on ship's draft, speed,
turning circle and a checklist of all equipment available and working.
The ship initiates a pre-arrival information exchange about 24 hours before her ETA pilot
point. The Ship to Shore Master/ Pilot Exchange and Shore to Ship Pilot/ Master
Exchange forms can be used. These information exchanges can be by facsimile
transmission and will vary from ship to ship, port to port. It is better to keep them to the
basics and have them the minimum possible to avoid confusion. Where passage can last
for many hours situations may change, which will need changing of the plan.
When pilot comes on board, he will have ample time to discuss the berthing with the
master of the ship. The pilot should be handed over the Pilot Card and shown the
wheelhouse poster, which provides the summary of the manoeuvring information of the
ship.
The outward-bound passage plan can be discussed with the inward pilot and made
accordingly.

Q.10. In a passage planning what are the elements used in the routing scheme?

Ans. Elements used in routing scheme include:
traffic separation scheme aimed at separating opposing traffics;
traffic lane, which defines limits of one-way traffic flow;
separation zone besides which ships are proceeding in opposite or near opposite
direction;
roundabout within a defining limit having a separation point or circular zone;
9 of 101
INDEX



inshore traffic zone of a designated sea area between the adjacent coast and the
boundary of the traffic separation scheme;
recommended route often marked by buoys at the centre with undefined width;
deep water routes accurately surveyed for clearance of sea bottom and submerged
obstacles if any;
archipelagic sea lane for expeditious navigation in archipelagic waters;
precautionary areas where ships must navigate with great caution;
areas to be avoided by certain classes of ships and where navigation is very
hazardous.

Q.11. What do you understand by Ship Reporting System and how is it used to plan a
passage?

Ans. Ship Reporting System has been introduced by several countries in the world to
keep a track of any ship in and around their coasts by radio, radar or transponder.
Uses of Ship Reporting System form a part of passage planning. Ship Reporting System
is used to get or exchange information about ships, such as their position, course, speed
and cargo in addition to monitoring passing traffic. These information are useful for
search and rescue and prevention of pollution.
Ship Reporting Systems can be adopted internationally by IMO. All ships or certain
category of ships or ships carrying certain cargoes will use such systems.
It is the obligation of the ship and the master to comply with the requirements of a Ship
Reporting System and report to the appropriate authorities all information that is
required. The master will also give additional reports upon leaving or entering a Ship
Reporting System.
List of radio signals provides all details of Ship Reporting System. Details of IMO
adopted Ship Reporting Systems are contained in Part G of the IMO publication Ships'
Routing updated by the 1996 Amendments to Ships' Routing.

Q.12. What role does a Vessel Traffic Service play in planning a passage?

Ans. Vessel Traffic Service (VTS) is basically introduced in ports and their approaches to
monitor the compliance of a ship with the local regulations. It also plays an important
role in optimising traffic management. Vessel Traffic Service may be mandatory within
the territorial seas of a coastal state.
On board a ship Vessel Traffic Service should form a part of the passage planning.
Specific radio frequencies are to be given for the ship to monitor navigational or other
warnings and seek advice on when to proceed to areas where traffic flow is regulated.
Vessel Traffic Service requirements are marked on the relevant charts. For more specific
information sailing directions and list of radio signals should be used.

10 of 101
INDEX



CHAPTER 2

WATCHKEEPING

Q.1. What are the duties of an Officer on Watch (OOW) on the bridge?

Ans. The primary duties of an Officer on Watch are (i) Watchkeeping, (ii) Navigation
and (iii) GMDSS radio watchkeeping.
Officer on Watch is a representative of the master and is primarily responsible at all times
for the safe navigation of the ship and for complying with COLREGS. As Officer on
Watch, he is in charge of the bridge team for that watch, until properly relieved of his
duty. The Officer on Watch shall ensure that master's standing orders are fully complied
with and bridge watch manning levels are safe at all times under prevailing circumstances
and conditions.
Watchkeeping duties include but are not limited to the following:
maintaining a proper look out and general surveillance of the ship;
collision avoidance in accordance with COLREGS;
recording bridge activities and making periodic checks on all navigational equipment
in use;
follow procedures for handing over watch as per shipboard operation procedures;
calling for support on the bridge as and when required;
execute the passage plan safely and monitor the progress;
maintain continuous GMDSS radio watch including distress signals if any;
be conversant thoroughly with the speed, handling characteristics, stopping distances
and turning circle of the ship;
must not hesitate to use helm, engines or sound signalling apparatus at any time;
must be fully conversant with all safety equipment on board and their usage
particularly with reference to prevention of pollution and emergency situations;
should not leave the bridge unattended at any time.
There are additional duties for the Officer on Watch that will be entrusted to him
depending on his rank. He must be fully familiar with them e.g. cargo monitoring,
general communications, control of machinery, supervision and control of safety systems
etc. These additional duties must not interfere with the primary duties of the Officer on
Watch.

Q.2. What do understand by maintaining a lookout?

Ans. COLREG places a mandatory provision for keeping a proper lookout on ship at all
times. It must serve the following purpose:
maintaining a continuous state of vigilance by sight and hearing as well as by all
other available means in order to assess any significant change in the operating
environment;
appraising at all times the risk of collision, stranding and other dangers to navigation;
detecting ships or aircraft in distress, shipwrecked persons, wrecks, debris or other
hazards to safe navigation.

11 of 101
INDEX



Lookout duties cannot be shared with other works e.g. a helmsman on duty, while
steering should not be considered a lookout man unless the ship is small and he has the
unobstructed all round view from the steering position.
Ships with fully enclosed bridges should have such provisions that sound reception from
all audible sounds on the open deck is clear at all times inside the bridge.

Q.3. What do you understand by a sole lookout?

Ans. Under the STCW code, the OOW may be the sole lookout in the daytime under the
following conditions:
careful assessment has been made and established without doubt that it is safe to
operate with a sole lookout;
full account has been taken of all relevant factors, including, but not limited to state
of weather, visibility, traffic density, dangers to navigation in the proximity,
navigating in or near traffic separation schemes etc.;
assistance is immediately available to be summoned to the bridge when any change in
situation so requires;
clear guidelines are incorporated in the shipboard operational procedures manual.

Q.4. What special precautions are to be taken by the OOW?

Ans. The OOW must maintain a very high level of general awareness of day-to-day
operation of the ship. It will include general watch over the ship's decks to monitor,
where possible people working on deck, and any cargo or cargo handling equipment.
Special care and additional watches are to be kept in places where there is risk of piracy
or armed attack. Whenever people are working aloft or in the vicinity of radar antennae,
radio aerials and sound signalling apparatus, the OOW should be particularly observant.
Warning notices are to be posted at appropriate places and all concerned should be
informed to take adequate precautions and inform the OOW once the assigned work is
completed.

Q.5. How does the OOW comply with the provisions of the COLREGS?

Ans. Compliance of the provisions of the COLREGS means not only the conduct of the
vessels under steering and sailing rules, but displaying the correct lights, shapes and
making the correct sound and light signals. Vessels may not be displaying their correct
lights/ shapes or the lights/ shapes may not be visible due certain restrictions of the ship's
structure when approached from a certain direction. It is therefore always prudent to
allow extra searoom as long as it is safe to do so.
In all cases early and positive action should be taken when close quarter situation exists
and to avoid collision. Once an action is taken the OOW must ensure that the action so
taken has the desired effect. Valuable time should not be wasted in trying to contact the
other vessel seeking collision avoidance action from the other party. It is not possible to
have confirmed and positive identification of the other party and even so
misunderstanding in communication could arise leading to disastrous results.
12 of 101
INDEX



Risk of collision in a clear weather can be detected by taking frequent compass bearings
of the other approaching vessel/s. If the bearings are study risk of collision exist.
However risk of collision may still be there when approaching very large ships, ships
under tow or ships at close range even when there is an appreciable bearing change.
In restricted visibility radar and radar plotting can be effectively used to assess risk of
collision. However over reliance on electronic gadgets can be dangerous and the OOW
should take every opportunity in clear weather to practice radar plotting and check and
improve on his efficiency.

Q.6. What records must be maintained on the bridge by the OOW?

Ans. The OOW must maintain a proper and formal record of all-navigational activities
and incidents, which are of importance to safety of navigation. OOW is provided with
appropriate logbooks.
Besides notations in the logbook, paper records from the course recorders, echo sounders,
NAVTEX receivers etc. should be retained at least for the duration of the voyage marked
with date and time. All information on position, course and speed should be recorded in
the bridge logbook or in an approved electronic means in such a manner that the ship's
actual track can be reconstructed at any time later.

Q.7. What kinds of checks are required to be carried out on the navigational equipment
on board?

Ans. The OOW must carry out the operational checks on navigation equipment when
preparing for sea and prior to port entry. It is important for the OOW to know that full
engine power and the manoeuvrability of the ship is available especially before entering
restricted coastal waters after a long ocean passage.
Routine checks include:
daily manual steering at least once a watch when the automatic pilot is in use;
magnetic and gyro compass errors once a watch if possible and after every major
change of course;
synchronisation of gyro repeaters including engine room control and emergency
steering position;
electronic equipment for accurate functioning and proper synchronisation with the
bridge to which it is connected;
proper configuration of the electronic equipment as set is not changed;
in built check systems of the electronic equipment to have a periodic review of the
health of the system;
comparison with other equipment or independent sources to ensure good and
adequate performance at all times;
helm and engine room RPM indicators to ensure that helm and engine orders are
followed.




13 of 101
INDEX



Q.8. How does the OOW hand over watch?

Ans. The OOW should not hand over the watch if he has reasons to believe the relieving
officer is unfit due to illness, inebriated due to alcohol/drug or unable due to fatigue to
take over the watch. He must inform the master of the ship immediately.
The relieving OOW must come at least 10/15 minutes before his watch to familiarise
himself with the night vision and get satisfied with the ship's position, its course and
speed, engine controls, visibility and that of any dangers to navigation he may encounter
in his watch. The relieving OOW must also ensure that his bridge team for the new watch
is properly familiar with the night vision and fit for duty. If any avoiding action is being
taken at the time of relieving of duty, hand over should be deferred till such time such
action is completed.

Q.9. When does the OOW call the Master?

Ans. Guidance on specific circumstances for calling the master is given in the shipboard
operational procedures. Standing and bridge orders by the master support it. All
companies have a checklist giving circumstances and situations where the master should
be called. A typical checklist could be in the following format:
restricted visibility is encountered or expected;
traffic conditions or movement of other ships are causing concern;
difficulties are encountered in maintaining course;
failure to sight land or a navigation mark or change of sounding at the appropriate
time;
conversely if sighted land or a navigation mark or change of sounding at an
inappropriate time;
breakdown of machinery, propulsion, steering gear or any essential navigational
equipment failure;
alarm, indicator of any malfunction especially radio equipment;
heavy weather and suspicion of any damage due to it;
navigational hazards encountered, e.g. ice or derelict;
any other emergencies or if in doubt.
Once on the bridge, the master must take over the total control of the ship and inform the
OOW in clear and unambiguous terms. The fact that the master has taken command on
the bridge should be recorded in the logbook.

Q.10.What constitutes a bridge team and what are the assigned duties of a bridge team?

Ans. A bridge team is assigned specified duties, which can be performed effectively by
the individuals in the team. Duties are prioritised and each member must understand his
tasks and duties so assigned. A continuous and positive reporting system of events must
be part of the assignment of the bridge team to monitor the performance. The team should
be able to take actions appropriate to the circumstances and conditions if any
deterioration of the performance takes place.
The team should be able to co-ordinate and communicate with other effectively at all
times and especially so during emergency situations. It should be able to support each
14 of 101
INDEX



other and anticipate dangerous situations arising at any time. The bridge team must have
a plan, which must be well understood by all members of the team having good
situational awareness. The development of an error chain should be avoided and actions
taken to break such error sequence.

Q.11. How are new personnel familiarised with the watchkeeping?

Ans. Under the ISM Code and the STCW Convention, every personnel joining the ship
must familiarise himself with the ship specific equipment and associated ship procedures
as laid down in the shipboard operational procedure manual. He must observe, practice
and understand the limitations of the navigational aids and systems being used and
continually monitor their performance. He must use the dead reckoning position to check
the position fixes obtained from GPS and /or sextant observations. Over reliance on
automated electronic navigational equipment should be avoided at all times. Visual
navigational aids like bearing of lighthouses etc. should always be used to support
electronic position fixing.

Q.12. What special precautions must be taken while navigating in coastal waters?

Ans. Following steps should be followed along with any special instructions from the
master:
most suitable large scale chart should be used;
position of the ship should be fixed at frequent intervals;
all relevant navigational aids must be positively identified before they are used;
ship's routing scheme and ship reporting system must be followed scrupulously;
OOW must be aware of the draft of the ship with relation to the depth of water for
squat, which may have very critical effect on the safe navigation of the ship;
he must be fully aware of the stability conditions of the ship and its manoeuvring
characteristics;
parallel indexing while alteration of course in restricted waters.

Q.13. While navigating in pilotage waters with a pilot on board describe the duties of the
OOW.
(Refer to Q.9 of Chapter 1)

Ans. Pilot is a part of the bridge team once he embarks and arrives on the bridge. Pilot
has specialised knowledge of navigation in local waters. Depending on the local pilotage
laws, the master may delegate the conduct of the ship to the pilot, who will navigate the
ship in close co-ordination with the master. It is important that responsibilities of the
master and the pilot are clearly agreed and mutually understood. There should be no
ambiguity. The presence of the pilot does not relieve the master or the OOW of their
duties and obligations for the safety of the ship.
Passage plan made on board for pilotage waters must be discussed with the pilot and
agreed or amended as the case may be in a safe place with sufficient time and sea room.
Safe passage must be monitored at all times by regularly fixing the position of the ship
particularly after each alteration of course and observing the squat and keel clearance
15 of 101
INDEX



carefully. Verbal orders from the pilot must be repeated and executed correctly. These
will include the helm and engine orders and the OOW must ensure that rudder angle and
the RPM indicator confirm to the order so given.
If a master leaves the bridge, the OOW should not hesitate to clarify any doubt with the
pilot and if not satisfied with the situation call the master urgently.
In high traffic density or restricted visibility, there should be a helmsman steering the
vessel to assist the OOW.

Q.14. What basic principles the ship for communication by radio must follow?

Ans. The ship for radio communication must follow the following basic principles:
top priority is given to distress, urgency and safety communication;
interference with other radio users should be avoided;
proper frequencies should be used for the correct purpose.

Q.15. What precautions are required while anchoring and at anchor watch?

Ans. Anchoring position is predetermined with careful consideration to the swinging
circle based upon the length of cable used. Landmarks and transit bearings should be
selected for easier monitoring of the position of the ship. Appropriate lights and shapes
must be displayed according to the COLREGS and the local regulations.
OOW must check the anchorage position to ensure that the ship does not drag its anchor
or move too close to another anchored vessel.
A proper lookout must be maintained at all times and inspections round the ship carried
out especially in waters where there is a risk of piracy or armed robbery. The master
should immediately be notified in case any of the above incident or bad weather, bad
visibility or the ship is suspected to be dragging her anchor.

Q.16. Which are the danger messages the OOW is obliged under SOLAS to broadcast to
ships and near coast stations?

Ans. Under the SOLAS, the OOW is obliged to broadcast the following danger
messages:
dangerous ice;
a dangerous derelict or any other direct danger to navigation;
a tropical storm;
sub-freezing air temperatures associated with gale force winds causing severe ice
accretion or superstructures;
winds of force 10 or above on the Beaufort scale for which no storm warning has
been received.
The safety signal should be used when announcing danger messages.





16 of 101
INDEX



CHAPTER 3

BRIDGE EQUIPMENTS

Q.1.What are the general precautions the OOW should take in the operation and
maintenance of bridge equipment?

Ans. OOW must be completely familiar with all the navigational and communications
equipment, charts and publication on board. He must be fully acquainted with the
operating manual of each equipment, particularly with regard to setting up the controls
and procedures to be followed in case of equipment failure. Periodic checks must be
conducted on the equipment and defects, if any must be brought to the notice of the
master and entered in the logbook. Preventive maintenance must be carried out as per the
instruction manual. All charts and publications for the intended voyage should be kept on
board and corrected up to date.

Q.2. What do you understand by good Radar Practice?

Ans. The radar should be kept running at all times and when using the same, the OOW
should keep the following points in mind:
quality of performance should be continuously monitored through a performance
monitor, if fitted;
heading marker should be correctly aligned checking it with the fore and aft of the
ship and the compass heading;
small vessels, ice and objects like containers may not be detected by the radar;
video processing techniques should be used with care;
careful use of clutter control to avoid obscuring of objects by sea or rain clutter;
shadow and blind sectors should be known to the OOW and adequate precautions
taken while navigating by radar;
practising in clear weather for radar collision avoidance can be greatly helpful in
restricted visibility, radar observations and target vectors can be visually checked;
range scales depend on the traffic density, speed of the ship and how often the radar is
being observed;
detection of small targets is better at short range;
plotting of targets is better at longer range;
use of long range is advisable to give advance warning of approaching vessels and
land;
safe speed of a ship is dependant on the above factors;
closest point of approach (CPA) of a target is determined by the course, speed and
aspect of the target to indicate whether or not there is a risk of collision;
accuracy of the CPA plot is dependant on the accurate input of own ship's course and
speed, yawing ship or inaccurate speed can make a head-on target look like passing
clear;
multiple plotting must be done to have greater accuracy;
change in course or speed of either ship or target may loose accuracy of plotting;
17 of 101
INDEX



change of relative bearing of the target can not be assumed as no risk of collision.

Q.3.What aspects of the radar need to be checked while using the same for position fixing
and monitoring ship's progress?

Ans. When using radar for position fixing and monitoring ship's progress, the OOW must
check:
the overall performance of the radar;
the identity of the fixed object being observed;
gyro error and accuracy of the heading line alignment;
accuracy of the variable range marker (VRM), electronic bearing lines (EBL) and
fixed range rings;
the parallel index lines are set correctly.

Q.4. What is parallel indexing when monitoring the ship's progress in a passage
planning?

Ans. Parallel indexing provides a method on the radar of verifying that the ship is
maintaining a safe course to pass a fixed object, such as a head landmark at the desired
distance. Parallel indexing does not substitute position fixing of a ship at regular
intervals.
The technique requires an index line to be drawn to pass through the radar echo of a fixed
object at a tangent to a fixed VRM decided as the safe distance. The index line will line
up parallel to the ground track that the ship will need to follow to maintain a safe distance
while passing.
Parallel indexing can be used in both true motion and relative motion screen of the radar.
In case of true motion display the echo remains stationary and the edge of VRM should
move along the index line. In case of relative motion display, the echo of a fixed object
moves in a direction and speed reciprocal of own ship's speed on the ground and the echo
should move along the index line.
18 of 101
INDEX




CHAPTER 4

STEERING GEAR AND ELECTRONIC POSITION-FIXING SYSTEMS

Q.1. How is a steering gear tested?

Ans. After prolonged use of autopilot and before entering coastal waters the steering gear
must be tested at all the manual steering positions on the bridge.
In coastal waters more than one steering gear power unit, when such units are capable of
simultaneous operation should be used.
Within 12 hours before departure from a port, check and test the steering gear along with
the operation of the following:
the main steering gear;
the auxiliary steering gear;
the remote steering gear control systems;
the main steering position on the bridge;
the emergency power supply;
the rudder angle indicator in relation to actual rudder position;
the remote steering gear control system power failure alarms;
the steering gear power unit failure alarms; and
automatic isolating arrangements and other automatic equipment.
The checks and test should include the full rudder movement, the timing of such
movement from hard-over to hard-over and the operation of the means of communication
between the bridge and the steering gear compartment.
All OOW must ensure they are familiar with the operation or maintenance of the steering
gear along with the change over procedures.
Emergency steering drills should take place at least in every three months. It should
include direct control from within the steering gear compartment, the communication
procedure with the bridge and, where applicable the operation of alternative power
supplies.
The dates/ time of testing including details of emergency steering drills carried out are to
be recorded in the logbook.

Q.2. What is the difference between a track-keeping and course-keeping autopilot?

Ans. Track-keeping autopilot allows the ship to follow the track laid for a passage,
whereas course-keeping autopilot ensures that the ship points to the right direction. Wind
and current for example can move the ship sideways and off its track, while the ship's
heading remains same.
In a track-keeping mode the autopilot should perform turns automatically between track
legs, using either pre-set turn radius or rate of turn values. If there is a malfunction in
track-keeping mode, an alarm should come and the system should automatically revert to
course-keeping mode.


19 of 101
INDEX



Q.3. How does an off-course alarm work in an autopilot?

Ans. Off-course alarm is fitted in every autopilot to warn the OOW when the ship
deviates from the course set by a pre-set amount. Non-activation of the off-course alarm
will not always mean that the ship is maintaining its planned track. The ship may have
moved off the track by wind or current even though the heading remains same.

Q.4. What precautions are required to be taken while using a transmitting magnetic
compass (TMC) or a gyro compass for navigating a ship?

Ans. A transmitting magnetic compass (TMC), if used to provide heading outputs to
other bridge systems should be corrected for compass error through transit bearings,
azimuth or amplitude observations. The TMC should be tested once a week in clear
weather. If TMC is not used the magnetic compass is generally fitted above the bridge on
the centreline of the ship with a periscope so that the compass is readable from the
helmsman's position.
Magnetic compass uses the magnetic properties of the earth for its direction finding.
There are corrections like variation, which is the difference between the true north and
the magnetic north and deviation, which is the difference between the magnetic north and
the compass north of a ship. Both these corrections vary from place to place and with
different ship's head. They must be recorded and applied correctly to the compass course
to find the true course. Every ship is provided with a deviation chart posted on the bridge.
Large or unusual deviation found for a ship's head should be investigated thoroughly. It
could be because of major steel conversion of the ship, magnetic anomaly in a certain
place or carriage of magnetic cargoes like iron ore or steel. It is also possible that
magnets inside the binnacle of the compass were tempered with. Magnetism of all
electrical bridge equipment can affect the magnetic compass and the minimum distances
from them are specified and should be strictly followed.
Gyrocompass uses the directional properties of a gyroscope, which is the rigidity in space
and precession. Gyrocompass should be run continuously. Should a gyrocompass stop for
any reasons, it should be restarted and checked for errors after it is 'settled'. Speed and
latitude corrections must be applied to the gyrocompass. Where the gyro has no speed log
or position input, manual corrections would have to be made.
Gyrocompass has a number of repeaters connected to it. They must all be checked for
alignment with the master gyro including the repeater in the emergency steering gear
compartment. Gyro repeaters on the bridge wings must be checked against the master
gyro at least once a watch and after excessive manoeuvring. Gyro compass error must be
checked and recorded every watch if possible. Care must be taken the error is applied
correctly for all bearings etc.
Gyrocompass gives the output of direction to several bridge equipment and care should
be taken that in case of failure of the gyro, the OOW is aware of contingency plans and
actions required.




20 of 101
INDEX



Q.5. What types of speed measurement instruments are used on the ship?

Ans. Generally speed through the water is used for collision avoidance and speed over
the ground is used for navigation. Speed made good can be measured on ships and
represents the speed the ship has achieved over a period of time. Speed made good can
also be measured from the charts between two position fixes and calculated and
transmitted by electronic position-fixing systems.
Doppler-type logs can be single-axis or dual-axis. In case of single-axis, the speed is
measured in the fore and aft direction and in dual-axis measured fore and aft and
athwartships. If coupled with a rate of turn measurement, dual-axis logs can calculate the
speed and direction of movement of the bow and the stern.
It is good navigation practice to set the log at zero at the start of every voyage.

Q.6. What precautions are required to be taken while using an echo sounder?

Ans. A navigational echo sounder is expected to work up to a depth of 200m
(approximately 110 fathoms). Care should be taken as follows:
units of sounding of the echo sounder is the same as those used in the chart;
when comparing the echo and chart soundings, allowance must be made for the draft
of the ship or any tidal effects;
errors caused due to aeration, double reflection of echo are taken into consideration;
echo sounder is always used in coastal waters and when making a landfall;
shallow water alarm system if fitted should be set to an appropriate depth to warn of
approaching shallow waters.

Q.7. What are the electronic position-fixing systems used on the ship and what care
should be taken while using the same?

Ans. Except Loran C, other electronic position-fixing systems like Decca and Omega is
being phased out. Loran C has a basic range of 1200 miles and corrections need to be
applied for the variations of the conductivity of the earth's surface.
A global navigation satellite system (GNSS) today provides continuous worldwide
position, time and speed information. The USA operates global Positioning System
(GPS) and the Russian Federation operates Global Navigation Satellite System
(GLONASS).
GPS provides an accuracy of 100 metres. Differential GPS (DGPS) is corrected by
terrestrial monitoring systems and can be as accurate as 10 metres.
Following care should be taken when using electronic position-fixing systems:
OOW must understand the capabilities and the limitations of all electronic position-
fixing systems;
the integrity and the quality of the data transmitted must be safe guarded by pre-set
quality limits to monitor the quality of the fix;
comparing all positions to identify and reject any false position;
comparing electronic position-fixing with estimated position calculated by taking
observation with input from log, gyro etc.;
checking the status of the data and ensuring only the valid data is used.
21 of 101
INDEX




Q.8. What is Integrated Bridge Systems (IBS)?

Ans. Integrated Bridge Systems (IBS) are designed to combine systems, which are
interconnected to allow centralised monitoring of sensor information and control of a
number of operations such as passage execution, communications, machinery control,
safety and security.
IBS is not mandatory. Various designs are offered by classification societies and factors
taken into account are the design of the bridge, type of equipment fitted and the layout of
that equipment on the bridge.
Design of the IBS should be such that failure of one sub-system does not cause the failure
of another and the OOW knows about the failure immediately. In a navigation
management system, the link is provided between charts, position-fixing system, the log,
the gyrocompass and the autopilot.
The IBS has an alarm system provided to warn the OOW if a potential dangerous
situation arises. The alarm system is connected to radar, gyro, autopilot, position-fixing
systems, ECDIS, the steering gear and the power distribution system. There should be
watch safety or fitness alarm to transfer the alarm to cabins within 30 seconds, if the
OOW fails to acknowledge the alarm. An interval timer for setting alarm intervals of up
to 12 minutes should be part of the system. A number of alarm acknowledge points, each
with a pre-warning alarm to give the OOW notice that the alarm is about to be activated
should be available around the bridge. If the fitness time interval expires, an alarm should
sound away from the bridge.
Clear guidelines are to be written in the shipboard operation procedure manual with
advice as to when to commence and when to suspend the use of IBS. Over-reliance on
automatic systems with OOW not paying proper attention to visual navigational
watchkeeping techniques can be very dangerous.

Q.9. What is ECDIS and how is it used for navigation on ships?

Ans. Electronic Chart Display and Information System (ECDIS) include the display of
electronic vector and/or raster charts overlaid with the position of the ship and its track. It
has facilities to route plan and automatically update chart corrections using digital notices
to mariners. Sensors from GPS, log and gyro are connected to ECDIS to provide position
of the ship. Autopilot may be connected to provide an integrated bridge system. Some
ECDIS has radar-input display overlaid on the chart. This can be either selected targets or
a full radar picture. Care should be taken in differentiating target vectors based on ship's
speed through the water when OOW tries to overlay the same in a chart that is displaying
speed over the ground. Electronic chart display systems can be categorised as ECDIS,
RCDS (Raster Chart Display System) or ECS (Electronic Chart System). ECS must have
a complete set of paper charts to supplement it on board.




22 of 101
INDEX



Q.10. What is the difference between the electronic chart format of Vector and Raster
charts?

Ans. Vector chart has its features stored in a layered digital format and each feature has a
set of typical values. Storage in the database allows the chart to be displayed as a
seamless chart. The layers can be added or removed enabling fields of data required or
not required respectively.
Chart features can be expanded to get any additional information on any charted object.
Vector charts are inherently "intelligent" and thus allows three-dimensional monitoring
while sailing. Chart depth contours and air draught clearances around the ship can be
automatically monitored both at the planning stage and while the ship is on passage.
Alarms will be automatically triggered if a safety zone around the ship is breached at any
time.
Raster charts are exact copies of a paper chart and are produced by digital scanning
techniques. Information on raster charts cannot be layered and the move from one chart
to another cannot be seamless. Raster charts have to be individually selected and
displayed.
Raster charts have no inherent "intelligence" and the chart data itself cannot generate
automatic alarm systems, unless fed manually by the user during the route planning.
Datum and projections will be different in case of raster charts and care must be taken to
take account of such differences.
























23 of 101
INDEX



CHAPTER 5

P AND I CLUB

Q.1. What are P and I clubs?

Ans. P and I club means Protection and Indemnity club. The roots of the club were found
in 18th century England. Those were the days of sailing ships and extremely slow and
inefficient communication system. Ship owners and the underwriters had limited contact
and the hull insurance did not cover all aspects of loss on board. A group of ship owners
formed an association to provide each other insurance cover. This association was a non-
profit making body controlled by a group of close-knit ship owners.
These associations were named as Mutual Hull Insurance Clubs. The basic principle of
the club was that each member of the group of ship owners would share with other
members the cost of any hull claim, which an individual member suffered. It was paid
rateably according to the value of the vessel or vessels owned by that member of the club.
This spread the risk over a number of owners and provided the cover, which was
otherwise lacking in the insurance market. Pooling of risks made the cover cheaper than
what was available in the market. In addition the club was able to have greater control
over the handling of claims when compared to the insurance cover provided by
underwriters.
The increase in the volume and the complexities of world trade expanded the risks
covered. In due course the mutual insurance organisations joined forces to form the
present date Protection and Indemnity Club.
Most of the P and I clubs were established by beginning of 20th century. They were
administered by a group of members, the committee, which met periodically to decide on
the payment of claims and the levying of calls (premium).

Q.2. What are the covers provided by the P and I club?

Ans. Following are the typical covers provided by a P and I club:
personal injury claims covering third party liabilities covering death or injury to crew,
passenger and stevedores etc.;
crew claims covering repatriation;
collision liabilities e.g. 1/4
th
collision, excess collision, carriage of cargo after
collision, risks excluded under 3/4
th
collision liability clause;
fixed and floating objects claims;
cargo claims;
environmental pollution claims;
miscellaneous claims e.g. wreck removal, custom fines etc.;
freight, demurrage and defence for disputes under charter parties.

Claims other than above can also be considered under the so-called 'Omnibus Rule', in
which the club committee has the discretion to consider deserving claims from any
members at any time.
24 of 101
INDEX




Q.3. What is call money and how is decided by the P and I Club?

Ans. The premium rates to be paid to the club by a ship owner are called the call
money. The amount is decided by the committee based on the fleets ship types, ages,
gross tonnage, trades, flags, crew nationality, exposure to risks, and other factors
including the members claims record and the likelihood of large claims in the coming
year. The member is advised of the total estimated call for the next 12 months; this
comprises of an advance call and a supplementary call. Advance calls are levied on all
members at the start of the P & I year, which is February 20
th
(on this date sailing vessels
would depart for the Baltic from ports in the north-east coast of England following their
winter lay-up and by tradition and still is the date from which insurance was required).
Later in the year, if claims have been heavier than expected, the managers will ask the
members for a supplementary call to balance the books. Clubs aim to be accurate in
their predictions of future claims so as not to burden owners with supplementary calls.
Refunds are made when income (calls + investments) exceeds outgoing (claims +
expenses).

Q.4. Who are P & I club correspondents and what are their functions?

Ans. P & I clubs retain correspondents at numerous ports worldwide. In the USA a
correspondent is normally a law firm with maritime lawyers.
The correspondents:
Are for legal reasons, representatives and not agents of the club;
Will attend members vessels when so requested by the master or agent in order to
protect a members interests;
Are generally well acquainted with the clubs rules and policy, etc.;
Will report any occurrence likely to result in claim on the club;
May, pending instructions, appoint surveyors to inspect damages;
May be instructed by the club to offer letter of undertaking in case of possible
liability. In most cases of bunkering oil pollution or damage to jetty etc., a bond is to
be posted to avoid arrest.
Most clubs provide the ships with a list of correspondents.

Q.5. How are claims of P & I clubs paid?

Ans. When a member of a P & I club has a claim, the first $5 million will be met by the
clubs own fund. In excess of $5 million and up to $30 million the claim is divided
among the member clubs in the International Group Pool (including the club making the
claim), with the pooling contribution of each club being calculated taking into account its
entered tonnage, premium income and claims record in the Pool. For claims in excess of
the Pool limit, the International Group arranges an Excess of Loss reinsurance contract
in the market; this currently provides cover for $2000 million ($2 billion) in excess of
$30 million in relation to all types of claim except oil pollution, where the limit is $1000
million ($1 billion).
25 of 101
INDEX



Should the claim ever exceed the upper limit of the Excess of Loss Contract, it should fall
back on the Pool and be borne by each club pro rata according to its entered tonnage.
Such a claim is called an overspill claim and would be funded either from the club
reserves or by making a special overspill call on the membership. For most of the
history of the P & I clubs there are no upper limit to cover, but there is an upper limit of
$4.25 billion on overspill claims. Some clubs extensive reinsurance for overspill claims.

Q.6. How does a ship owner register his claim?

Ans. A ship owner, who is a member of the club, must give immediate notification of any
incident, which could result in a claim or liability within the scope of the clubs cover.
Once a claim or a potential claim has been notified the club takes over the investigation
and handling of the claim. It takes the help of the correspondents, surveyors and lawyers
appointed by the club.
In liaison with the member, the club will handle the claim to its logical conclusion. If
there is a third party claim where the member has to pay, the club will ask the member to
pay for the liability. Once the member pays the amount, an indemnity (i.e.
reimbursement) is asked for from the club in accordance with the club rules and the
members terms of entry. The amount recoverable is subject to a deductible i.e. an
amount agreed by the member to bear himself before he can claim from the club.

Q.7. Which liabilities are normally not covered by the P & I clubs?

Ans. Clubs will not normally cover:
Ad valorem bill of lading;
Deviation;
Delivery of cargo in a port other than the port specified in the bill of lading;
Failure to arrive or late arrival at a port of loading;
Delivery of cargo without production of bill of lading;
Ante-dated or post-dated bill of lading;
Clean bills of lading in case of damaged cargo;
Deck cargo carried on terms of an under-deck bill of lading;
Arrest or detention of an entered ship.

Q.8. What are the P & I covers for pollution?

Ans. P & I cover for pollution liabilities is generally to the extent that the pollution is as a
result of an escape or discharge or threatened escape or discharge of oil or any other
substance. Clubs have traditionally covered:
Liabilities for damages or compensation;
Costs of reasonably-taken measures for preventing, minimizing or cleaning up
pollution;
Costs or liabilities incurred as a result of compliance during government directions
during a pollution incident;
Special compensation payable to salvers;
Fines for pollution.
26 of 101
INDEX



CHAPTER 6

MARINE INSURANCE

Q.1.What types of marine insurance covers are required by ship owners and ship
managers?

Ans. A ship owner or a ship manager acting on behalf of a ship owner may require the
following insurance covers against:
actual or total loss of his ship's hull, machinery and equipment (H & M cover);
accidental (particular average) damage to his ship's hull, machinery and equipment (H
& M cover);
liability to owners of other vessels (and their cargoes) with which the ship collides
(collision liability);
liabilities for general average charges;
liabilities for damage done by his ship to a third party's properties;
liabilities for other third party risks, e.g. cargo claims, personal injuries, pollution,
wreck removal costs, etc. (called P & I risks);
liabilities for oil pollution claims;
loss of earnings due to strikes;
loss of earnings due to operation of war risks;
loss of freight;
loss of charter hire (e.g. When vessel goes off hire after sustaining damage);
increased value, disbursements and excess liabilities (an additional source of recovery
over and above the hull and machinery insured value in case of a total loss); and
employer's liabilities to workers.

Ship owners may need additional special insurance when the vessel is deviated from the
intended course e.g. ship owners' liability insurance (SOL), if he looses his defences to
liabilities under The Hague or Hague-Visby Rules.
There are no statutory requirements for ships or cargo to be insured, but if they are not
insured they need to be self-insured.
IMO guide lines on Shipowners' Responsibilities in Respect of Maritime Claims
recommends Shipowners to place on board the certificate of entry of the P & I Club.

Q.2. What kind of insurance covers are there for Time and Voyage Charterers?

Ans. The normal insurance covers for Time and Voyage Charterers are:
legal costs and expenses arising out of disputes related to hire, freight, dead freight
and passage money, general and particular average, demurrage or despatch, detention,
breach of charter party, bill of lading etc., the proper loading etc. of cargo, quality of
bunkers supplied;
loss of or damage to vessel;
loss of or damage to cargo;
oil pollution other than that arising from a tanker in US territorial waters;
27 of 101
INDEX



loss of or damage to third party property;
death or personal injury claims;
fines;
damage to fixed property (e.g. wharf or dock);
wreck clearance costs;
proportion of general average or salvage charges not covered by any other insurance;
liability arising out of breach of or deviation under a bill of lading (e.g. cargo carried
on deck against underdeck bill of lading);
physical loss of charterers bunkers;
loss of freight at risk;
oil pollution arising from a tanker in US territorial waters; and
stowaway costs.

Q.3. What are the basic principles of marine insurance?

Ans. The basic principles of marine insurance are:
indemnity, subrogation;
insurable interest i.e. ownership;
utmost good faith; and
doctrine of proximate cause.

Q.4. Differentiate between a) Actual Total Loss and b) Constructive Total Loss.

Ans. Actual Total Loss means when the subject matter is destroyed or so damaged as to
cease to be the thing of the kind insured or the assured is irretrievably deprived of the
subject matter insured.
When a ship concerned is missing and after a lapse of a reasonable time, no news of her
has been received, an actual total loss can be presumed.
An actual total loss can occur in four ways:
where property insured is actually destroyed e.g. a ship is wrecked or burnt out or
where the goods are totally crushed in the collapse of a stow of cargo;
where goods change their characteristic in such a manner that they are no more the
thing of the kind that was insured;
where the assured is irretrievably deprived of his property i.e. the ship is sunk in deep
waters;
where the insured property is reported as missing in the Lloyd's e.g. where a ship has
not reported for several weeks.

A constructive total loss is where the subject matter insured is reasonably abandoned on
account of:
its actual total loss appearing to be unavoidable; or
because it could not be prevented from actual total loss without an expenditure which
will exceed its insured value.
Where an assured is deprived of possession of his ship or goods by a peril insured against
and it is unlikely he can recover them or the cost of recovering exceeds the insured value.
28 of 101
INDEX



In case of goods the cost of repairing the damage and despatches to destination exceed
their value. Constructive total loss is where a ship is in danger of breaking or under war
risk, she is entrapped by war wrecked vessel. Constructive total loss is also where the
ship is grounded and so damaged that the retrieval and repairing cost will exceed the
insured value.
When an owner claims a constructive total loss, he must abandon the property to the
insurer.

Q.5. What is particular average loss in marine insurance?

Ans. Marine insurance act defines particular average loss as "partial loss, proximately
caused by a peril insured against and which is not a general average loss". The perils
insured are a set of clauses called the Perils Clause attached to the policy. Under such
clauses structural damage proximately caused by collision, grounding, heavy weather etc.
(perils of the sea) would normally be classed as a particular average loss. Many owners
prefer to pay an additional premium and cover the ship for any accidental damages under
the Institute Additional Perils Clauses Hull (APCs).

Q.6. What is general average loss under marine insurance?

Ans. The principle of general average can be said as " that which has been sacrificed for
the benefit of all shall be made good by the contribution of all ".
The objective of general average is to ensure that the owner of the ship or cargo who has
incurred an expenditure or suffered a sacrifice of his property in order to save the vessel
or the cargo from a perilous position receives a contribution to his loss from all those who
have benefited from the action.
General average loss is a partial loss incurred through a deliberate act performed with the
intention of preserving all the property involved in a voyage from a danger which
threatens them all. General average losses are equitably shared by all the parties to the "
common maritime adventure ", each party contributing in proportion to his share of the
total values involved. In theory therefore any expense, no matter how small, by a
shipowner resulting in saving the ship or cargo on board can be a general average act.
However in practice general average is not declared every time since it involves lots of
calculations, contributions, collection and huge amount of time, effort and expense.

Q.7. What constitutes common maritime adventure?

Ans. A common maritime adventure is a voyage where several parties have some
financial interest, as opposed to ballast voyage of a non-chartered liner vessel, where the
only party involved is the shipowner.
The parties to the common maritime adventure could include:
the shipowner;
each consignee of cargo;
if ship on time charter, owner of bunkers on board;
the recipient of freight (shipowner or time charterers);
the owner of any equipment on hire e.g. welding machine or diving equipment etc.
29 of 101
INDEX




Q.8. What are the essential elements of a general average act?

Ans. The essential elements of a general average act are:
there must be a sacrifice or expenditure;
the sacrifice or expenditure must be extraordinary;
the sacrifice or expenditure must be intentionally made or incurred;
the sacrifice or expenditure must be reasonably made or incurred;
the sacrifice or expenditure must be made for the common safety;
the sacrifice or expenditure must be made for the purpose of preserving the property
from peril.

Q.9. What are the sacrifices or expenditures normally allowed in a general average act?

Ans. Examples of sacrifices that may be allowed in a general average are:
cargo jettisoned to refloat a grounded vessel or to prevent the capsizing of a
dangerously listed vessel;
machinery damage sustained during refloating operations.
Examples of expenditures that may be allowed in a general average are:
costs of salvage expenditure including salver's reward;
costs of entering port, staying in and leaving a port of refuge;
costs of cargo discharge or any other operations including dry docking etc.

Q.10. What do you understand by sacrifices extraordinarily, intentionally and reasonably
made?

Ans. Extraordinary nature of sacrifice and expenditure is not an ordinary or every-day
loss or expense incurred in running a ship and carrying cargoes. Loss of anchor to prevent
grounding is not extraordinary, where as loosing an anchor laid out as ground tackle
during a refloating operation may be allowed. Similarly damage to engine due over-
working in trying to prevent grounding is not extraordinary, where as damage to engine
during a refloating operation may be allowed. A wide variety of costs, however small
including extra taxi fares for superintendents can be recovered in general average
expenditure.
Intentionally made expenditure are those of CO2 cylinders discharged to put off a fire on
board or wetting damage done due to flooding of a hold. The cost of damage done by the
fire itself is not covered under the general average act. Beaching a leaking ship to prevent
sinking is intentional and covered by general average. Cost of refloating an accidentally
grounded ship is intentional and allowed.
Reasonable expenditure can be that of amount of cargo required to be jettisoned. Excess
cargo jettisoned is not reasonable and may not be allowed under general average.
Similarly expenditure in a port of refuge over and above reasonable costs may not be
allowed.



30 of 101
INDEX



Q.11. How is the general average adjustment made?

Ans. Each item of property at risk in the common maritime adventure at the time of
incident giving rise to the general average act and saved by that act must contribute to the
general average according to its value to its owner (i.e. its sound market value) at the
termination of adventure (i.e. the end of the voyage, at the final destination). These are
contributory values.
Calculations of contributory values and assessment of general average losses are very
complex especially in a container ship. The value of the ship after the general average act
and the CIF value of sound and undamaged cargo remaining after the general average act
are calculated for general average purposes.
There must be equality of contribution between the owner of properties sacrificed and the
owner of properties saved, so that no one profits by the sacrifice. Properties sacrificed by
a general average act must, therefore, always contribute to its own loss.

Q.12. What documents and information are required to make a claim?

Ans. The documents and information include:
deck and engine room log books covering the casualty and repair period;
master's and/or chief engineer's detailed report as appropriate;
relevant letter of protest;
underwriter's surveyor's report;
class surveyor's report;
owner's superintendent's report;
receipted accounts for repair and/or any spare parts supplied by owners, in connection
with repairs duly endorsed by underwriter's surveyor as being fair and reasonable;
accounts covering any dry-docking and general expenses relating to the repairs
endorsed as above;
port disbursements;
fuel and engine room spares consumed together with cost of replacements;
accounts for owners' repairs effected concurrently with damage repairs;
copies of faxes, email and telexes sent and details of long-distance calls made in
connection with the casualty together with their costs;
any accounts rendered by surveyors etc., with dates of payment where made
There are similar documents and information required for repairs and after a collision. In
case of collision, steps taken to establish liabilities for the collision and eventual
settlement in apportionment of blame including copy of claim for attempted recovery.
Efforts to limit liabilities and costs thereof are taken into consideration.

31 of 101
INDEX



CHAPTER 7

ISM CODE

Q.1. What are the basic principles of the ISM code?

Ans. The three basic principles of ISM code are:
1. Safety of people on board,
2. Safety of the ship and cargo,
3. Safety of environment.
They are in the order as above. In other words pumping out of oil to save the ship or both
oil and cargo to save the people on board can be accepted.
Chapter IX of SOLAS 1974 was amended by resolution MSC.99 (73) to bring in the ISM
Code. It was accepted on 1
st
J anuary 2002 and entered into force with effect from 1
st
J uly
2002.
It was realised that safety culture must be inculcated in the ship and must percolate from
the top management to all the operational persons on board. There was also a need to
connect the umbilical chord between the ship and the shipowner. Responsibilities of
safety could not be left entirely to the master of the ship alone. The corner stone of good
safety management is commitment from the top.
In matters of safety and pollution prevention, it is the commitment, competence, attitude
and motivation of individuals at all levels that determines the end result.

Q.2. Define the following: 1. ISM code, 2. Company, 3. Administration, 4. Safety
Management System, 5. Document of Compliance, 6. Safety Management Certificate, 7.
Objective Evidence, 8. Observation, 9. Non-conformity, 10. Major Non-conformity, 11.
Anniversary Date, 12. Convention.

Ans.
1. ISM code is International Safety Management code for the safe operation of ships and
for pollution prevention, as adopted by IMO assembly.
2. Company is the owner of the ship or any other organisation or person such as a
manager or bareboat charterer, who has responsibility for operation of the ship from
owner, and who on assuming responsibility has agreed to take over all duties and
responsibilities imposed by the code.
3. Administration is the Government of the State whose flag the ship in entitled to fly.
4. Safety Management System is a structured and documented system enabling the
company and its personnel to implement effectively the safety and environmental
protection policy.
5. Document of Compliance is a document issued to a company complying with Code's
requirements.
6. Safety Management Certificate is a document issued to a ship signifying that
company and its shipboard management operate in accordance with the approved
SMS.
7. Objective Evidence is qualitative or quantitative information, records or statements of
fact pertaining to safety or the existence and implementation of a safety management
32 of 101
INDEX



system element, which is based on observation, measurement or test and which can
be verified.
8. Observation is a statement of fact made during a safety management audit and
substantiated by objective evidence.
9. Non-conformity is an observed situation where objective evidence indicates the non-
fulfilment of a specified requirement.
10. Major non-conformity is an identifiable deviation that poses a serious threat to the
safety of personnel or the ship or a serious risk to the environment that requires
immediate corrective action and includes the lack of effective and systematic
implementation of a requirement of this code.
11. Anniversary date is the day and month of each year corresponding to expiry date of
relevant document or certification.
12. Convention is SOLAS 1974 as amended.

Q.3. What are the objectives of SMS?

Ans. SMS should ensure:
compliance with mandatory rules and regulations; and
that applicable codes, guidelines and standards recommended by IMO,
administrations, classification societies and maritime industry organisations are taken
into account.

Q.4. What are the functional requirements for a SMS?

Ans. Every company should develop, implement and maintain a SMS which includes
following functional requirements:
a safety and environmental protection policy;
instructions and procedures to ensure safe operation of ships and protection of
environment in compliance with relevant international and flag State legislation;
defined level of authority and lines of communication between , and amongst, shore
and shipboard personnel;
procedures for reporting accidents and non-conformities with the provisions of this
Code;
procedures to prepare for and respond to emergency situations;
procedures for internal audits and management reviews.

Q.5. What is the Safety and Environmental Protection Policy?

Ans. The Safety and Environmental Protection Policy describes how the objectives of
the ISM code be achieved.
Company should ensure that the policy is implemented and maintained at all levels of the
organisation both ship-based and shore-based.




33 of 101
INDEX



Q.6. What are the responsibilities and the authorities of the company?

Ans. If the owner is not responsible for the implementation of the code, he must inform
the Flag State Administration (FSA) the name and details of the entity.
Company should define and document responsibilities, authorities, and interrelation of all
personnel who manage, perform and verify work related to and affecting safety and
pollution prevention.
Company is responsible to ensure that adequate resources and shore-based support are
provided to enable DPA to carry out their functions.

Q.7. Who is a DPA and what are his responsibilities?

Ans. DPA is the Designated Authority Ashore. The person responsible is to ensure safe
operation of each ship and provide a link between company and the crew. The DPA
should have direct access to the highest level of management.
Responsibility and authority of the DPA should include monitoring safety and pollution
prevention aspects of operation of each ship and ensuring adequate resources and shore
based support are applied, as required.

Q.8. What are Master's responsibilities and authorities?

Ans. Master's responsibilities and authorities are:
implementation of the safety and environmental protection policy of the company;
motivating the crew in the observation of the policy;
issuing appropriate orders and inspections in a clear and simple manner;
verifying that specified requirements are observed;
reviewing the SMS and reporting its deficiencies to shore based management.
The company should ensure that SMS operating on ship contains a clear statement
emphasising the master's authority. The company should establish in SMS that the master
has overriding authority and responsibility to make decisions with respect to safety and
pollution prevention and to request company's assistance as may be necessary.

Q.9. How does the company ensure proper resources and personnel are provided on the
ship?

Ans. Company should ensure that the master is properly qualified for command, fully
conversant with the company's SMS and given the necessary support for the safe
performance of the master's duties.
Company should:
ensure that the ship is manned with qualified, certificated and medically fit seafarers
in accordance with national an international requirements;
establish procedures to ensure new personnel and personnel transferred to new
assignments related to safety and environment protection are given proper
familiarisation with their duties;
identify essential pre-sailing instructions and have it documented and be given to all
concerned;
34 of 101
INDEX



ensure all personnel are familiar with the SMS and have adequate understanding of
all relevant rules, regulations, codes and guidelines;
establish and maintain procedures for identifying any training required in support of
SMS and ensure such training is provided for personnel concerned;
establish procedures by which the ship's personnel receive relevant information on the
SMS in a working language or languages understood by them;
ensure that the ship's personnel are able to communicate effectively in the execution
of their duties related to the SMS.

Q.10. How is the ISM code implemented on the ship?

Ans. The ISM code is implemented on the ship by:
1. Development of plans for shipboard operations, instructions and checklists for key
shipboard operations concerning the safety of the ship and pollution prevention.
Tasks involved should be defined and assigned to qualified.
2. Emergency preparedness to respond to on board emergencies. The company should
establish programmes for drills and exercises to prepare for emergency actions.
3. Reports and analysis of non-conformities, accidents and hazardous occurrences. SMS
should include procedures to report and analyse above. All incidents are to be
investigated with the objective of improving the safety and pollution prevention
record. Procedures are established for implementation of corrective action.
4. Maintenance of the ship and equipment. This will include:
inspections are held at appropriate intervals;
any non-conformity is reported with its cause if possible;
appropriate corrective action is taken; and
records of these activities are maintained;
all equipment and systems are tested regularly;
inspections and measures as above must be integrated into ship's operational
maintenance routine.
5.Documentation should ensure that valid documents are available at all times, changes in
documentation are reviewed and approved by authorised personnel and obsolete
documents are promptly removed. Documents are incorporated in the SMS manual.
6.Company verification, review and evaluation should ensure audits are conducted at
regular intervals. Corrective actions should be carried out. Auditors should be
independent.

Q.11. How is the certification and verification done for ISM?

Ans. Ship can only be operational with a valid DOC (Document of Compliance) issued to
a company. DOC is valid for ship types it lists e.g. tanker, gas carrier, container ship etc.
DOC is issued by the FSA and valid for 5 years, with annual verification by FSA with in
3 months before or after the anniversary date. Copy of the DOC must be kept on board
and need not be authenticated or certified.
DOC can be withdrawn if the annual verification is not requested or there is a reported
major non-conformity. If a DOC is withdrawn, all associated SMC (Safety Management
Certificate) or ISMC (Interim Safety Management Certificate) will be withdrawn.
35 of 101
INDEX



SMC is issued to ship by the FSA. The period of validity for SMC is 5 years with annual
verification within 3 months before or after the anniversary date. Interim verification is
done between 2
nd
and 3
rd
anniversary dates.
SMC can be withdrawn if the annual verification is not requested or there is a reported
major non-conformity.
IDOC is issued to a company newly established or a new type of ship is added to an
existing DOC.
Interim Document of Compliance (IDOC) is issued by the FSA and valid for not more
than 12 months.
ISMC is issued to a new ship on delivery or when a company takes on responsibility for
the operation of a ship which is new to the company or when a ship changes flag. ISMC
is issued by the FSA and valid for not more than 6 months but can be extended as a
special case by the FSA. IMSC is issued after verification that:
DOC or IDOC is relevant to the ship;
SMS provided by the company for the ship includes key elements of ISM code and
has been assessed during the audit for issuance of DOC or IDOC;
company has planned a ship audit within 3 months;
master and officers are familiar with SMS and planned arrangements for its
implementation;
essential pre-sailing inspections are provided; and
relevant information on SMS has been given in
working language (s) understood by ship's personnel.

Q.12. Under the ISM Code define a Safety Officer and a Safety representative and their
duties.

Ans. Every ship must appoint a competent person as a safety officer. He is defined as a
person who has sufficient training and experience or knowledge and other qualities to
enable him properly to undertake the duty imposed under the relevant provision in these
regulations. He has in addition a minimum of two years' consecutive sea service since
attaining the age of 18. In case of a tanker the safety officer shall minimum six months
service in a tanker included in the 2 years' sea service.
Appointment of a safety officer must be recorded in writing in the OLB.
The duties of a safety officer are:
improve the standard of safety consciousness among the crew and ensure that the
provisions of the code of Safe Working Practices and safety instructions, rules and
guidance for the ship relating to health and safety are complied with;
investigate so far as possible every accident involving death, major or serious injury
and every dangerous occurrences;
investigate all potential hazards to health and safety;
investigate all reasonable complaints by workers about health and safety and make
recommendations to the master to prevent their recurrence or to remove any hazard,
provided that the duty to investigate will not extend to accidents arising from a
casualty to the ship;
ensure that health and safety inspections of the ship is carried out at least every 3
months and more frequently if there are substantial changes in the conditions of work;
36 of 101
INDEX



make representation and where appropriate recommendations to the master about any
deficiencies in respect of health, security, safety and following of the code;
maintain a record of all accidents involving death, major or serious injury and every
dangerous occurrence and make it available to any elected Safety Representative, to
the master and to any official of the FSA;
stop any work in progress, which he believes with reasonable certainty may cause
accident and report the matter immediately to the master or his deputy.
The safety officer is not to carry out above duties in case when emergency action to safe
guard life or the ship is being taken. The safety officer should not be in charge of medical
treatment.
The company must make rules for the election and appointment of safety representatives.
The safety representatives must be voted with the maximum votes. He must have a
minimum 2 years' consecutive sea service since attaining the age of 18 years, which in
case of tankers must include 6 months' tanker service.
The appointment of a safety representative will terminate on that person signing off or
resigning from the company.
If the ship has crew number from 6 to 15, the officers and crew should elect one safety
representative. If there are more than 16, one safety representative each should be elected
from the officers and the crew respectively. If there are more than 30 ratings one safety
representative from the officers and three safety representatives from the rating i.e. one
from the deck, one from the engine and one from the catering department.
Appointment of a safety representative must be recorded in writing in the OLB.
The safety representative has the following powers:
to participate subject to concurrence of the safety officer in any investigation or
inspection;
to make similar investigation or inspection on his own;
to make representation to the employee on potential hazards and dangerous
occurrences at the work place;
to make representations to the master and the employer on general matters affecting
the health and safety of workers on the ship;
to request the safety officer to carry out any occupational health and safety inspection
they consider necessary and report the findings to them.
The safety representative must have good relationship with safety officer and should
work with him to raise the safety standard on board.

Q.13. What is a safety committee and what is its function?

Ans. Every ship having an elected safety representative must have a safety committee.
The master is the chairman of that committee. The safety officer and the safety
representatives are the members including any competent person chosen. The
appointment of any competent person must be recorded in the OLB.
The safety committee has the same powers under the regulations as the safety
representatives. The secretary of the committee should not preferably be the safety
officer, as he has to concentrate on the discussions. The committee should be compact
and well knit to ensure its proper functioning. The meetings should be held every 4 to 6
weeks and as required by the circumstances.
37 of 101
INDEX



Duties of a safety committee are:
to use its best endeavour to ensure that the Code of Safe Working Procedures as laid
down are followed;
to improve the standards of safety consciousness among the crew;
to make representations and recommendations on the crew's behalf on occupational
health and safety matters;
to inspect the safety officers records;
to ensure the observance of the employer's occupational health and safety policies and
make recommendations for their improvement;
to consider and take appropriate action concerning any occupational health and safety
matters, accident reports, MS Notices, publications etc.;
to keep a record of the meetings and any representations, replies or action resulting
therefrom.

Q.14. What are the duties of the Company and Master under the Code of Safe Working
Procedures on board?

Ans. Under the Health and Safety at work regulations, the Company and the Master must
co-ordinate with the employer and facilitate the work of any person appointed to provide
protective and preventive services. Any safety officer or safety representative appointed
in carrying out their health and safety functions must also co-ordinate and work closely
with the company and the master.
The company and the master are to:
provide a copy of the Code of Safe Working Practices for the Merchant Seamen;
provide them with relevant information about risks and measures for protection under
the regulations;
factors known or suspected to affect the health and safety of the workers on the ship;
arrangements for fire-fighting, first aid and emergency procedures;
ensure that persons have necessary resources and means to carry out their functions
and duties;
allow persons to undertake necessary training in health and safety;
receive representations and discuss and implement any agreed measures for health
and safety;
maintain a record of every accident and make it available on request to any worker,
inspector or surveyor.








38 of 101
INDEX



CHAPTER 8

ISPS CODE

Q.1. What is ISPS code?

Ans. ISPS code is the International Ship and Port facility Security code. SOLAS chapter
XI-2 part A and part B relates to special measures to enhance maritime security. In this
context the principles behind ISPS code is similar to the ISM code on board. ISPS code
emphasises the security of the persons on board, security of the ship and security of
environment, in that order.
ISPS code uses the word facility for the port, which means the port perse need not be
under the ISPS umbrella. The port must define the facilities, which need protection and
chart out a security plan accordingly. For the first time ships and ports come under the
FSA for the implementation of the ISPS code.
Companies must comply with the relevant requirements of SOLAS chapter XI-2 part A,
taking into account the guidance given in part B of the code.

Q.2. What are the objectives of the ISPS code?

Ans. The objectives of the code are:
to establish an international framework involving co-operation between Contracting
Governments (CG) and shipping and port industries to detect security threats and take
preventive measures;
to establish respective roles and responsibilities of the CG and shipping and port
industries for ensuring maritime security;
to ensure early and efficient collection and exchange of security-related information;
to provide methodology for security assessments so as to have plans in place to react
to changed security levels; and
to ensure confidence that adequate and proportionate maritime security measures are
in place.

Q.3. In order to achieve the objectives what functional requirements are embodied in the
code?

Ans. The functional requirements are:
gathering and assessment of information regarding security threats and exchanging
such information with appropriate CGs;
requiring the maintenance of communication protocols for ships and port facilities;
preventing unauthorised access to ships, port facilities and their restricted areas;
preventing the introduction of unauthorised weapons, incendiary devices or
explosives to ships or port facilities;
providing means of raising the alarm in reaction to security threats or security
incidents;
requiring the ship and port facility security plans based upon security incidents;
39 of 101
INDEX



requiring training, drills and exercises to ensure familiarisation with security plans
and procedures.

Q.4. Define 1. Convention, 2. Ship Security Plan (SSP), 3. Port Facility Security Plan
(PFSP), 4. Ship Security Officer (SSO), 5. Company Security Officer (CSO), 6. Port
Facility Security Officer (PFSO), 7. Security Level 1 (SL1), 8. Security Level 2 (SL2)
and 9. Security Level 3 (SL3).

Ans.
1. Convention means SOLAS 1974 as amended.
2. SSP means a plan developed to ensure the application of measures on board the
ship designed to protect persons on board, cargo, cargo transport units, ship's
stores or the ship from the risks of a security incident.
3. PFSP means a plan developed to ensure the application of measures designed to
protect the port facility and ships, persons, cargo, cargo transport units, ship's
stores within the port facility from the risks of a security incident.
4. SSO means the person on board the ship, accountable to the master, designated by
the company as responsible for the security of the ship, including implementation
and maintenance of the ship security plan, and for liaison with the CSO and
PFSO.
5. CSO means the person designated by the company for ensuring that a ship
security assessment is carried out; that a ship security plan is developed,
submitted for approval and there after implemented and maintained, and for
liaison with the SSO and PFSO.
6. PFSO means an officer designated as responsible for the development for the
development, implementation, revision and maintenance of the port facility
security plan and for liaison with the SSO and CSO.
7. SL1 means the level for which minimum appropriate protective measures shall be
maintained at all times.
8. SL2 means the level for which appropriate additional protective security measures
shall be maintained for a period of time as a result of heightened risk of a security
incident.
9. SL3 means the level for which further specific protective security measures shall
be maintained for a limited period of time when a security incident is probable or
imminent, although it may not be possible to identify the specific target.

Q.5. Which ships' are covered under ISPS code?

Ans. Following types of ships engaged on international voyages are covered under the
ISPS:
passenger ships including high-speed passenger craft;
cargo ships including high-speed craft, of 500 GRT and upwards;
mobile offshore drilling units; and
port facilities serving such ships engaged in international voyages.
This code does not apply to warships, naval auxiliaries or other ships owned or operated
by a CG and used only on Government non-commercial service.
40 of 101
INDEX




Q.6. What are the responsibilities of the CG under this code?

Ans. CG will assimilate credible, corroborated, specific threat information and their
potential consequences. It shall issue appropriate instructions and provide security-related
information to ships and ports, which may be affected.
CG will also:
set the applicable security levels;
approve a PFSA and its amendments;
decide on the requirements of PFSO in a port;
exercise control and compliance of the code;
exercising the requirement of DoS (Declaration of Security);
test the effectiveness of the SSP and PFSP and amend them as required.

Q.7. What is DoS and when is it required to be completed?

Ans. Whenever there is an interface with ship/ship, ship/port, the ship can ask for a DoS.
A ship can request the completion of a DoS when:
the ship operates at a higher security level than the port or another ship it is
interfacing with;
there is an agreement on DoS between the CGs covering certain international voyages
or specific ships on those voyages (e.g. Malacca Straits);
there has been a security threat or security incident involving the ship or the port;
the ship is in a port not covered by ISPS code;
the interfacing is with another ship without ISPS code.
PFSO/ master or SSO of interfacing ships should acknowledge the DoS.
DoS should address the security requirements to be shared between ship and port. CGs
should specify the minimum period of the DoS for the port and the ship.

Q.8. What is the obligation of the company under the ISPS code?

Ans. The company shall ensure the Ship Security Plan (SSP) clearly emphasises the
overriding authority of the master and his responsibilities in taking decisions with respect
to the safety and security of the ship.
The company shall ensure that the CSO, the master and the SSO are given the necessary
support to fulfil their duties and responsibilities in accordance with ISPS code.

Q.9. What activities are allowed under different Security Levels, SL1, SL2 and SL3 on
ships?

Ans. At SL1, the following activities shall be carried out:
ensuring the performance of all ship security duties;
controlling ship access;
controlling embarkation of persons and their effects;
monitoring restricted areas to ensure that only authorised persons have access;
41 of 101
INDEX



monitoring deck areas and areas surrounding the ship;
supervising the handling of cargo and ship's stores; and
ensuring that security communication is readily available.
At SL2, additional protective measures, specified in the SSP shall be implemented. At
SL3, further specific protective measure specified in the SSP shall be implemented. The
ship shall acknowledge the security levels set by the CGs.
Any ship or port having a SL higher than a port or ship respectively must liaison with the
PFSO or SSO as the case may be to co-ordinate appropriate actions.

Q.10. How is a Ship Security Assessment (SSA) done?

Ans. The SSA is an essential and integral part of developing and updating the Ship
Security Plan (SSP). The CSO will ensure that persons of appropriate skills taking the
guidelines provided in part B of ISPS code carry out the SSA.
SSA will include on-scene security survey with the following elements taken into
consideration:
identification of existing security measures, procedures and operations;
identification and evaluation of key shipboard operations that it is important to
protect;
identification of possible threats and likelihood of their occurrence; and
identification of weakness, including human factors, in the infrastructure, policies and
procedures.
SSA shall be documented, reviewed, accepted and retained by the company.

Q.11. How is a Ship Security Plan (SSP) made?

Ans. The SSP has to be approved by the FSA and must cover the three security levels. A
Recognised Security Organisation (RSO) may prepare, review and approve the SSP on
behalf of the FSA. However if the RSO is to review and approve, it cannot prepare the
plan.
SSP shall be developed as per guidelines given in part B of the code and shall be written
in a working language of the ship. The language used should be in English, Spanish or
French along with the working language of the ship.
The plan should address the following:
measures to prevent weapons, dangerous devices and substances;
identification of restricted areas and measures to prevent unauthorised access;
measures for prevention of unauthorised access to ship;
procedures for responding to security threats or breaches, responsibilities,
instructions, evacuation, auditing, training, drills, exercises;
procedures for interfacing with port, periodic review and updating, reporting security
incident;
identification of the CSO and his 24hours contact details;
procedures to ensure inspections, testing, calibration and maintenance of security
equipment and their frequencies;
identification of the location of Ship Security Alert System (SSAS) and the procedure
for its usage, testing, activation, deactivation and resetting.
42 of 101
INDEX



Internal audits are to be conducted by independent auditors. Changes in SSP are to be
approved by the FSA. SSP can be in an electronic format and must be protected from
unauthorised access. SSP is not subject to inspections by CGs unless the inspectors have
adequate reasons to believe that the vessel is not ISPS compliant e.g. no gangway check
of entry.

Q.12. What records are required to be kept on board for the SSP?

Ans. Following records are required to be kept on board with reference to the SSP:
training, drills and exercises;
security threats and security incidents;
breaches of security;
changes in security levels;
communications between ship to ship or ship to port on security such as specific
security threats;
internal audits and review of security activities;
periodic review of SSA and SSP;
implementation of any changes to SSA and SSP;
maintenance, calibration, testing of security equipment and testing of SSAS.
The records are to be kept in English, Spanish or French along with the working language
of the ship. The records may be kept in an electronic format, which cannot be deleted,
destroyed or amended by unauthorised personnel.

Q.13. What are the duties and responsibilities of a CSO?

Ans. The company designates a CSO, who can act for more than one ship.
The duties and responsibilities of a CSO are:
advising ships of the security levels to be encountered;
ensuring that the SSA is carried out;
ensuring the development, submission for approval, implementation and maintenance
of the SSP;
ensuring that the SSP is modified as appropriate to correct deficiencies;
arranging internal audits and reviews security activities;
arranging initial and subsequent inspections by FSA;
ensuring that deficiencies and NCs are identified and promptly addressed;
enhancing security awareness and vigilance;
ensuring adequate training for personnel on board responsible for security;
ensuring effective communication and co-operation between the SSO and PFSO;
ensuring consistency between security and safety requirements;
ensuring that all SSA and SSP are ship specific; and
ensuring that alternative or equivalent arrangements are implemented and maintained.




43 of 101
INDEX



Q.14. What are duties and responsibilities of a SSO?

Ans. Every ship must have a designated SSO.
The duties and responsibilities are:
undertaking regular security inspections of ship to ensure adequate security measures
are taken;
maintaining the SSP and its amendments if any;
co-ordinating security aspects of handling of cargo, ship's stores etc. with shipboard
personals and port authorities;
proposing modifications to the SSP;
reporting any deficiencies to CSO during audits or inspections;
enhancing security awareness and vigilance on board;
ensuring adequate training provided to shipboard personals;
reporting all security incidents;
co-ordinating implementation of the SSP with CSO and PFSO; and
ensuring that security equipment is properly operated, tested, calibrated and
maintained.

Q.15. What activities are allowed under different Security Levels, SL1, SL2 and SL3 in a
port?

Ans. Port facilities are required to act upon the security levels set up by the CG. These
security measures in a port shall be such that they cause the minimum interference with
the port working and passenger embarkation or disembarkation.
At SL1, the following activities shall be carried out:
ensuring the performance of all PFS activities;
controlling access to the port facilities;
monitoring of port facility, including anchoring and berthing areas;
monitoring restricted areas to ensure that only authorised persons have access;
supervising the handling of cargo and ship's stores; and
ensuring that security communication is readily available.
At SL2, additional security measures and at SL3 further specific protective measures as
specified in the PFSP. The PFSO and the SSO will co-operate to ensure all security
measures are well understood and implemented.

Q.16. How is the Port Facility Security Assessment (PFSA) done?

Ans. PFSA is an essential and integral part of developing and updating Port Facility
Security Plan (PFSP).
The CG or the RSO, who must have appropriate skills, carries out PFSA. It must be
periodically reviewed and updated taking into account any fresh security threats or
changes in the port facilities.
The PFSA shall include the following:
identification and evaluation of important assets and infrastructures which need
protection;
44 of 101
INDEX



identification of possible threats and the frequency of occurrence;
identification of procedural changes in reducing vulnerability; and
identification of weaknesses including human factors in the infrastructures, policies
and procedures.
PFSA can be applicable to more than one port if accepted by the CG. The methodology
used to make the PFSA should be recorded.

Q.17. How is the Port Facility Security Plan (PFSP) made?

Ans. PFSP is developed and maintained based on the PFSA for each port facility. The
plan provides for SL1, SL2 and SL3. A RSO may be asked to prepare the PFSP, which
needs to be approved by the FSA.
The PFSP will address the following:
measures designed to prevent weapons, dangerous substances and devices into the
port;
measures designed to prevent unauthorised access to port facilities, ships and
restricted areas;
procedures to respond to various security levels and maintaining critical port
operations;
procedures to implement security instructions from CG on SL3;
procedures for evacuation, interfacing, periodical review of plans and updating,
reporting security incidents and breaches;
assignment of a PFSO, his duties and his 24 hours contact details;
ensure security of the PFSP, effective cargo security and port facilities; and
procedures for auditing of the PFSP, responding to security alert of a ship in port,
facilitate shore leave of ship's personals and visitors.
The auditors must be independent. The PFSP may be combined with other ports. Changes
in the plan must be approved by the CG. The plan may be kept in an electronic format
and must be protected from deletion, destruction or amendments. The plan must be
protected from unauthorised access or disclosure.

Q.18. What are the duties and responsibilities of a PFSO?

Ans. PFSO is a designated officer for the port facilities.
His duties and responsibilities include:
conducting an initial comprehensive port security survey of all port facilities;
developing and maintenance of PFSP;
implementation and exercise the PFSP;
undertaking regular security inspections to continue with appropriate security
measures;
recommending and modifying PFSP to correct deficiencies and incorporate changes;
ensuring security awareness among port personals, training them, reporting to
relevant authorities and maintaining records of security occurrences;
co-ordinating implementation of PFSP with CSO, SSO, security services;
ensuring standards of security are met;
45 of 101
INDEX



ensuring the security equipment are operated, tested, calibrated and maintained; and
assisting the SSO in confirming the identity of those seeking to board the ship.
The PFSO must be given the necessary support to fulfil his duties as per the ISPS code.

Q.19. What is the certificate issued to a port under the ISPS code?

Ans. The certificate issued to a port facility under the ISPS code is a " Statement of
Compliance of a Port Facility ".

Q.20. For the purpose of ISPS code which amendments were brought about in the
SOLAS 1974?

Ans. Under the SOLAS conference in December 2002, chapters V and XI were amended.
Chapter V makes it mandatory for all ships of 300 GRT and upwards but less than 50,000
GRT to have AIS fitted not later than the first safety equipment survey after 1
st
J uly 2004
or by 31
st
December 2004, whichever is earlier. AIS shall be in operation at all times
except where international agreements provides otherwise.
Chapter XI is divided into two parts XI-1 and XI-2.
Chapter XI-1 deals with Ship Identification Number (SIN), which must be permanently
marked in a visible place either on the stern of the ship or on the port and starboard side
along with the end transverse bulkhead of machinery space or the hold main beam, which
are easily accessible. The permanent markings should be plainly visible clear of any other
markings on the hull and shall be painted in a contrasting colour. The height of the
markings should be not less than 100mm and of proportionate length. These must be
raised or centre-punching method. SIN is a seven digit number unique number for the
ship painted after the letters IMO. It must be with the ship till it is scrapped.
Chapter XI-1 also deals with each vessel having a Continuous Synopsis Record (CSR).
CSR is issued by the FSA in the format developed by IMO and contains the following
information:
name of the State flag the ship flies;
date of registry, identification number, name of the ship, port of registry, name and
full style address of the registered owner, bareboat charterer(s), company which
carries out the safety management services;
name of all classification societies, the ship is classed;
name of the FSA and CG, who issued the DOC;
name of the RSO, who audited the ship for ISM;
name of the FSA, CG or the RSO, who issued the International Ship Security
Certificate (ISSC);
the date on which the ship ceases to be registered with that state.
CSR should incorporate any changes in the above information. CSR must be in English,
French or Spanish along with a translation in the working language of the ship and to be
kept on board available for inspections at all times. CGs will co-operate in passing all the
information in case of change of CG or FSA.



46 of 101
INDEX



Q.21. What are the functional requirements of a Ship Security Alert System (SSAS)? In
the Indian context, what happens when the SSAS is alerted on board?

Ans. All ships are to be provided with SSAS by 1
st
J uly 2004, cargo ships of 500 GRT or
more and MODU constructed before 1
st
J uly 2004 to install it not later than 1
st
J uly 2006.
SSAS, when activated, shall:
initiate and transmit a ship-to-shore security alert to a competent authority as
designated by the FSA (in the Indian context it alerts the DGS in a 24 x 7 operation
room, having the state of art communication systems like satellite telephone, land
line, mobile and e-mail facilities). It also alerts the CSO. SSAS gives the identity of
the ship and her exact location indicating that the security of the ship is under threat
or compromised;
not send security alert to other ships or raise audio or visual alarm on board; and
continue the ship security alert until deactivated or reset.
SSAS should be activated from the bridge and one more location on the ship. It should be
so designed to prevent inadvertent activation.
Whenever a FSA receives SSAS signal, it must activate the CG close to the ship to seek
help on breach of security on a ship.

Q.22. What do you understand by protocol of communication under the ISPS code?

Ans. Protocol of communication under the ISPS code means that communications must
follow a certain order i.e. SSO Master CSO FSA CG and viceversa and similarly
PFSO FSA CG and viceversa.













47 of 101
INDEX



CHAPTER 9

PORT STATE CONTROL

Q.1. What is Port State Control? What are its primary responsibilities?

Ans. Port State Control (PSC) is the inspection of foreign ships present in a nation's port
for the purpose of verifying that the condition of the ships and their equipment comply
with the provisions of international conventions and codes, and that the ships are manned
and operated in compliance with those provisions.
The primary responsibility for maintaining ships' standard rests with the flag states, as
well as their owners and masters. However, many flag states do not, for various reasons,
fulfil their obligations under international maritime conventions, and PSC provides a
useful safety net to catch substandard ships. PSC effectively does what the Flag State
control should, but in many cases fails, to do.
In the website: www.parismou.org, a detailed explanation of the working of the PSC is
given.
In the Indian context PSC is conducted by the FSA, who may also inspect Indian flag
vessels in Indian ports.

Q.2. Which are the eight PSC regimes in operation worldwide?

Ans. The eight PSC agreements currently in force are:
Paris MOU (website: http://www.parismou.org);
Latin-American Agreement
(website: http://www.acuerdolatino.int.ar);
Tokyo MOU (website: http://www.tokyo-mou.org);
Caribbean MOU;
Mediterranean MOU
(website: http://www.medmou.org) ;
Indian Ocean MOU;
Abuja MOU;
Black Sea MOU;
The US Coast Guard operates a national wide Port State Control Initiative. Countries in
the Persian Gulf region have agreed informally on the need to establish a PSC regime.

Q.3. What are the general criteria as laid down by the PSC MOUs?

Ans. The general criteria for PSC MOUs are:
ships visiting a port of a state for the first time or after an absence of 12 months or
more;
ships which have been permitted to leave the port of a state with deficiencies to be
rectified;
ships which have been reported by pilots or port authorities as being deficient;
ships whose certificates are not in order;
48 of 101
INDEX



ships carrying dangerous or polluting goods which have failed to report relevant
information;
ships which have been suspended from class in the preceding 6 months;
ships which have been subject of a report or notification by another authority;
ships which have been involved in a collision, grounding or stranding on their way to
port;
ships accused of an alleged violation of the provisions of IMO as to pose a threat
persons, property or environment.
Ships are permitted to leave the port of a member state on conditions such as deficiencies
are to be rectified before departure or at the next port or within 14days. If there are other
conditions, it must be specified. Ships above 13 years are to be in the overall targeting
factor of PSC.

Q.4. Which certificates and documents are to be inspected for the PSC?

Ans. The certificates and documents are to be inspected for PSC:
1. International Tonnage Certificate (1969);
2. Passenger Ship Safety Certificate;
3. Cargo Ship Safety Construction Certificate;
4. Cargo Ship Safety Equipment Certificate;
5. Cargo Ship Safety Radiotelegraphy Certificate;
6. Cargo Ship Safety Radiotelephony Certificate;
7. Cargo Ship Safety Radio Certificate;
8. Cargo Ship Safety Certificate;
9. Exemption Certificate including where appropriate the list of cargoes;
10. International Certificate of Fitness for Carriage of Liquefied Gases in Bulk;
11. International Certificate of fitness for the carriage of Dangerous Chemical in
Bulk;
12. International Oil Pollution Prevention Certificate;
13. International Pollution Prevention Certificate for the Carriage of Noxious Liquid
Substance in Bulk;
14. International Load Line Certificate;
15. International Load Line Exemption Certificate;
16. Oil Record Book, part I and II;
17. Cargo Record Book;
18. Minimum Safe Manning Document;
19. Certificate of Competency including Dangerous Goods Endorsement;
20. Medical Fitness Certificate;
21. Stability information including grain loading information and Document of
Authorisation;
22. Document of Compliance and Safety Management Certificate issued in
accordance with the ISM Code;
23. Certificates as to ship's hull strength and machinery installations issued by the
classification society in question;
24. Document of Compliance with the special requirements for Ships Carrying
Dangerous Goods;
49 of 101
INDEX



25. High Speed Craft Safety Certificate and Permit To Operate High Speed Craft;
26. Dangerous goods special list or manifest, or detailed stowage plan;
27. Ship's log book (OLB) with respect to the records of tests and drills and the log
for records of inspection and maintenance of lifesaving appliance and
arrangements;
28. Special Purpose Ship Safety Certificate;
29. Mobile Offshore Drilling Unit (MODU) Safety Certificate;
30. For oil tankers, the record of oil discharge monitoring and control system for the
last ballast voyage;
31. Muster list, fire control plan, and for passenger ships , a damage control plan;
32. Shipboard Oil Pollution Emergency Plan (SOPEP);
33. Survey report files (in case of bulk carriers and oil tankers);
34. Reports of previous port state control inspections;
35. For RO-RO passenger ships, information on the A/A maximum ration (A/Amax
Certificate);
36. Document of authorisation for the carriage of grain;
37. Cargo Securing Manual;
38. Garbage Management Plan and Garbage Record Book;
39. Decision Support System for masters of passenger ships;
40. SAR Co-operation Plan for passenger ships trading on fixed routes;
41. List of operational limitations for passenger ships;
42. Bulk carrier booklet; and
43. Loading and unloading plan for bulk carriers.

Q.5. When can a ship be detained under the PSC code?

Ans. Where a ship in port appears to be dangerously unsafe or in case of deficiencies
which are clearly hazardous to safety, health or the environment, she can be detained.
When a ship is in clear contravention with the IMO codes or the health and the well being
of the people on board is in danger, she can be detained.
Pollution offences would also detain the ship.

Q.6. What is 'Equasis' and what are its main principles?

Ans. Equasis is a database holding safety-related details of more than 66.000 ships (as of
J une 2001), including a record of port state control inspections. It is on Internet and may
be viewed by any member of the public.
The main principles behind the Equasis information system are that:
it be a tool aiming at reducing substandard ships, limited to safety related information
on ships;
it has no commercial purpose and basically addresses public concern;
it aims to be an international database covering the whole world fleet;
it has active and constructive co-operation with the world maritime industry;
it is a tool for better selection of ships and has no legal pressure to it, being done on a
voluntary basis;
50 of 101
INDEX



it will promote the exchange of unbiased information, transparency in maritime
transport and allow persons involved in maritime transport to be better informed
about the performance of ships and maritime organisations with which they are
dealing.

The EU launched Equasis in 1997 to form apart of the Quality Shipping compaign. It
is formally supported by signatories of marine Administrations, classification
societies, P & I clubs and the ITF.
Website: www.equasis.org.


51 of 101
INDEX



CHAPTER 10

PORT OF REFUGE

Q.1. What constitutes a port of refuge?

Ans. A port of refuge is a port or place that the vessel diverts to when her master
considers it unsafe to continue the voyage due to a peril that threatens the common
safety , e.g. when there is a dangerous ingress of water into a vessel, a dangerous shift of
cargo, the vessel adopts an angle of loll, there is a serious fire on board etc. Where such a
deviation is for the preservation from peril of property involved in a common maritime
adventure, it will usually constitute a general average act and the costs of the deviation to
stay at the port of refuge will be allowed in general average.

Q.2. What are the typical procedures followed by a port for a ship calling a port of
refuge?

Ans. Procedures at any port of refuge will obviously vary with the circumstances
surrounding the event necessitating the ship's arrival, but in general, the following basic
steps should be followed:
As soon as the port of refuge decision is taken inform owners and charterers;
Record ship's position. Keep accurate records of all events and expenditure;
Appoint an agent, who must inform the port authority, pilot, local P & I club
surveyor, immigration, customs, port health;
Salvor to be given the salvor's security;
Obtain health clearances;
Enter the vessel under average;
After safe arrival in port inform owner and charterer, who will declare general
average;
Note protest as soon as possible;
Notify insurance agent if there is hull and machinery damage;
Notify classification society;
If cargo damage is suspected inform P & I club;
If the voyage is terminated GA Bond and GA Guarantee are to be provided;
Arrange cargo discharge, trans-shipment or warehousing of cargo;
On receipt of class surveyor's report, tenders are called to do the final repairs in
consultation with Salvage Association Surveyor and Insurance Agent;
Carry out repairs under class and salvage association guidelines;
On completion of repairs carry out another survey by class, and if found seaworthy
will issue an interim certificate of class to await the final certificate;
Reload cargo under survey if voyage being continued;
Extend Protest to include all details of the damage and repairs. Keep copies of all
letters;
Port agent will pay all repair bills;
52 of 101
INDEX



Send all relevant documents to the owners for onward transmission to average
adjuster;
Enter vessel outwards with customs outward clearance;
Continue the voyage.

Examples of letters of protest:

For discrepancy between ship and shore figures:-

LETTER OF PROTEST
M.V. Voyage No.:
Cargo: Berth/Terminal:
Port: Time:
Date:
To: (recipient name and/or position)

Please be advised that there is a discrepancy between ship and shore figure covering
(description of cargo) loaded at your terminal (date).

Shore figure ---------
Ship figure -----------
Difference ------------

The undersigned hereby declares that the Bill of Lading was signed under protest because
of the unreasonable difference between the ship and shore figures.

Protest lodged by ---------------- Master
(Signature and vessel's stamp)

Signed for receipt-----------------
---------------------------------------Company
For slow discharging:-

LETTER OF PROTEST
M.V. Voyage No.:
Cargo: Berth/Terminal:
Port: Time:
Date:
To: (recipient name and/or position)

Please be advised that the average discharge rate has been ------------- mtph.

The vessel can discharge ------------ mpth against psi.... kg/cm2.

We have consequently not been allowed to use the vessel's full capacity.

53 of 101
INDEX



I hereby lodge protest accordingly, and we, including my desponent owners, hold you
and/or Charterers responsible for all delays and consequences.


Protest lodged by ---------------- Master
(Signature and vessel's stamp)

Signed for receipt-----------------
---------------------------------------Company



General purpose letter of protest:

LETTER OF PROTEST
M.V. Voyage No.:
Cargo: Berth/Terminal:
Port: Time:
Date:
To: (recipient name and/or position)

Please be advised that ......................................................

I hereby lodge protest accordingly, and we, including my desponent owners, hold you
and/or Charterers responsible for all delays and consequences.


Protest lodged by ---------------- Master
(Signature and vessel's stamp)

Signed for receipt-----------------
---------------------------------------Company


54 of 101
INDEX



CHAPTER 11

STCW 95 AND THE STCW CODE

Q.1. What is STCW 95 and how is different from STCW 78?

Ans. The International Convention on Standard of Training, Certification and
Watchkeeping for Seafarers, 1978 (STCW 78) was extensively revised in J uly 1995. The
revised version is known as STCW 95 and entered into force on 1st February 1997 under
IMO's " tacit acceptance" procedures.
Important amendments to chapter 1 (General Provisions) in STCW 95 include:
enhanced procedures concerning exercise of PSC;
requirement to establish procedures for investigating acts by persons to whom they
have issued certificates that endanger safety or environment;
recognition of technical innovation and use of simulators for training duly supported
by quality assurance;
inclusion of medical standards including levels of fitness particularly with reference
to eyesight and hearing;
requirement of every master, officer and radio officer to meet the fitness standards
every 5 years including up-gradation as per section A I/11 of the STCW Code;
a reference to ISM Code in regulation 14 giving details of company's responsibilities
for manning and certification, etc.;
chapter II deals with master and deck department and chapter III deals with engine
department;
chapter V deals with special requirements concerning training and qualification of
personnel on board Ro-Ro passenger ships, where crew must undergo training for
crowd management and human behaviour;
chapter VII deals with functional approach to training;
seafarers with training and seagoing services before 1st August 1998 can be
recognised up to 1st February 2002;
STCW 95 incorporates STCW Code to which many technical regulation of the
convention is transferred, the revised convention contains general, basic requirements
that are enlarged and explained in the STCW Code;
the major benefit of the STCW Code is that future amendments will not need a full
IMO conference to update the same;
part A of the STCW Code is mandatory and contains for example tables for minimum
standards required for seafarers;
part B of the STCW Code is recommended and contains guidance and advice
intended to help with the implementation of the revised convention;
for each STCW convention regulation there is related mandatory section in part A
and a related guidance in part B e.g. regulation I/11 is revalidation of certificates,
corresponding to section A-I/3 and guidelines in section B-I/3;
STCW 95 is implemented in India by the MS act under the guidance of the
Directorate General of Shipping.
55 of 101
INDEX



An important change in STCW 95 as compared with STCW 78 is that seafarers are
required to attend FSA recognised maritime institutions after completion of their sea time
and before appearing for their Certificate of Competency (CoC) examinations. The
course, study plan etc. are given in the META manual duly approved by the DGS.

Q.2. What is a "White List"?

Ans. Countries, which have accepted the STCW 95 and implemented the education and
training courses, certification procedures and other factors relevant to implementation are
required to provide detailed information to the IMO concerning administrative procedure
taken to ensure compliance with the Convention. The Maritime Safety Committee uses
this information for other parties to accept certificates issued by these parties. Countries
assessed by the IMO to be properly implementing the STCW 95 are placed on a so-called
"White List" (properly called the list of confirmed parties) and published by the IMO on
its website: www.imo.org.
To gain a place in the White List, countries must report details of to the IMO Secretary
General of national laws, training requirements, standards and systems in place, and
ensure that all of those elements meet the revised STCW 95 requirements and can pass
the scrutiny of persons with a detailed knowledge of those requirements.
A position in the White List indicates that the issuance of certificates is in accordance
with the STCW Convention. A country may not accept a non White List certificate unless
the same is endorsed since 1st February 2002 by the FSA of the issuing country.
As of 31st December 2002 there are 109 IMO members in the White List.

Q.3. What are the certificates required for a seafarer under the STCW code?

Ans. All seamen (word seaman is not defined in the regulation, but assumed to include all
seafarers including masters) must receive familiarisation and basic safety training or
instruction in accordance with STCW Code section A-VI/1, and must meet the
appropriate standards of competence specified therein.
Section A-VI/1 provides that all seafarers must be trained in:
personal survival techniques;
fire prevention and fire fighting;
elementary first aid; and
personal safety and social responsibilities.
The seafarers must be provided with the necessary certificates for the above and should
be able to undertake the tasks, duties and responsibilities as listed in the STCW Code.
Every person designated to launch or take charge of survival craft or rescue boats other
than fast rescue boats must have a certificate of proficiency of such craft.
Every person designated to launch or take charge of a fast rescue boat must have a
certificate of proficiency in such boats. Fast rescue boat means a rescue boat which is not
less than 6 metres but not more than 8.5 metres long, and is capable of manoeuvring for
at least 4 hours at a speed of at least 20 knots in calm weather with suitably qualified
crew of at least 3 persons and at least 8 knots with a full complement of persons and
equipment.
56 of 101
INDEX



" Survival Craft " and " Rescue Boat " has the same meaning under the LSA
Regulations.

Q.4. What are the mandatory requirements for certification of deck and engineer
officers?

Ans. STCW 95 prescribes mandatory minimum requirements for certification of deck and
engine officers including requirements relating to age, medical fitness, seagoing service
and standards of competence. To satisfy these requirements, candidates for certificate of
competency must:
meet certain medical standards (including eyesight);
satisfactorily complete the minimum period of seagoing service;
reach the required vocational and academic standard;
undertake ancillary technical training; and
in case of officer candidates, on completion of programmes of education and training
approved by the DGS, pass an oral examination conducted by the DGS.
DGS also formulates courses and training for near coastal vessel. Certificates are also
issued for " unlimited trading " or " limited trading ". Limited trading specifies the ship's
types, engine types or trades.
Dual certification allows for officers to be issued with a single certificate of competency
combining deck, engineering and radio competencies subsequent to approved education,
training and assessment.

Q.5. What are the functions for deck examination as defined by STCW 95 and what are
the levels of responsibilities?

Ans. STCW defines seven functions as follows:
Navigation;
Cargo handling and Stowage;
Control and operation of the ship and care of persons on board;
Marine Engineering;
Electrical, electronic and control engineering;
Maintenance and repair; and
Radio communications.
- at the following levels of responsibility:
1. Management (master, chief mate, chief engineer, second engineer);
2. Operational (watchkeeping officers); and
3. Support (watch rating and other ratings with safety and pollution responsibilities).
Management level means the level or responsibility associated with: serving as
master, chief mate, chief engineer or second engineer on board a sea going ship, and
ensuring all functions within the designated area of responsibility are properly
performed under STCW code Section A-I/1.1.2;
Operational level means the level or responsibility associated with: serving as officer
in charge of a navigational watch or engineering watch or as designated duty engineer
for periodically unmanned machinery spaces or as a radio officer on board seagoing
ship, and maintaining direct control over the performance of all functions within the
57 of 101
INDEX



designated area of responsibility in accordance with proper procedures and under the
direction of an individual serving in the management level for that area of
responsibility under STCW Code, Section A-I/1.1.3;
Support level means the level of responsibility associated with performing assigned
tasks, duties and responsibilities on board a seagoing ship under the direction of an
individual serving in the operational or management level under STCW Code,
Section A-I/1.1.4.

Q.6. What are the general provisions of sea service requirements as per STCW code?

Ans. The minimum amount of sea-service acceptable for each grade of certificate of
competency is given in Training and Certification guidance Part 2 for deck officers and
part 3 for engineer officers. No certificates can be issued with out the requisite sea-
service. At least 6 months of qualifying sea-service must be completed within the last 5
years. Certificate of watchkeeping services must be duly signed by the Master or Chief
Engineer of the ship in which the service was performed. In case of service of Master or
Chief Engineer, the responsible officer of the company must sign the certificate. The
certificates incorporate testimonials as laid sown in the STCW code annexes.
Where there is an approved Vocational Training (VQ) programme for on-board training,
the trainee must produce a Training Record Book or a Training Portfolio completed in
accordance with the recommendations of the Merchant Navy Training Board (MNTB).
The applicant for his first examination must also produce as a minimum, evidence of
participation in shipboard drills, exercises and training. Applicants not having Vocational
Training programme must produce an approved Personal Training and Service Record
Book duly certified by the relevant officer on board.

Q.7. What are the training and certification requirements for 1. Tankers, 2. Gas and
Chemical Carriers, 3. Ro-Ro Passenger Ships, and 4. Passenger ships other than Ro-Ro
Ships.

Ans.
1.Tankers:
Ratings assigned specific duties and responsibilities related to cargo equipment (e.g.
pumpman) and all officers on tankers must complete the following;
at least three months' seagoing service on tankers in order to acquire adequate
knowledge of safe operational practices; or
a FSA approved tanker-familiarisation training programme covering the syllabus in
STCW Code section A-V/1, paragraphs 2 to 7; or
at least 30 days service under the supervision of qualified officers of tanker of less
than 3000grt engaged on voyages not exceeding 72 hours.

In addition to the above the rating must undertake the advanced fire fighting training
programme specified in STCW Code section A-VI/3.
The master, chief engineer, chief mate, second engineer of the tanker must complete an
oil tanker training programme covering the syllabus in STCW Code section A-V/1
paragraphs 8 to 14 and must have at least 3 months' sea service on an oil tanker.
58 of 101
INDEX




2. Gas and Chemical Carriers:
In addition to the certificates required for a tanker as mentioned above, the master, chief
engineer, chief mate, second engineer of a chemical tanker or gas carrier must complete a
chemical tanker training programme covering the syllabus in STCW Code section A-V/1
paragraphs 15 to 21 and section A-V/1 paragraphs 22 to 34 respectively and must have at
least 3 months' sea service on a chemical tanker or gas carrier as the case may be.
The requirements for Tanker Familiarisation Training and Specialised Tanker Training
must be completed within the 5-year period prior to the date of application for an
endorsement or Tanker Familiarisation certificate.

3.Ro-Ro Passenger Ships:
All personnel providing a direct service to passengers, including those working in shops,
bars and restaurants, must be able to communicate effectively between themselves and
with the passengers during an emergency, as detailed in STCW Code section A-V/2,
paragraph 3, and be able to demonstrate the correct donning of lifejackets. All personnel
designated on muster lists to assist passengers in an emergency, must complete crowd
management training as described in STCW Code section A-V/2, paragraph 1. This
requires a refresher training every 5 years.
All personnel with responsibilities related to loading ro-ro cargo and securing must be
sufficiently familiar with the design and operational limitations affecting ro-ro passenger
ships and the tasks detailed in STCW Code section A-V/2 paragraph 2.
Masters, chief engineer officers, chief mates, second engineer officers and persons having
immediate responsibility on ro-ro passenger ships for embarking/ disembarking
passengers, loading/ discharging or securing of cargo and closing of hull openings must
successfully complete FSA approved training in passenger safety, cargo safety and hull
integrity specified in STCW Code section A-V/2, paragraph 4 and training in crisis
management and human behaviour as specified in STCW Code section A-V/2 paragraphs
1 and 3.
This training can be given also in-house or in conjunction with external training
providers.

4. Passenger Ships other than Ro-Ro Ships:
All personnel providing a direct service to passengers, including those working in shops,
bars and restaurants, must be able to communicate effectively between themselves and
with the passengers during an emergency, as detailed in STCW Code section A-V/3,
paragraph 3, and be able to demonstrate the correct donning of lifejackets.
All personnel designated on muster lists to assist passengers in an emergency, must
complete crowd management training as described in STCW Code section A-V/3,
paragraph 1. This requires a refresher training every 5 years.
All personnel assigned specific duties and responsibilities on board related to design and
operational limitations of ships must be sufficiently familiar with the special nature of
passenger ships and operational limitation as detailed in STCW Code section A-V/3
paragraph 2.

59 of 101
INDEX



Q.8. What are the requirements for revalidation of certificate of competency as per
STCW Code?

Ans. Every master, officer and radio operator holding a certificate of competency under
STCW 78 or STCW 95, who wish to serve at sea must revalidate the certificate at
intervals not exceeding 5 years. Revalidation of watch keeping certificate is not required.
All candidates for revalidation must:
meet the medical fitness requirements and produce that certificate;
for service in the deck department, have served as a master or deck officer in
seagoing ships of any flag (other than fishing vessels) of more than 80grt or 24 metres
in length for at least 12 months (which need not be continuous) during the preceding
5 years;
for service in the engine department, have served as an engineer officer in seagoing
ships of any flag (other than fishing vessels) of at least 350kW registered power for at
least 12 months (which need not be continuous) during the preceding 5 years;
for service as a radio operator have served as a radio operator or an officer in
seagoing ships of any flag for at least 12 months (which need not be continuous)
during the preceding 5 years.

Q.9. What are the safe manning regulations as per STCW 95 and the Code?

Ans. Safe manning, Hours of work and Watchkeeping are the principal regulations of the
STCW 95 and its associated STCW Code.
Safe Manning Document is kept on board the ship at all times and the does not proceed to
sea without a valid document and properly qualified persons manning the ship at all
times. The ship will be considered safely manned when the persons sailing on board will
maintain safe navigational, engineering and radio watches, moor and unmoor ship safely,
manage safety functions, perform operations for the prevention of damage to
environment, provide medical care on board, ensure safe carriage of cargo and maintain
the structural integrity of the ship. They must also be capable of closing watertight
arrangements on board along with damage control, operate fire fighting, emergency and
life-saving equipment on board. They should be able to muster and disembark all persons
in case of an emergency. They must be capable of operating main propulsion and
auxiliary machinery and maintain them in safe condition to enable the ship to overcome
the foreseeable perils of the voyage.
Under the hours of work, the important aspect is the minimum hours of rest, which must
be not less than 10 hours in any 24-hour period and 77 hours in any 7-day period. Subject
to regulation 6, hours of rest may be divided into no more than two periods, one of which
shall be at least 6 hours in length, and the interval between consecutive shall not exceed
14 hours.
Musters, fire fighting drills and lifeboat drills must be conducted in a manner, which
minimises the disturbance of rest periods and does not induce fatigue. A seafarer shall
have adequate compensatory rest period if his normal period of rest is disturbed by call-
outs to work.
The master of a ship may require a seafarer to work any hours of work necessary for the
immediate safety of the ship, persons on board ship or cargo or for the purpose of giving
60 of 101
INDEX



assistance to another ship or to a person in distress at sea. Rest period may be suspended
till such time normalcy is restored. After the emergencies, the master must ensure that the
seafarer gets his adequate rest period.
A record of seafarers daily hours of rest must be maintained by the master or a person
authorised by the master and must be duly endorsed by the master.


61 of 101
INDEX




CHAPTER 12

MASTER AND HIS RESPONSIBILITY

Q.1. How is the command of a ship taken or handed over?

Ans. On taking over command, a prudent master, on arriving at his ship, should:
have a check list ready of ' things to do on joining';
note the condition of the visible exterior of the vessel, including draft marks, load
line, etc.;
note the standard of rigging and maintenance of the accommodation ladder or
gangway, and its accessories;
note the standard of maintenance of LSA and FFA;
take delivery of the all official documents from the off-going master;
make official log book entry and sign it jointly with the off-going master;
enter his name, certificate of competency type and number in the boxes on the front
cover of the OLB;
add his reference number and his particulars in the OLB;
obtain the combination number of the ship's safe and associated keys from the off-
going master;
count all monies and sight all accounts and related documents in the master's custody;
sight all owners'. managers', classification and P & I documentation in the master's
custody;
And before sailing the new master should:
receive familiarisation training in accordance with STCW 95;
sight his personal life jacket and ensure that he knows how to don it in case of an
emergency;
inspect the muster list and ensure it is updated;
read the relevant clauses of the charter party or bill of lading;
note any owner's or charterer's voyage instructions and /or side letters or addenda to
the charter party;
consult the chief engineer on the condition of machinery and bunker fuel and
lubricating oil situation, ensuring that any "safety surplus" of fuel required by the
charter party to be carried is on board in addition to normal passage requirements;
consult the chief officer on the situation with cargo, stability, ballast, fresh water,
stores, maintenance of the ship etc.;
examine the passage plan, if already made, for the next leg of the voyage, and consult
appropriate officer;
check that all required charts and nautical publications are on board;
check that all crew are on board as per the Safe Manning Document;
check the ISM documentation for outstanding non-conformities;
read and if necessary write standing orders;
satisfy himself that he has personally exercised due diligence in ensuring that the
vessel is seaworthy at the start of the voyage;
62 of 101
INDEX



make full inspection of the ship as soon as practicable and, if possible before taking
the ship to sea.
On handing over command to a successor and before leaving the ship, the master should:
ensure that he has signed each completed page of the Oil Record Book;
bring his accounts with owners or managers up to date;
count all ship's money in the master's custody;
write hand-over notes for the succeeding master;
have all documents relating to the ship, crew, cargo etc., in order for handing over to
the succeeding master;
make the hand-over in person to the succeeding master;
make the relevant entry in the OLB that he has handed over command and record that
he has delivered to his successor the documents relating to the ship and crew, which
are in his custody, and sign this entry jointly with the succeeding master.

Q.2. How does a successor take over command of a ship in case of an emergency?

Ans. The master's proper successor to command in emergency is the senior surviving
deck officer. Should the appointed master be incapacitated or die while the ship is at sea,
the next-in-command is legally entitled to take the ship to her next port of call. He does
not have to make the nearest port in order for another master to join unless so instructed
by the owner or manager. The temporary master may legally command the vessel if he
has STCW 95 master's qualification required for the size and operating area of the vessel.
He must ensure that the Safe Manning Provisions of the regulation are complied with as
per the Safe Manning Document. The employer may confirm the temporary master in his
position.

Q.3. What are the chief responsibilities of a master?

Ans. Chief among master's numerous responsibilities are:
preservation of safety of crew, any passengers and the ship;
safeguarding of the marine environment;
to act as if the ship cargo were his own uninsured property;
the prosecution of the voyage with the minimum of delay and expense;
to always act in the best interest of the ship owner;
to carry out all that is usual and necessary for the employment of the vessel;
to obey the owner's instructions (except when they would mean breaching the law);
and
to exercise care of the goods entrusted to him and see that everything is done to
preserve them from harm during the voyage (e.g. ensuring proper ventilation, bilges
are pumped, temperatures monitored and controlled, etc.).





63 of 101
INDEX



Q.4. What is a crew agreement and what are the master's responsibilities regarding it?

Ans. A crew agreement is a contract between the employer (not the master) and each
seaman whose name appears on a list of crew incorporated in the Crew Agreement
document. It must be in writing and duly approved by the FSA. Both parties must sign it
although the master or an agent may sign it on behalf of the employer. The agreement
must be carried on the ship to which it is related when at sea.
Contractual provisions must be contained in all approved crew agreement to cover:
the person between whom the agreement is made;
the description of the voyage or voyages to which the agreement relates, and their
geographical limits and/or the duration of the employment;
the capacity in which each seafarer is to be employed;
the seafarer's pay, hours of work, leave and subsistence, which may be wholly or in
part by incorporation of provisions of industrial agreement between the employer and
the relevant trade unions;
other rights and duties of the parties to the agreement; and
the circumstances in which, not withstanding the notice provisions, the agreement
may be terminated by either party.

Q.5. What is a breach of crew agreement and how is it dealt with?

Ans. Each crew agreement contains a Notice Clause listing breaches for which the master
may terminate the agreement with the seaman. Typical clauses may be:
if a seaman is absent without leave at a time fixed for sailing; or
if in the opinion of the master, the continued employment of the seaman would be
likely to endanger the vessel or any person on board.
If a code of conduct is expressly incorporated in the crew agreement, the procedure in
that code must be strictly followed by the master in dealing with any breach of the crew
agreement.
Breach of the crew agreement is a matter of contract law i.e. civil law, and may result in
dismissal and /or a civil action for damages brought by the employer. The act constituting
the breach of the crew agreement (e.g. assault, or possession of drugs) may, at the same
time, be a criminal offence and may be dealt with accordingly; this may necessitate the
master requesting police assistance from the port state or the coastal state authorities.

Q.6. What are the guidelines for drug and alcohol abuse on board?

Ans. Every shipping company has its own guidelines for drug and alcohol abuse on
board. It broadly follows the " Guidelines for the Control of Drugs and Alcohol Onboard
Ships" published by OCIMF in 1990. A drug and alcohol policy statement is made by the
company and must be effective all through the working of the ship and master must
ensure that the same is adhered.
Drug and Alcohol (D&A) testing is now a common condition of service in all shipping
companies and crew members including the master must agree and sign a company
policy requirement for D&A testing. Testing is normally carried out by analysis of urine
samples, taken in accordance with the written instructions from the company. The
64 of 101
INDEX



samples are usually forwarded to the company's designated laboratory via a rigorously
monitored chain of custody. The Master's Own Test is usually supervised by the chief
engineer.
A company may reserve the right to search personal belongings of crew members who
have signed the D&A undertaking, where reasonable cause exists to believe that the
manufacture, distribution, use or possession of drug or drug paraphernalia is occurring
contrary to its D&A policy.
Possession or distribution of drugs by any person, including a passenger as well as a
seafarer or other category of person on board an Indian ship is a breach of Indian criminal
law. It is also a breach of Crew Agreement and the Merchant Shipping Act.

Q.7. Which conditions may constitute a criminal liability for a seafarer?

Ans. Following acts will constitute a criminal liability:
causing the loss or destruction of or serious damage to his ship or its machinery,
navigational equipment or safety equipment; or
causing the loss or destruction of or serious damage to any other ship or any structure;
or
causing the death of or serious injury to any person; or
omits to do anything required to preserve his ship or its machinery, navigational
equipment or safety equipment from being lost, destroyed or seriously damaged; or
omits to do anything required to preserve any person on board his ship from death or
serious injury; or
omits to do anything required to prevent his ship from causing loss or destruction of
or serious damage to any other ship or any structure or the death or serious injury to
any person not on board his ship.
The conditions referred to above are acts of omission, which were deliberate and
amounted to a breach or neglect of duty with the master or the seaman under the
influence of drug or alcohol.
The defence in these cases could be that the accused took all possible and reasonable
steps to discharge his duties and he was under the influence of a drug taken by him for
medical purposes and under medical advice.

Q.8. What are master's actions in response to complaints from seamen?

Ans. When three or more seamen complain about provisions or water, the master should,
as soon as possible make an entry in the Official Log Book (narrative section) of the
names of the seamen making the complaint, and the nature of and reason(s) of their
complaint. Master should investigate the complaint and take appropriate action to remedy
the same as soon as possible.
A further entry should be made in the OLB detailing the master's response to the
complaint. If the seamen are dissatisfied with the master's action in response to their
complaint, a further entry should be made in the OLB and arrangements made for them to
complain to the FSA.
65 of 101
INDEX



When a complaint is made of some other matter, consideration should be given as to
whether to record the same in the OLB. It may be prudent to record any complaints
related to safety of the ship or the safety or social well being of any person on board.

Q.9. What are the actions of a master if the crew goes on strike?

Ans. The master should make the following entry in the OLB - " This day the normal
working of the ship was disrupted by reason of members of the crew being on strike in
furtherance of a trade dispute".
There should be no attempt by the master to sail the ship without a full crew of properly
trained and qualified persons. There should be no attempt to break the strike by sailing
the ships with gaps in the crew compliment or with any unsafe condition. Safety of any
person should at no time be jeopardised.
It is in the interest of all concerned that the master of the ship does not participate in any
strike and he must maintain his statutory and contractual position. In that case the master
of the ship will have an honourable position to be a part of the negotiated settlement
during and after the strike.
The master should seek advice from the company DPA and work in close co-ordination
with all concerned including members from ITF and/or union to ensure that there is no
violence or bitterness in a negotiated settlement.

Q.10. What procedures are required to be followed in case of a death on board?

Ans. Consult the Ship Captain's Medical Guide, Chapter 12 (The Dying and the Dead)
for guidance. This chapter contains sections on Cause of Death, Procedure after Death
and Disposal of Body.
Establish the cause of death, if possible. If a doctor is available, have the cause of the
death certified by the doctor. Obtain witness statements from relevant personnel as soon
as possible after the occurrence of the death. The FSA investigation or other officers, who
may come on board in connection with the death, will require these statements.
Inform the owner or manager as soon as possible. Check the Safe Manning Document to
ascertain whether a replacement for the deceased seafarer needs to be obtained before the
vessel proceeds to sea. If the replacement is necessary inform the owner or the manager.
If the vessel is near or in a port inform the agent requesting him to inform the relevant
authorities of the port state (i.e. port health authority, police and customs).
Inform the next of kin as soon as possible and in any case with in 3 days. The owner or
the managers will probably do this, but it is the master's statutory obligation to do so.
Inform the P&I club correspondent and seek his advice on local formalities and
procedure for repatriation of the body, if this were required.
If the death was accidental, have the safety officer make his statutory investigation, report
and accident log entry. Make appropriate entries in the OLB. Preserve the body as per
guidelines given in the Ship Captain's Medical Guide. The usual and preferred procedure
to preserve a body is by chilling. Where the body cannot be preserved, any burial at sea
should be in conformity with the procedures laid out in the Ship Captain's Medical Guide
and only with the express permission of the deceased person's next-of-kin.
66 of 101
INDEX



The Birth and Death form should be obtained and dully filled with all relevant details as
per the OLB and despatched to the appropriate authority. List of crew as per articles of
agreement must be dully entered and witnessed. Amend the crew list for the future ports.
The Discharge Book should record " DECEASED " in the date of discharge space.
Accounts of the deceased should be completed with advances if paid, overtime payable
etc. and forwarded to the owner or manager.
Have two officers tally and pack the deceased person's personal property. Pack one copy
of the tally sheet with the property and attach a copy to the OLB as an annex. Record the
same in the narrative section of the OLB.
If the ship is outside the Flag State and the body of the deceased is to be repatriated or
buried locally, consult the P&I Club correspondent and take actions as per their advice. It
is imperative that the next-of-kin are consulted and kept fully informed.





67 of 101
INDEX



CHAPTER 13

CHARTER PARTY

Q.1. What is a liner trade and how is it different from a tramp trade?

Ans. Liner trade is a trade where a ship is operated on one or more fixed routes with
advertised and scheduled sailing. True passenger liners operating on ocean services
were mostly displaced in the 1960s by jet airliners. Today, very few long-haul
passenger liners remain and most passenger ships now operate as cruise ships.
A liner cargo vessel will accept any suitable cargo, if space permits. Most liners are
container ships, ro/ros or multi-purpose (ro-ro/lo-lo) vessels. The ship's operator may
be the owners or bareboat charterers or time charterers, in which case they will be
referred as disponent owners or time-chartered owner. The liner vessel's operator is
normally the performing carrier or the ocean carrier. The carrier's customers are
shippers, who may include freight forwarders and non-vessel-operating-carriers
(NVOCs) or non-vessel-operating-common-carriers (NVOCCs) sometimes called
non-vessel-owning-common-carriers.
A carrier may issue a booking note when a cargo booking is made, and will usually
issue a bill of lading or a sea waybill, depending on the shipper's requirements, as a
form of receipt to the shipper of each consignment of goods, as evidence of the
contract of carriage. The carrier will usually employ liner agents and/or loading
brokers in order to canvass for and book his cargoes. The carrier may be a member of
a liner conference, consortium, alliance or similar arrangement, or may be a non-
conference operator.
When a ship is employed in the charter market, some times called a tramp trade, the
owner generally intends that she will be fixed by shipbrokers on a succession of
charters. The ship may be fixed on a voyage charter market called the spot market or
in the time charter market. In both the cases of voyage or time charter, the ship may
be sub-chartered by the head charterer to another charterer. The ship may
simultaneously be employed under a contract of affreightment.
A tramp vessel will not operate on a fixed route to an advertised schedule, except
when time-chartered to a liner operator. Ship owners normally employ the services of
shipbrokers to fix any vessel on time or voyage charter. The master on behalf of the
charterers issues the bill of lading.

Q.2. How are ships in the dry bulk and tanker market categorised?

Ans. In the dry bulk shipping market the categories are as under:
Handysize 10,000 - 29,999 dwt;
Handymax 30,000 - 49,999 dwt;
Panamax 50, 000 - 79.999 dwt;
Capesize 80,000 dwt and above
Tanker market categories are:
Handysize 27,000 - 36,999 dwt;
Handymax 37,000 - 49,999 dwt;

68 of 101
INDEX



Panamax 50,000 - 74,999 dwt;
Aframax 80,000 - 119,000 dwt;
Suezmax 150,000 - 200,000 dwt and she can sail through the Suez Canal when
fully loaded.

Q.3.Which parties are involved in transportation of goods by sea?

Ans. The seller and the buyer are the parties contracting with each other for the
delivery of the goods. Both parties agree on trade terms, which will influence the
type, and terms of shipping documents (e.g. bill of lading or seaway bill). The seller
may employ the services of a freight forwarder, who may the legal shipper. NVOCC
operator may also be contracting for the transportation of the goods. The carrier will
issue the document evidencing receipt of the goods by the carrier (e.g. bill of lading
or seaway bill) whoever the shipper is in law, to that party. In the U.S.A. the shipper
is called the consignor.
A freight forwarder is a transport intermediary, who arranges the export of another
party's goods by land, sea or air and "forwards" the goods into the care of the sea
carrier. Freight forwarders advise on routeing, booking space, paying freight,
preparing customs documents, make customs entry, arrange packaging and
warehousing etc. They also arrange goods transit insurance, and in many cases do the
groupage or consolidation i.e. converting LCL (Less than Container Load) into FCL
(Full Container Load). It will have a cost-effective shipment in one transport unit of
several small parcels sent by different shippers, where they are destined for the same
port or place of delivery.
A carrier is a party who contracts with a shipper for the transportation of goods by
sea. In the liner trade, where NVOCC operators are offering shipping services, the
carrier with whom the seller makes his contract is not necessarily the carrier actually
performing the sea carriage.
The consignee is the party to whom the goods are consigned or sent by the shipper.
He may the buyer of the goods or acting as an import agent for the buyer.
The receiver is the party who takes receipt of the goods from the sea carrier at the
port or place of delivery. Some consignees will take direct delivery of the cargo, but
in most cases they will employ a freight forwarder as a clearing agent in the customs
and other formalities of importing the goods, and for transportation of goods to their
ultimate destination. When loss or damage to goods is discovered on discharge, it is
often the receiver who notifies the carrier.
The notify party (a term found in the bill of lading or seaway bill) is the party who
must be informed by the carrier of the ship's arrival, so that the collection of the
goods can be arranged. The notify party can be a consignee or a receiver.
Banks will form links in the transport document chain when payment for the goods is
being made by means of a letter of credit.
Depending on the trade terms, either the buyer or the seller will take out goods transit
insurance with a cargo insurer.




69 of 101
INDEX



Q.4. Outline the meaning of following International Trade Terms (INCOTERMS):
EXW, FCA, FAS, FOB, CFR, CIF, CPT, CIP, DAF, DES, DEQ, DDU & DDP.

Ans.
EXW : Ex Works (named place).
FCA : Free Carrier (named place)
FAS : Free Alongside Ship (named port of shipment)
FOB : Free On Board (named port of shipment)
CFR : Cost and Freight (named port of destination)
CIF : Cost Insurance and Freight (named port of destination)
CPT : Carriage Paid To (named port of destination)
CIP : Carriage and Insurance Paid To (named port of destination)
DAF : Delivered At Frontier (named place)
DES : Delivered Ex Ship (named port of destination)
DEQ : Delivered Ex Quay (named port of destination)
DDU : Delivered Duty Paid (named port of destination)
DDP : Delivered Duty Paid (named port of destination)

It can be seen from the above that from EXW to DDP, the seller gathers more
responsibility and the right of ownership in the transport chain moves from the seller's
premises towards the buyer's premises.

Q.5. Explain the terms FOB and CIF in detail and their advantages.

Ans. FOB means Free On Board (named port of shipment) e.g. FOB Paradip. The
seller must supply the goods and documents as stated in the contract of sale. He must
load the goods on board the vessel named by the buyer at the named port of shipment
on the date or within the period stipulated. He must bear all costs and risks of the
goods until they have passed the ship's rail at the named port of shipment, including
export charges and taxes. Risk passes when the goods pass the ship's rail. The seller
must notify the buyer when the goods have been loaded. The seller must give
sufficient information to the buyer to arrange insurance: if the seller fails to give
enough information, the risk stays with him. The buyer must charter the ship or
reserve space on a ship and notify the seller of the name of the ship, load port/berth
and loading rate. The buyer bears all costs including insurance from the time the
goods cross the rails of the ship at the load port. He must also pay the freight
collectable by the carrier from the buyer at the discharge port. Seller will provide the
buyer the bills of lading, certificate of origin etc.
FOB is advantageous when the cargo is of a type or size (i.e. oil), where the buyer
arranges the charter of the ship. FOB is also popular in countries with foreign
exchange restrictions or where the governments want the importers to use the national
flag vessels. It is used mainly for bulk sale contracts. The title of the goods does not
pass to the buyer in the bill of lading until shipment is completed. FOB contract is
based on the load port and the buyer after the shipment and release of the bill of
lading is free to sell the goods even while they are on the vessel. FOB invoice price is

70 of 101
INDEX



lower than the CIF price. We can find FOB ST, which means free on board stowed
and trimmed.
CIF means Cost, Insurance and Freight. It is a contract based on a discharge port. The
seller must pay all costs including the marine insurance and freight to carry the goods
to the named destination, but risk passes from the seller to the buyer when the goods
cross the rails of the ship at the load port. The seller must supply the goods and pays
for the carriage of the goods to the agreed port of destination, paying the freight and
loading/unloading charges. He must arrange at his own expense the marine insurance
policy covering the goods against the risks of carriage for the CIF price plus 10%.
Any war risks insurance required by the buyer must be arranged by the seller but
charged to the buyer.
The seller provides the buyer with clean, negotiable bill of lading for the agreed date
of loading, an invoice, an insurance policy or certificate of insurance and a copy of
the charter party if required. The seller must tender all documents to the buyer, his
agent or his bank.
The buyer must accept the documents when tendered by the seller and must pay the
agreed contract price. Property passes on transfer to the buyer of the documents. The
buyer bears all costs and charges excluding freight, marine insurance and unloading
costs unless included in the freight when collected from the carrier. The buyer must
pay for the war risk insurance if he requires it. He must effectively bear all costs of
the goods from passing the ship's rail at the port of shipment. He is protected by the
insurance arranged by the seller. As the seller pays the freight the bill of lading is
marked " Freight Prepaid ". The master must ensure that the freight is actually paid
before signing the bill of lading.
The buyer bears the risk during the voyage, but the title of the goods only passes,
when the buyer takes up the documents. The buyer must pay when documents are
received. CIF contract is more of a sale of document than a sale of goods so as to
enable the negotiability of the bill of lading.
The advantage of the CIF contract to the buyer is making the seller wholly
responsible for the arranging the shipment. The seller is protected against loss or
damage before payment by the insurance policy. The seller can also retain title in the
goods beyond the time of shipment and as security against payment by the buyer, so it
is easy for the seller to obtain credit at his bank. Goods cost more under CIF terms
than FOB. In view of the advantages of the CIF terms in which the banker's
documentary credit system requires the transfer of title through the passing of the
documents, a vast majority of the sea borne cargo shipments is CIF.

Q.6. What is a Documentary Credit System (DCS) between a buyer and seller of
goods?

Ans. DCS is a money transfer system commonly used in overseas trade to enable
sellers to obtain early payment; i.e. soon after shipment of the goods. Banks check the
documents carefully before they make the payments. As an example if we assume a
seller in India and a buyer in New Zealand:
1. Seller and Buyer conclude their sales contract, specifying payment by
documentary credit.

71 of 101
INDEX



2. Buyer instructs his bank in NZ to open a credit in favour of Seller.
3. Buyer's NZ bank verifies Buyer's Credit-Worthiness and issues a Letter of Credit
(LoC) containing terms of the credit i.e. documents, times of loading etc. Buyer's
bank sends the LoC to Seller's bank.
4. Seller's bank checks LoC requirements, then sends LoC to Seller.
5. Seller despatches goods, assembles documents required by LoC, usually invoice,
insurance certificate, full set of 'clean on board' bill of lading made 'to order',
which are obtained once the goods are shipped. Seller presents all shipping
documents to his bank and asks for payment.
6. Seller's bank checks documents against LoC requirement. If they comply
including the clean bill of lading, the Seller's bank pays Seller and sends
documents to Buyer's bank.
7. Buyer's bank checks documents against LoC. If they comply, Buyer's bank
releases documents to Buyer against payment, then reimburses Seller's bank.
8. Buyer receives documents, enabling him to obtain release of goods from ship.
In case the bill of lading is claused, there could be no payments made as payment is
made only against clean bill of lading.

Q.7. What are the different charters? Name salient features of a) Time, b) Voyage and
c) Bareboat charter parties.

Ans. In the maritime context charters include:
contracts of carriage of specified quantities of cargo in specified vessels
between specified ports (Voyage Charter);
contracts for hire of specified vessels, including:
time charters; and
bareboat charters (also known as demise charters).
(a) A voyage charter is a contract for the carriage by a named vessel of a specified
quantity of cargo between named ports or places. It can be compared to hiring of a
taxi for a single journey or several consecutive journeys like a consecutive voyage
charters. The ship owner agrees to present his ship (given name) for loading at a the
agreed place within an agreed period of time and following loading will carry the
cargo to the agreed place, where he will deliver the cargo.
The charterer, who may be the cargo owner or may be chartering for the account of
another party such as a shipper or the receiver, agrees to provide for loading, within
the agreed period of time, the agreed quantity of the agreed commodity. He also
agrees to pay the agreed amount of freight, and to take delivery of the cargo at the
destination place. In effect, the charterer hires the cargo capacity of the vessel e.g. a
chemical carrier carries several parcels fixed with different charterers. Control of the
ship stays with the ship owner. The ship owner pays for the wages of the crew and
master, all the running and voyage costs.
(b) A time charter is a contract for the hire of a named vessel for a specified period of
time, may be equivalent to a chauffeur-driven car (ship's crew being "the chauffeur").
The charterer agree to hire from the ship owner a named vessel, of a specified
technical characteristics, for an agreed period of time for the charterer's purpose
subject to agreed restrictions. The hire period may be the duration of one voyage (a

72 of 101
INDEX



"trip charter") or anything up to several years ("period charter"). The ship owner is
responsible for vessel's running expense i.e. manning, repairs and maintenance,
stores, master's and crew's wages, hull and machinery insurance etc. The ship owner
operates the vessel technically, but not commercially. The owner bears no cargo-
handling expenses and does not normally appoint stevedores. The charterers are
responsible for the commercial employment of the vessel, bunker fuel purchase and
insurance, port and canal dues (including pilotage, towage etc.) and all loading/
stowing/ trimming/ discharging arrangements and costs. They direct the ship's
commercial operations, but not her daily running and maintenance. The charterers
normally appoint stevedores and nominate agents. Charterer to provide the master full
instructions for sailing and the master and chief engineer must keep full correct logs
for inspection by the charterers. Clauses may provide for charterers to make an extra
payment for hatch cleaning etc. Time charterers are normally allowed to fly their own
house flag and paint the funnel and shipside their colours at their expenses.
(c) A bareboat charter (some times called charter by demise or demise charter)-
is a contract of hire of vessel for an agreed period during which the charterers
acquire most of the rights of the owner;
is like a long-term vehicle lease contract;
is mostly on the BARECON 89 charter party form;
is used by bankers or finance houses who are not prepared to operate or manage
the ship themselves;
is often hinged to a management agreement where the owner will manage the ship
for the period of charter, especially in the tanker trade;
may be hinged to a purchase option after expiry of the charter or before (hire
payment being made in instalments and transfer of ownership following the
payment of final instalment).
The owner places the vessel without any crew at the disposal of the charterer and
pays the capital cost and usually no other costs. The charterer pays for the technical
and commercial management of the ship.
Under BARECON A form, the owner usually pays for the insurance premium. Under
BARECON B form, the charterers pay for the insurance premium. BARECON B is
for long term bareboat charter and mainly for newly built ships but can be used for
second hand ships. BARECON 89 is an amalgamation of BARECON A and B forms.
It is designed to cater to the modern demand of bareboat charterers and shipowners. A
lease agreement is a means of financing the acquisition of ship. It utilises the bareboat
charter as a vehicle for loan repayment agreement. The tax benefit can be shared by
agreements made besides the bareboat charter party. Normally the lessee owns a ship
and on contracting for a new built ship has a lease agreement in which he transfers the
ship to a lessor. The lessor in turn gives the ship on bareboat charter back to the
lessee. This allows tax benefits, which are passed on to the lessee on his payment of
installations.






73 of 101
INDEX



Q.8. What is a sub-charter?

Ans. It is common in a time or voyage charter to allow for sub-charter a ship in whole
or in part, on condition that the head charterer remains responsible to the shipowner
for the performance of the original charter party. It is possible therefore to have a
vessel:
owned by a bank or finance house;
1. leased or bareboat chartered to company A;
2. time-chartered from company A by company B;
3. voyage chartered from company B by company C;
4. employed by company C in its own liner service or even sub-chartered from
company C to company D.
Any reference to a disponent owner refers to a sub-charterer, who assumes the
responsibilities of a real owner.

Q.9. What is a contract of affreightment (COA)?

Ans. Contract of affreightment (COA) is essentially a contract to fulfil a long-term
need for transport of especially bulk cargoes like iron ore or coal. It is an agreement
between the shipowner, disponent owner or carrier for the carriage of a specified
large quantity of cargo between specified ports over a specified period of time. The
type and size of the ships to be used are to be stipulated by the charterers and
nominated by the owners. The total period of charter is defined in the initial stage, but
the shipment dates are kept flexible giving it an even spread of time e.g. every three
months etc. The minimum quantity to be loaded every voyage is stipulated giving an
option e.g. 20000 tons 5% MOLO (more or less owners option) or MOLCO (more or
less charterers option).
COA may be based on a standard charter party with additional rider clauses,
supplemented by separate voyage charter party for each voyage.

Q.10. What are the duties and responsibilities of a shipbroker?

Ans. A shipbroker is the normally the negotiator for fixing a ship between a
shipowner and a charterer. But the term includes the following:
1. Owners brokers, who find and arrange employment of their principles ship;
2. Charterers brokers, who find ships for their principals requirements;
3. Tanker brokers, who arrange oil cargo fixtures for the specialised oil trade;
4. Coasting brokers, who work for short sea trade;
5. Ships agent, who are employed by the shipowners or charterers to service the
ship in a port;
6. Sale and purchase brokers who buy and sell ships and if required arrange new
buildings for a shipowner.
There are several steps in a ship fixing process:
1. Cargo orders from charterers or shippers looking for a ship;
2. Circulation by owners broker of position list or tonnage list detailing expected
open dates and positions of ships;

74 of 101
INDEX



3. Study of market report by brokers;
4. Negotiations of main terms with offers and counter offers;
5. Negotiations on subjects e.g. subject stem or subject receivers approval etc.,
where the main terms have been agreed but the final agreement is subject to
various secondary agreed terms;
6. Fixture, where the final terms and conditions are fully agreed and all subjects
lifted.
Follow up of a fixture is called post fixture and a good shipbroker ensures the close
post fixture working of the ship not only for his future relationship with the parties
concerned but also for the brokerage amount he has to receive from the shipowner or
the charterer.

Q.11. Given below are some of the chartering terms in abbreviations used by
shipbrokers:
AA: always afloat
ABT: about
AG: Arabian Gulf
APS: arrival pilot station
B: ballast
B/Ls or Bs/L: bills of lading
BB: ballast bonus, below bridge
BBB: before breaking bulk
BENDS: both ends (load and discharge ports)
BWAD: brackish water arrival draft
C/P: charter party
CD: customary despatch
CFR: cost and freight
CHOPT: charters option
CIF: cost insurance and freight
COA: contract of affreightment
COMBO: combination port
CONT: continent
COP: custom of port
CQD: customary quick despatch
CVS: consecutive voyages
DLY: delivery
DFD: demurrage/ free despatch
DHD: demurrage half despatch
DLRS: US dollars
DOP: dropping outward pilot
DWAT: dead-weight all told
DWCC: dead-weight cargo capacity
ECSA: East Coast South America
EIU: even if used
ETA: estimated (expected) time of arrival
ETC: estimated (expected) time of commencement (completion)

75 of 101
INDEX



ETD: estimated (expected) time of departure
ETS: estimated (expected) time of sailing
FAC: fast as can
FAS: free alongside ship
FCL: full container load
FDESP: free of despatch
FEAST: Far East
FHEX: Friday and holidays excepted
FHINC: Friday and holidays included
FILO: free in liner out
FIO: free in and out
FIOS(T): free in and out stowed
FIT: free in and trimmed
FLT: full liner terms
FOB: free on board
FOQ: free on quay
FOW: free on wharf
FP: free pratique
FWAD: fresh water arrival draft
Gross terms: carrier arranges/ pays for cargo handling but laytime will probably
apply.
GSB: good and safe berth
GSP: good and safe port
HAT: highest astronomical tide
HSS: heavy grain, sorghums, soyabeans
HWOST: high water ordinary spring tides
IWL: institute warranty limits
K: knots
L: laden
L/C: letter of credit
LAT: lowest astronomical tide
LCL: less than container load
Liner Terms: carrier arranges/ pays for cargo handling at load and discharge ports as
well as carriage
LO/LO: lift on/ lift off
LT: long ton (1LT =1.016 MT =2240 lbs.)
MHWN: mean high water neaps
MHWS: mean high water springs
Min/max (minimax): minimum/ maximum (exact quantity)
MLWN: mean low water neaps
MLWS: mean low water springs
MOL: more or less
MOLCO: more or less charters option
MOLOO: more or less owners option
MT: metric tonne (1MT =1000kg =0.9842 LT)
NAABSA: not always afloat but safe aground

76 of 101
INDEX



Nett Terms: cargo handling is arranged/ paid for by charters or shipper
NOR: Notice of Readiness
NVOC(C): non-vessel-owning (common) carrier
PCT: percent
PPT: prompt (cargo or ship available promptly)
RO/RO: roll on /roll off
ROB: remaining on board
SA: safe anchorage
SATPMSHEX: Saturday afternoon, Sundays and Holidays excluded
SB: safe berth
SC: scale
SCALELOAD: load rate according to C/P scale
SHEX: Sundays and holidays excluded
SHINC: Sundays and holidays included
Sous palan: under hook (i.e. barge cargo)
SP: safe port
Spot: cargo or ship available immediately
Stem: readiness of cargo
SWAD: salt water arrival draft
SWL: safe working load
T/C: time charter
TIP: taking inward pilot
USNH: US East Coast north of Cape Hatteras
W/M: weight or measure
WCCON: whether custom cleared or not
WIBON: whether in berth or not
WIFPON: whether in free pratique or not
WIPON: whether in port or not
WP: weather permitting
WW: weather working
WWReady: when and where ready

Q.12. What are the salient clauses of a voyage charter party?

Ans. The basic provisions of a typical voyage charter party are:
1. Preamble - which identifies the parties to the C/P, name of the vessel, her present
position and ETA load port (named) with the obligation to proceed to the load
port, amount and nature of cargo to be loaded, obligation to proceed to discharge
port (named) and deliver the cargo.
2. Owners responsibility - which states owners liabilities or exclusion thereof in
case of loss, damage or delay in delivery of cargo.
3. Deviation - gives the liberty to the ship to call any port in any order and to save
life or property.
4. Freight - gives the rate per W/M, amount and payment of freight.
5. Loading/ discharging costs - states who is responsible for the loading/ discharging
costs of the cargo.

77 of 101
INDEX



6. Laytime - gives the duration of the laytime allowed, exception to the laytime,
commencement of laytime and time and manner in which to tender a NOR.
7. Demurrage - states the duration of the demurrage period allowed and whether it is
allowed in the load and/ or discharge port.
8. Lien - whether the owner can have a lien on the cargo for freight, dead freight,
demurrage and/ or detention and whether the charterers are to be responsible for
the freight and demurrage etc. incurred at the discharge port.
9. Bills of lading - gives the masters obligation to sign the bills of lading.
10. Laydays and cancelling - states the conditions under which the charters have the
option to cancel the charter.
11. General Average - gives the rules under which GA can be settled.
12. Agency owners or charterers obligation to appoint agent at loading and
discharge ports.
13. Brokerage amount of brokerage payable and parties thereof.
14. Strikes in case of strike or lockout fulfilling the obligation as per CP, the
responsibilities for the consequences.
15. War Risks liberty of owner to cancel charter in case of outbreak of war, liberty
of master to sail from load port before completion of loading in the event of
outbreak of war.
16. Ice liberties of master in case of inaccessibility to a load or discharge port due to
ice.
17. Clause Paramount identity of liabilities applying to bills of lading issued.
18. New J ason Clause protection of owner against U.S. lawsuits where General
Average is to be adjusted in accordance with U.S. laws.
19. Both To Blame Collision Clause protection of owner against U.S. law in case of
collision.
20. Law and Arbitration jurisdiction to which any dispute to be referred i.e. place of
arbitration and appointment of arbitrators.

Q.13. What is World Scale and how is it used for reference to fix a tanker on
charter?

Ans. World Scale is the code name for the New Worldwide Tanker Nominal Freight
Scale , published by Worldscale Association (London) Limited and the Worldscale
Association (NYC) Inc., which are controlled by panels of leading tanker brokers in
London and New York City respectively.
Oil cargo may be bought and sold many times while being carried at sea. The cargo
owner therefore will need great flexibility in his discharge options. Unlike a dry cargo
fixture, where the sea passage and other expenses are recalculated for a different
route/ port, tanker fixtures are based on a standard and deviation from that standard in
percentage terms. This avoids the problems on recalculation every time the ship has
to change its route or port of discharge. Worldscale provides a set of nominal rates
designed to provide roughly the same daily income irrespective of the port of
discharge.
Worldscale is a schedule of nominal tanker freight rates used as a standard of
reference by means of which rates for all voyages and market levels in the crude and

78 of 101
INDEX



oil products tanker trades can be readily compared and judged. This makes the
business of tankers on charter easier, quicker and more flexible.
Worldscale is based on an average vessel with average costs earning an average rate.
It works on the basis that, using the realistic costs of operating an imaginary standard
tanker of average size on an average 15,000 miles round voyage, the break-even
freight rate on that route for that ship can be worked out. This Worldscale Flat rate is
calculated in USD per metric ton of cargo carried on a standard loaded voyage
between a loading port and a discharge port with a ballasted return voyage. The
standard vessel is of 75,000 dead weight with an average service speed of 14.5 knots
and consumption 55 m.t. of 380 CSt fuel per day while steaming, plus 100 m.t. per
round voyage for other purposes and an additional 5 m.t. in each port in the voyage.
Port time allowed is 4 days for the voyage. On an assumption of the vessel is on time
charter, the fixed hire is taken as USD 12,000 per day. Bunker prices are assessed
annually by the Worldscale associations and are based as well for the port charges on
the previous years average. Average exchange rates for the previous September is
used. The total voyage costs divided by the cargo tonnage will give the Worldscale
Flat rate or W100 for that voyage.
From the Worldscale Flat rate, the Associations calculate the different rates for about
60,000 other key tanker routes and list them daily in a schedule made available to
those who subscribe for it. Steaming distances, Suez and Panama Canal transit dues,
port charges, bunker price differences between ports and various other factors mean
that, in order for the ship to break even, some routes will require a higher freight rate
than others. A voyage from Rotterdam to Wilhemshaven from Mina al Fahal (via
Suez) will be listed as 12002 miles and may on a given date have a Worldscale Flat
rate of USD11.08, while the same voyage via Cape of Good Hope (21642 miles) will
be listed as USD17.37. These published Worldscale Flat rates are used for tanker
charter negotiations.
It is customary in the tanker chartering market to express freight levels as percentage
of the published Worldscale rates, a method known as points of scale. Thus
Worldscale 100 or W100 means 100 points of 100% of the published rate or the
published rate itself. W250 means 250% of the published rate.
Economic of scale dictates that a large tanker carrying large quantity of oil will have
less freight rate per ton to break even in a similar voyage to a small tanker carrying
less oil. A VLCC may therefore be quoted as W41, whereas a 50,000-tonner will
have W150 or more. In a fixture the negotiated freight rate will depend on the market
fluctuations, but the basis for the negotiation will be the Worldscale Freight Rate.
Examples of tanker fixture can be:
Persian Gulf to Singapore M.T. Nilachal Express 255,000t, W42.5 J anuary 5 (Lanark
Oil).








79 of 101
INDEX



Q.14. What are the salient features of a time charter party?

Ans. The salient features of a typical charter party are:
1. Preamble identifies the parties charterer/ shipowner and gives full details of
the ship, her present position etc.
2. Period/ port of delivery/ time of delivery period of hire, port and time of
delivery to charterer.
3. Trade legalities of trade, legalities of cargoes carried, safety of ports used and
prohibition of cargoes injurious to ship.
4. Owners to provide owners obligation to pay for specified items.
5. Charterers to provide charterers obligation to pay for specified items.
6. Bunkers charterers obligation to buy bunkers R.O.B. at delivery port, provide
specified bunkers to vessel, owners obligation to buy bunkers R.O.B. at
redelivery port, minimum quantity of bunkers to be on board on redelivery.
7. Hire charterers obligation to pay hire at the specified rate, at specified
intervals until redelivery; giving owner the right to withdraw vessel for default
in hire payment.
8. Redelivery charterers obligation to redeliver vessel in same condition as
when on delivery (fair wear and tear accepted), redelivery place/date/time,
notices required to be given.
9. Cargo Space agreement on giving the entire cargo space of ship at charterers
disposal.
10. Master to execute the voyage speedily, master and crew to assist the charterer,
masters compliance with charterers orders relating to vessels employment,
agency etc., charterers indemnifying owners and his servants on signing B/L or
any other documents or complying with charterers orders, exclusion of owners
liability for cargo claims, owners agreement to investigate charterers
complaints about crew.
11. Direction and Log charterers obligation to provide master with voyage
instructions and information, obligation of master and engineers to make voyage
logs available to charterers and their agents.
12. Suspension of Hire suspension of hire payment for any duration of
downtime of the vessel in specified circumstances, charterers responsibility
for loss of time in specified circumstances.
13. Cleaning Boilers owners responsibility to clean boilers with vessel in service,
if possible, charterers obligation to allow boiler-cleaning time where necessary,
suspension of hire when boiler-cleaning time extends beyond a specified time.
14. Responsibilities and Exemptions conditions under which the owners will be
responsible for delay in delivery, delay during the charter, or loss or damage to
cargo, owners exclusion of responsibility in all other circumstances, charterers
responsibility for loss or damage to vessel or owners caused by improper
loading, bunkering or other acts by them or their servants.
15. Advances charterers obligation to advance necessary funds to master for
ordinary disbursements at any port, deduction of advances from hire.

80 of 101
INDEX



16. Excluded ports prohibition on charterers from ordering vessel to a place where
disease is prevalent or which could be beyond the agreed limits of the crew
agreement, or to any ice-bound place.
17. Loss of vessel cessation of charter hire from the date of loss of vessel.
18. Overtime owners obligation to place the vessel 24 hours in a day to
charterers disposal and charterers obligation to pay overtime for crew
working.
19. Lien owners lien for claims under the charter on cargoes, sub-freights and bill
of lading freight.
20. Salvage equal sharing of salvage money after deductions of master and crews
proportions and other expenses.
21. Sublet charterers option to sublet vessel, original charterers responsibility to
fulfil the C/P obligations.
22. War prohibition on charterer from using the vessel in war zones or for
carriage of goods which will expose her to risks of capture etc.; charterers
responsibility to pay any war risks premiums, hire for time lost due to war like
operations and increased costs due to war zone operations, liberty of vessel to
comply with flag state orders during war, cancellation of charter by either party
and redelivery of vessel if flag state becomes involved in war.
23. Cancelling charters option of cancelling charter if the vessel is not delivered
by agreed date, charterers obligation to declare intention to cancel.
24. Arbitration reference of dispute to arbitration in Mumbai or at any agreed
place, nomination of arbitrators by parties, umpires decision where arbitrators
disagree.
25. General Average rules under which GA is to be settled; non-contribution of
hire to GA.
26. Commission amount of (brokerage) commission to be paid by owners, and
party to whom payable.













81 of 101
INDEX



CHAPTER 14

BILLS OF LADING

Q.1. What is a Bill of Lading and describe its functions?

Ans. A Bill of Lading
1. Is a receipt for goods either received (before shipment) or shipped on board;
2. Is good evidence of the existence of a contract between the shipper and carrier. It is
not a true contract, since only one party signs it.
3. Is a document of title, signifying that the holder has the legal right to possession of
the goods it describes. Right to possession is different from right to ownership, which
is determined by the terms of sale contract.
4. May, depending on how it is made out, be negotiable i.e. transferable to a third party
so as to effect transfer of title to the goods it describes.

Q.2. How will you describe B/L as a receipt for goods?

Ans. The B/Ls prime function is as a receipt issued for:
1. Goods received for shipment either by a carrier or a freight forwarder pending
shipment on a vessel: or
2. Goods shipped on board the carrying vessel.
B/L states the quantity and apparent order and condition of the goods shipped and
normally declares received in good order and condition unless otherwise stated or
shipped in good order and condition unless otherwise stated. If there is a shortage or
damage to the cargo, appropriate remarks are made on the face of the B/L.
If there is no clausing of the B/L showing a defective condition or quantity of the goods
on receipt by the carrier, the consignee may reasonably expect to receive the goods in
good order and condition. Any loss or damage to the goods will then be presumably due
to carriers negligence unless it can be proved due to acts of God, inherent vice of the
goods etc.
When a mates receipt is given the description on the B/L of the quantity/ condition of the
goods is copied from the mates receipt. It is important that the mates receipt states the
actual quantity and condition of the goods, where there is other remarks than good order
and condition.

Q.3. How will you describe B/L as evidence of contract?

Ans. The conditions on which goods are accepted for shipment constitute the terms of the
contract of carriage between the shipper and the carrier, except when the shipper is also a
charterer; in which case, there could be no charter party, or there is a charter party and the
charterer is also the shipper, or there is a charter party but the charterer is not the shipper.
Where there is no charter party e.g. where containerized cargo is loaded on a container
vessel in the shipowners own B/L, the shipowner is the legal carrier and issues its own
B/L containing the companys terms and conditions of carriage. Some liner operators
issue a booking note signed by both the parties, which is a contract of carriage.
1
82 of 101
INDEX



Where the charterer is also the shipper, the charterer is in effect issuing himself a B/L.
B/L here serves only as a receipt of goods. B/L is a short form and will contain only
relevant clauses such as Clause Paramount, Both-to-Blame etc. However the terms of the
B/L must be consistent with the C/P.
Where the charterer is not the shipper e.g. a carrier is time-chartering a vessel and
operating her in his own liner service, the contract of hire is contained in the time charter
party. The contract of hire between the carrier and the shipowner is contained in the time
charter party. A B/L issued to the shipper evidences the contract of carriage between the
carrier and the shipper. If the B/L contains no reference to the existence of a C/P, the
shippers contract of carriage will be with the shipowner. But if the B/L contains a
reference to a C/P, the shippers contract will be with the time charter.

Q.4. How will you describe B/L as a document of title?

Ans. Title in the context of carriage of goods means the right to possession as against the
right to ownership.
A document of title is a document, which gives a person (bailee) the authority to hold the
cargo and deliver it to any person in exchange of that document.
Possession of an original B/L is equivalent to the right to possession of the goods as per
the B/L. In other words any holder of the original B/L can obtain delivery of the goods at
the discharge port by producing the original B/L.
Title of the goods can be transferred after shipment to a third party by negotiation. A B/L
made out so as to enable its negotiation is a negotiable document of title and B/L not
made out in a way that permits negotiation is termed as non negotiable and clearly
endorsed to indicate that.
A negotiable B/L is made out to order in the space allotted for consignees name, or to
NILACHAL CONSIGNEE LTD. or his order in the same space. This will allow the
original consignee to transfer title to a third party if required.
Transfer of title from the shipper is made under three methods:
1. Blank endorsement, whereby the shipper stamps the back of each original B/L with
his companys stamp and signature without inserting any transferees name, before
passing the set of B/L to the transferee. A blank endorsed B/L is like a bearer cheque
made out to be encashed by any one presenting the same. It is a dangerous document
as any one presenting the original B/L can take delivery of the cargo. It is commonly
used as required by the bankers of the day.
2. Specific endorsement on the back of the B/L e.g. deliver to NILACHAL Receivers
Ltd. with the stamp and signature of the shipper. The person to whom the title is
transferred may be termed as the endorsee.
3. Attaching authorized delivery instructions on the shippers stationery e.g. a Delivery
Order from the shipper to the consignee.
Once the B/L is negotiated the endorsee or transferee become subject to the same
liabilities and has the same rights against the carrier as if the contract of carriage had
originally been made with the endorsee. This means if freight or demurrage is payable,
the endorsee must pay before taking delivery.
2
83 of 101
INDEX



The reason for having three original B/L is that in case the 1
st
original is lost or misplaced
the consignee can take delivery of the cargo with the 2
nd
or 3
rd
original. Nowadays with
electronic B/L generation, the need of three original B/Ls is generally not required.
Several non-negotiable B/Ls are given to the shipper for various purposes including the
one marked Captains Copy.

Q.5. Describe different types of B/L.

Ans. B/Ls are produced in many styles by shipping companies, shippers, charterers,
freight forwarders and organizations like BIMCO. Several types are used for different
purposes.
1. Long-form B/L has spaces or boxes on its front for typed details and the numerous
printed conditions of carriage at the back. Most liner shipping companies have their
own long-term B/L.
2. Short-form B/L has only a few standard terms printed on it. It usually mentions
that the B/L issued is under terms and conditions of a relevant C/P.
3. Direct B/L is for carriage of goods from one place to another and does not
anticipate any transshipment. It has clauses on the reverse and is used for liner
services.
4. Combined transport B/L covers carriage of goods from door-to-door by several
modes of transport. It is common in liner container trade.
5. Through B/L is issued when the carriage will involve both sea and other transport
modes, but different carriers will only be held responsible for that stage of transport
only, e.g. railway, sea or road.
6. Received for shipment B/L is issued when the cargo is received at the freight
depot after being cleared through customs and other authorities and ready for
shipment on board. When the goods are eventually shipped on board, the above B/L
is returned and a fresh on board B/L is issued.
7. Shipped B/L is issued when the goods are loaded on to the carrying ship.
8. Straight B/L is an American term for no-negotiable B/L.

Q.6. Differentiate between a Clean and Dirty B/L. What is a letter of indemnity (LOI)
and what precaution must be used before accepting the same?

Ans. A clean B/L has no superimposed clauses stating a defective condition or shortage
of the goods. It states that the goods are received in apparent good order and condition
without any remarks as to their condition.
A dirty B/L is also known as a claused or foul B/L. it is claused with remarks such as
torn bags, rusty drums or three more cases in dispute if found on board will be
delivered etc.
A banker normally demands a full set of clean B/L as per the terms of the Letter of Credit
(LoC). Pressure will be exerted on the master to release a clean B/L even when the actual
conditions do not justify doing so.
Letter of Indemnity (LoI) or a back letter as it is sometimes called is often offered by the
shipper promising to indemnify the master or the carrier against any loss or liabilities as a
consequence of signing a clean B/L. However acceptance of a LoI for a clean B/L makes
3
84 of 101
INDEX



the master party to an act of deception or fraud on banks, consignee/buyer, and insurer,
since it is an attempt to obtain payment for goods knowing them to be unsound. This type
of LoI has no legal standing in the courts of law and cannot be sued on if the shipper goes
back on his promise of indemnity.
A master must consult his owners and the P & I club if he is in doubt. He must never
accept a LoI without the written orders from his owners.

Q.7. What is a Mates Receipt?

Ans. A Mates receipt (MR) is a receipt issued and signed by the chief mate of the ship
for goods received on board. MR is nowadays replaced by a modern document called the
Standard Shipping Note (SSN), but can still be seen in conventional trade like general
cargo, dry bulk or tanker. The information in both the MR should be identical to that of
the B/L. the MR should be completed from the ships tally and show the actual quantity
and condition of the cargo as received. When the condition of cargo justifies it, the M/R
should be remarked as torn bags, stained bales or rust drums etc. Should there be a
difference in the tally of the ship and the shipper, MR should reflect the smaller of the
two figures with the remark that X more bales in dispute, if onboard to be delivered, X
being the difference in the tally figures.
MR is normally on a shipowners format and made in triplicate. The original is given to
the shipper, the 2
nd
given to the agent and the 3
rd
left in the book of MR to be referred to
at the time of issuance of the B/L.
M/R is not a document of title.

Q.8. What precautions must be taken while signing a B/L?

Ans. When a shipmaster has to sign and issue original bills of lading, he must take great
care to ensure that all potential contractual pitfalls are covered. He must consult the P & I
club and seek their advice before signing and releasing the original B/L. Shipped B/L is
signed and given to the shipper through the agent. Freight may be payable before signing
the B/L depending on the carriers terms.
When a MR is issued to the shipper on shipment of cargo, the MR may be required to be
surrendered before issuance of the original shipped on board B/L.
The master must check the following before issuance of the B/L:
1. that the goods have actually been shipped;
2. that the date of shipment is correct as stated in the MR;
3. that the B/L is not marked freight paid or freight prepaid if not true;
4. that the clausing of the MR is incorporated in the B/L;
5. that the reference is made to the C/P, where on exists;
6. that any C/P terms do not conflict with the B/L terms; and
7. that the number of the original B/L released is stated.
Every original B/L must be fully signed by the authorized signatory.




4
85 of 101
INDEX



Q.9. How does the master give delivery of cargo on presentation of the original B/L?

Ans. The master, the carrier and his agent is legally obliged to deliver the goods to the
first person presenting the original B/L at the discharge port, together with his identity
and proof that freight and any other charges due have been paid.
Once the goods are delivered to the receiver, there will be no lien for unpaid freight etc.
If the B/L is transferred to another party, the endorsement on the B/L must be checked
before delivery.
If the B/L presented is in order, the owners agent issues a Delivery Order, which must
be endorsed by the shipping, agent, customs and port authorities etc.

Q.10. What is a seaway bill?

Ans. A seaway bill is a receipt for goods shipped on board and:
1. Is a good evidence of existence and terms of a contract between the shipper and the
carrier, but not a contract by itself;
2. Identifies the person to whom the delivery of goods is to be made by the carrier in
accordance with the contract of carriage. In contrast to a B/L the seaway bill always
bears the consignee name and address in an appropriate box.
3. Is non-negotiable and usually (but not always) bear the words non-negotiable on
their face. The condition of carriage may also bear a statement such as This
Waybill is not a bill of lading and no bill of lading will be issued or This Waybill
is not a document of title.
4. Is not a document of title and does not give the right to possession of the goods.
5. May be a receipt for the freight, if endorsed to indicate that freight is paid.
6. May contain conditions of carriage.
7. May be subject to Hague-Visby Rules or Hague Rules.
A seaway bill is used when a negotiated document will not be required i.e. when the
goods will not be sold or credit will not be raised on the security of the goods from a
bank etc. If the shipper and the buyer are well established trading partners, seaway bill is
encouraged by BIMCO.
The benefits of a seaway bill as against a B/L are that:
1. They can be carried on board the vessel especially on a short sea passage and the
cargo along with the document for the cargo come together.
2. They are subject to any documentary formalities other than a reasonable check by the
carrier or his agent of the identity of the person claiming delivery of the goods.
3. Since they are not documents of title, they are less likely to be used fraudulently.
Money cannot be raised against a seaway bill.
Seaway bill uses similar procedure for issuance as B/L. if the seaway bill is not carried on
the ship it is sent by the shipper to the consignee, who must produce the same before
taking delivery. The carrier or his agent will normally ensure that the delivery is made to
the proper party after checking his identity. A substantial proportion of international trade
today is done by seaway bill.



5
86 of 101
INDEX



Q.11. What are the typical problems related to B/L?

Ans. The typical B/L related problems are:
1. When damaged or otherwise defective cargo is presented for loading;
2. If master is asked to sign a clean B/L when it is not justified;
3. If shore and loading figures differ;
4. If a charterers B/L is used, where the master is required to sign a clean B/L as
presented by the charterer;
5. If the number of original B/L in the set as shown in the face of the B/L is not the same
as the number of negotiable B/L;
6. If two or more sets of B/L is requested by the shipper;
7. If the B/L presented to the master for signing is written in an incomprehensible
language or alphabet;
8. If the master is asked to sign a blank or partially completed B/L;
9. Early departure procedure is used to allow tankers to sail on completion of cargo with
out waiting for final cargo figures;
10. If the B/L has to be reissued or amended;
11. If the master is asked to pre-date or post-date a B/L;
12. If delivery of cargo is asked for without the presentation of the original B/L, which
may cause misdelivery and serious problems;
13. If cargo delivery is requested against the presentation of a B/L carried on board when
the B/L is to order and does not specify the name of the consignee or the port of
discharge;
14. If two parties present original B/L; and
15. If goods are unclaimed in a discharge port.

Q.12. What are the rules governing carriers obligations and liability?

Ans. A B/L sets out the minimum terms and conditions of carriage, which include a) the
carriers obligations, b) the carriers exceptions from liability, c) the extent of carriers
liability to the shipper, d) the shippers responsibilities and e) the amount recoverable
from the carrier in case of loss of goods while in the carriers care.
Under the carriers obligations, the sets of rules followed are a) the Hague Rules, b) the
Hague-Visby rules and c) the Hamburg rules, which is not favoured by many shipowners
as they less to their advantage.
The carriers responsibilities under the Hague-Visby rules are a) to ensure seaworthiness
of the vessel, b) the care of the cargo and c) to issue a B/L when requested by the shipper.
In terms of obligation imposed on the master of the carrying ship, the Hague rules may be
considered to be the same as the Hague-Visby rules.
Hamburg Rules are called the United Nations Convention on the Carriage of Goods by
Sea 1978. The main features of the rule are that the carrier is responsible for the goods
from the time it accepts the goods at the port of shipment, unless it is proved that he, his
servants or agents took all measures that could be reasonably required to avoid the
damages and its consequences. Hamburg Rules does not give the carrier many exceptions
from liability as Hague and Hague-Visby Rules. It does not give exoneration from
liability arising from negligence in navigation or management of the ship.
6
87 of 101
INDEX



Under the carriers exceptions from liability, we have the carriers right to deviate and the
rights in respect of dangerous goods. There are 17 exceptions from the liability granted to
the carrier:
1. act, neglect or default of the master, mariner, pilot or the servants of the carrier in
the navigation or management of the ship;
2. fire, unless caused by neglect or actual privity of the carrier;
3. perils, dangers and accidents of the sea or other navigable waters;
4. act of God;
5. act of war;
6. act of public enemies;
7. arrest or restraint of princes, rulers or people or seizure under legal process;
8. quarantine regulations;
9. acts of omission of the shipper or owner of the goods, his agent or representatives;
10. strikes, lockouts, stoppage or restraint of labour;
11. riots and civil commotions;
12. saving or attempting to save life at sea;
13. wastage in bulk or weight or any other loss or damage from inherent defect, quality
or vice of the goods;
14. insufficiency of packing;
15. insufficiency or inadequacy of marks;
16. latent defects not discoverable by due diligence; and
17. any other cause without the actual fault or privity of the carrier, his agent or
servants, burden of proof lying with the carrier.

7
88 of 101
INDEX



CHAPTER 15

CARRIAGE OF GOODS BY SEA ACT

Q.1. What are the salient features of the Carriage of Goods by Sea Act 1971 (COGSA
71)?

Ans. COGSA 71 is an UK act to make the Hague-Visby Rules apply to the carriage of
goods in certain circumstances. It contains 6 sections as follows:
1. Application of Hague Rules as amended;
2. Contracting States;
3. Absolute warranty of seaworthiness not to be implied in contracts to which Rules
apply;
4. Application of Act to British possessions;
5. Extension of application of Rules to carriage from ports to British possessions;
6. Supplemental.
COGSA 71 is applicable to the documents like B/L if the contract contained in or
evidenced by it provides e.g. the Clause Paramount, which will state that Hague-Visby
Rule governs the contract. It is a receipt, which is a non-negotiable document. COGSA
71 applies only to seaborne part of the carriage. In case of Multi-Modal or Combined
Transport Operation B/L, other modes of transport can be covered by insurance.

Q.2. What are the salient features of the Carriage of Goods by Sea Act 1992 (COGSA
92)?

Ans. COGSA 92 makes major changes to the law regarding who has the right to sue the
carrier and whom the carrier can sue for freight, demurrage etc. It applies to any B/L,
seaway bill or ships delivery order. COGSA 92 lays down guidelines for transfer of
liabilities to the party who takes or demands the delivery of goods and who is not the
original party. Once the B/L is transferred the holder becomes liable for payment of
freight, port charges and demurrage etc. There are no third party liabilities. If a Letter of
Indemnity (LoI) is issued and B/L released against it or cargo delivery is given, this rule
will not apply. The main advantages of COGSA 92 are that number of claims in tort has
been reduced considerably and the carriers right of claim or counter claim against cargo
receivers is free from uncertainty.

Q.3. What are the provisions for carriage of deck cargo?

Ans. As per common law, all cargoes are to be loaded below deck, since deck cargo is
exposed to greater risks of cargo damage due water etc. A carrier cannot protect itself or
take refuge under the exception of liabilities, if a deck cargo is carried without express
agreement of the shipper.
Under Hague-Visby Rule the items defined as goods, exclude live animals and will
not cover live animals. The shipper must make a special contract with the carrier and the
shipping note must state For Deck Carriage carried at shippers risk. The B/L will be
have an endorsement Stowed on Deck on the face of it.
89 of 101
INDEX



It becomes a breach of contract for the carrier, if the goods are stowed on deck
irrespective of an agreement to carry them below deck. P & I club recommends that on
deck cargo must be claused on the B/L mentioning On Deck, and the B/L include a
clause of disclaiming liabilities for loss or damage howsoever caused. Normally a
statement on the face of the B/L Carried on Deck without Liability to the Carrier fulfils
both the functions.
Some goods should never be stowed on deck and the suitability of cargo and the position
of stowage should be carefully monitored. Liberty is given to the shipowner to carry the
goods on deck at the carriers option.
In a container ship the goods carried in closed container on deck is regarded as equivalent
to under-deck carriage of goods. Goods in container stowed on deck on a non-container
vessel are treated as deck cargo and precautions as stated above must be taken in stowage
and issuance of B/L.

Q.4. How is the rule of General Average (GA) act applicable in case of a deck cargo?

Ans. In case of carriage of cargo on deck, the York-Antwerp Rule 1994 provides that
No jettison of deck cargo shall be made good as general average unless such cargo is
carried, in accordance with the recognized custom of the trade. If any cargo is not
customarily carried on deck, the owner shall have no claim for GA contribution. A
container carried on deck on a purpose built container ship will make a GA contribution,
whereas the same container carried on deck on a ship will not contribute for GA, unless
the carriage is with the consent of the cargo owner.
If the deck cargo is salvaged, the owner of the deck cargo is liable to pay contribution for
the GA.
Timber cargo carried on deck on a timber carrier will be treated as regular cargo carried
as per the trade practice.

Q.5. What is IMDG Code?

Ans. IMDG Code is International Maritime Dangerous Goods Code. It was adopted by
IMO resolution A.716 (17) and published in 1995. It was recommended for adoption
under SOLAS regulation VII/1.4 and MARPOL Annex III regulation 1(3).
It contains the basic principles, detailed requirements for individual substances, materials
and articles; and a number of recommendations for good operational practice including
advice on terminology, packing, labelling, stowage, segregation and handling, and
emergency response action. It does not contain all details of procedure for packing of
dangerous goods or actions to take in the event of an emergency or accident involving
personnel who handle goods at sea; these aspects are covered by a supplement published
with the IMDG Code.
The provisions of the following parts of the 2002 edition remain recommendatory after
1
st
J anuary 2004, where as the others are mandatory under amendments to SOLAS
Chapter VII (Carriage of Dangerous Goods) adopted in May 2002:
1. Chapter 1.3 (Training);
2. Chapter 2.1 (Explosives, Introductory Notes 1 to 4 only);
3. Chapter 2.3, section 2.3.3 (Determination of flashpoint only);
90 of 101
INDEX



4. Chapter 3.2 (Columns 15 and 17 of the Dangerous Goods List only);
5. Chapter 5.4.5 (Multimodal dangerous goods form) insofar as layout of the form is
concerned;
6. Chapter 7.3 (Special requirements in the event of an incident and fire precautions
involving dangerous goods only).
The two-volume Code is divided into seven parts.
Volume 1 contains the following parts:
1. Part 1: General provisions, definitions, training;
2. Part 2: Classification;
3. Part 4: Packing and tank provisions;
4. Part 5: Consignment procedures;
5. Part 6: Construction and testing of packaging , intermediate bulk containers (IBCs),
large packaging, portable tanks and road tank vehicles; and
6. Part 7:provision concerning transport operations.
Volume 2 contains:
1. Part 3: Dangerous Goods List and limited quantities exceptions;
2. Appendix A: List of generic and N.O.S. (not otherwise specified) proper shipping
names;
3. Appendix B: Glossary of terms: and
4. Index.
The supplement is published separately by IMO and contains following texts related to
the IMDG Code:
1. Emergency Response Procedures for Ships Carrying Dangerous Goods ( The EmS
Guide);
2. Medical First Aid Guide for use in Accidents Involving Dangerous Goods;
3. Reporting Procedures;
4. IMO/ILO/UN ECE Guidelines for Packing Cargo Transport Units;
5. International Code for the Safe Carriage of Packaged Irradiated Nuclear Fuel,
Plutonium and High-Level Radioactive Wastes on board Ships (INF Code);
6. Recommendations on the safe use of Pesticide;
7. Appendix: Resolutions and Circulars referred to in the IMDG Code and Supplement.
The BC Code, included in the supplement to the pre-2000 edition of the Code is now
published separately.

Q.6. What are the classes of Dangerous Goods?

Ans. The following classes and divisions are listed in the IMDG Code 2002 edition:
Class 1: Explosives.
1. Division 1.1: substances and articles, which have a mass explosion hazard.
2. Division 1.2: substances and articles, which have a projection hazard but not a mass
explosion hazard.
3. Division 1.3: substances and articles, which have a fire hazard and either a minor
blast hazard or a minor projection hazard or both, but not a mass explosion hazard.
4. Division 1.4: substances and articles, which present no significant hazard.
5. Division 1.5: very insensitive substances, which have a mass explosion hazard.
91 of 101
INDEX



6. Division 1.6 extremely insensitive articles, which do not have a mass explosion
hazard.
Class 2: Gases.
1. Class 2.1: flammable gases.
2. Class 2.2: non-flammable, non-toxic gases.
3. Class 2.3: toxic gases.
Class 3: Flammable Liquids.
Class 4: Flammable solids: substances liable to spontaneous combustion; substances
which, in contact with water, emit flammable gases.
1. Class 4.1: flammable solids, self-reactive substances and desensitized explosives.
2. Class 4.2: substances liable to spontaneous combustion.
3. Class 4.3: substances which, in contact with water, emit flammable gases.
Class 5: Oxidising substances and organic peroxides.
1. Class 5.1: oxidising substances.
2. Class 5.2: organic peroxides.
Class 6: Toxic and infectious substances.
1. Class 6.1: toxic substances.
2. Class 6.2: infectious substances.
Class 7: Radioactive material.
Class 8: Corrosive substances.
Class 9: Miscellaneous dangerous substances and articles.
It must be noted that the numerical order of the classes and divisions is not the measure
for the degree of danger.

Q.7. How will you accept any bulk cargo other than grain for loading on board?

Ans. Prior to loading of any bulk cargo other than grain, the master must be in possession
of stability information, containing comprehensive information on the ships stability and
on the distribution of the cargo and ballast for the standard loading conditions. The
master must have all informations on load per unit area of the tank top plating, maximum
allowable load in a hold and full instructions for load/ discharge operations in port of
loading and discharge. The owner must ensure that the master is provided with these
informations.
Bulk cargoes must be stowed and trimmed in a best possible way to ensure adequate
stability of the ship in all conditions of sea passage. The master and the terminal
authorities must duly approve the loading plan. The plan is lodged with the appropriate
authority of the Port State. The master has the right to suspend the cargo operation if, in
his opinion the vessel exceeds the allowable load limit or the shearing forces and bending
moments at any time.
The master must ensure that the loading and unloading methods do not damage the ship.
Draft of the ship must be monitored regularly and loading and discharging adjusted
accordingly.
The master must not accept any concentrate or other cargoes, which may liquefy unless
the moisture content of the cargo as indicated in the Moisture Content Certificate or
Shippers Declaration is less than the Transportable Moisture Limit (TML). If the
moisture content is above that limit, appropriate safety arrangements must be made to the
92 of 101
INDEX



satisfaction of the Certifying Authority to ensure adequate stability in case of cargo
shifting and the ship has adequate structural integrity.
If a bulk cargo is not classified under the SOLAS Convention, but has chemical
properties that may create a potential hazard, special precautions must be taken for the
safe carriage of the cargo.
The master must not accept any bulk cargo for loading unless he has all informations as
stated above are with him. He must calculate his stability parameters after taking into
consideration the proposed loading arrangements. He must take all special precautions as
required by the regulations, failing which he will be guilty of an offence.

Q.8. What are the International Grain Code requirements?

Ans. Under SOLAS regulation VI/9.1 (Requirements for cargo ships carrying grain),
every ship carrying grain must have a Document of Authorization (DoA) as required by
the International Grain Code (IGC) and issued by the FSA. IGC defines grain as
including wheat, maize (corn), oats, rye, barley, rice, pulses, seeds and processed forms
thereof, whose behaviour is similar to that of grain in its natural state.
The DoA is issued to every ship loading grain by the FSA as evidence that the ship is
capable of complying with IGC. DoA is accompanied and incorporated into the Grain
Loading Manual provided to the master of the vessel. Copies of the DoA, Grain Loading
Plan and the stability data of the ship must be available for inspection at all times in load
or discharge ports.
A ship not having on board a DoA may be permitted to load bulk grain cargo subject to
certain conditions, one of which is that the total weight of the bulk grain does not exceed
one third of the ships deadweight.
The ship must comply with the minimum stability criteria for the voyage.
In addition the ship carrying grain must carry the following documents:
1. Ship Inspection Report and Treatment Order to certify the holds are clean, insect free
and capable of loading grain. Most grain loading countries have stringent rules for
inspection of grain loading holds;
2. Paint Compliance Certificate to certify that the paints used in the holds are not in
contravention to the Port States rules on carriage of food stuff;
3. Fumigation Certificate, when holds are required to be fumigated after inspection;
4. Certificate of Loading (Bulk Grain) as issued by the US port National Cargo Bureau
certifying that bulk grain cargo has been loaded in accordance with US Coast Guard
Regulations.
Great care must be taken for loading grain in bulk. Besides claim, the fear of detention or
arrest of the ship is real since the cargo is meant for human consumption.








93 of 101
INDEX



Q.9. What are the hazardous bulk cargo documents needed?

Ans. Following hazardous bulk cargo documents are required:
1. Shippers declaration under the IMO Code of Safe Practice for Solid Bulk Cargo
(BC Code). It outlines for the master e.g. coal; the transportable moisture limit
(TML), estimated stowage factor (SF), angle of repose, contractual sizing of the
shipment, contractual sulphur content and IMO category for ocean transportation
purposes. It also gives relevant BC Code for the cargo and the emergency procedures
and special precautions required for the carriage of the goods. Shipper may issue a
masters response sheet to the master to log down the actual behaviour of the cargo
in the voyage corresponding to that stated on the shippers declaration;
2. An export permit may be required by the carrier from the shipper before loading
certain cargoes e.g. arms or works of art etc. as there could be a legal embargo from
the UN;
3. Certificate of Origin, a Certificate of quality and a Certificate of readiness to load;
4. Cargo stowage plan after loading and prior to discharge to enable stevedores to plan
the discharge;
5. Hatch sealing certificate may be issued after loading to prevent unauthorised entry;
6. Certificate of fitness to proceed to sea, which may be required to obtain outward
clearance from the custom office;
7. Post delivery an empty hold certificate may be issued to the master to confirm that
the cargoes are completely discharged. It will be useful to counter any claim of short
landing;
8. Ships delivery order as issued to different cargo receivers.


94 of 101
INDEX



CHAPTER 16

INTERNATIONAL MARITIME LAW

Q.1. What are International law, Customary law and Treaties?

Ans. International law is a system of law regulating the relations between sovereign
States and their rights and duties with respect to each other. It derives mainly from the
customary law and treaties.
Customary law derives from practice followed continuously in a particular location or by
particular States, such that the practice becomes accepted as part of law in that location or
State. Customary law is sometimes regarded as the foundation stone of International law.
Treaties are written international agreement between two states like a bilateral treaty
between two States or a multilateral treaty between a number of states, which is binding
in international law. Treaties are normally made under auspices of an internationally
accepted organisation like the UN or one of its agencies such as IMO or ILO. Treaties are
binding only to those States, which are parties to the treaty but may be binding even on
non-party States if those provisions are also a part of customary law. Treaties are
normally drafted, considered for adoption, formally adopted and then opened for
signature by the States. It may take several years before a treaty is adopted and has legal
status only after the statute of the State accepts the same.
The law of the sea has been made at various UN Conferences on the Law of the Sea
(UNCLOS).
The following treaty-making bodies formulate the merchant shipping rules:
1. The International Maritime Organization (IMO),
2. The International Labour Organization (ILO),
3. The World Health Organization (WHO),
4. The International Telecommunication Union (ITU).

Q.2. What is UNCLOS and what are the provisions incorporated in it?

Ans. UNCLOS is United Nation Conference on the Law Of the Sea. Three UNCLOS
conferences were convened at Geneva; UNCLOS I in 1958, UNCLOS II in 1960 and
UNCLOS III in 1974. UNCLOS III is commonly known as UNCLOS.
UNCLOS attempts to codify the international law of the sea. It is a treaty document of
320 articles and 9 annexes, governing all aspects of ocean space, such as delimitation,
environment control, marine scientific research, economic and commercial activities,
transfer of technology and settlement of disputes relating to ocean matters. It came into
force internationally on 16
th
November 1994.
UNCLOS sets limits of the territorial sea at 12 nautical miles, with a contiguous zone at
24 nautical miles from the base line. It defines innocent passage through the territorial sea
and defines transit passage through international straits. It defines archipelagic States and
allows for passage through archipelagic waters. UNCLOS establishes exclusive economic
zones (EEZs) extending to 200 nautical miles where appropriate. UNCLOS also defines
the legal status of the high seas and the regulations for the control of marine pollution.
States in dispute about their interpretation of the UNCLOS may submit their
95 of 101
INDEX



disagreement to the International Court of J ustice (in The Hague), or the Law of the Sea
Tribunal (in Hamburg). The responsibility of enforcing the regulations as per UNCLOS
lies with State in the coastal region and the Port State in the port.
UNCLOS has stringent international rules to prevent pollution from the vessel
incorporated in the MARPOL 73/78. Coastal States may make entry to internal waters
and harbours conditional on meeting additional pollution regulations.
The Merchant Shipping Act incorporates regulations pertaining to prevention of
pollution.

Q.3. What is the nature and purpose of IMO?

Ans. IMO is a specialised agency of the UN dealing with maritime affairs. Its
membership consists of 162 signatory States including India and every other maritime
nation of the world. IMO member states constitute more than 96% of the merchant
tonnage.
Article 1 of the Convention on the IMO summarises the purposes. It is to facilitate inter-
governmental co-operation on State regulation and practices relating to maritime
technical matters; and to encourage and facilitate the adoption of the highest practicable
standards of maritime safety, efficiency of navigation and prevention and control of
marine pollution from ships.
The address of IMO is 4 Albert Embankment, London SE1 7SR, England.

Q.4. What are the main organs of the IMO?

Ans. The main organs of the IMO are its Assembly, Council, Maritime Safety Committee
(MSC), Marine Environment Protection Committee and a number of sub-committees of
the main technical committees.
Assembly is the highest governing body of IMO. It consists of all member states and
meets once every 2 years in regular sessions and in extraordinary sessions if necessary.
The Assembly is responsible for approving IMOs work programme, for voting IMOs
budget and for determining IMOs financial arrangements. It elects IMOs Council.
Plenary sessions of the Assembly are open to the press and public, but the majority of its
work is done in Committee.
The Council is composed of 40 Member States elected by the Assembly for 2-year terms
beginning after each regular session. 10 Council members are Member States with the
largest interest in providing international shipping services e.g. Greece and Norway. 10
are other States with the largest interest in providing international seaborne trade. 20 are
other States with special interest in maritime transport or navigation and whose election
to the Council will ensure the representation of all major geographical areas of the world.
Council is the executive organ of the IMO, responsible under the Assembly for
supervising IMOs work. It performs the functions of Assembly between sessions, except
for making recommendations to Governments on maritime safety and pollution.
Main Committees include the Maritime Safety Committee (MSC), the Marine
Environment Protection Committee (MEPC) and the Legal Committee. Each has sub-
committees, which deal with technical matters. The committees may produce resolutions.
96 of 101
INDEX



The secretariat consists of the Secretary-General and nearly 300 personnel, based at
London.

Q.5. Describe the IMO instruments e.g. Conventions, Protocols, Amendments,
Recommendations, Codes and Guidelines and Resolutions.

Ans. Conventions are multilateral treaty documents. They are chief instruments of the
IMO, which are legally binding. They regulate some aspects of maritime affairs of major
concern to IMO e.g. Safety of Life at Sea or Marine Pollution. These are identified by the
name and the year of adoption by the Assembly e.g. the International Convention on the
Safety of Life at Sea 1974 (SOLAS 1974). It can have detailed technical provisions
attached in annexes e.g. the six annexes to the MARPOL Convention, each dealing with a
different aspect of marine pollution. Technical provisions in detail can be placed in an
associated code e.g. the LSA Code giving technical details of equipment required. Code-
names are given e.g. COLREG more correctly called COLREG 1972. Member State,
which ratifies to an IMO convention, must give effect to it by making its requirements
part of its national law. Ratification means the acceptance of dual obligation for the
Member State to commit to the provision of the convention and willingness to accept
international supervision.
Protocols are important treaty instruments made when major amendments are required to
conventions already adopted but not yet entered into force. SOLAS Convention 1974 has
been amended twice by means of protocols; by the 1978 SOLAS Protocol, which entered
into force on 1
st
May 1981 and by the 1988 SOLAS Protocol, entered into force on 3
rd

February 2000 and replaced and abrogated the 1978 protocol. The combined instrument
was known as SOLAS 74/78 and now known as SOLAS 74/88.
The MARPOL Convention 1973 has also been amended by protocols. The 1973
MARPOL protocol made major changes to MARPOL, in the wake of several large-scale
pollution incidents in the 1970s. The combined convention-protocol instrument called
MARPOL 73/78 came into force on 2
nd
October 1983. The 1997 MARPOL protocol
contains annex VI for Regulation for the Prevention of Air Pollution from Ships and was
adopted on 26
th
September 1997. It will enter into force after being accepted by at least
15 States with not less than 50% of the World Merchant Tonnage. After that date
MARPOL 73/78 may be referred to as MARPOL73/78/97.
Similarly International Convention on Load Lines 1966 has been amended by a 1988
Protocol, which entered into force on 3
rd
February 2000. It may be referred to as
LL66/88.
Recommendations are hundreds in number and deals with wide ranging subjects, most of
them technical in nature. They are not formal treaty documents like Conventions or
Protocols and are not subject to ratification. They provide more specific guidelines than
the treaty documents. Though they are not legally binding some Governments apply the
provisions in whole or in part. Many recommendations are closely linked to conventions.
Some recommendations constitute Codes, Guidelines or Recommended practices on
important matters not considered suitable for regulation by formal treaty instruments such
as Conventions or Protocols. Many codes are non-mandatory e.g. Timber Deck Cargoes
Code etc. and many are mandatory e.g. ISM Code, IBC Code etc. under a regulation of a
parent Convention.
97 of 101
INDEX



Resolutions are the final documents resulting from the agreement by the IMO Assembly
or a main committee (e.g. MSC) of some matter such as an Amendment or
Recommendation. Resolution of the Assembly e.g. Resolution A.586 (XIV); A refers to
the Assembly, 586 is the serial number of the resolution, and XIV indicates that it was
made by the 14
th
Session of the Assembly. Resolution of a main IMO committee e.g.
MEPC.54 (32) means Marine Environment Protection Committee (MEPC), 54 is the
serial number of the resolution, and 32 indicates the 32
nd
session of the Committee.

Q.6. How is a Convention developed, entered into force and amended in the IMO?

Ans. The need for a new convention arises from shipping and related industries. It is
discussed by member states in the main IMO organs like the Assembly, Council and four
main committees. It is usually raised in one of the committees. The proposal goes to the
Council and, as necessary to the Assembly.
With the authorisation of the Council or Assembly, the committee concerned considers
the matter in great detail and draws up a draft Convention. The committee takes views
and advice from other Governmental or Non-Governmental organisations to formulate
the final draft before submission to the Council and Assembly with a recommendation
that a conference be convened to consider the draft for formal adoption. The draft
Convention is sent to all member states for their comments with invitations to attend the
conference. The draft convention is changed if necessary incorporating the comments
acceptable to all member states. The Convention is then adopted and deposited with the
Secretary-General, who sends copies to all Governments of member states. The
Convention is opened for signature by states, usually for 12 months. Signatories may
ratify or accept the Convention. Non-signatories may accede to the convention.
The Convention is not binding on any ratifying state until formally accepted by that state.
Each Convention stipulates conditions to be met before it enters into force. The more
important and complex the document, the more stringent are the conditions for entry into
force. TONNAGE 1969 required acceptance by 25 states with combined tonnage of at
least 65% of world gross tonnage, whereas the International Convention for Safe
Containers (CSC) needed only acceptance by 10 states.
Governments make the necessary changes in the national legislation to enforce provisions
of the convention. Governments deposit a formal instrument of acceptance with the IMO
and become a Contracting State. When the stipulated entry conditions are met, the
Convention enters into force for all the states, which have accepted it, generally after a
period of grace to enable states to take measures for implementation.
The IMO Assembly may make amendments to conventions, protocols or their annexes
after discussion, agreement and adoption. Amendments are made by a resolution such as
MEPC.51 (32) Amendments to the Annex of the Protocol of 1978 relating to the
International Convention for the Prevention of Pollution by Ships, 1973 (Discharge
criteria of Annex I of MARPOL 73/78). Major IMO conventions such as SOLAS and
MARPOL have been amended many times. Earlier conventions needed a certain
percentage of Contracting States, usually two thirds for an acceptance of an amendment.
This delayed the process of acceptance. Nowadays by the method of tacit acceptance of
amendments by states, if there are no objections to the amendment by a specified date by
a specified number of states, it automatically enters into force.
98 of 101
INDEX




Q.7. Give brief descriptions of various chapters of SOLAS 1974.

Ans.
Chapter Title Related IMO Codes
I. General provisions
II-1. Construction- structure, subdivision and stability, machinery and
electrical installations.
II-2. Construction- fire protection, fire detection and fire extinction FSS Code
and FTP Code; revised chapters in force from 1
st
J uly 2002. Technical
requirements contained in the associated codes.
III. Life-saving appliances and arrangements LSA Code.
IV. Radiocommunication.
V. Safety of Navigation International Code of Signals- Revised chapter in
force from 1
st
J uly 2002.
VI. Carriage of cargoes BC Code, CSS Code, International Grain Code,
Timber Deck Cargoes Code.
VII. Carriage of dangerous goods- IMDG Code, IBC Code, IGC Code, INF
Code.
VIII. Nuclear ships- Code of Safety for Nuclear Ships- applies to all nuclear ships
except warships.
IX. Management for the safe operation of ships- ISM Code.
X. Safety measures for high-speed craft- HSC Code- applies to high-speed craft built
on/after 1
st
J anuary 1996.
XI- 1. Special measures to enhance maritime safety- contains regulations on (1)
Authorisation of recognised organisations: (2) Enhanced surveys, (3) Ship
identification number, (4) Port State Control on operational requirements.
XI- 2. Special measures to enhance maritime security- ISPS Code- Regulation 2/3
enshrine new ISPS Code. Regulation 2/5 requires all ships to be provided with a ship
security alert system.
XII- Additional safety measures for bulk carriers- BLU Code- applies to bulk carriers as
defined in regulation IX/1.6.

99 of 101
INDEX



CHAPTER 17

SHIP REGISTRATION

Q.1. What are the provisions for ship registration?

Ans. UNCLOS Article 91 describes Nationality of Ships and states that every state must
fix the conditions for the grant of its nationality to ships, registration of ships in its
territory and the right to fly its flag. Ships have the nationality of the State whose flag
they are entitled to fly. The State must keep a record of the ships flying its flag.
UNCLOS Article 92 describes Status of Ships and provides that the ship must sail on one
flag only and cannot change the flag unless on real transfer of ownership or change of
registry.
UNCLOS Article 94 describes the duties of the Flag State and states that every state must
effectively exercise its jurisdiction and control in administrative, technical and social
matters over ships flying its flag. Every State must maintain a register of ships containing
the names and particulars of ships flying its flag. The State must also assume jurisdiction
under its internal law and ensure safety of ships at sea by their construction, equipment,
seaworthiness, manning, and training of crew, maintenance of communication and
prevention of collision. The States must ensure the every ship is duly surveyed by
qualified surveyors periodically and has on board charts, publications and navigational
equipment appropriate for the safe navigation of the ship.

Q.2. What are the purposes and benefits of ship registration?

Ans. Registration of a ship establishes the ships nationality, measurement and tonnage
for identification purposes. It provides documentary evidence of ownership in the register
(not in the Certificate of Registry). It allows the ship to operate commercially and grants
recognition as a vessel of the flag state and enjoyment of the normal privileges. Flying a
flag of a country normally means the ship is a territory of that country and needs
protection especially under the ISPS Code. But flags of convenience (FOC) may change
this definition. Financial institutions lending money to a shipowner register their
maritime mortgage with the registrar, as their claim against the ship is clear and
protected.
For the Flag State the registration of a ship restricts and controls ownership of vessel
under a flag. It facilitates ship purchase and sale and mortgage where proof of title will be
required as a prerequisite item. It brings free income to FOC countries for registering and
may have some prestige and strategic importance.
FOC register may offer many benefits:
- freedom to employ foreign nationals as master, officers and/ or crew;
- low taxes on company earnings;
- low registry fees;
- low statutory survey fees;
- limitation of owners liabilities;
100 of 101
INDEX



- relaxed or non-existence foreign exchange regulations on owners earnings;
- allowing foreign company or foreign national to register;
- freedom to raise a loan by mortgaging the ship; and
- benefits from bilateral or multilateral agreements on trade, cargo sharing, port entry
or taxation.

WRITE ON INDIAN MERCHANT SHIPPING ACT.

Q.3.What is the IMO identification number?

Ans. The IMO identification number is an unique number given to a passenger ship of
100grt and upwards and all cargo ships of 300grt and upwards. SOLAS 1974 chapter XI-
1/3 was modified in December 2002 and requires all ships to have permanent markings of
the IMO number in a visible place. Cargo ships to have them marked on the port and
starboard side or at the stern and a passenger ship marked horizontally on deck. In
addition the number should marked on the main beam of the ship. IMO number is a 7-
digit number written e.g. IMO 8765432. It is a permanent identification number, which
shall remain unchanged for the life of the ship. The official number of the ship will
however change on change of flag. The IMO number must be inserted on the Certificate
of Registry and all other certificates issued under the IMO Convention.

Q.4.What is a classification society? Is it mandatory? What are the advantages of having
a ship under class?

Ans. Every vessel must be constructed as per standards laid down in SOLAS 1974,
Chapter II-1 and Chapter II-2. Employment of classification societies (CS) is not
mandatory. The FSA gives the authority to the CS to conduct certain surveys e.g. Load
Line etc. and issue relevant certificates. A newly built ship need not have a CS to oversee
the construction, but for the fact that the owners and/or the FSA are not professionally
trained to follow the SOLAS convention on construction of ship like the CS. The CS also
has its own rules and regulations based on years of experience in construction and
inspection of ships at various stages.
Classification is a contractual requirement of hull and machinery underwriters, cargo
underwriters and P&I Club. Statutory safety certification is given only when a ships hull
structure and ship board engineering systems are satisfactorily working and constructed
under the supervision of a CS.
Basis above, a ship with class will be able to insure her and can get commercial benefits
e.g. better cargo and freight etc. especially in a highly competitive market.





101 of 101
INDEX

You might also like