PURPOSE
M.R. No.
Equip. Title
PRELIMINARY
TENDER
APPROVAL
CONFIRMATION
CONSTRUCTION
AS-BUILT
INFORMATION
DSN :
FWIC Rev:
Dept:
Supplier Rev:
Date:
A
REV.
TITLE:
Gin Ling
PREPD
Zhao JC
CHKD
Page
Page 1 of 4
Chan YB
APPD
17.01.08
DATE
0!
FW CONTRACT NO.
SC-12/13900/9
DOCUMENT NO.
ISBL-WP-MEC-25
REV. NO.
A
Date:
17 Jan 2008
Rev. No:
ISBL-WP-MEC-25
Page 2 of 4
CONTENTS
1.0
1.0
SCOPE
2.0
REFERENCES
3.0
4.0
INSTALLATION METHOD
5.0
ALIGNMENT
6.0
SAFETY
SCOPE
Date:
17 Jan 2008
Rev. No:
ISBL-WP-MEC-25
Page 3 of 4
This procedure specifies the requirements for the Alignment/Leveling of the following Air heater
coolers:
.
R-9601 Hot Separator Vapour Cooler, E-9621
T-9601 Condenser, E-9622
T9601 Bottoms Cooler, E-9623
Compressor Recycle Cooler, E-9624
R-9702 Feed Cooler, E-9721
R-9702 Effluent Cooler, E-9722
R-9702 Hot Separator Cooler, E-9723
T-9701 Condenser, E-9724
T-9701 Vent Gas Cooler E-9725
T-9701 Bottoms Cooler, E-9726
T-9801 Condenser, E-9821
T-9801 Distillate Cooler, E-9822
T-9802 Condenser, E-9823A/B
T-9802 Distillate Cooler, E-9824
T-9802 Bottoms Cooler, E-9825
2.0
REFERENCES
The requirements contained in the latest editions of the following standard shall form an integral part
of the requirements of this procedure.
2.1 Manufacturers drawings
2.2 Installation/Maintenance Operating Manual H0031-COM-P-19
3.0
4.0
INSTALLATION METHOD
4.1 Mark out locations where air fin cooler is to be installed and conduct necessary site
measurements to note if there is any deviations from equipment drawing.
4.2 Check the bolt hole dimension, quantity and level of the substructure support plate at pipe rack.
Ensure that the substructure top surface is true leveled and flat.
4.3 If not level, insert shim plates provided under fin cooler baseplate to achieve true seating plan as
stated in drawings.
Date:
17 Jan 2008
Rev. No:
ISBL-WP-MEC-25
Page 4 of 4
4.4 Remove the temporary shipping support legs while using temporary supports to prevent it from
falling.
4.5 Lift the fin cooler to position as per stated in section 3.0 above.
4.6 Tighten the nuts of the machine bolts between the baseplate and the substructure support plate.
Later, it will be tightened it to torque values specified in the project specifications.
4.7 Check alignment of the driving and driven sheaves and check the blade pitch angle together
with FWs manufacturers supervision as described in section 5.0 below.
4.8 Install louver if required by manufacturer.
4.9 Bring the motor towards the fan shaft and install the motor support to the slotted holes at the
machinery mount
4.10 Install the belt. Place the belts and tension them with the supervision of FWs manufacturer to
the specified value.
4.11 Turn fan propellers by hand to ensure that they operate freely without obstacle. Switch the
motor for an instant check that the direction of rotation and blade positions are compatible with
the supervision of FWs manufacturer.
4.12 Finally install the belt guards.
5.0
ALIGNMENT
5.1 Set and align fan assembly, ensuring blade angles are correct, align fan shafts, sheaves and
driver.
5.2 Other information refers to ITP.
6.0
SAFETY
Refer to the attached TRA for the erection & alignment work of Air Heater cooler.