H2HiC Bell type furnaces for annealing of cold rolled strip coils
With reference to the talk you had with us we are revising the technical and commercial offer based on the following.
1.
2.
3.
4.
5.
You have asked us to indicate the production figures for 1 mm thk reference coils You have mentioned that the majority of your requirement will be for approximately 1 mm thk sheets and there is as such no need for additional convectors for thinner gauges. Even if it is required it niay be fot only 1_ 2 bases However as requested by you we are giving prices for 21 convectors ( for all 7 bases) Extra price of 1 No of additional cooling hood given separately is now the part of the main commercial offer. Extra price for adding 1 Base and 1 inner cover and associated components to make it a 4-Heating hoods, 4 cooling hoods, g Bases installation is given in commercial offer. Utility requirement / Generating plant capacity and also the storage volume is updated based on availability of 1 7 Kgs / sq cm N2 pressure, eithlr 10 Kgs sq cm or 5 Kgs i sq cm pressure.
We trust the information provided above is clear in all respects. We are very keen to be associated with a fast growing company like yours and keenly waiting to meet you and discuss to take it
foruard.
would tn , ^JL
trJ1
Encl
V>--'
A__-
\J/
As stated.
SECOWARWICKATUEDPM,LII).
tDr FL00i,
&I
Flx
I +tl
673{x4@
lxrElE
ltr
rE,
Ut!b.lh: rrr..!Ldum.o!*cgm,
*rv.racd.rrlclrcdn
Em6l :
dbd8
lhdtunEc.s,.om
Sl
No Chapter
Basic Design Data Reference Charge Process Data Thermal cycles & Annual production
Utility - Flow Rate, Storage Requirement
Page No
02 04 04 05 06
08
Consumptions Advantages of H2 atmosphere annealing when compared with HNX atmosphere annealing Safeties Scope of Supply Make of Equipments References and Typical photographs of Hydrogen atmosphere Bell type furnace installations (H2 HiC) supplied by SWAPL Exclusions Prices Terms & Conditions
09
11
13
26
.0.
28
31
12.0
Y
13.0
14.0
35 38
"rR
Kr']^
1.0
.1
: : :
2000 mm (max) 900 mm (min) 508 mm / 610 mm 1350 mm (max) 500 mm (min)
weight : Thickness : .2 charqe soecifications Charge diameter : .. No of coils per stack No of convectors per base :
Coil unit Stack height including convectors Maximum charge weight excluding
iJ : .
mm
5500 mm
120 MT
Material grade
DQ,25% DDQ,
1.3
motor impeller
: :
Base fan
:
base):
heating :
ArJ
F.'i
Atl.oa CL
Burners
8500 kcals/Nm3
Vu.i
r
\-oo k".,
8 Nos. per heating Kromschroder
Considered PID control loop (PLC), Pulse firing at burner level. Ceramic fiber blankets & modules
Conugated type
Air and water cooling type
Crane Hook Clearance available from the base level Annual Operating Hours
16500 8400
mm
.4.
Material of Construction
Base fan lmpeller
lnconel 800
HK grade
lnner Diffuser
Outer Diffuser
Atsr 316
rs 2062 AISI 309, 6 mm thick
MS, 5 mm thick
lntermediate Convectors
lnner Cover Heating Hood casing Cooling Hood casing
_t
"-t'
KV
Reference Charge
Number of coils Coil internal diameter Coil external diameter Strip width Strip thickness Coil unit weight Stack Weight 4 508 mm 1975 mm 1250 mm
1mm
27.5Mr
110 MT
3.0
Process Data
Thermal cycle as specified here below are those commonly used to obtain required sieel grades. The detailed incoming material chemistry to obtain such grades shall be recommended by know-how supplier
oC
710
850
oC
710
850
Furnace temperature,
650-700
oC
690
160
160
oC
350
350
-.*:-I""i^:e
Kt'^^
4,0
KJ /"
5.0
5.t
Hydrogen
Hydrogen Oxygen Dew Point Pressure (Max) Flow rate Recommended generating capacity Recommended Storage Storage volume if the pressure of storing is 10 Kgs/ Sq cm Storage volume if the pressure of storing is 5 Kgs/ Sq cm
100o/o
60 NM cube / Hr
120 Nm3
12CubM
24 Cub M
5.2
Nitrogen
Nitrogen Oxygen Dew Point Pressure maximum Pressure minimum Flow rate
100% 5 PPM max.
(including compressed nitrogen Required as given under 5.3) 800 Nm"/h (maximum) 160 NM cube / Hr 800 Nm3
Recommended generating capacity Recommended Storage Storage volume if the pressure of storing is 17 Kgs/ Sq cm
47CubM
.{ Jl
KV
"J
: : : : : :
!
included in 5.2as mentioned under 5.2 Dry, filtered & oittess minus 60oC 0.01 mg/m3 < 5 microns
10o/o
voltage,50 Hz
: : : : :
320 kVA
Fuel [NG]
LCV Pressure maximum Temperature Flow Rate 8500 kcals/Nms
15 kg/cm2
5.6
: : : : : : : : :
4-5 kg/cm'? oc Max 33 12oC 7.5-8 < 30 ppm CaCO3 and MgCO3 < '10 ppm 73 m'/h
:
We have considered normally open type SOV for the water line to allow water to the baftery limit of the installation in case of power failure.
Pump will be provided to fill the over head tank from the sump tank.
-l<-'"/
\\)//
Ltd.
6.0
Consumptions
For the product mix mentioned under 1.0, the consumption figures per ton of the material annealed will be as follows:
NG, kcal / MT Hydrogen, Nm3 / MT [Hydrogen consumption will go up if the coolant carry over with the coil is more than 500 mg / m'?l. Nitrogen excluding the compressed Nr, Nm3 / MT
143000 f ISOOO
2.5-3
2
2
Compressed N2, Nm3 / MT Recirculation of cooling water, m3/MT [PS: evaporation etc. will be about 1.5% of thls] Electricity, kwh / MT (Base fan + Combustion Air blower + Cooling Hood)
-2.2
5.0
11.7
12.5
K
a
i'-
"'"-
ffi*6:"
.K .;:;.i%,, !Sii::::ky./
^\tr*
Vr,/
s'
Ltd.
7.0.
High Productivity
The productivity of the equipment is depends on charge weight and annealing cycle time. Keeping the charge weight same, H2 itmosphere result in shorter annealing cycle time and hence higher productivity compared to Nitrogen atmosphere annealing. 95% N2,
ilgpgl'es_ 9f Hydrogen hetping the improved heat transfer (compared to 5o/o H2) and reducing cycle time are given below.
Sl No Properties
9s% N2
too% H2
5%H2
7
4.t
7.27
2 Density Kgs
M3
0.09 0.41
3 Thermal Conduuctivity
WmX
0.08
80
762
High Convection
Hydrogen has very low density (0.09 kgs /m3) and better dynamic viscosity compared to Nitrogen density (1.21 kgs/m3) and viscosity. Considering the lower load for H2 atmosphere (for a fixed rpm), while using H2 atmosphere, the base fan speed can be increased for a given power of base motor resulting improved convection.
Uniformity of properties
lncreased convection (High convection) and befter conductivity of H2 result in uniform temperature within the charge material which in turn result in uniform properties of the material being annealed.
l(., "
Less Space requirement As less number of equipments space requirement is also less which reduces the cost of foundation and labor cost.
a
Less Labor
Less labor cost due to increased automation and lesser number of equipments
11
8.0.
Safeties
Hydrogen atmosphere annealing is absolutely safe thanks to specialized equipment and automatic control system interlocks through pLC.
will be incorporated using high level automation and sequences controlled by the PLC logic for the operation of the hydrogen atmosphere annealing Furnace installation. Some of the safeties considered for ihe installation are listed below.
Safetie_s
Tightness test Tightness of the annealing atmosphere will be checked at the start ofthe cycle and the purging of the atmosphere will start only when the tightness of the base is found okay.
.
1
purging Both initial and final purge will be done using Nitrogen. Safety is ensured by calculating the time for this purge and the minlmum flow rate. 02
Analysis
is checked for completion of N2 purge sequence.
02 percentage
Base Pressure
.oY-y'
(,|"1',*'
Base pressure will be monitored continuously during the cycle and the inlet to the annealing atmosphere switched over to Nitrogen in case the pressure drop below 90 mm WC.
Fail safe operation
All the valves selected for the installation will be fail safe in operation. Transmitters of reputed makes like Rosemount
Error test will be carried out at the sta( of the each cycle Speclal Hydraulic system with locking feature for enra safety
l(u't".
tz
High levels of safety using the pLC interlock to avoid manual interventions.
2 different outlet lines are considered for the protective gas ouflet (one for N2 + H2 and other for N2 + Air)
Excellent sealing arrangement between inner cover flange & base flange by means of superior quality elastomer seal.
f\'
Kn'"
Ltd.
13
9.0
Scope of Suppty
ln general our scope of work basically includes the following Design, engineering, procurement lnspection & Supply of the equipment
9.1.
o o o
Casing, traverse and flue ducts Refractory ceramic fiber insulation Combustion system comprising:
8 Nos. NG fired Kromschroder make burners with SS individual recuperators for preheated combustion air.
. I sets of ball valves for fuel and butterfly valve for air. . Limiting orifice valves, solenoid valves for the Air and Gas lines . 8 Nos. ratio regulators for maintaining desired air and gas ratio . Combustion air blower with motor . Transmitters to read the flow of gas and air o PULSE FIRING system comprising central pulse firing
controller, flame controller for each burner, ignition transformer and flame rod /ionization rod for each burner
o o . . . .
All necessary wiring within the heating hood panel and the equipments mounted on the heating hood.
l'\ ,/
Yr'
,/
k,/
Seco Warwick Allied Pvt. Ltd. SWAPUBAF/Ql 3/033C-H2HiC Technicat Structure and lininq
t4
The heating hood consists of a gas tight cylindrical steel structure, with the necessary openings for mounting the burners. The steel plate casing is mainly lined internally with ceramic fiber blankets fitted to the casing by special stainless steel anchors and speed washers.
The roof casing is flat and reinforced with a steel structure on which is fixed a lifting traverse for handling the heating hood by means ofthe crane hook.
(^l
r.''
ls
9.2
. . . o . . o . o o . . o o
8 Nos. Swing type hydraulic cylinders with specialized mechanical locking arrangement for clamping the inner cover to the base complete with the DC valves, Pressure switches etc.
Base Panel and electrical accessories Annealing Bases Function The work base supports the coils to be annealed and the base equipment. lt will have high strength and rigidity, good stress resistance, good thermal insulation and perfect tightness. Descriotion
9.2.1
The base is made of a heavy gauge plate gas tight resting on a chassis of structural steel work.
k'J',t
16
9.2.2
The recirculation of gas transfers heat from the inner cover to the load and homogenizes the heat flux into the load. The impeller is driven by a.extended shaft base fan motor assembly. Cooling water is required for cooling the bearing housing of these assemblies. The motor is equipped with VWF drive.
Gas from the impeller will be guided to the annular area between the charge outer diameter and inner cover by fabricated diffuser arrangement. The diffuser is covered by a bottom convector. Characteristics lmoeller Steel Grade Diameter Motor
:
: :
'.
:
:
r'//
^./
F!
l7
9.2.3
Tightness and clamping equipment Function For safety, good gas tightness has to be ensured between inner cover and base. Descriotion
Tightness is secured between the work base and the inner cover by a solid seal and a hydraulic clamping system. The inner cover seal is of special design for high tightness. The seal is placed in a water-cooled jacket and is pressed against the bottom base plate (Flange) of the inner cover by means of hydraulic cylinder clamps.
8 Nos. of Cylinders are provided on each base to achieve good repartition of the pressure between inner cover and base seal.
-t
Quality Section
Water flow
: : :
rate
-( .,.
N^)".
18
9.3
7 Nos, of Corrugated lnner covers Shell and dish end made from 6 mm thick AlSl 309 / DIN 4828 grade material with machined Mild Steel flange at the bottom. Function
The inner cover covers the charge to be annealed under a prolective atmosphere and transfer heat flux from the furnace to the load.
Descriplion The inner cover is of corrugated type, which will provide more strength and larger heat transfer area.
It is composed of:
. . . . .
a lower cylindrical base, a channel located in bottom part allowing to recover the cooling water. a machined & stress relieved bottom flange, which is rested on the base seal.
Characteristics Quality Type Thickness Shell thickness dished end bottom flange
: : : :
.2
<J',l
19
9.4
3 Nos of Air & Water cooling type Gooling Hoods each comprlsing the following: Casing made from 5 mm thick AlSl 430 material and overhead lifting traverse, guide eyes, bottom flange from mild steel. 2 Nos. of Cooling Fans with motors, 2 set motor starter Function The cooling hood cools the inner cover by blowing air at the beginning of the cooling phase (Air cooling) and then by water to bring the charge down to a temperature where inner cover can be removed. Description
(./
\1' /
/
SWAPL make Cooling hood
K"' :t.
20
9.5
1 No of Motor Control Center for all 7 Bases with Base pLC CpUs
Base Panel (for each base will comprise the remote l/O station) for the base. Heating hood panel will house the pulse firing components and also the remote l/O station for the Heating hood Common CPU will be arranged in Main PLC panel.
1 No PC panel to house the PCs and KVM switches will be provided outside.
9.5.1
ElectricalEquipment
Our equipment includes mainly low voltage AC motors, motor control center as well as WVF cubicles. Motor Control Center with VWF Drives for 7 nos. bases Motor control center cubicles will be located in the main Electrical room. Motor control center feeders will be of fixed type and will house the equipment indicated hereunder:
r' / / r'
9.5.2
lncoming unit Direct on line starter for Hydraulio pump feeders (flxed type) circuit breakers for other equipment Frequency convertor crucible (VWF) for the base fan MCCB protection and lnput / Output chokes will be provided for the drives.
Control Equipment
forTnos.ofbases
Functions performed:
/ / / r' r' /
Temperature measurement Temperature Control Hydrogen Gas Flow rate Protective gas. pressure Control Safety Sequential
features Control
!(i \\ ,/ ,/ ^.J
,/
..
'
, ^r
.".
Seco Warwick Allied Pvt. Ltd. SWAPL/BAF/Ql 3/033C-H2HiC Technicat Seouences lnner cover clamping Tightness test N2 purge Heating and soaking Natural cooling Air Cooling Water cooling N2 Purge lnner cover unclamping
21
9.5.3
Supervisioneouipment
Main analog values and status of each base would be displayed on PC screens.
The main PC station will also show the various alarm history, log book provision for events for a particular annealing cycle, keeping track of the malfunction and reporting for thelime inlervals requested for the corrective action, Operating hours of the equipment for the maintenance / calibration requirement. The deployment of the equipment will be displayed both in the tabular / bar chart manner to get the actual time of the end of that heating / cooling sequence to preplan the activity.
Logglng of the various process activities are possible and can be compiled for the temperature profiles, utility consumption plots for the hydrogen Gas and N2. Anneal plot with the Zoom feature and the annealing protocol for each charge will be available.
Anneal plot will comprise the detailed curves for the following.
Actual circulating gas temperature Temperature Set point profile Actual Furnace temperature Furnace temperature set point N2 Flow Hydrogen Gas flow Base Pressure Motor Speed in rpm / Frequency of the
VWF drive
Anneal No. Material data including the coil No., grade, thickness, width, weight. Anneal program with the tracks Process data with the heating time, Cooling time and total time/J ,'l
s,/
kv
nr
22
The details of the already executed cycle will be available from the Archive option using anneal No. Performance of each charge is noted and the reports will also be made equipment-wise, month-wise, date-wise, year-wise for comparison. Separate production charts also will be made available for showing the daily account of coils loaded, unloaded and under annea'ling. Archiving is made possible and most of the data which are in the database can be stored and retrieved. Data for the last 12 months will be stored in the system and can be retrieved
The set point data entered by the supervisor, the temperature and the atmosphere tracks will be worked with the coil data to get the actual cooling and heating limes for the charge. The model will also decide the initial and final purging times with the definite flow rate.
lnterlock for Maximum charge weight, Minimum charge weight, Maximum coil OD, Minimum and Maximum thickness, Maximum width of the coils etc will be provided for the coils selection for a cycle. The supervisor will decide the program for an anneating cycle depending on the quality requirements of the linished product and the type of raw material using the various set points as well as the temperature and the atmosphere tracks (of 9 segments each). Uniformity of the properties is quite assured in this method as the operators are not involved in selting the set points and the entire control is with the supervisor. Manual interventions will be possible from the process data output mask by pressing the Enter key. This will be possible only if the supervisor is logged on. The idea is to avoid the pperator changing the cyclbs, which would affect the ,^rrl[roperties of the material.
,Kv,,,
i-/
23
9.5.4
Svstem Confiouration The system foreseen will have the following components 1 No Main PLC 1 Base PLC for each base (CPU arranged on MCC Panel and base panel to house the Remote l/O station) 1 No remote l/O station for the heating hood l/Os 'l No. SCADA PC 1 No. Engineering PC
PLCS, PCs, will be connected on Profinet and base fan will be on Profibug network.
Main PLC will supervise all utility supplies such as Nitrogen, Hydrogen, Cooling Water, Fuel, Hydraulic controls and vent line purging valves.
l< ^/
n/
9.7
9.8 9.9.
1 set of valves & instruments for the main 1 No. common hydraulic power
utilities
"y''. X V,t
pack
for the performance
Commissioning
ir:*rP^", optionaritems 97A^t^ battery piping within the material $";( \r.' 9.11. lnterconnecting material - Pipes and limit (1 M abovL the nearby column) , cables, cabling material within ,r!,16q oV' f,t{./ the battery limit ( MCC incomer) - Price offered separately 9.12. Erection and commissioning of the installation by our skilled labor. \9'
.
/\,/.,7
Note - Local conveyance of our engineers during Erection and commissioning at site will be provided by ACCIL
1{\ tl
./,uY"
9.13
2 years normal operation spares. List given below and price offered
separately
25
9.14.
9.15.
Embedded steel for the civil foundation, gratings, chequered plates, etc. for the annealing installation - Price offered separately Convector / lnner cover lifting tong UPS for the PLC / PC load separately
9.'t6
Price offered
9.17. 9.18.
Mass Flow meters for N2,H2 and fuel Gas at the battery limit. offered separately
price
Emergency water supply SOV, Water return pump with standby & sump pump and interconnecting material within the battery limit including level switch - Price offered separately Flue exhaust system consisting of flue exhausts dampers, duct work within the battery limit and flue exhaust blower - - price offered separately Chimney will be manufactured by ACCIL based on SWAPL drawings.
9.19
9.20
Note
Set of Convectors (21 Nos ) suitable for annealing coils of lower strip thickness - Price offered separately.
Price for extra 1 No Base and lnner cover is mentioned separately in the Price schedule
a.
rt16la4
u Jr ---,.
iwcCf
K- t/
Ligf
llr0lc l
bicrt
Pct,
g,'/
aFi
7^.ioS
Pol/r
Br,rz{eir.r
4o
t1P
lo
a.
rh";)lo'-r Ai't
15 i'lP
^/cJ
fi\.n -l
t'
.r,rP
$r
3t,L
bNat
Aa, fo'1
F\fi/)rLltr-
tt\ch'{
5ap
I 't i sb,^'lbf
26
10.0
Make of
Equipments
Item Description
1 s*1tA'V tl.\t4/a< b,
Make of Equipments
A Lctt'
n ' '(
Make
2/2 way Solenoid valves 3/2 Solenoid valve with the valve manifold Pilot operated Pneumatic Ballvalve & Bulterfly valve
Virqo, lndia
Rotex, lndia
GP and DP lransmitlers
Emerson Process
(Rosemount205l series)
Pressure regulators (< 4 Kgs
i sq cm inlet
Kromschroder, Germany
Kromschroder, Germany
lndfoss, lndia
Kromschroder, Germany
Quantameter
Ratio regulator Limiting orifice Motors
/ /
ABB
Base Fan lvlotor Thermocouples Burners Ceramic Fiber Flame controller lgnition Transfomer
Kjt
*
27
Kromschroder, Germany
',
Switchgears PC
Bosch Siemens
-2
KJ
"^
28
11.0
References and Typical photographs of Hydrogen atmosphere Bell type furnace installations (H2HiG) supplied by SWAPL
11.1. References
\.
. . o . . . . . . . . . . . . . o . . . . . o . . . o
Thyssenkrupp Electrical Steel Bd. Ltd, Nasik (lndia) - 8 Bases Tube Products of lndia, Chennai, (lndia) - '12 Bases Hero Cycles Limited, Ludhiana, (lndia)- 16 Bases Bhushan Steel & Power Limited, Kolkata, (lndia) - 22 Bases
Bhushan Steel Limited, Sahibabad, (lndia) - 12 Bases (6 Bases under execution) Bhushan Steel Limited, Khopoli, (lndia) - 6 Bases Six October for Metal industries (SOMICO), (Egypt) - 5 Bases Ruchi Alloys & Strips Limited, lndore, (lndia) - 16 Bases (6 Bases under execution) PT Essar Dhananjaya, (lndonesia) - 4 bases Kandil lndustries, (Egypt) - 4 Nos KYCR, (Bangladesh) - 4 Bases Essar Steel Limited, Hazira, (lndia) - 36 Bases Lyka Udyog, Kolkata, (lndia)- 2 Bases Karnataka Strips Pvt, Limited, Bellary, (lndia) - 4 Bases Fajr-e- Sepahan Galvanising Co, Middle East Asia (Through
CMIFPE)-11Bases
Corpacero, Colombia (Through CMIFPE) - 7 Bases JSL Stainless, Hisar, (lndia) - 12 Bases Essar Steel Pune Facility, Pune, (lndia) (Formerly Shree Precoated steel Limited)-6 Bases Uttam Galva Steel Ltd, Khopoli, (lndia) - 10 bases (4 bases under execution) Uttam Strips Pvt Ltd, Bhiwadi, (lndia)- 16 Bases (8 Bases under execution) Dharampal Premchand, Agartala, (lndia) -2 Bases Surya Roshni Limited, Bahadurgargh, (lndia) - 2 bases Theis Precision Steel Pvt Ltd, Navsari, (lndia) =4 Bases JSL Stainless, Jajpur, (lndia) - 4 bases National Steel & Agro lndustries Ltd., lndore, (lndia) - 4 bases Loha lspaat Limited, Taloja, (lndia) - 2 bases (under execution) Roofings Rolling Mills Ltd., (Uganda) - 2 bases (under execution)
1../*
29
H2HiC installations
.,
11.2.2. Uttam Galva Steel Ltd. Khopoli, lndia (10 Nos Bases,4 Nos. are under execution)
30
K/v
..
Ltd.
3l
schedule) v
ft,rt*,/-ar
'
MS Base insert support ring plate in the foundation columns and base guides (offered separately in the price schedule) Embedded conduits (ACCIL scope) Protection and covering for trenches, troughs and pits ( offered tt separately in the price schedule) tv, otuA
nav\evtdt
tt)*
Gratings, supports, base supports, for flooring the annealing installa'tion ( offerea separately in ihe price sc-hedule; fv reejHandling equipment Coil handling equipments Handling equipment for lifting the lnner cover and convectors (offered separately in the price schedule) To4toctuol,cl
("'r'
All handling equipment within the main building such as overhead traveling crane, mobile crane, fork lift truck, bogies, trailers, etc.
Machines
. . .
Electricity
All motors and gear motors except those not included in the scope of supply. The low tension distribution network with the bus bars, transformers, circuit breakers, main panel for energy measurement
.---...
n ",^_..-
,^
,"
.(
automatic switchgear.
. .
Electric power metering system ( Multifunction energy meter at the MCC incomer is considered)
The supply of power for the maintenance and handling equipment included as part of the shop.
lnterconnecting material The cables and cabling, the intercommunications and the associated design work within & outside the battery limits.
The pipes, pipe fittings, piping of all utilities as also the pipes and fittings for the hydraulic system within & outside the battery limit.
(Price for interconnecting material within the battery limit is offered separately) The earthing circuits including lighting conducting rod outside the battery limit earthing pits, etc. The complete intercommunication system. Hardware / software modification of the customer computer The general and safety lightning for the shop, for the building and for th! aircraft warning together with power supply. Utilities Receiving stations for NG gas including necessary accessories like presJure regulating valves, safety and manual valves, flow meters etc.
The metering of fluids and gases at the main utility - Prices offered separately lor H2, N2 and fuel measurement. All generating source of air, demineralized water, hydrogen' Nitrogen, Fuel etc.
The general distribution network for the fluids, gases, and other services, The feeding, treatment, cooling, emergency diesel pumps and return pumping of water. Piping to any storage and storage itself.
,. (_vt,l
tf1
Seco Warwick Allied Pvt. Ltd. SWAPL/BAF/Ql 3/033C-H2HiC Technical Miscellaneous Post annealing cooling stations Two years normal operating spares Any sump pump Any fan suction duct work to the outside ofthe building and any air filtration. Noise insulation Any fire protection / fire fighting system Heating / air conditioning and ventilation of buildings, control rooms, working positions and associated rooms.
33
offered Optionally
The rooms (hydraulic, electrical, control, etc.) associated with the shop.
The first and subsequent filling of oils and greases. The consumable material and utilities. Transport and insurance to site
. -
ln general, all equipment and services not mentioned and detailed in the specification.
It may please be noted that it is very necessary to have the EOT crane duly instalted and commissioned before the erection of the annealing installation is taken up, since an EOT crane is a must for handling the large equipment involved.
12'2
Particular
exclusions
same. trolle,
Nitrogen/ Hydrogen Generating stations, storage tanks, and pressure control system etc. for the Coil grabs and transfer
n*\- no ira
({ , , *'7 Lifting tong for the lnner Cover and Convectors. Offered Optionalli lnterconnecting material (pipes, piping & interconnecting materials A J :r battery . --1 lowt*w
t::,
lnterconnecting material (pipes, piping & interconnecting materials of the utilities and Cabling, cabling material) within the limit. (Ootional extra orice indicated in the orice schedule)
r
I
34
Ltd.
35
13.0
Prices
't
3.'t.
Equipment price
Our price for the equipment mentioned in the scope of supply 9.1 to 9.1 0 chiefly comprising
13.2
7 Nos Annealing bases 7 Nos. corrugated lnner protective covers 4 Nos Heating hoods with Kromschroder burners and pulse firing system 3 Nos Air & Water cooling type cooling hood etc.
will be Rs - - /- (Rupees -
Lakhs onty)
13.2.1.
Optional extra price for interconnecting material within the battery limit as explained in 9.11 of scope of supply
Our optional extra price for supply of interconnecting material (pipes, piping material and cables and cabling material) with the battery limit for 7 Nos bases will be Rs-- /-(Rupees-, only)
13.2.2
Optional extra price for Erection & Commissioning of supplied equipment as explained in 9.12 of scope of supply
Our optional extra price for Erection & Commissioning of the supplied equipment by our skllled tabor will be Rs - -/- (Rupees- - only)
Note:
You will provide local conveyance for our engineers durlng erection and commissioning.
13.2.3
Optional extra price for supply of spares for 2 years normal operation as explained in 9.13 of scope of supply
Our optional extra price for supply of 2 years normal operation wlll be Rs - - /- (Rupees - - only)
l.|'
"<
KJ.
36
Optional extra price for supply of Embedded steel for the civil foundation, gratings, chequered plates, etc. for the annealing installation as explained in 9.14 of scope of supply
Our optional extra price for supply of Embedded steel for the civil foundation, gratings, chequered plates, etc. for the annealing installation will be Rs - - /- (Rupees - only)
13.2.5
Optional extra price for supply of lnner cover / convector lifting tong as explained in 9.15 of scope of supply
Our optional extra price for supply of lnner cover / convector lifting tong will be Rs - - /- (Rupees - - only)
'13.2.6
Optional extra price for supply UPS as explained in 9.16 of scope of supply
-(Rupees--only)
13.2.7
-i
Optional extra price for supply of Mass flow type flow measurement for H2, N2 and Fuel Gas at the battery limit as explained in 9.17 of scope of supply
Our optional extra price for supply of flow measurement for H2, N2 and fuel gas at the battery limit will be Rs - -
/-(Rupees--only)
13.2.8
Optional extra price for Diesel pump, Return water Pump (with standby), Sump pump intertonnecting miteriat *ittrtn tt battery limit as ...1f " explained in 9.18 of scope of ,*.",",t"^Jr",y
and supply
,t ')tu'
J
,
--only) 13.2.9
optional e)dra price for Diesel pump, Return water Pump (with standby), Sump pump and interconnecting material within the battery iimit witt Ue Rs - - /- (Rupeei
("I.':)r:O'
U/
Optional extra price for Flue exhaust system consisting of flue exhausts dampers, duct work within the battery limit and flue exhaust blower as explained in 9.19 of scope of supply
Our optional extra price for flue exhaust system consisting of flue exhausts dampers, duct work within the battery limit and flue exhaust blower will be Rs - - /. (Rupees - - only)
/,,
rtJ.{
37
13.2.10
Optional extra price for I set of convectors (21 Nos) suitable for annealing coils of lower strip thickness as explained in 9.20 of scope of supply
Our optional extra price for 1 set of convectors (3 Nos) suitable for annealing coils of lower strip thickness will be Rs - - /- (Rupees - - only)
13.2.11
Optional extra price for supplying 1 No of Cooling Hood as explained in 9.4 of scope of supply
Our optional extra frice for supplying 1 No cooling hood will be Rs - - /- (Rupees - - only)
13.2.12
Optional extra price for supplying 1 No additional base, lnner cover and associated components
Our optional extra price for supplying 1 No additional base, lnner cover and associated components will be
Rs--/-(Rupees--only)
14.0
J6
Price Basis
TheDricesouotedaboveareEx-WorksShahapurbasis.Freight'insurance' irii"-., t"-"s and local levies etc will be to your account'
i-"iJ"
Excise DutY
excise gate pass for which Extra as applicable at the time of dispatch against you can avail MODVAT.
Taxes
Extra as aPPlicable
Payment Terms
30% advance along with the order' with taxes and duties in full 65% against readiness on pro-rata basis and commissioning' but not 5% retention amount payable against erection and aij J"v" oi ioi''pr"tion- of erection But if erection will be amount retention i" held up for no fault of ours tnis paiJ to us wiiliin 6 months of date of dispatch'
;i;;ih;;
ffi;i;ffi"s
Delivery
from the date of receipt 1o-12 months including erection & commissioning order atong with advance, ""0
tirli,iirp"i.nt""i"i""
paYments.
clause will be applicable' This is given in good faith and force majeure
Force Majeure clause delivery' erection or ln all cases where a time schedule for dispatch' shall be extended bv a delivery for time ,l"rriiri"ti- rir. oeen .pe"in"o, inl caused bv i;ii"p"tJ' erection or complelion is IJ"'['iJir"'pliiSiii / clearTg"-.f-t^o-' the purchaser instructions or lacr of instrucrioni / approvals *t'atsoever beyond our and or bv industrial disputes, strik;s;; oilny "au"e controt' rr durins the execution or O"f"yed' lost or damaged' we' shall not the contract, some or all tn't"i-iJt -omptetion "t" of th-e contract We shall be accept any liability for delay o1 n'on
iltv
undernoliabilityifweo.o,'',0*nt'"ctors/suppliefs.arepreventedfrom tv t""tont of war [whether declared or ;*i;;;;i;;i ot tn" ourig"iiont ;;iililhi;., icts ottoreign e;emi' hostilities' riots' civil commotions'
outs' mutinv' insu rrections' rebellion' fire' floods' Govt o.rders or restrictions' revolution, accidents, ",'tnq'"f"t' materiats due to import or other statutory obtain
.r
ct''/
t ri.
39
restrictions, lack ofwagon or shipping spdce, damage to planl, machinery or equipment or any other cause beyond our / our sub contractors / suppliers reasonable control.
Warranty
The satisfactory performance of the furnace is warranted under our supply. All materials will be under warranty for 12 months from the date of commissioning or 15 months from the date of supply which ever is earlier. Durlng the warranty period, all defective materials workmanship / designs will be replaced / rectified by us free of cost to you. The rectification may involve repair or replacement of defective parts or assembly. lt may become necessary for the purchaser to send the defective component to us for repair. Unless very necessary, we will not be deputing our personnel to carry out the replacement / modificalion at site which have to be carried out by the purchaser as per our instructions / drawings and with the repaired / replaced materials / equipment sent by us. Our warranty however excludes normal wear and tear of the parts / materials and excludes any damage due to misuse or reasons beyond our control like accident, natural calamities, etc. Warranty will not be applicable if equipment is tampered, repaired or altered, quality of product or process of manufacture changed without our consent in writing.
Warranty period for bought out components will be applicable from the date of supply / readiness of respective components from our suppliers end.
Validity
30 days and thereafter on our confirmation after revalidation.
lnsurance
"r/
)r/
(|'..t
Our price excludes insurance. lnsurance may please be arranged by you to cover risks during transit, storage, erection and commissioningi
For Seco Warwick
^ ,,,' {
/
Biju Davis General Manager (Bell furnaces)
r 'r'
-0) ./\ ./
u-..
K.v
t;
WARUIICXATIIID }YI. [1I). Tol fl FL008 rFgrEcH Fri( l0r, [0,I trrd.r ltrfiE, flrE [i]. a0( Fu
SECO
r?
{a0
i l
l4e8
l&b.l!.i wu.!!bdum.c..,con,
u.rlcoryuf,lcicon.pl
Efi8N
: d[d&lldtum.ct!.corn
6rh
Kind
Attn:
cEo
Ref :
Dear Sir,
Sub. :
This has reference to our above mentioned technical offer and the discussions had with your Technical Director Mr. M. Sivaramakrishnan at your Khopoli plant on 24th June 2013 and
O6th
September 2013.
We have discussed technical specifications, scope of supply and accordingly we have submitted our revised final technical offer. A copy oftne revised final'iechnical specification is attached for your ready reference. We were asked to send the commercial offer directly to you for your kind consideration. please find here below Prices for the scope discussed.
1.0
Prices
1.1
Equipment Price
Our price for the equipment mentioned in the scope of supply 9.1 to 9.10 of technical offer chiefly comprising
7 Nos Annealing bases 7 Nos. corrugated lnner Protective covers 4 Nos Heating hoods with Kromschroder burners and pulse firing system 3 Nos Air & Water cooling type cooling hood etc.
Kt)
apei'
& Chhr
.
r cro4! | Pld !. ttr*!. r2r, 65a^r. , 5rc{z ,|r *!L eE wE, MU^l3a ra3li Rd5. l[U<A s.rrlAruR olsr..]m .2i 611 , plor .1o-l{n, po o {o r?, r .tE sr^rE. rhN! -.oo s. t$or^ ,L: +!1 :2 aae firr. *r :: roo.
^Dt,
'.ir
1.2
I
Optional extra price for interconnecting material within the battery limit as explained in g.1 1 oi scope of supply Our optional extra price for supply of interconnecting material (pipes, piping material and cables and cabling material) with the battery limit for 7 Nos bases will be Rs 33,25,000/- (Rupees Thirty Three Lakhs Twenty Five Thousands only)
1.2.2
O-ptional elitra price for Erection & Commissioning of supplied equipment as explained in 9.12 of
scope of supply
during erection and commissioning. 1.2.3 Optional extra prlce for supply of spares for 2 years normal operalion as explalned in 9.13 of scope of supply Our optional extra price for supply of 2 years normal operation will be Rs 37,00,000^ (Rupees Thirty Seven Lakhs only) 1.2.4 Optional extra price for supply of _Embedded steel for the civil foundation, gratings, chequered plates, etc. for the annealing installation as explained in g. j4 of scope of supply Our optional extra price for supply of Embedded steel for the civil foundation, gratings, chequered plates, etc. for the annealing installation will be Rs 27,16,000/(Rupees Twenty Seven Lakhs Sixteen Thousands only) Note Steel considered above is only for the 7 Nos of bases
1
.2.5
Optional extra price for supply of lnner cover / convector lifting tong as explained in 9.15 of scope of supply Our optional extra price for supply of lnner cover / convector lifting tong wi be Rs 7,20,000/- (Rupees Seven Lakhs Twenty Thousands only)
\7
,L ,I
K{'l
I?
Seco Warwick Allied Pvt. Ltd.
a-
consisting of flue exhausts dampers, duct work within the battery limit and flue exhaust blower will be Rs 8,40,000/- (Rupees Eight Lakhs Forty Thousands only)
1.2.',to
Optional extra price for 1 set of convectors (21Nos) suitable for annealing coils of lower strip thickness as explained in 9.20 of scope of supply Our optional extra price for 1 set of convectors (21 Nos) suitable for annealing coils of lower strip thickness will be Rs 26,60,000/- (Rupees Twenty Six Lakhs Eighty Sixty Thousands only)
.2.11
Optional extra price for supplying 1 No of Cooling Hood as explained in 9.4 of scope of supply Our optional extra price for supplying 1 No cooling hood will be Rs 9,42,000^ (Rupees Nine Lakhs Forty Two Thousands only)
.(
\\ /// ^'' /
/\ /
K""
1.2.12.
Optional extra price for supplying 1 No additional base, lnner cover and associated components Our optional extra price for supplying 1 No additional base, lnner cover and associated components will be Rs 99,00,000 (Rupees Ninety Nine Lakhs onty) The above price is in addition to the above One sel of interconnecting materials @Rs 4,75,0001 Erection and commissioning @Rs 3,50,0001 3 Nos convectors for thinner gauges @Rs 3,80,000/1 Set of embedded steel @ Rs 3,88,000^
2.0
The prices quoted above are Ex- Works Shahapur basis. Freight, insurance, Excise duties, taxes and local levies etc. will be to your account.
Excise Duty
Extra as applicable at the time of dispatch against excise gate pass for which you can avail MODVAT.
Taxes
Extra as applicable
Delivery
10-12 months including erection & commissioning from the date of receipt of order along with advance, timely dispatch clearance and progressive payments. This is given in good faith and force majeure clause will be applicable.
F"'
Ltd.
Y.
Warranty
The satisfactory performance of the furnabe is warranted under our supply. All materials will be under warranty for 12 months from the date of commissioning or 15 months from the date of supply which ever is earlier. During the warranty period, all defective materials workmanship / designs will be replaced / rectified by us free of cost to you. The rectification may involve repair or replacement of defective parts or assembly. lt may become necessary for the purchaser to send the defective component to us for repair. Unless very necessary, we will not be deputing our personnel to carry out lhe replacement / modification at site which have to be carried out by the purchaser as per our instructions / drawings and with the repaired / replaced materials / equipment sent by us. Our warranty however excludes normal wear and tear of the parts / materials and excludes any damage due to misuse or reasons beyond our control like accident, natural calamities, etc. Warranty will not be applicable if equipment is tampered, repaired or altered, quality of product or process of manufacture changed without our consent in writing.
l_
r\
F"v
rl
FSeco Warwick Allied pvt. Ltd. SWAPL/BAF/el 3/033C_H2HiC Commerciat Warranty period for bought out components will be applicable from the date of supply / readiness of respective components from our suppliers enJ.
wi allow us to take the photographs and video ofthe equipment supplied and equipment in operation.
You
Vatidity
30 days and thereafter on our confirmalion after revalidation.
Insurance
Our price excludes insurance. lnsurance may please be arranged by you to cover risks during hansit, storage, erection and commissioningl We trust that the information provided above is clear in all respect.
u,
a fast growing company rike yours and are keenly waiting to meet you and discuss the offerd and to take it forwjrd.
Thanking you and assuring you our best attention and co-operation at a[ times, we
remain.
Yours truly,
For Seco Warwick