Professional Documents
Culture Documents
ADA&508ComplianceAssistancePleaseCalltheFastLaneHelpDeskat18006736188.
Togetstartedfollowthestepsoutlinedbelow: 1.GototheFastLanehomepageathttp://www.FastLane.nsf.gov. 2.SelecttheProposal,Awards&Statuslinkonthetop(blue)menubar. 3.FillinLogIninformationinthePI/COPILogInboxontherightsideofthescreen. Note:ThePrincipalInvestigator(PI)fortheproposedPhaseIprojectMUSTloginandpreparetheproposal.
ClicktheLogInbutton
4.OnthePrincipalInvestigator(PI)/CoPrincipalInvestigator(COPI)Managementscreen,selectProposal Functions
5.OntheProposalFunctionsscreen,clickProposalPreparation
1 Revised04/12/2013
6.OnthePrincipalInvestigator(PI)Informationscreen,checkthePIinformationforaccuracy.Youmaychooseto updateoreditthePIinformationbyselectingtheEditPIInformationbutton.YoucannotchangethePIhere. Oncefinished,clickthePrepareProposalbutton.
7.Onceyouselecttoprepareyourproposal,theProposalActionsscreenappears.
ScrolldownpasttheTemporaryProposalsinProgresssectiontotheCreateNewProposalsectionatthebottom, andclickontheSBIRPhaseIorSTTRPhaseIbutton.
2 Revised04/12/2013
TheCoverSheethasbeendividedinto4sections.TocompletetheCoverSheetyoumustcompleteall4sections. 9a.ThefirstCoverSheetGOButtonisAwardeeOrganization/PrimaryPlaceofPerformanceSelection
TheAwardeeOrganizationinformationisprepopulatedfromthePIinformation.ClickontheAdd/Change PrimaryPlaceofPerformancebuttontomakenecessaryupdates.
3 Revised04/12/2013
AfterthePrimaryPlaceofPerformanceisidentified,clickSavePrimaryPlaceofPerformance.
Aftersaving,clickGoBackontheAdd/ChangePrimaryPlaceofPerformanceandtheInstitutionsforthis ProposalpagetoreturntotheCoverSheetsComponentsForm.
4 Revised04/12/2013
9d.ThefourthCoverSheetGOButtonisRemainderoftheCoverSheet ClicktheGObuttonandprovidetherequiredinformationtocompletethecoversheet.
BudgetandDurationInformation:Threeitemsarerequested.
5 Revised04/12/2013
AnnouncementandConsiderationInformation,PrincipalInvestigator(PI)InformationandCoPrincipal Investigator(CoPI)Information:Thesesectionswillautomaticallypopulate.
PreviousNSFAward:Donotcheckthebox.PreliminaryproposalsarenotacceptedintheSBIR/STTRProgram
OtherFederalAgencies:ProvidealistingofallotherFederalagenciestowhichyouhavesubmitted,orplanto submit,thisproposal.
6 Revised04/12/2013
PrimaryPlaceofPerformance:Thissectionwillautomaticallypopulate.
OtherInformation:Checktheappropriatebox(s)thatareapplicabletoyourproposal.
SmallBusinessInnovationResearch:Selecttheappropriatetopicfromthedropdownboxandtypeinthe appropriatesubtopic(referencesolicitation).
TheSmallBusinessConcernCertifies:Answerallofthefollowingquestions.
7 Revised04/12/2013
NOTE:IfthePIrespondsYEStothequestionIthasreceivedPhaseIIawardsfromtheFederalGovernment, thecompanysCompanyCommercializationHistorymustbeprovidedintheSupplementaryDocumentsmodule oftheproposalortheentireproposalwillbeReturnedWithoutReview.TheCommercializationHistorymustbe submittedontheNSFtemplate:http://www.nsf.gov/eng/iip/sbir/Forms/CommercialHistoryTemplate.pdf. CompanyOfficerInformation(ForBusinessandFinancialMatters),OtherInformation,Affiliated Companies,ResearchInstitutionInvestigatorandProprietaryNotice:Fillinallrequestedinformation.
8 Revised04/12/2013
10.ClickontheGobuttontotheleftofAdd/DeleteNonCoPISeniorPersonnel:
9 Revised04/12/2013
Afteraddingallparticipants,clickGoBackuntilyoureturntotheFormPreparationscreen.
11.ClickontheGobuttontotheleftofReferencesCited:
10 Revised04/12/2013
Ifuploadingafile,clickTransferFileontheabovescreen.
Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploaddocument.ClickGoBackuntil youreturntotheFormPreparationscreen.
12.ClickontheGobuttontoleftofBudgets(IncludingJustification):
TheProjectBudgetScreenwillappear.Thecompanynameshouldbehighlighted;thenClickontheAddYear button.
11 Revised04/12/2013
Year1willbehighlighted;thenClicktheAddbutton.FastLanewillreturntotheProjectBudgetScreen.
ClickontheFundshyperlink(undertheYearheading).
A.SeniorPersonnelsection:ClicktheAdd/RemoveSeniorPersonnelbutton.
Checkthebox(s)fortheSeniorPersonneltobeincludedonthebudgetandthenclickSavetoreturntothe Year1Budgetscreen.
ProvidethenumberofCALENDARmonthsandproposedcostforallSeniorPersonnel;thenclickCalculate. YoumustenterinformationintotheCalendarMonthsfieldoneachlineforwhichfundsarerequested.
12 Revised04/12/2013
B.OtherPersonnelsection:Provideallapplicableinformationonpersonnelinthecategorieslisted.Providethe numberofCALENDARmonthsandproposedcostforallOtherPersonnel;thenclickCalculate.
Providenamesandtitlesofallpersonnelinthebudgetjustification,aswellasacleardescriptionoftheir responsibilitiesintheproject.Note:Ifyouproposednewemployeesthatareyettobehired,simplylist thatpositionasapotentialhireandproceedwiththebalanceoftheinformationasiftheywere alreadyinyourorganization). ThesmallbusinessconcernshouldNOTbudgetanypersonnelorfundsonthePostDoctoralScholars line. IntheBudgetJustification,pleaseincludetheactualannualsalaryinformationthatjustifiesthe calculationoftheamountsrequested(whichshouldmatchthelineitemintheBudget)forallpersonnelin theproject. C.FringeBenefitssection:ProvidetheestimatedamountoffringebenefitsforSeniorPersonnelandOther Personnel;thenclickCalculate.
13 Revised04/12/2013
D.Equipmentsection:NopurchasesofequipmentarepermittedinanNSFSBIRPhaseIproject;thissectionshould beleftblank.
F.ParticipantSupportCostssection:SBIR/STTRPhaseIproposalsdonotusethisbudgetlineitem;thissection shouldbeleftblank.
14 Revised04/12/2013
H.TotalDirectCostssection:ClickCalculateandthetotalofitemsAthroughGwillupdate.
J.TotalDirectandIndirectCostssection:ClickCalculateandthetotalofitemsHandIwillupdate.
L.TotalCostandFeesection:Afterallapplicablelineitemshavebeeninputtedintoyourbudget,clickCalculate andSave;thenclickGoBacktoreturntotheProjectBudgetscreen.
15 Revised04/12/2013
Aftercuttingandpasting/typingdetailsintextbox,clickSaveTextandthenGoBacktoreturntotheProject Budgetscreen.
Ifuploadingafile,clickTransferFileontheabovescreen.
Then, follow the instructions on the below screen and click Upload File to upload document. Once the budget justification is complete, click Go Back until you return to the Form Preparation screen or until you return to theProjectBudgetscreentoaddasubawardee.
16 Revised04/12/2013
12b.SubawardeeBudgetsection:ClickAddAnotherOrganizationifasubawardeebudgetisrequired.
Toaddtheorganizationtothebudget,completeasearchbytheorganizationsnameorDUNSnumber.
Highlighttheappropriateorganizationfromtheresultsthatappearinthebox;thenclickSelect.
17 Revised04/12/2013
ReturntotheProjectBudgetscreenandfollowthepreviousinstructionsforaddingthebelowdatatothe subawardeebudgetandbudgetjustificationwhenapplicable.(Note:Subawardbudgetcannotincludefundsfor PermanentEquipment,ParticipantSupportCosts,orResidualFunds.) Years SeniorPersonnel/OtherPersonnel FringeBenefits Travel OtherDirectCosts TotalDirectCosts IndirectCosts TotalDirectandIndirectCosts TotalCostandResidualFunds
*Whenapplicable,providequotes,pricelistsetc.(sameasthemainbudget)inthebudget justification.DonotuploadquotestotheSupplementaryDocumentsmodule.
Aftercompletingallbudgetrequirements,clickGoBacktoreturntotheFormPreparationscreen.
18 Revised04/12/2013
SamplebudgetforFastLanedataentry:
19 Revised04/12/2013
20 Revised04/12/2013
ClickthePrinttabontherighthandsidetoseethePDFversionofthebudget.
21 Revised04/12/2013
SamplebudgetpopulatedasPDF:
22 Revised04/12/2013
23 Revised04/12/2013
SamplesubawardbudgetpopulatedasPDF:
24 Revised04/12/2013
25 Revised04/12/2013
SampleBudgetJustification:
A.1. Senior Personnel Dr. Jane Smith, Chief Technical Officer, will work two person-months on the project (line A.1) at an hourly rate of $48/hr. 2 months * 173.33hrs/month * $48/hr = $16,640. B. Other Personnel Three other personnel will work on the project (line B.2). An electrical engineer, Mr. Michael Jones, will spend four months of effort building the prototype amplifier circuitry, at a rate of $24/hour. 4 months * 173.33hrs/month * $24/hr = $16,640. Two technicians will spend a total of three months each doing electrical and mechanical characterization, respectively, at a rate of $18/hour. 6 months * 173.33hrs/month * $18/hr = $18,720. C. Fringe Benefits Fringe benefits are requested to cover medical, dental, and vision coverage for employees. The fringe benefits rate, based on company records, is 20% of direct labor costs. Therefore, requested fringe benefits are 0.20 * $52,000 (total direct labor) = $10,400. E. Travel Dr. Smith and Mr. Jones will travel to the Grantees Workshop, at an estimated cost of $2,000 per person. Total cost for this trip is $4,000. Dr. Smith will also make one two-day trip to visit collaborators at Brown University. This trip will include round-trip airfare ($400), two nights at a hotel ($300), meals ($80), and a rental car ($150). Total cost for this trip is $930. Total budgeted travel is $4,930. G.1. Materials and Supplies The following is a list of materials and supplies to purchase, with quantity, unit cost, and total cost. Items with a total line item cost over $5,000 have quotes or pricing documentation included as separate pages in this budget justification. Chemical precursors: $150/unit, 20 units, $3,000. Specialized alloys: $600/kg, 10 kg, $6,000. Temperature sensors: $250/unit, 8 units, $2,000. Total budgeted materials and supplies is $11,000. G.3. Consultant Services Dr. I. D. Snow will be our consultant. She will work for a total of ten days (80 hours/8 hours per day) at the maximum consultant rate of $600/day. Total requested costs are $6,000. A copy of the signed commitment letter from Dr. Snow is included with this budget justification.
26 Revised04/12/2013
G.5. Subawards One subaward has been reached with Brown University. A signed letter of commitment from the subaward lead, Dr. Fred Johnson, is included in the proposal package. A full subaward budget and budget justification is also included with the proposal (see below). The total subaward amount is $35,000. G.6 Other ABC Machining will manufacture two sample holders, requiring an estimated 20 hours of effort. The rate for this service is $75/hour. Total cost is 20 * $75 = $1,500. We will also pay for use of electron microscopes at Purdue University, with a total of 10 hours budgeted. The cost for outside industrial users (see attached price list) is $200/hour, for a total cost of $2,000. Total other costs are $3,500. I. Indirect Costs The indirect rate for this project is 40% of total salaries and wages, for a total of $52,000 * 40% = $20,800. K. Fee The fee is calculated as 4.43% of the total direct plus indirect costs (line J), or $6,370. Taking the maximum allowed fee of 7% would lead to a project budget over the $150,000 limit for Phase I.
SubAwardBudgetJustification:
A.1. Senior Personnel Prof. Fred Johnson, project lead on the subaward, will commit two summer months of effort to the project (line A.1), at a cost of $10,000. B. Other Personnel One postdoctoral researcher will spend 2 months on the project, at a monthly rate of $4,500. Total cost is $9,000. A Post-Doctoral Mentoring Plan is included in the Supplementary Documents as required to support this budget line. G.1. Materials and Supplies The subaward budget includes $4,200 for materials and supplies to cover the cost of reagents, glassware, and precursors. I. Indirect Costs Per the Universitys guidelines, the overhead rate on the project will be 50.9%. The total indirect costs will be 50.9% of the $23,200 in direct costs, or $11,800.
27 Revised04/12/2013
13.ClickontheGobuttontotheleftofFacilities,Equipment,andOtherResources:
Uploadadescriptionthatspecifiessignificantequipment,instrumentation,computers,andphysicalfacilities necessarytocompletetheproject.Forfacilitiesandequipmentwhichwillbeused,butwhicharenotownedby thecompany,demonstratethatthecompanyhasorwillhaveaccesstotheseresources.Purchaseofpermanent equipmentisNOTpermittedinanSBIR/STTRPhaseIproject. AcompletedFacilities,EquipmentandOtherResourcesdocumentshouldincludethebelowinformation(if applicable). Laboratory Clinical Animal Computer Office Other MajorEquipment OtherResources
ThisdocumentisrequiredforallproposalstoNSF
Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploaddocument.ClickGoBackuntil youreturntotheFormPreparationscreen.
28 Revised04/12/2013
14.ClickontheGobuttontotheleftofProjectSummary:
TheSBIR/STTRPhaseIProjectSummaryhasthreerequiredsections: Overview IntellectualMerit Broader/CommercialImpact Theaggregateofthethreetextboxescannotexceed4,600characters.Themaximumnumberoflinesthatmaybe includedonapageis51.InformationmustbeenteredineachofthethreetextboxesforFastLanetoallow submissionoftheProjectSummary. ThefirstparagraphoftheIntellectualMeritMUSTbeginwithThisSmallBusinessInnovationResearchPhaseI projectorThisSmallBusinessTechnologyTransferPhaseIproject,asappropriate. TypetheProjectSummaryinthebelowtextboxes.Whenthissectioniscompleted,clickSaveandthenOK toreturntotheFormPreparationscreen.InformationMUSTbeenteredintoallthreetextboxes,orthe proposalwillnotbeaccepted.
DONOTusetheoptiontouploadtheProjectSummaryintotheSupplementaryDocuments
29 Revised04/12/2013
NO!
30 Revised04/12/2013
15.ClickontheGobuttontotheleftofProjectDescription:
TheSBIR/STTRPhaseIProjectDescriptionhassevenrequiredsections,whichshouldbeincludedinasingle document.Pleaseconsultthesolicitationfordetailedinstructionsaboutwhatshouldbeincludedineachsection. PleaseorganizetheProjectDescriptioninthisorder,andlabeleachpartaccordingly. Part1:IdentificationandSignificanceoftheInnovation Part2:BackgroundandPhaseITechnicalObjectives Part3:PhaseIResearchPlan Part4.CommercialPotential Part5.ConsultantsandSubawards/Subcontracts Part6.EquivalentorOverlappingProposalstoOtherFederalAgencies Part7:LineageoftheInnovation Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploadthedocument.ClickGoBack untilyoureturntotheFormPreparationscreen.
TheProjectDescription(completefile)cannotexceed15pagesortheproposal willbeReturnedWithoutReview.
DonotincludeReferencesCitedattheendoftheProjectDescription.Thereisaseparate moduletoindicatereferences.
31 Revised04/12/2013
16.ClickontheGobuttontotheleftofBiographicalSketches:
BiographicalsketchesforSeniorPersonnel(aslistedinthebudget)arerequiredforallproposalstoNSF.
32 Revised04/12/2013
Type/UploadtheBiographicalSketchinthebelowtextbox.Whenthissectioniscompleted,clickGoBackto returntotheFormPreparationscreen.
Ifuploadingafile,clickTransferFileontheabovescreen.
Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploaddocument.ClickGoBackuntil youreturntotheFormPreparationscreen.
17.ClickontheGobuttontotheleftofCurrent&PendingSupport:
33 Revised04/12/2013
ClicktheradiobuttonbesidetheappropriatepersonsnameandthenclickNewFormtouploadtheirCurrent& PendingSupport.
Fillinalltherequiredinformation,clickSaveTextandthenGoBackuntilyoureturntotheFormPreparation screen.
Ifuploadingafile,clickTransferFileontheabovescreen.
NSFconsidersthePhaseIProposalbeingsubmittedasPendingSupport.Therefore,ALLproposalsbeing submittedmusthaveatleastoneentryintheCurrent&PendingSupportmodule.
Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploadthedocument.ClickGoBack untilyoureturntotheFormPreparationscreen.
34 Revised04/12/2013
18.ClickontheGobuttontotheleftofDataManagementPlan:
Proposalsmustcontainasupplementarydocumentlabeled"DataManagementPlan"whichcansimplyconsistof thestatement,"AlldatageneratedinthisSBIR(orSTTR)PhaseIprojectisconsideredproprietary."
Followtheinstructionsonthebelowscreen,thenclickUploadFiletouploadthedocument.ClickGoBack untilyoureturntotheFormPreparationscreen.
35 Revised04/12/2013
19.ClickontheGobuttontotheleftofMentoringPlan:
36
Revised04/12/2013
20.ClickontheGobuttontotheleftofOtherSupplementaryDocs:
ReferencethecurrentsolicitationforrestrictionsandexplanationsofwhatNSFrequires and/orallowsintheSupplementaryDocuments.
LettersofSupportforTechnologylettersofcommitmentfromConsultantsorSubawardeesshouldbeuploaded intheBudgetJustificationmodule,NOThere. PostDocMentoringPlan(requiredonlyiffundsareincludedonline"B.1PostDoctoralScholars"onasubaward budget) CompanyCommercializationHistory(mustbeprovidediftheproposingsmallbusinesshasreceivedpriorPhase IISBIR/STTRawardsfromanyagency;mustusetheNSFtemplate) DataManagementPlanrequiredbyNSFforallproposals LettersregardingUseofHumanSubjects(e.g.InstitutionalReviewBoard)orIACUCapprovalforanimaluse (requiredonlyifthePhaseIresearchinvolveshumanoranimalsubjects) CooperativeResearchAgreementorletterstatingthatCRAwillbeexecuteduponaward(requiredforallSTTR proposals) PleasevisitthefollowingwebsiteforIIPtemplateshttp://www.nsf.gov/eng/iip/sbir/forms.jsp
Theinclusionofadditionaldocuments(beyondwhatisrequiredand/orallowedperthe solicitation)willresultintheproposalbeingReturnedWithoutReview.
Type/Uploadyournecessaryinformationinthebelowtextbox.Whenthissectioniscompleted,clickGoBackto returntotheProposalActionsscreen.
37 Revised04/12/2013
ProposalSubmissionProcedures
38 Revised04/12/2013
39 Revised04/12/2013
3.Ifyouarereadytocompletethesubmissionprocess,selectthethirdGobuttonforAllowSROtoview,edit andsubmitproposal.
4.ThenclicktheOKbuttononthebelowscreen.
SROACCESSSTEPS
Atthispoint,theSponsoredResearchOfficer(SRO)hastotakethefollowingstepstosubmittheproposaltoNSF. 1.GototheFastLaneHomePageandselecttheResearchAdministrationlink.
3.ClickProposals/Supplements/FileUpdates/Withdrawals.ThescreendisplaysontheDocumentsinProgress tab.
40 Revised04/12/2013
4.ClickSubmitintherowfortheproposalyouwanttosubmit.
5.TheProposalErrors/Warningsscreengivesyouthecapabilitytosubmittheproposal,iftherearenoerrors thatpreventsubmission.
41 Revised04/12/2013
5.Therearetwooptionsatthispoint:SubmitandSigntheProposalorSubmittheProposalOnly.Thesteps belowarefortheSubmitandSigntheProposaloption.(IfyouareanSPOwithAORpermissions,youhavethe capabilitytosubmitandsigntheproposal.Ifyousubmitwithoutsigning,pleasehavetheAORsigntheproposal within5daysofsubmission.) 5a.DebarmentandSuspension:clicktheradiobuttonforYesorNoifthereareanydebarmentsor suspensionsofyouorofyourorganizationfromtransactionswithfederalagencies.(IfyouansweredYes,provide anexplanationinthetextbox.)
5b.InstitutionInformation:Checktheaccuracyofyourorganizationsinformation,thenclickSignandSubmit.