Name of Scheme : Construction of 60000 Lit cap OHT

Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
Machine : DELUXE
# 255
Code :- SR60IND
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
| 1| Earthwork excavation in hard stiff clay,|
|
|
|
|
|
|
| black cotton, hard red earth, shales,
|
|
|
|
|
|
|
| murrams, ordinary gravel stoney earth
|
|
|
|
|
|
|
| mixed with 50% fair sized boulders etc.,|
|
|
|
|
|
|
| with an initial lead of 10m and lift of |
|
|
|
|
|
|
| 2m. and as directed by TWAD BOARD
|
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|For foundation
|1
x4
| 2.200| 2.200| 2.000|
38.720
|
|
|
|
|
|
|
|
|
|
|For GL brace
|1
x4
| 1.425| 0.200| 0.300|
0.342
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
39.062Cum |
|
|
|
|
|
|
|-------------|
| 2| 2nd depth of 2m to 3m in Hard Stiff
|
|
|
|
|
|
|
| clay.
|
|
|
|
|
|
|
|FOR FOUNDATION SECOND DEPTH
|1
x4
| 2.200| 2.200| 0.250|
4.840
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
4.840Cum |
|
|
|
|
|
|
|-------------|
| 3| Filling with clean river sand complying |
|
|
|
|
|
|
| with standard specification including
|
|
|
|
|
|
|
| watering ramming and consolidation etc.,|
|
|
|
|
|
|
| complete and as directed by TWAD BOARD |
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
|FOR FOUNDATION
|1
x4
| 2.200| 2.200| 0.150|
2.904
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
2.904Cum |
|
|
|
|
|
|
|-------------|
| 4| Levelling coarse in cement concrete
|
|
|
|
|
|
|
| 1:4:8 (one cement,four sand and eight
|
|
|
|
|
|
|
| aggregate) using 40mm hard broken stone |
|
|
|
|
|
|
| for foundation and leveling coarse
|
|
|
|
|
|
|
| including cost of all materials,
|
|
|
|
|
|
|
| mixing,placing, ramming, curing,
|
|
|
|
|
|
|
| finishing etc., complete and as directed|
|
|
|
|
|
|
| by TWAD BOARD Officers.
|
|
|
|
|
|
|
| Beyond 1.5m upto 4.5m below GL
|
|
|
|
|
|
|
|FOR FOUNDATION
|1
x4
| 2.200| 2.200| 0.100|
1.936
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.936Cum |
|
|
|
|
|
|
|-------------|
| 5| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|
Beyond 1.5m & upto 4.5m below GL |
|
|
|
|
|
|
|FOR RECTANGULAR PORTION
|1
x4
| 1.900| 1.900| 0.150|
2.166
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
2
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
|FOR TRAPEZOIDAL PORTION
|
|
|
|
|
|
|
|4*0.35/3*((1.9*1.9)+(0.5*0.5)+(1.9*0.5) |1
x1
| 2.245|
-- |
-- |
2.245
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
4.411Cum |
|
|
|
|
|
|
|-------------|
| 6| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|
Upto 1.5m below GL
|
|
|
|
|
|
|
|FOR COLUMN UPTO GL
|1
x4
| 0.300| 0.300| 1.500|
0.540
|
|
|
|
|
|
|
|
|
|
|FOR GL BRACE
|1
x4
| 3.325| 0.200| 0.300|
0.798
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.338Cum |
|
|
|
|
|
|
|-------------|
| 7| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|
From 0 m to 4.5m above GL
|
|
|
|
|
|
|
|COLUMN UPTO 4.5 M
|1
x4
| 0.300| 0.300| 4.500|
1.620
|
|
|
|
|
|
|
|
|
|
|FOR BRACE AT 3.06M
|1
x4
| 3.325| 0.200| 0.300|
0.798
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
2.418Cum |
|
|
|
|
|
|
|-------------|
| 8| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|
From 4.50m to 7.32m above GL
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|FOR COLUMN 4.5 TO 6.42 M
|1
x4
| 0.300| 0.300| 1.920|
0.691
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
3
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
0.691Cum |
|
|
|
|
|
|
|-------------|
| 9| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|
From 4.50m to 7.32m above GL
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|FOR FLOOR GRID BEAM(AT 6.42M)
|1
x4
| 3.625| 0.300| 0.670|
2.915
|
|
|
|
|
|
|
|
|
|
|FOR FLOOR SLAB(7.09-7.32)
|1
x.785| 5.550| 5.550| 0.230|
5.561
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
8.476Cum |
|
|
|
|
|
|
|-------------|
| 10| Reinforced Cement Concrete 1:1.5:3 (One |
|
|
|
|
|
|
| cement,one and half sand and three
|
|
|
|
|
|
|
| aggregate) using 20 mm Machine crushed |
|
|
|
|
|
|
| HBG stone for the following members
|
|
|
|
|
|
|
| excluding the cost of reinforcement and |
|
|
|
|
|
|
| fabricating, centering, shuttering and |
|
|
|
|
|
|
| strutting charges but including the cost|
|
|
|
|
|
|
| of all materials, mixing, placing in
|
|
|
|
|
|
|
| position, lifting, vibrating, finishing |
|
|
|
|
|
|
| & curing, etc. complete.and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
| From 7.32m to 10.98m above GL
|
|
|
|
|
|
|
|FOR FLOOR SLAB(7.32M-7.35M)
|1
x.785| 5.550| 5.550| 0.030|
0.725
|
|
|
|
|
|
|
|
|
|
|FOR HAUNCHES(FROM 7.35-7.53M)
|1
x1.57| 4.880| 0.180| 0.180|
0.248
|
|
|
|
|
|
|
|
|
|
|FOR SIDE WALL (7.35-10.800)
|1
x3.14| 5.125| 0.125| 3.450|
6.940
|
|
|
|
|
|
|
|
|
|
|FOR ROOF SLAB(10.8-10.925)
|1
x.785| 5.450| 5.450| 0.125|
2.915
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR MH COVER
|-1 x1
| 0.600| 0.600| 0.125|
-0.045
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR VENTILATOR
|-2 x.785| 0.150| 0.150| 0.125|
-0.004
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
10.779Cum |
|
|
|
|
|
|
|-------------|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
4
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
| 11| Supply and erection of steel centering, |
|
|
|
|
|
|
| shuttering for soffits and sides
|
|
|
|
|
|
|
| including necessary supports and
|
|
|
|
|
|
|
| strutting for all RCC works using MS
|
|
|
|
|
|
|
| sheets of suitable size of BG 10
|
|
|
|
|
|
|
| stiffened with MS angle of size 25 X 25 |
|
|
|
|
|
|
| X 3mm for boarding laid over Silver Oak |
|
|
|
|
|
|
| joists of size 10cm X 6.5cm space at
|
|
|
|
|
|
|
| 10cm c/c and supported by Casurino Props|
|
|
|
|
|
|
| 10cm - 13cm spaced at 75cm c/c etc.,
|
|
|
|
|
|
|
| complete and as directed by TWAD Board |
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
| For
0.00 to 3.30 M (Plane Surface)
|
|
|
|
|
|
|
|FOR FOOTING SIDES(PLAIN)
|4
x4
| 1.900|
-- | 0.150|
4.560
|
|
|
|
|
|
|
|
|
|
|FOR BRACE @GL SIDES(PLAIN)
|4
x2
| 3.325|
-- | 0.300|
7.980
|
|
|
|
|
|
|
|
|
|
|FOR BRACE BOTTOM(PLAIN)
|4
x1
| 3.325| 0.200|
-- |
2.660
|
|
|
|
|
|
|
|
|
|
|FOR BRACE SIDES @ 3.21 M
|4
x2
| 3.325|
-- | 0.300|
7.980
|
|
|
|
|
|
|
|
|
|
|FOR BRACE BOTTOM
|4
x1
| 3.325| 0.200|
-- |
2.660
|
|
|
|
|
|
|
|
|
|
|ROOF BOTTOM
|1
x.785| 5.450| 5.450|
-- |
23.316
|
|
|
|
|
|
|
|
|
|
|ADD FOR MANHOLE
|1
x4
| 0.600|
-- | 0.125|
0.300
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR MANHOLE
|-1 x1
| 0.600| 0.600|
-- |
-0.360
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR SIDEWALL
|-1 x3.14| 5.125|
-- | 0.125|
-2.012
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
47.084Sqm |
|
|
|
|
|
|
|-------------|
| 12| Centering Square column 00.00m to 03.30m|
|
|
|
|
|
|
|FOR SQUARE COLUMN BELOW GL
|4
x4
| 0.300|
-- | 1.500|
7.200
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR COLUMN &BRACE JN
|-4 x2
| 0.300| 0.200|
-- |
-0.480
|
|
|
|
|
|
|
|
|
|
|FOR SQUARE COLUMN (0 -3.30M)
|4
x4
| 0.300|
-- | 3.300|
15.840
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR COLUMN & BRACE JN.
|-4 x2
| 0.300| 0.200|
-- |
-0.480
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
22.080Sqm |
|
|
|
|
|
|
|-------------|
| 13| Centering Square column 03.30m to 04.30m|
|
|
|
|
|
|
|FOR SQUARE COLUMN(3.3 -4.3M)
|4
x4
| 0.300|
-- | 1.000|
4.800
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
4.800Sqm |
|
|
|
|
|
|
|-------------|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
5
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
| 14| Centering Square column 04.30m to 05.30m|
|
|
|
|
|
|
|FOR SQUARE COLUMN(4.3-5.30)
|4
x4
| 0.300|
-- | 1.000|
4.800
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
4.800Sqm |
|
|
|
|
|
|
|-------------|
| 15| Centering Square column 05.30m to 06.30m|
|
|
|
|
|
|
|SQUARE COLUMN(5.30 - 6.30)
|4
x4
| 0.300|
-- | 1.000|
4.800
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
4.800Sqm |
|
|
|
|
|
|
|-------------|
| 16| Centering Square column 06.30m to 07.30m|
|
|
|
|
|
|
|SQUARE COLUMN (6.30-6.42M)
|4
x4
| 0.300|
-- | 0.120|
0.576
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
0.576Sqm |
|
|
|
|
|
|
|-------------|
| 17| Centering plane surface 06.30m to 07.30m|
|
|
|
|
|
|
|FLOOR BEAM SIDES OUTER @6.42M
|1
x4
| 3.925|
-- | 0.670|
10.519
|
|
|
|
|
|
|
|
|
|
|
SIDES INNER
|1
x4
| 3.325|
-- | 0.670|
8.911
|
|
|
|
|
|
|
|
|
|
|
BOTTOM
|1
x4
| 3.625| 0.300|
-- |
4.350
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR COLUMN JN
|-1 x4
| 0.300| 0.300|
-- |
-0.360
|
|
|
|
|
|
|
|
|
|
|FLOOR SLAB INCLUDING WORKING
|
|
|
|
|
|
|
|PLATFORM
|1
x.785| 7.350| 7.350|
-- |
42.408
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR FLOOR BEAM
|-1 x4
| 3.625|
-- | 0.300|
-4.350
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
61.478Sqm |
|
|
|
|
|
|
|-------------|
| 18| Upto 1LL Centering curved 0.00m to
|
|
|
|
|
|
|
| 03.30m
|
|
|
|
|
|
|
|FLOOR SLAB SIDES(CURVED SURFACE)
|1
x3.14| 5.550|
-- | 0.260|
4.531
|
|
|
|
|
|
|
|
|
|
|SIDE WALL INNER
|1
x3.14| 5.000|
-- | 3.120|
48.984
|
|
|
|
|
|
|
|
|
|
|SIDE WALL OUTER
|1
x3.14| 5.250|
-- | 3.040|
50.114
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
| 103.629Sqm |
|
|
|
|
|
|
|-------------|
| 19| Upto 1LL Centering curved 3.30m to
|
|
|
|
|
|
|
| 04.30m
|
|
|
|
|
|
|
|SIDE WALL INNER(3.30-3.45)
|1
x3.14| 5.000|
-- | 0.150|
2.355
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
6
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
| -DOOUTER
|1
x3.14| 5.250|
-- | 0.410|
6.759
|
|
|
|
|
|
|
|
|
|
|ROOF SLAB SIDES AT 3.45M
|1
x3.14| 5.450|
-- | 0.125|
2.139
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
11.253Sqm |
|
|
|
|
|
|
|-------------|
| 20| Applying two coats of cement paint of
|
|
|
|
|
|
|
| approved colour and quality over cement |
|
|
|
|
|
|
| plastered wall surfaces and new surfaces|
|
|
|
|
|
|
| including cleaning, preparing the
|
|
|
|
|
|
|
| surface area and including cost of all |
|
|
|
|
|
|
| materials, labour charges, curing etc., |
|
|
|
|
|
|
| complete and as directed by TWAD BOARD |
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
|FOR COLUMN UPTO 6.42 M FROM GL
|4
x4
| 0.300|
-- | 6.420|
30.816
|
|
|
|
|
|
|
|
|
|
|FOR BRACES
|1
x4
| 3.325| 1.000|
-- |
13.300
|
|
|
|
|
|
|
|
|
|
|FLOOR BEAM OUTER FACE
|4
x1
| 3.925|
-- | 0.670|
10.519
|
|
|
|
|
|
|
|
|
|
|
INNER FACE
|4
x1
| 3.325|
-- | 0.670|
8.911
|
|
|
|
|
|
|
|
|
|
|
BOTTOM
|4
x1
| 3.625|
-- | 0.300|
4.350
|
|
|
|
|
|
|
|
|
|
|FLOOR SLAB BOTTOM
|1
x.785| 5.550| 5.550|
-- |
24.180
|
|
|
|
|
|
|
|
|
|
|
SIDES
|1
x3.14| 5.550|
-- | 0.260|
4.531
|
|
|
|
|
|
|
|
|
|
|
TOP
|1
x3.14| 5.400|
-- | 0.150|
2.543
|
|
|
|
|
|
|
|
|
|
|SIDE WALL OUTER
|1
x3.14| 5.250| 3.450|
-- |
56.873
|
|
|
|
|
|
|
|
|
|
|ROOF SLAB SIDES
|1
x3.14| 5.450|
-- | 0.125|
2.139
|
|
|
|
|
|
|
|
|
|
|ROOF SLAB BOTTOM OFFSET
|1
x3.14| 5.350|
-- | 0.100|
1.680
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR COLUMN & BRACE JN
|-4 x2
|
-- | 0.200| 0.300|
-0.480
|
|
|
|
|
|
|
|
|
|
|FLOOR RING BEAM
|-1 x4
| 3.625| 0.300|
-- |
-4.350
|
|
|
|
|
|
|
|
|
|
|DEDUCT FOR COLUMN TOP
|-1 x4
| 0.300| 0.300|
-- |
-0.360
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
| 154.652Sqm |
|
|
|
|
|
|
|-------------|
| 21| Supplying, fabricating and placing in
|
|
|
|
|
|
|
| position of Steel rods(above 16 mm
|
|
|
|
|
|
|
| diameter) for reinforcement including
|
|
|
|
|
|
|
| cost of steel and binding wire, labour |
|
|
|
|
|
|
| charges etc., complete for RCC works and|
|
|
|
|
|
|
| as directed by TWAD Board Officers.
|
|
|
|
|
|
|
|R.T.S ROD
|1
x1
| 26.060|
-- |
-- |
26.060
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
7
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
26.060Qtl |
|
|
|
|
|
|
|-------------|
| 22| Supply,delivery and fixing of MS ladder |
|
|
|
|
|
|
| out side the tank of following width and|
|
|
|
|
|
|
| length made out of 50 x 50 x 6mm MS
|
|
|
|
|
|
|
| angle for size and steps in 16mm MS
|
|
|
|
|
|
|
| plain rods at 30cm C/C providing with
|
|
|
|
|
|
|
| suitable side support MS clamps,locking |
|
|
|
|
|
|
| arrangements with one red oxide as
|
|
|
|
|
|
|
| primer, bottom anchorage by CC 1:4:8 and|
|
|
|
|
|
|
| fixing the ladder on top of OHT's roof |
|
|
|
|
|
|
| slab including cost of all materials,
|
|
|
|
|
|
|
| labour charges etc., and as directed by |
|
|
|
|
|
|
| TWAD Board Officers. For 60000 Lit. to |
|
|
|
|
|
|
| 100000 Lit. Capacity SR.
|
|
|
|
|
|
|
|VIDE SEPARATE SHEET
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000no |
|
|
|
|
|
|
|-------------|
| 23| Supplying and fixing in position of RCC |
|
|
|
|
|
|
| (1:1.5:3) in side access lader of
|
|
|
|
|
|
|
| following size using 20mm size HBS jelly|
|
|
|
|
|
|
| including cost of all materials,
|
|
|
|
|
|
|
| centring, shuttering,strutting,
|
|
|
|
|
|
|
| fabrication and placing in position of |
|
|
|
|
|
|
| reinforcement, finishing, curing etc., |
|
|
|
|
|
|
| complete and as directed by TWAD Board |
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
|VIDE SEPARATE SHEET
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000No |
|
|
|
|
|
|
|-------------|
| 24| Providing RCC (1:1.5:3) Ventilator using|
|
|
|
|
|
|
| 20mm HBG stone including cost of all
|
|
|
|
|
|
|
| materials, centering, shuttering,
|
|
|
|
|
|
|
| strutting,reinforcement, placing of
|
|
|
|
|
|
|
| concrete, finishing, curing and fixing |
|
|
|
|
|
|
| in position on the roof slab with
|
|
|
|
|
|
|
| mosquito proof net arrangement and etc.,|
|
|
|
|
|
|
| complete and as directed by TWAD Board |
|
|
|
|
|
|
| officers.
|
|
|
|
|
|
|
|VIDE SEPARATE SHEET 0.15M DIA
|1
x2
|
-- |
-- |
-- |
2.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
2.000No |
|
|
|
|
|
|
|-------------|
| 25| Providing and fixing of cut stone (Rough|
|
|
|
|
|
|
| dressed) set in CM 1:3 of size 0.45 X
|
|
|
|
|
|
|
| 0.45 X 0.15M at site including cost of |
|
|
|
|
|
|
| all materials, labour charges, curing
|
|
|
|
|
|
|
| etc., complete and as directed by TWAD |
|
|
|
|
|
|
| Board Officers.
|
|
|
|
|
|
|
|
|1
x1
| 0.450| 0.450| 0.150|
0.030
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
8
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
0.030Cum |
|
|
|
|
|
|
|-------------|
| 26| Supply,Delivery and fixing of CI Manhole|
|
|
|
|
|
|
| frame with cover of following size
|
|
|
|
|
|
|
| including cost of all materials, fixing |
|
|
|
|
|
|
| of MS clamps,Bolt and nuts etc.,complete|
|
|
|
|
|
|
| and as directed by TWAD Board Officers. |
|
|
|
|
|
|
|SIZE 0.60 X 0.60 M
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000No |
|
|
|
|
|
|
|-------------|
| 27| Supply,delivery and fixing in position |
|
|
|
|
|
|
| of enamelled water level indicator of
|
|
|
|
|
|
|
| approved design and pattern (graduation |
|
|
|
|
|
|
| in metric system) with required all
|
|
|
|
|
|
|
| accessories and as directed by TWAD
|
|
|
|
|
|
|
| Board Officers.
|
|
|
|
|
|
|
|
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000No |
|
|
|
|
|
|
|-------------|
| 28| Painting the TWAD Board Emblum and
|
|
|
|
|
|
|
| writing the slogon in accordance with
|
|
|
|
|
|
|
| size and specifications as approved by |
|
|
|
|
|
|
| the TWAD Board Officers with approved
|
|
|
|
|
|
|
| colour and quality of paint on the
|
|
|
|
|
|
|
| exterior surface of Service Reservoir
|
|
|
|
|
|
|
| complete etc., and as directed by TWAD |
|
|
|
|
|
|
| Board Officers.
|
|
|
|
|
|
|
|
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000Sqm |
|
|
|
|
|
|
|-------------|
| 29| Providing pipe connection work for SR
|
|
|
|
|
|
|
| .Rate including supply & laying of
|
|
|
|
|
|
|
| pipes, specials and valves etc.,
|
|
|
|
|
|
|
| complete and as directed by TWAD Board |
|
|
|
|
|
|
| Officers.
|
|
|
|
|
|
|
|VIDE SEPARATE SHEET
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000No |
|
|
|
|
|
|
|-------------|
| 30| Provision for levelling the Site
|
|
|
|
|
|
|
|FOR SR SITE
|1
x1
|
-- |
-- |
-- |
1.000
|
|
|
|
|
|
|
|
|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+

Name of Scheme : Construction of 60000 Lit cap OHT


Page:
9
Name of Work
: 60000 LIT. SR IND. FOOTING(I.S.2000)
+---+-----------------------------------------+---------+-------+-------+-------+-------------+
|Sl.|
Description
|No1 x No2| Length|Breadth| Depth | Qty
|
|No.|
|
|
|
|
|
|
|---+-----------------------------------------+---------+-------+-------+-------+-------------+
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
1.000LS |
|
|
|
|
|
|
|-------------|
| 31| Refilling the foundation with excavated |
|
|
|
|
|
|
| Soil (other than sand) in layers of not |
|
|
|
|
|
|
| more than 15cm thick, watering, well
|
|
|
|
|
|
|
| ramming, consolidating, complying with |
|
|
|
|
|
|
| standard specification and as directed |
|
|
|
|
|
|
| by TWAD Board Officers.
|
|
|
|
|
|
|
|(39.602+4.84)-(2.904+1.936+4.411+1.338) |1
x1
| 33.853|
-- |
-- |
33.853
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|-------------|
|
|
Total|
|
|
|
|
33.853Cum |
|
|
|
|
|
|
|-------------|
+---+-----------------------------------------+---------+-------+-------+-------+-------------+