Scope of Work The scope of works includes site survey, excavation, degassing/draining/flushing, cold cutting and removal of 23 nos.

abandoned crude oil/other hydrocarbon pipelines of different sizes i.e. !2", !#", !$", 2%", 22", 2&", 32", 3#" etc.' in (outh ) *ast +uwait areas. The work includes the following, !- (upply of all necessary manpower, constructional plant, materials and any other services re.uired for completion of the works. 2- (ite survey of the route of the abandoned crude oil/other hydrocarbon pipelines and preparation of the detailed drawings showing the exact route/configuration of the abandoned pipelines. 3- *xcavation, providing proper shoring and dewatering etc. as re.uired, expose and identify the abandoned pipelines which are to be removed. &- /onstruction of temporary lined-drain pits of ade.uate capacity along with necessary fencing in suitable locations for collecting the crude oil, sludge, oily/ flushing water including fabrication and installation of &" dia drain connections with drain valves. 0- (upply of all materials, fabrication and installation of temporary pig launchers and receivers for flushing and cleaning of the pipelines. #- 1solation, draining/degassing, water flushing of pipelines to ensure that lines are reasonably clean and are free from 2ydrocarbon/toxic gases including 22(. 3- 2ot tapping to provide vent connections on the abandoned crude pipelines at re.uired locations, for releasing any trapped gases inside the pipeline. $- /old cutting of the pipelines in !2 meters lengths, cleaning and transport the pipes to site scrap storage yard or any other location, as directed by the superintendent. 4- 5ismantling and removal of all associated valves, pipe supports, fittings, cathodic protection installations, cabling, pipe fittings and transporting the same to (ite scrap storage area as directed by the company. !%- *xcavating, demolishing of concrete blocks, valve pits etc. and removal and transport of the rubbish materials to company6s approved dumping areas. !!- 2azardous sludge materials, all solids, dangerous and inactive wastes removed from the site shall be transported and disposed of. !2- 7rovision of new gatch materials, as re.uired for backfilling of all the excavated pipe trenches, temporary drain pits and any other excavated areas. !3- /leaning and removal of all the spilled crude oil/sludge on daily basis and disposal to temporary drain pits. !&- 8abrication and installation of &" pipeline and piping connections for transporting/transferring of the crude oil/oily water to the temporary drain pits. !0- Transporting crude oil/flushed oily water to (huaiba 1ndustrial 9rea or to any other designated locations for treatment/ safe disposal, as directed by the company. The contractor is deemed to have included the cost of transportation and processing/treatment fees etc. in the contract prices. !#- (ections of pipelines under the asphalt road / oil lakes are not re.uired to be removed. 1nstallation of

markers, blind plates, vent lines and crash barriers on both sides of the pipeline sections under the asphalt roads and oil lakes.

You might also like