Part-3 Set of 25 Nos.

Quick Concept Review Questions-True or False Type Study of these 25 questions shall be of great help in getting success in ISTQB Foundation Level Exam as per the Latest Syllabus updated in 2011 Correct Answers have been hilighted in Yellow Q. 1: Equivalence testing divides the input domain into classes of data from which test cases can be derived to reduce the total number of test cases that must be developed. A. True B. False <<<<<< =================== >>>>>> Q. 2: With thorough testing it is possible to remove all defects from a program prior to delivery to the customer. A. True B. False <<<<<< =================== >>>>>> Q. 3: Configuration and compatibility testing are typically good choices for outsourcing A. True B. False <<<<<< =================== >>>>>> Q. 4: The goal of a software tester is to find bugs, find them as early as possible and make sure they get fixed. A. True B. False <<<<<< =================== >>>>>> Q. 5: Beta testing is performed at developing organization's site where as Alpha testing is performed by people at their own locations. A. True B. False

<<<<<< =================== >>>>>> Q. 6: Defects are recorded into three major purposes. They are: 1.To correct the defect 2.To report status of the application 3.To improve the software development process A. True B. False <<<<<< =================== >>>>>> Q. 7: Drivers are tools used to control and operate tge software being testeD. A. True B. False <<<<<< =================== >>>>>> Q. 8: The tool modifies the program code or manipulates tge operating environment in any way is considered non-invasive A. True B. False <<<<<< =================== >>>>>> Q. 9: The number of tests to test all control statements equals the cyclomatic complexity A. True B. False <<<<<< =================== >>>>>> Q. 10: Boundary value analysis can only be used during white-box testing. A. True B. False <<<<<< =================== >>>>>> Q. 11: Black-box testing technique is also called as structure based technique

A. True B. False <<<<<< =================== >>>>>> Q. 12: Data defects can occur when accessing the programs data log files. A. True B. False <<<<<< =================== >>>>>> Q. 13: A test case specification document is used to keep track of each test run. A. True B. False <<<<<< =================== >>>>>> Q. 14: Business process-based testing is used in system testing and acceptance testing. A. True B. False <<<<<< =================== >>>>>> Q. 15: The requirements document identifies all system components and requirements to be tested, as well as detailed approaches to be followed, so that the testing of components and requirements is effective. A. True B. False <<<<<< =================== >>>>>> Q. 16: Quality control and quality assurance are different names for the same activity. A. True B. False <<<<<< =================== >>>>>> Q. 17: Cause and effect diagrams can be used to view attempts to solving quality issues that have not worked in the past.

A. True B. False <<<<<< =================== >>>>>> Q. 18: Once the requirement document is approved, the Tester can begin creating a Requirements Matrix to track the requirements throughout the SDLC. A. True B. False <<<<<< =================== >>>>>> Q. 19: A risk-based approach to testing provides proactive opportunities to reduce the levels of product risk, starting in the initial stages of a project A. True B. False <<<<<< =================== >>>>>> Q. 20: The test case log is used to keep track of the status of each test case. A. True B. False <<<<<< =================== >>>>>> Q. 21: A test plan is prepared for management by the project leader, which explains all project control variances relative to the testing effort. It also summarizes test case logs and coverage statistics A. B. False <<<<<< =================== >>>>>> Q. 22: Memory leak checker tools are used to create runtime performance profiles at the module, library and function level. A. True B. False <<<<<< =================== >>>>>> for key programs. True

Q. 23: Configuration management tools support activities related to managing the environment, including configuration management, change control, library control, documentation control. A. True B. False <<<<<< =================== >>>>>> Q. 24: The key process area at CMM Level 4 - Managed focus on establishing a quantitative understanding of both the software process and the software work products being built. A. True B. False <<<<<< =================== >>>>>> Q. 25: Non-functional system testing is a testing process that test system requirements that do not relate to functionality. A. True B. False