Mugi Raharjo D&C Operator

The coal-handling system of Sino-Java Power Plant of Indonesia is designed according to the qualification of 2300MW coal-fired generator unit. Coal-handling system is mainly made up with program control, coal-handling equipment, coal unloading equipment and coal yard equipment.
Installed capacity(MW) Coal storage quantity (Ton) Hour coal consumption(t/h) Day coal consumption (t/d) Year coal consumption(t/y)

2 300 182.000 2152 6080 182.410

Notice: Its calculated by 20 hours per day and 6000 hours per year.

Hardcoal, The caloriec value above 5700 kcal/kg (23,26 MJ/kg). Hardcoal terdiri dari batubara steam, batubara coking, bituminous dan antrasit.

Steam Coal Gros Caloric Value above 23.865,0 kJ/kg (5700 kcal/kg) use for steam generator
1. 2. Antrasit Bituminous

Cooking Coal Gros Caloric Value greater than 23.865,0 kJ/kg (5700 kcal/kg) with dust free use to made cocas raw reductor for blast furnace Antrasit Coal - Gros Caloric Value 6900 kcal/kg have characteristic like steam coal with high quality and high caloric

Brown coal, low caloric value category, common use for power plant

Subbituminous,
Gross Calorific value between17.435,0 kJ/kg (4165 kcal/kg) and 23.860,0 kJ/kg (5700 kcal/kg).

Lignit (Low Rank Coal/Brown Coal), Gross Calorific value under 4.165 kcal/kg (17,44 MJ/kg) with volatile matter above 31% at dry condition

Save

Coal Bunker Level, with scheduled fetching Arrange coal mixing Stacking schedule for under 3 days and finished it with reference optimum sea level Comand and coordinate with ABC sub contractor

Belt Conveyor Ship Unloader Stacker Reclaimer Coal Crusher Roller screen Coal Plough Buffer air lock Rainwater scraper Electric triple damper Vibrator Belt iron remover Disc iron remover Sewage pump Mechanical sampling equipment Three position telescopic head Automatic tensioning device Dedusting

Fetching

Coal transport Process from Coal Yard or from

Ship Unloader to Coal Bunker


Stacking

Coal transport Process from Ship Unloader to

Coal Yard

C7 interlock only with C3A, can not interlock with C3B C1,C2, interlock with C3A & C3B can not interlock with one of them. C7 and C8 can not remote stacking, local only In case C3A already runing and another lines C6B to C3B will running, the normal sequence is C6B running first to C3B, but C6B and C3B will running first, it is not secured. Same case if C3B already running. After flow chart is selected and already press Auto Start, all will automatically running. The process can not be stop, although we unselected to cancel process. The solution is press stop the selected motor manually. The operator must be know this, to prevent accident, because incidentally late information from local site.