Professional Documents
Culture Documents
DIPLOMA ENGG. FACULTY NAME : REENA RAM BRANCH : ELECTRICAL TERM DATE: LAB REQUIRED AS PER SCHEME
EXPERIMENT NO. 1 2 3 4 5 6 EXPERIMENT NAME Study of thermal power station equipments and its layout. Study of Hydro power station equipments and its layout. Study of Nuclear power station equipments and its layout. Synchronize an alternator with infinite bus bar. Performance of synchronous motor with respect to change in excitation. Methods of fault location and testing of power cable. PLANNED WEEK DATES
SEM :- 6 DESIGNATION : LECTURER SUBJECT:- EPG LAB AVAILABLE AS PER TIME TABLE
EXPERIMENTS ACTUAL COVERD TO BE COVERD IF SLIPAGE REMARKS
7 8 9 10 11 13
Tutorials on inter-connection. Role of load dispatch centre (LDC) Study of different types of load curves. Determination of depreciation cost in power station. Effect of pollution and methods for reducing it. Study of safety devices applied to equipment in TPS/NPS/HPS. (any one)
DIPLOMA ELECTRICAL ENGG. S FACULTY NAME : KAUSHIK NARSHANA DESIGNATION : LECTU BRANCH : ELECTRICAL SUBJECT:- SGP TERM DATE: LAB REQUIRED AS PER SCHEME LAB
EXPERIMENT NO. 1 2 3 4 5 6 EXPERIMENT NAME Use overload relay and obtain its Time-Current characteristic Use Buchholz relay for transformer protection. Use thermal overload relay for protection of motor and set the relay properly. Check the Polarity of C.T. & P.T. and connect it with the relay. Apply the balance current protection scheme using appropriate switch gear. Find the fusing factor of a given fusing material PLANNED WEEK DATES
Operate air break C.B in a simulated condition. Read and interpret the protection scheme for an alternator in power station (from Blue print and visit). Read and interpret various protective scheme used for transmission lines and feeders (from Blue print and visit). Draw schematic diagram of protective schemes for 66 KV/ 132 KV/220 KV Sub station. (after visit) Visit a substation and prepare its technical report emphasizing on control side
8 9 10 11
F INSTITUTIONS, JUNAGADH
SEM :- 6 DESIGNATION : LECTURER SUBJECT:- SGP TERM DATE: LAB AVAILABLE AS PER TIME TABLE
EXPERIMENTS ACTUAL COVERD TO BE COVERD IF SLIPAGE REMARKS
ENGG.
PRINCIPAL SIGN
8 9 10 11 12
F INSTITUTIONS, JUNAGADH
SEM :- 6 DESIGNATION : LECTURER SUBJECT:- ECT TERM DATE: LAB AVAILABLE AS PER TIME TABLE
EXPERIMENTS ACTUAL COVERD TO BE COVERD IF SLIPAGE REMARKS
PRINCIPAL SIGN